6.1. ERMUSR 11-12-2013 Elk River
Municipal Utilities UTILITIES COMMISSION MEETING
TO: FROM:
Elk River Municipal Utilities Commission Troy Adams, P.E.—General Manager
John Dietz—Chair
Al Nadeau—Vice Chair
Daryl Thompson—Trustee
MEETING DATE: AGENDA ITEM NUMBER:
November 12, 2013 6.1a
SUBJECT:
Staff Updates—General Manager
DISCUSSION:
• As a follow-up to the electric assessment agenda item from last month's Commission
meeting, the electric assessment ordinance addition was adopted by City Council on
October 21, 2013.
• The Minnesota Municipal Transmission Group (MMTG) Annual Meeting is scheduled
for November 22, 2013. The meeting is held in Mason City, IA. As of now because I am
on the MMTG Executive Board of Directors as the Vice President, I am planning on
making the day trip for the meeting.
• On November 12, there is a CAPX2020 conference call hosted by Central Minnesota
Municipal Power Agency (CMMPA) that I will be participating in. The meeting is
regarding our current ownership rights and some potential options.
• The Minnesota Municipal Utilities Association(MMUA) 2013 Technical & Operations
Conference is scheduled for December 10-12, 2013, in St. Cloud, MN. The conference
brochure is attached. I am currently the on the MMUA Executive Board of Directors as
the Secretary/Treasurer and will be attending their board meeting on the morning of the
10th prior to the conference. Mark Fuchs and Wade Lovelette will also be attending the
conference.
• The final for the rehabilitation of the Freeport Water Tower has been completed. ERMU,
Badger State Inspection(BSI), and Odland Protective Coating(OPC) met to discuss
project discrepancies and damages. An agreement was reached with Odland. It was
agreed that OPC would be responsible for$13,513, half of the additional
engineering/inspections costs due to the project extending beyond the scheduled
completion date.
• Attached are two articles from American Public Power Association (APPA)regarding
Boulder, CO, and their efforts to create a municipal electric utility as well as additional
industry articles.
e3 Page 1 oft NATURE
Powerr Pwide�
P OWFREO TO SERVE
81
ATTACHMENTS:
• APPA Public Power Daily—Boulder residents to vote today on opposing ballot
initiatives on creation of a municipal utility—November 5, 2013
• APPA Public Power Daily— Boulder, Colo., municipalization effort gets big boost from
voters—November 7, 2013
• APPA Public Power Daily—Low sales growth challenges utilities' traditional business
models, Fitch says—October 30, 2013
• Spectrum IEEE— Fighting Coal to a Draw—July 2013
• Spectrum IEEE—Unclean at Any Speed—July 2013
• MMUA 2013 Technical & Operations Conference Brochure
111% POWERED 1Y
'a Page 2 oft NATURE
Peliable Public
Power Provider POWERED To SERVE
82
Boulder residents to vote today on opposing ballot initiatives on creation of a municipal u... Page 1 of 2
Public Porn Roily
I,ies1I9V.No ember S,2013
Boulder residents to vote today on opposing ballot initiatives on
creation of a municipal utility
Xcel Energy, the investor-owned utility that serves the city of Boulder, Colo., has contributed half a
million dollars in the last two months to a group campaigning for Question 310, a Nov. 5 ballot
initiative that would make it more difficult for the city to move forward with its plan to form a
municipal electric utility. By today -- the day of the election-- Xcel is expected to have made another
contribution of$195,000, bringing the total to $695,000, the local newspaper reported. Meanwhile,
Boulder received a report from a consultant affirming that creation of a city-owned electric utility
would be a viable way of meeting the community's energy goals.
The Boulder Daily Camera reported in late September that the Xcel Energy had made a contribution
of$300,000 to the group, called Voter Approval of Debt Limits. The private utility made another
contribution of$200,000, the newspaper reported on Nov. 1, noting that Oct. 31 was the last day that
groups had to file campaign finance contributions before the election.
Boulder voters today will face two conflicting ballot initiatives.
Ballot Question 2E was placed on the ballot by the Boulder City Council. It would amend the city
charter to put a limit of$214 million on the amount of debt Boulder could issue to acquire Xcel's
distribution system(and to pay any stranded costs demanded by Xcel).
Ballot Question 310 was placed on the ballot as the result of a citizens'petition backed by Xcel
Energy. It would require the city,before it could issue any debt to form a municipal utility, to receive
approval from voters; and would stipulate that such an election could be held only in an odd-
numbered year.
The city said the following three outcomes are possible as a result of today's election:
1. One measure passes and the other one fails;
2. Both measures pass; or
3. Both measures fail.
If the City Council-backed measure has the most votes, the petitioned initiative will not take effect,
the city said. If the petitioned initiative has the most votes, both measures will be in effect, but where
they conflict, the measure with the most votes will prevail.
If both measures fail, the City Council would have authority to issue bonds to create a local electric
utility, if certain conditions can be met. However, the City Council has said it"would seek to
understand the intentions of voters and determine how to proceed at that time."
In late July, the Boulder City Council voted to begin condemnation proceedings to acquire the local
electricity distribution system from Xcel. In August, the council affirmed that decision, voting again
to move forward with efforts to buy Xcel's poles, wires and other facilities.
Boulder has been studying options for a more locally controlled, greener energy future for the last two
83
http://www.naylornetwork.com/app-ppd/articles/print-V2.asp?aid=240858 11/5/2013
Boulder residents to vote today on opposing ballot initiatives on creation of a municipal u... Page 2 of 2
years. Residents of the Colorado community approved two ballot measures in November 2011 that
authorized the city to continue to explore the possibility of buying Xcel Energy's distribution system
and forming a city-owned utility.
In July, an independent evaluator said Boulder is likely to be able to offer rate parity with Xcel at the
outset and also over a 20-year period. (See Public Power Daily,Aug. 26.) The city received a second
report in mid-October from the evaluator, PowerServices Inc., affirming its earlier finding that the
city's findings were "sound and thorough." The report is available in the energy section of the city's
website. —JEANNINE ANDERSON
84
http://www.naylornetwork.com/app-ppd/articles/print-V 2.asp?aid=240858 11/5/2013
Boulder, Colo., municipalization effort gets big boost from voters Page I of 1
lluusix .Ain oinirc ].2017
Boulder, Colo., municipalization effort gets big boost from
voters
Boulder, Colo., voters gave a significant boost to efforts to form a municipal electric utility, voting by
almost two-to-one for a City Council-backed ballot measure and against a competing debt-limit
measure pushed by Xcel Energy. The city has been exploring the feasibility of municipalization for
the past two years, with the goal of ensuring local control and access to reliable power that is
increasingly clean and competitively priced.
Ballot Question 2E, which was placed on the ballot by the Boulder City Council, amends the city
charter to put a limit of$214 million on the amount of debt Boulder could issue to acquire Xcel's
distribution system (and to pay any stranded costs to Xcel).
Ballot Question 310,backed by Xcel Energy, would have required the city,before it could issue any
debt to form a municipal utility, to receive approval from voters. If the proposed utility service area
extended beyond city limits, Question 310 would have required that affected residents in
unincorporated Boulder County be allowed to vote in the debt limit election. The initiative also
stipulated that such an election could be held only in an odd-numbered year. Xcel spent some
$700,000 on a campaign to support its ballot question.
In late July, the Boulder City Council voted to begin condemnation proceedings to acquire the local
electricity distribution system from Xcel. In August, the council affirmed that decision, voting again
to move forward with efforts to buy Xcel's poles, wires and other facilities. Last month, an
independent consultant, PowerServices, Inc., affirmed its earlier conclusion that Boulder is likely to
be able to offer rate parity with Xcel at the outset and over a 20-year period. PowerServices said the
city's findings were "sound and thorough."
More information is available in the energy section of the city's website. ROBERT VARELA
85
http://www.naylometwork.com/app-ppd/articles/print-V2.asp?aid=241171 11/7/2013
Low sales growth challenges utilities' traditional business models, Fitch says Page 1 of 1
��uJnesJ.n_Oclubt 10 201
Low sales growth challenges utilities' traditional business
models, Fitch says
U.S. electric utilities face an ongoing period of low sales growth that will challenge their traditional
operating profiles and force utilities to broaden their product offerings, according to a Fitch Ratings
report. Electricity efficiency gains, demand-side management programs and distributed generation
have reduced customer consumption and cannibalized traditional, utility-supplied power, Fitch said.
Utilities will have to include efficiency, distributed generation and demand-side management as part
of their product portfolio going forward, the credit rating company said.
Energy efficiency, whether mandated or promoted by cost savings, continues to play a significant
factor in dampening retail sales, as does net metering and distributed generation, the report said. Fitch
also noted that the economic recovery and expansion since 2009 has done little for electricity sales
growth.
The Energy Information Administration recently revised its forecasts for retail U.S. electricity sales
growth to 0.7 percent per year through 2040. However, given the trend of declining per capita
consumption, EIA's long-term forecasts for electricity sales growth are optimistic, the report said. Per
year electricity sales growth of"perhaps just 0.5 percent seems attainable, although further inroads of
efficiency likely will prove even 0.5 percent per year electricity sales growth as too optimistic." Fitch
said it expects substantial regional variance from the national forecast with growth in the Southeast
and Southwest.
Low electricity sales growth will pressure unit costs and challenge the economics and benefits of
future capital investments and rate design, as costs are allocated over a changing customer profile, the
report said. Fitch said the economics of energy efficiency are compelling, as the benchmark levelized
cost of electricity used to compare the cost of energy efficiency programs is substantially less than all
forms of conventional or renewable power generation. Fitch expects reductions in electricity sales to
increase at a rate of approximately 50 percent per year for the foreseeable future from the maturation
of state efficiency programs as well as new federal standards on lighting and household appliances.
The full report, Power Down II: Efficiency Gains Short Circuit kWh Sales, is available at
www.fitchratings.com. ROBERT VARELA
86
http://www.naylornetwork.com/app-ppd/articles/print-V2.asp?aid=240053 10/30/2013
A:4h
Elk River
Municipal Utilities UTILITIES COMMISSION MEETING
TO: FROM:
Elk River Municipal Utilities Commission Theresa Slominski— Finance and Office Manager
John Dietz—Chair
Al Nadeau—Vice Chair
Daryl Thompson—Trustee
MEETING DATE: AGENDA ITEM NUMBER:
November 12, 2013 6.1
SUBJECT:
Staff Update
DISCUSSION:
We had 2,491 credit card payment transactions in October, compared to 2,266 in September.
The fee for October should be $5,604.75.
Our employee insurance meetings are scheduled for the first week of November,November 5th
and 6th, when we will be bringing in a representative from Blue Cross & Blue Shield and David
Martin Agency to review the new HSA plan with staff. We have been providing information in a
FAQ presentation to help answer questions and prepare employees for the decision of which
insurance plan to participate in. Staff have been asking a lot of great questions, which indicates
to me that they are at least considering the HSA plan. I will provide a verbal update at the
commission meeting.
We currently have $196,784 in PCA credits - through September's billing from our power
provider and our distribution of credits in the same month. October's power bill had not been
received as of the date this update is being prepared but I will continue to update the commission
on this balance. As stated before, we would like to be able to distribute remaining PCA credits
in December.
We have begun some work with our new financial advisor, Springsted, in reviewing our bonds
relative to any potential refinancing and bond arbitrage reporting. They were onsite and met
with myself and staff at the City and provided some additional follow-up information. A
potential for refunding does exist with our 2006A bond for a savings of approximately $120,000
over the remaining 8 years.
We have our go-live dates for our NISC software! The accounting piece of the software will be
implemented in August 2014 and the customer billing piece will be implemented in February
2015. This was the soonest we could get on their calendar of work.
lam: ewrnto 11
{ Page 1 of 1 I1 NATURE
Reliable Public
Power Provider POWERED To SERVE
98
Elk River
Municipal Utilities UTILITIES COMMISSION MEETING
TO: FROM:
Elk River Municipal Utilities Commission Mark Fuchs—Electric Superintendent
John Dietz—Chair
Al Nadeau—Vice Chair
Daryl Thompson—Trustee
MEETING DATE: AGENDA ITEM NUMBER:
November 12, 2013 6.1c
SUBJECT:
Staff Update
DISCUSSION:
• Had thirteen new services.
• Finished changing out a few of our older rusty live front switchgear. The new switchgear
is dead front and safer to work on.
• Finished rebuilding Troy and Union Street. We still have to pull some poles when
Charter gets their wire off our poles.
• Finished the first parts of feeder 94 rebuild. The first part of this job is removing the
overhead three phase rear lot line that is located between School St. and Gates Ave.
• Continue working on the second part of feeder 94 rebuild. We are installing primary wire
to loop the transformers for the businesses east of Gates Ave.
• After getting the new substation transformer at the north substation site back on line and
the 69kv breaker changed out at the Waco substation, we had to put the feeders back to
normal.
• Started working on the Triple Deck Feeder rebuild. Underground Piercing got all of the
pipe bored in and is now working on getting the wire pulled in the pipe. We have the new
poles set along Main St. and are working on getting new wire pulled in.
®
Page 1 of I INAJUREI
Reliable Public
Power Provider P O W E R E D T o S E R V E
99
Elk River M
Municipal Utilities UTILITIES COMMISSION MEETING
TO: FROM:
Elk River Municipal Utilities Commission Wade Lovelette—Superintendent of Technical
John Dietz—Chair Services
Al Nadeau—Vice Chair
Daryl Thompson—Trustee
MEETING DATE: AGENDA ITEM NUMBER:
November 12, 2013 6.1d
SUBJECT:
Staff Update
DISCUSSION:
• The Locating department had a total of 403 locate tickets in October; four of them
being emergency tickets, five cancelations, seven meets, 346 normal, 40 updated
tickets and one boundary survey. The number of locate tickets received are starting
to increase now that freeze-up is getting near.
• In October, the Security Systems Department had a total of 1 1 1 phone contacts,
eight systems quoted, eight system sales made, 15 installs completed, 26 service
calls and eight personal visits.
• Electric Technicians continue with the meter reading, power bill, substation checks
and off-peak issues. They continue to change out the three phase meters to radio read
meters. They are taking the annual oil samples from all of the substation
transformers.
• The power plant staff did the monthly run of the engines. The engines ran good with
no problems.
• Staff continues to collect data with the GPS for our ArcView maps as time permits.
• Steve and Jeff continue directional boring on some of the rebuild projects.
• The North Substation and Waco Substation upgrades are completed. We energized
the new transformer at North on October 4th and fully loaded on October 7`h. Waco
substation had the new circuit switcher installed the week of October 7`h.
kalif II it
11
Page 1 of 1 rNA LJR
Reliable Public
Power Provider POWERED To SERVE
100
Elk River
Municipal Utilities UTILITIES COMMISSION MEETING
TO: FROM:
Elk River Municipal Utilities Commission David Berg—Water Superintendent
John Dietz—Chair
Al Nadeau—Vice Chair
Daryl Thompson—Trustee
MEETING DATE: AGENDA ITEM NUMBER:
November 12, 2013 6.1e
SUBJECT:
Staff Update
DISCUSSION:
• The water department pulled well#4's pump as it needed maintenance. Eric took some great
pictures that really showed how much this maintenance was needed. A meager test was
performed on the well motor when it was pulled out. It only measured at .07 and it should be
closer to 200, so the motor will be sent to Arizona for repair. The pump will be assessed and
repaired by Renner& Sons Inc. The two pipes that are deepest down will also have to be replaced
because of holes and bad threads.
• Irrigation meters are coming in to be stored over winter. They will be cleaned and tested
for flow before they are picked up for spring reinstallation.
• Angela has been organizing the water maps to prepare them for scanning them this
winter. By scanning them, we will be able to tie the maps to the GPS mapping system.
She has also been working with Mike and Gene on the electric department's GPS
mapping.
• We had an intern from St. Cloud Technical College—Water& Wastewater Program at
the end of October. The intern was able to work with each one of the employees on
different water tasks throughout his week of job shadowing.
• Pete finished working with Bolton-Menk to assist with finding valves to GPS. He also
finished installing steel fence posts to mark gate valves. This helps to locate valves
faster in the event of a water main break.
• The hydrant maintenance is finished for the season, Angela and Pete painted and 252
hydrants.
la WERE , IT
Page 1 of 2 NATURE
Reliable Public
Power Provider P O W F R E a T o S E R V E
101
• The Johnson tower has been drained for the winter. We originally were going to take a
chance and leave water in it; however after consulting with engineers, we were a little
concerned that the tower may not get enough water transition with the lower use through
the winter months. Not enough use with a tower can cause ice buildup and not allow
enough fresh water to move through the system. With future building we may be able to
leave the Johnson Tower active year round.
ATTACHMENTS:
• Article: "Minnesota's Groundwater: Is our use sustainable?"
• Pictures of Well #4's pump as it was being removed
R .►W IOEAEO 11
�$ Page 2 of 2AuR�
Reliable P O W E E E O T o S E R V E
102
Elk River
Municipal Utilities UTILITIES COMMISSION MEETING
TO: FROM:
Elk River Municipal Utilities Commission Tom Sagstetter- Conservation and Key Accounts
John Dietz—Chair Manager
Al Nadeau—Vice Chair
Daryl Thompson—Trustee
MEETING DATE: AGENDA ITEM NUMBER:
November 12, 2013 6.1f
SUBJECT:
Staff Update
DISCUSSION:
• Attended a half day seminar sponsored by the Environmental Initiative. The seminar was
focused on utility business models and changes that are likely in the next few years to
respond to all the different pressures facing the utility industry. The current policy
approach seems to be one that is falling away from incentivizing increased sales and
shifting to a cost/price transparency and decoupling of rates for utilities. The other trend
that was emphasized was smaller community based distributed generation. The
distributed generation is at individual customer owned facilities or larger third party
generation facilities. This seminar was to educate regulators and utilities as to where
public policy is going in terms of utility thinking around the country. The meeting was
well attended by the MN Office of Energy Security. Bill Grant, Deputy Commissioner of
Energy and Communications, was a key speaker at the event. ERMU will need to pay
close attention in the coming years to the impacts of proposed changes to the utility
industry to ensure our residential and commercial customers are not negatively impacted
from wholesale policy changes at the state level as they relate to regulated utilities,
municipals, and cooperatives.
• I am drafting a letter for the City Council in support of the proposed solar PV installation
that GRE is proposing on behalf of the Energy City Commission. At this time the site on
Highway 10 does not look favorable for a site because there is limited southern exposure
and the large right-of-way that runs along Highway 10. There is a possibility that GRE
could install some at the RDF processing facility, but that has not been talked about in
great detail at this time.
• The holiday lighting contest applications and LED coupons have been sent out and we
are starting to receive them back. It appears that mailing the applications to residents was
beneficial for the contest. Residents can also use the new website to submit the
application.
• I spoke with Cal about Energy City and he communicated to me that Energy City will
continue to be supported by Elk River and will most likely be the responsibility of the
Economic Development department. y�
�'.. 'ra111EeEO r ii J Page 1 of 2 NATURE
Powerr lProovder POWERED To SERVE
129
• The landfill expansion is beginning to look more promising. I have had frequent
discussions with Waste Management and it appears that the expansion is gaining
momentum internally. I am also exploring the addition of combined heat and power
(CHP) for electric generation at the facility. The technology would use the waste heat
from the engines to boil water to make steam and turn a secondary generator to create
electricity. This seems to be very popular with policy makers and could increase
production from the existing and new engines.
• Energy City tours have been popular. Provided a landfill tour to GRACO and will be giving a
tour of the GRE processing and power plant this week. The GRACO tour had 10 engineers that
were primarily interested in the operations of the landfill and power plant(specifically pumps and
motors). The tour of the processing facility and power plant will be for 35 individuals from
Spectrum High School. The class is interested in environmental issues and how technology helps
improve the environment.
• Billing corrections to Demand Billed customers. The October bills were calculated using an
upgraded version of Power Manager. The upgraded software had two unintended changes when
applied to the ERMU version of Power Manager. First,the Demand Billed(rate class 15)
customers saw an additional line added to their bill that was labeled"Low Load Factor Credit 5".
This line rounded the total energy bill up to next whole dollar. The second unintended change
was increasing the sales tax charged on the same Demand Billed customers. The only billing
errors discovered at this point have been to the Demand Billed customer class and staff is spot
checking all rate classes to ensure no other additional charges have occurred with the software
upgrade.
ATTACHMENTS:
• Article: "LES Gas-To-Energy Plant Goes On-Line Nov. 1"
Page 2 of 2 IIIIEREI
11
NATURE
Reliable Public
Power Provider POWERED To SFRVE
130
•
•
LES gas-to-energy plant goes on line Nov. 1 Page I of 2
�Lnul.q O,iobn-24._Il0
LES gas-to-energy plant goes on line Nov. 1
.tat ft II
�S � 5fr jf
L� 4. tie
From left: LES Administrative Board Chair Marilyn McNabb,Lincoln Mayor Chris
Beutler and LES Administrator and CEO Kevin Wailes cut the ribbon for the Landfill
Gas to Energy Project.Photo courtesy of Lincoln Electric System
The Lincoln Electric System in Nebraska will begin operations at its new Landfill Gas to Energy
Project on Nov. 1. The project is a 4.8-megawatt generating facility located at the Nebraska utility's
Terry Bundy Generating Station. It is fueled by methane gas produced from decomposing waste at the
city's Bluff Road Landfill, located about one mile away.
A video of the plant's dedication on Oct. 4 can be viewed from LES's YouTube channel.
The project began in April 2008 when the city solicited bids to evaluate the feasibility of capturing the
landfill gas, LES said. In November 2011, the city and LES signed a 20-year agreement for the utility
to purchase and convert the landfill's methane gas to electricity.
Prior to the project, landfill gas was released through vents, LES said. To operate the plant, LES will
purchase approximately 300,000 million British thermal units of the gas from the city each year.
The project is expected to produce 26,000 megawatt-hours of energy annually. LES expects to pay the
city about $337,000 in the first year at a rate of$1.10 per one million Btus.
"LES recognized that turning the city's landfill gas into electricity could be a significant part of
meeting its customers' future needs and the growing desire for more renewable energy in its power
mix," Lincoln Mayor Chris Beutler said during the dedication ceremony. "It's inspiring to know that
the landfill's natural byproduct is being captured and burned to create enough energy to power over
2,500 households."
LES installed a gas pipeline between the landfill and the Terry Bundy Generating Station, as well as
gas cleaning and compression equipment and electrical generating equipment. LES's investment for
131
http://www.naylornetwork.com/app-ppd/articles/print-V2.asp?aid=239797 10/28/2013
LES gas-to-energy plant goes on line Nov. 1 Page 2 of 2
the equipment, including pipeline, construction, engineering and other expenses has totaled $11.32
million. That is about 8.75 percent under the project budget of$12.93 million, LES said.
LES's retail sales will be supplied by approximately 12 percent renewable energy with the addition of
the project's units, LES Administrator and CEO Kevin Wailes said during the dedication.
By 2016, the amount of renewable energy will jump to 23 percent when the utility adds 100 new
megawatts of wind-generated energy that was secured through a power purchase agreement earlier
this summer, said Wailes (See Public Power Daily, Aug. 6, 2013).
This project is unique, compared to the utility's other intermittent renewable energy sources, because
the landfill gas units can be dispatched, said Wailes.
Most of the time, with renewable energy, "you're somewhat at nature's whim," said Wailes. The
landfill gas units, though, "can run all of the time, or we can actually dispatch them to meet certain
periods of loads," he said. "That makes them even more valuable."
The plant is recovering gas from 60 acres of the 171-acre landfill, LES said. There is potential for
1,600 kilowatts of expansion, which the utility has the first rights to purchase. LES also has a 15-year
extension option at the end of the 20-year agreement since the landfill is not expected to reach
capacity until 2035, LES said. —FALLON FORBUSH
132