Loading...
5.7. SR 07-08-2002 Howard R, Green Gompany July 2, 2002 File: 806550J-0030 Item 5.7. The Honorable Mayor and City Council City of Elk River 13065 Orono Parkway Elk River, MN 55330-5600 RE: 175TM AVENUE IMPROVEMENTS REVISED FEASIBILITY STUDY Dear Council Members: Attached is the revised Feasibility Study for the assessment of the street improvements proposed for 175th Avenue between Tyler Street and Fillmore Street. As directed by the City Council, we have revised the proposed assessments to reflect a six (6) percent increase in the credit given for those properties which gave the easements along 175th Avenue for no compensation. The six (6) percent increase in the credit is due to the fact that the original offers were determined in 2000. Six (6) percent accounts for inflation of three (3) percent for each of the past two years. Table 1 on page five of the Feasibility Study provides information relative to which properties received compensation for signing the easements and which properties received no compensation. Table 3 on page eight shows the proposed assessments, the inflated credit amounts, and the difference or assessable amount remaining. As shown on Table 3, the total assessment for this project is proposed to be $81,092.00. Attached are two resolutions for the City Council's consideration. The first resolution accepts the Feasibility Study and orders the public hearing to be held on August 12, 2002. The second resolution determines the cost to be assessed and orders the preparation of an assessment roll. The assessment hearing would also be held on August 12, 2002. For your information, the project is scheduled to be bid in late July, and bids would be available for the Council to consider August 12, 2002, after the public hearing and assessment hearing. If you have any questions regarding this project or either of these two proposed resolutions, I will be in attendance at your July 8, 2002, City Council meeting. Sincerely, Howard R. Green Company Ter~ J~. a~urer, P.E. TJM:mw Enclosures Ltr-070202-Council[1]Ltr-070202-Council[1] 1326 Energy Park Drive · St. Paul, MN 55108 ° 651/644-4389 fax 651/644-9446 toll free 888/368-4389 RESOLUTION 02- A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION RECEIVING THE FEASIBILITY REPORT AND ORDERING A PUBLIC HEARING ON THE IMPROVEMENT IN THE MATTER OF THE 175th AVENUE IMPROVEMENTS OF 2002 WHEREAS the Feasibility Report ordered by the Council in Resolution 02-08 has been prepared with reference to the 175th Avenue Improvements and was received by the City on July 8, 2002; and WHEREAS the Feasibility Report recommends that the proposed improvement is feasible; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: 1. The City Council will consider the 175th Avenue Improvements as described in the Feasibility Report and the assessment of the property abutting this proposed improvement for all or a portion of the cost of the improvement pursuant to Minnesota Statutes, Section 429, at an estimated total cost for the improvement of $941,400. 2. A public hearing shall be held before the City Council on the proposed improvement on the 12th day of August, 2002, at six o'clock p.m. at the Elk River City Hall Council Chambers. The City Clerk shall provide two published notices (one week apart) in the official newspaper with at least three days between the last publication date and the hearing, and mailed notice ten days prior to the hearing as required by law. Passed and adopted this 8th day of July, 2002. Stephanie A. Klinzing, Mayor ATTEST: Sandra A. Peine, City Clerk C:\WlNDOWS\Temporary Internet Files\Content. lE5\0L6JOLEB\Res-070202-a8[1].doc RESOLUTION 02- A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION DETERMINING ASSESSED COST OF IMPROVEMENT AND ORDERING PREPARATION OF PROPOSED ASSESSMENT ROLL IN THE MATTER OF 175TM AVENUE IMPROVEMENTS OF 2002 WHEREAS costs have been determined for the 175th Avenue Improvements consisting of a contract price of $735,400, and expenses incurred or to be incurred by the City in the making of the improvement in the amount of $206,000, for a total cost of the improvement of $941,400. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: Based upon the City Assessment Policies, it is determined that the portion of this improvement to be paid by the City and not assessed to benefited properties is $ 860,300. The portion of the cost to be assessed against benefited properties pursuant to the Elk River City Assessment Policies shall be $81,100. The assessments shall be payable in equal annual installments and shall extend over a period of five (5) years, the first of the installments to be payable on or before the first Monday in January, 2003, with interest at the rate of % per annum from the date of the adoption of the assessment resolution. The City Administrator with the assistance of the Project Engineer shall forthwith calculate the proper amount to be specially assessed for such improvement against every assessable lot, piece, or parcel of land, without regard to cash valuation, as provided by law, and shall have available at the City Administrator's office a copy of the proposed assessment roll for public inspection. Upon completion of the proposed assessment roll, the City Administrator shall notify the Council and schedule a public hearing upon the proposed assessment, causing notice of the hearing by publication and mail to be made at least two weeks prior to the hearing. Passed and adopted this 8th day of July, 2002. ATTEST: Stephanie A. Klinzing, Mayor Sandra A. Peine, City Clerk C:\W!NDOWS\Temporary Internet Files\Content. lE5\GXAVE94'lSRes-070202-a1311].doc FEASIBILITY STUDY FOR 175TH AVENUE IMPROVEMENTS ELK RIVER, MINNESOTA May 2002 Revised June 2002 Howard R, Green Company Feasib lity Study 175th Avenue Improvements Project No. 806550J City of Elk River INDEX Page I. INTRODUCTION ............................................................................................... 1 11. PROJECT SCOPE ............................................................................................. 1 III. NECESSITY AND COST-EFFECTIVENESS .................................................... 1 IV. EXISTING CONDITIONS ................................................................................... 2 V. PROPQSED IMPROVEMENTS ......................................................................... 3 VI. RIGHT-OF-WAY, EASEMENTS AND PERMITS ............................................... 5 VII. ESTIMATED PROJECT COSTS ...................................................................... 6 VIII. FINANCING ....................................................................................................... 7 IX. PROJECT SCHEDULE ...................................................................................... 9 X. CONCLUSION ................................................................................................... 9 EXHIBITS Exhibit 1, Study Area Exhibit 3 - Proposed Street and Utility Improvements Exhibit 4 - Assessments Howard R. Green Company Project No. 806550J Feasibility Study 175th Avenue Improvements City of Elk River FEASIBILITY STUDY FOR 175TH AVENUE IMPROVEMENTS ELK RIVER, MINNESOTA May 2002 Revised June 2002 I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly registered Professional Engineer under the laws of the State of Minnesota. Terry Jl Maurer,' P.E. Reg. No. 15316 epa edb : Phillip G. Bergem, . Reg. No. 18568 Date Date Howard R. Green, Consulting Engineers 1326 Energy Park Drive St. Paul, MN 55108 Phone: (651) 644-4389 Fax: (651) 644-9446 Howard R. Green Company Project No. 806550J Feasibility Study 175th Avenue Improvements City of Elk River INDEX II. III. IV. V. VI. VII. VIII. IX. X. Page INTRODUCTION ......................... PROJECT SCOPE ............................................................................................. 1 NECESSITY AND COST-EFFECTIVENESS .................................................... 1 EXISTING CONDITIONS ................................................................................... 2 PROPOSED IMPROVEMENTS ......................................................................... 3 RIGHT-OF-WAY, EASEMENTS AND PERMITS ............................................... 5 ESTIMATED PROJECT COSTS ....................................................................... 6 FINANCING ....................................................................................................... 7 PROJECT SCHEDULE ...................................................................................... 9 CONCLUSION ................................................................................................... 9 EXHIBITS Exhibit 1 - Study Area Exhibit 2 - Proposed Street Section Exhibit 3 - Proposed Street and Utility Improvements Exhibit 4 - Assessments Howard R. Green Company Project No. 806550J Feasibility Study 175th Avenue Improvements City of Elk River I. INTRODUCTION On January 28, 2002, the Elk River City Council adopted Resolution 02-08 authorizing Howard R. Green Company to prepare a Feasibility Study for the 175th Avenue Improvements Project in the City of Elk River. The project location is shown on Exhibit 1. The proposed 175th Avenue Improvements includes the reconstruction of the road, installation of lateral sanitary sewer, trunk watermain, and a detached bituminous trail. II. PROJECT SCOPE The purpose of this study is to analyze the extension of lateral sanitary sewer and trunk watermain together with the reconstruction of 175th Avenue from Tyler Street to Fillmore Street, and determine the feasibility of the proposed project. This study will discuss the existing conditions, proposed improvements, and estimated construction costs with the addition of overhead costs to include city administration, engineering, fiscal, land acquisition and legal expenses. The City's Assessment Manual and past practices will be used as guidelines to discuss financing methods for the proposed improvements. III. NECESSITY AND COST-EFFECTIVENESS The improvements proposed in this study are necessary for a number of reasons. 175th Avenue is in extremely poor condition and normal maintenance and repair operations are no longer sufficient. The construction of lateral sanitary sewer and trunk watermain will allow proposed new developments to be serviced. The trunk watermain will also provide the first segment of a loop to continue to improve fire flow conditions in the southern portion of the East Elk River Area. Installation of lateral sanitary sewer and trunk watermain is necessary to provide the "backbone" of infrastructure for planned future development in the East Elk River Area. The street reconstruction is necessary to provide an adequate transportation system in this area of the city. The proposed improvements will be developed into a project large enough to ensure a competitive bidding process. Therefore, the proposed improvements will be cost- effective. Based on the information contained within this report, the proposed Howard R. Green Company Project No. 806550J Feasibility Study 175th Avenue Improvements City of Elk River improvements are necessary, cost-effective, and feasible from an engineering standpoint. IV. EXISTING CONDITIONS Street 175th Avenue starts at Tyler Street and continues 1-mile east to Fillmore Street. The westernmost 300-feet of the road was reconstructed as part of the East Elk River Area Tyler Street Improvements project in 2000. The existing section of 175th Avenue consists of a two-lane, 21-foot wide bituminous surface with no shoulders. The newly constructed segment to the west is 40 feet wide with curb and gutter and storm sewer. The existing pavement is severely distressed with extreme cracking and rutting. There is a defined ditch area and although the road is currently raised above the adjacent land, there is not a clear flow pattern for water runoff. The property within the study area is zoned Single Family Residential (Rla and Rle) and Agricultural Residential (AR). Sanitary Sewer During construction of the East Elk River Area Phase I project, an 8-inch sanitary sewer line was stubbed out from Tyler Street into 175th Avenue for future connection. Existing residences along 175th Avenue currently have septic systems to handle sanitary waste. There is a significant amount of undeveloped land on the north side of 175th Avenue at the easterly end. Watermain A 16-inch trunk watermain was also stubbed into 175th Avenue from Tyler Street as part of East Elk River Area Phase I project. A new 1.5 million gallon water tower is under construction north of the proposed Park Pointe development in the Eagles Marsh development. Howard R. Green Company Project No. 806550J Feasibility Study 175th Avenue Improvements City of Elk River Storm Drainage There is no existing storm sewer located within the project area. Runoff from storm events is collected and conveyed through ditches along the existing roads. Culverts are located where appropriate when roads and driveways cross these ditches. There is an existing culvert under 175th Avenue that drains water from Kliever's Marsh to the ditch system south of 175th Avenue. Existing Private Utilities Private utilities which have facilities in or near the project area will be notified of the project and requested to incorporate repairs and replacements with the project as needed at their cost. Private utilities include Qwest, Connexus Energy, Northstar Access, Charter Cable TV, and Minnegasco. V. PROPOSED IMPROVEMENTS The proposed improvements for the 175th Avenue project include lateral sanitary sewer, trunk watermain, street construction, and a detached bituminous trail. A detailed description of each proposed improvement is provided below. Street The proposed street improvement consists of reconstruction of 175th Avenue from the segment constructed as part of the East Elk River Area Tyler Street Improvements project east to Fillmore Street. A connection will be made to existing Polk Street and a new entrance constructed to future Ivanhoe Street accessing Park Pointe Addition. The proposed street section for these roads is in accordance with Mn/DOT requirements for an MSA eligible road, as 175th Avenue is part of the City's MSA system. Based on soil borings, the proposed pavement section consists of 6 inches of Class 5 aggregate base, 2 inches of bituminous base course, and 1-% inches of bituminous wear course. The proposed road section will consist of two 12-foot lanes with 6-foot bituminous shoulders. Twelve-foot turn and bypass lanes will be constructed at Ivanhoe Street. Proposed improvements also include a 10-foot bituminous detached trail located on the north side of 175th Avenue. The proposed street section is shown on Exhibit 2. Howard R. Green Company Project No. 806550J Feasibility Study 175th Avenue Improvements City of Elk River Sanitary Sewer The proposed sanitary sewer improvement, as shown on Exhibit 3, consists of extending an 8-inch sanitary sewer main east along 175th Avenue to the western edge of Park Pointe Addition. This sanitary sewer line will be constructed at minimum grade to try to maximize the area of service. Sanitary sewer stubs and services will be placed to the north and south along 175th Avenue to allow for future connections of the residences that abut 175th Avenue, or future development to the south. Waterrnain The proposed watermain improvement, as shown on Exhibit 3, includes the installation of a 16-inch trunk watermain east along 175th Avenue to the western edge of Park Pointe. Watermain stubs and services will be placed to the north and south along 175th Avenue to allow for future connections of the existing residences or future development to the south. Modeling of the proposed water improvements was completed using Cybernet software to verify proposed sizing of the watermain. The two criteria used when modeling the system were a fire flow of 3,500 gallons per minute (gpm) and residual pressure of 20 pounds per square inch (psi). The Insurance Services Office (ISO) requires that fire flows for industrial and commercial areas meet or exceed 3,500 gpm with a residual pressure of 20 psi or greater in the system. Modeling of the system with the proposed trunk watermain sizing produced results that satisfied the above criteria. Storm Drainage Ditches will be constructed adjacent to the roadway to convey stormwater flow. Water will be directed to proposed ponds within the Park Pointe Development or to a former County Ditch system that conveys water to the south and west, ultimately flowing into the Mississippi River. Culverts will be placed under driveways and connecting roads where necessary. Howard R. Green Company Project No. 806550J Feasibility Study 175th Avenue Improvements City of Elk River VI. RIGHT-OF-WAY, EASEMENTS AND PERMITS Ri.qht-of-Way and Easements Existing right-of-way width is generally 33' on either side of the road centerline. An exception is along the Shores of Briarwood plat, along the north side of 175th Avenue near Polk Street, where it is 40' in width. Proposed permanent right-of-way widths are 50' to the north and 45' to the south. Permanent street, utility and drainage easements will be acquired from 17 parcels. Temporary construction easements will be required from 13 of the parcels to accommodate construction activities. On March 18, 2002 the City Council adopted resolution 02-24 authorizing eminent domain for the acquisition of easements along 175th Avenue. Initial offers were made to most property owners. Through a series of meetings and negotiations all easements have been acquired. Table 1 below lists the 17 property owners, initial offer made for the easement and the final settlement amount. Table 1 Property Owner Original Offer Amount Received Mitchell Trust Being platted $0 Hohlen $2,875 $2,875 ChubaJan Patten $2,725 $0' Brinza $575 $0' Monte $1,475 $0' Osman $3,100 $5,500 Meisenbach $1,525 $0' Robinson $3,775 $0' Graham $1,375 Easement removed from project Ganyo $1,175 $2,000 Klein $2,900 $0 Schneider $5,450 $5,450 Collins $1,450 $2,000 Myhre $1,375 $2,000 Cargill Part of global agreement $0 Mn/DOT Will provide permit $0 Cascade Land Company N/A $0 TOTAL $19,825 *Received letter from City stating that a credit in the amount of the original offer would be given against any future street assessment. Howard R. Green Company Project No. 806550J Feasibility Study 175th Avenue Improvements City of Elk River Permits Several permits will be required prior to construction of the proposed improvements. Required permits include, but are not limited to, the following: · Minnesota Pollution Control Agency · Minnesota Department of Health · Minnesota Pollution Control Agency Sanitary Sewer Watermain Grading VII. ESTIMATED PROJECT COST The estimated construction costs and associated overhead costs for the proposed improvements are summarized in Table 2 below. In accordance with the City's assessment manual, the overhead costs have been estimated at 28% of the total construction cost. The overhead cost includes city administration, engineering design, construction staking and inspection, and fiscal and legal costs. Right-of-way costs were listed in the previous section and are not included below. Table 2 Project Cost Estimate Sanitary Sewer Improvements Estimated Construction Cost $ 92,700 Contingency (5%) 4,600 Total Construction Cost $ 97,300 Administration, Engineering, Fiscal & Legal 27,200 Subtotal: $124,500 Watermain Improvements Estimated Construction Cost Contingency (5%) Total Construction Cost Administration, Engineering, Fiscal & Legal Subtotal: $130,900 6,500 $137,000 38,500 $175,900 6 Howard R. Green Company Project No. 806550J Feasibility Study 175th Avenue Improvements City of Elk River Street Improvements Construction Cost Contingency (5%) Total Construction Cost Administration, Engineering, Fiscal & Legal Subtotal: $ 477,000 23,900 $ 500,900 $140,300 $ 641,2OO Cost Estimate Summary Sanitary Sewer Improvements Watermain Improvements Street Improvements Total Estimated Project Cost $ 124,500 $ 175,700 $ 641,200 $ 941,400 VIII. FINANCING In January 1999 the City of Elk River submitted the 175th Avenue improvements project for TEA-21 Federal funding. The project was ranked by the Area Transportation Partnership (ATP) and approved by Mn/DOT and the Federal Highway Administration later that year. Federal Surface Transportation Program (STP) funds are available to cover $360,000 of the road construction, to a maximum of 80% of the road construction portion of the project. Right-of-way, design and administration costs are not eligible for Federal fund reimbursement. As part of the approval process for the Park Pointe Addition, a condition was placed on the development that the developers pay for the lateral sanitary sewer from Tyler Street to the west edge of the development. The City Council and Elk River Municipal Utilities Commission discussed the funding of the trunk watermain. The City's comprehensive plan indicates adjacent land to the north would not be assessed before 2007 for utilities and the property to the south is not in the urban service area. Therefore, it was a joint decision to bid the watermain as an alternative which could be deleted from the project. If watermain is included in the construction, the past policy indicates that the Elk River Municipal Utilities would fund the lateral portion with the City funding the trunk oversizing until adjacent properties were assessed. Howard R. Green Company Project No. 806550J Feasibility Study 175th Avenue Improvements City of Elk River It is proposed to assess the street construction at a rate of $5,000 per residential unit. There are a total of 25 residential units along 175th Avenue. The only properties with more ~l~an one unit are the Klein parcel with two and the Mitchell parcel with 1 1. The Cargill parcel has not been proposed to be assessed because of the global agreement between the City and Cargill. The proposed assessable units are shown on Exhibit 4. As noted in Table 1, several of the property owners received a letter from the City stating that a credit in the amount of the offer for permanent right-of-way and necessary easements would be applied towards street assessments. The offers were based on minimum damage assessments performed in 2000. It is proposed that the amount be increased by 3% per year due to inflation. Table 3 below summarizes the proposed assessment, credit based on the original offer plus 3% per year, and the difference for each property. Table 3 Property Owner Assessment Credit Difference Mitchell Trust $55,000 $27,878 $27,122 Hohlen $5,000 $0 $5,000 ChubaNan Patten $5,000 $2,888 $2,112 Brinza $5,000 $2,888 $2,112 Monte $5,000 $1,563 $3,437 Osman $5,000 $0 $5,000 Meisenbach $5,000 $1,616 $3,384 Robinson $5,000 $4,001 $999 Graham $5,000 $0 $5,000 Ganyo $5,000 $0 $5,000 Klein $10,000 $3,074 $6,926 Schneider $5,000 $0 $5,000 Collins $5,000 $0 $5,000 Myhre $5,000 $0 $5,000 Cargill N/A N/A N/A Mn/DOT $0 $0 $O TOTAL $81,092 As noted in Table 1, the Mitchell property is the site for the proposed Park Pointe Development. The credit amount was calculated by using the same method and rate as applied towards all other residential properties along 175th Avenue. The credit is for 8 Howard R. Green Company Project No. 806550J Feasibility Study 175th Avenue Improvements City of Elk River permanent right-of-way and necessary temporary easements for construction of the improvements. The same is true of the Klein property, which is also owned by the Developer's of the Park Pointe Addition. IX. PROJECT SCHEDULE The schedule for the 175th Avenue Improvement project, as provided in Table 4, is based upon guidelines established in Minnesota State Statues, Chapter 429, Local Improvements and Special Assessments. These dates will be revised if necessary as the project develops. Table 4 Project Schedule City Council Receives Feasibility Study and Orders Public Hearing and Assessment Hearing Open Bids Public Hearing, Resolution Ordering the Improvement and Assessment Hearing/Resolution Adopting Assessment Roll Award Bid/Start Construction Construction Substantially Complete First Payment Due with Real Estate Taxes July 8, 2002 July 25, 2002 August 12, 2002 August 2002 Fall 2002 May 2003 X. CONCLUSION The total estimated project cost, including overhead costs is $941,600. The project is necessary and cost-effective. As previously stated, this cost will be financed through a combination of assessments to benefiting properties and TEA-21 funds, Municipal State Aid funds, Elk River Municipal Utilities funds, and City funds. Based on the information gathered and the analysis presented the proposed improvements discussed in this study are feasible from an engineering standpoint. The financial feasibility of the project will be determined by the City through discussions with the affected property owners. 9 Howard R. Green Company Project No. 806550J Feasibility Study 175th Avenue Improvements City of Elk River EXHIBITS AVENUE NW )USTRIAL CIRCLE HILLSIDE CITY PARK KLIEVER'S I[ IVANHOE AVEI~U~ DOT PROPERTY 175TH AVENUE S~COND ~,TIO )POSED ~AI~ DEPOT STREET AND UTILITY IMPROVEMENTS [~SIGNED BY:~ DRA'~ BY: E¥ APPROVED BY: ~B NUMBER CAD DATE: ~oy ~. 2002 8:~:1~ CAD FILE: B065~J~S~MENTS~80555OFEAS.~ (EYC VATE) (PRIVATE) CAF GILL PROF :RTY 1326 ENERGY PARK DRIVE ST PAUL. MINNESOTA ,55108 (651) 644-4389 Howard R Green Company CONSULTING E:NG!NE EI::RS '175TI.-I AVENUE F:EA,..REiLffY b~PdOy b~ruDY AFIEA MAp EXH~Bt~ /-- PROFILE GRADE R.O.W. ~ / ~ .. 50' ,.. I ._ / 45' ~ EXISTING SURFACE TYPICAL RURAL STREET SECTION G COURSE --1 1/2" 2550 TYPE MV4 WE MIXTURE (MVWE45035B) 5" AGGREGATE BASE CLAS.( --1 1/2" 2550 TYPE MV4 WEARING COURSE MIXTURE (MVWE45035B) TACK COAT 2" 2350 TYPE LV3 NONWEARING COURSE MIXTURE (LVNW35030B) ~" AGGREGATE ~A~,E CLASS 5 (SPEC 2211) WEARING COURSE 5 (SPEC 2211) 3 (SPEC 2211) INSET C INSET A INSET NOTE: DRIVE:WAY~ AND CROSSROAOS SHALL HAVE: A MINIMUM OF 1:6 INSLOPE 1326 ENERGY PARK DRI¥1[ ST, PAUL, MINNESOTA 55108 (651) 644-~589 Howard 2 Green Company CONSULTING ENGINEERS 175"rH AVENU~ F:EA~ ~Y 1 EXHIBIT 2 PROPOSED PARK POINTE ADDITION b PROPOSED PARK POINTE ADDITION LEGEND ....... 8' SANITARY SEWER CARGILL PROPERTY 16' WATERMAIN STORM SEWER DESIGNED BY: 0RAWN BY: APPRO~D BY: JO~ NUMBER 806550J CAD DATE: Mov 08. 2007 8:19:1,~ CAD FILE: 806550J~6.ASEMENTS"~B06550FEAS.DWG GQ) 0~ ~NH(~ 1326 ENERGY PARK ORIV~ ST, PAUL, MINNESOTA 55108 (651) 644-4389 rd R G'een Company SULTING ENGINEERS 1751'H AVENUE FEA~ b~Y 0 60 EXHIBIT 3 CITY OF ELK RIVER l~ce~ No. ~0 M AND GERALDINE GRAHAM P~rcel No. I0 DALE AND JOANNE ROBINSON P~zrcel No, 9 ARTHUR MEISENBACH STAT[ OF MINNESOTA Parcel No. 8 [] P~rcet No, 7 Po. rcel No. 6 CASCADE LAND CO. Parcet No. 5 JAMES AND MARY MONTE P~rceJ No, 12 RONALD AND PAMELA GAN¥O Parcel No~ ? IJAZ AND LAURA OSMAN P~c. el No. I3 JAMES AND WENDY KLEIN Po.'rcel NO. 4 MICHAEL AND DIANE BRINZA Parcel No. 3 DENNIS CHUBA AND MARILYN VANPATTEN Parcel No. 2 LOREN AND JOD~ HOLEN P~t'cel No. 1 SCOTT AND ANNETTE MITCHELL P~zrcel No. 14 LLOYD AND CLAIRE SCHNEIDER Pczrcel No. 15 CARGILL INCORPORATED Parcel No. 1 SCOTT AND ANNETTE MITCHELL LEGEND NUMBER OF ACCESSABLE UNITS Parcel No, 15 CARGILL INCORPORATED AP ROVED BY: JOB NUMBER ~ D E: U~ 08. 2002 8,,19;15 o,m ~ 1.~26 ENERGY PARK DRIVE ST. PAUL. MINN[SOTA 5510B (651) 644-4.389 Howard R Green Company CONSULTING ENGINEERS P~cel No. 16 Parcel No. I7 RON AND SUSAN MYHRI ;TEPHEN AND LDRI COLLIN 175TH AVENUE FF_A~ STUDY ASSESSMENT PARCELS o 60 EXHIBIT