6.0. & 7.0. SR 07-08-2002Item 6. & 7. MEMORANDUM TO: Mayor and Council FROM: DATE: Pat Klaers, Cit~)~.~nistrator July 8, 2002 SUBJECT: Highway 169 Corridor Management Plan Presentation Highway 10 Corridor Management Plan Presentation Recently the Minnesota Department of Transportation (Mn/DOT) authorized long-range studies on seven major transportation corridors throughout the state. The Highway 101/169 and Highway 10 corridors were two of the seven transportation routes that were studied by professional consulting firms hired by Mn/DOT. Each of the seven transportation routes were the subject of a corridor management plan (CMP) because they were identified as being at risk of not meeting Mn/DOT performance objectives. These performance objectives relate to such things as the number of accidents and average travel speed. Each CMP was put together after a series of meetings between Mn/DOT, the consulting firms, representatives of the impacted local units of government, and the public. The City Council has invited citizens, property owners, and business owners to attend an informational meeting on the CMP for both Highway 101/169 and Highway 10. Attached for your information are the Chamber of Commerce newsletter article on this meeting and two articles that have appeared in recent editions of the Elk Po'per StarNeuas. The Highway 101/169 presentation is scheduled at 7:00 p.m. and the Highway 10 presentation is scheduled for 8:00 p.m. The Highway 101/169 presentation will be made by Tim Thorcen, from CH2M Hill, and MnDOT representative Kurt Easdund. The Highway 10 presentation will be made by Howard Preston, from Howard R. Green, and MnDOT representative Terry Humbert. A few copies of the Highway 101/169 plan are available. The Highway 10 plan is on computer disk and copies are available. IMPORTANT INFORMATION ELK RIVER'S HIGHWAY TRANSPORTATION PLANS July 8, 2002 Meeting at Elk River City Hall Transportation issues have become a major issue for our area. Some are directly related to the Highway 101 / 169 and Highway 10 corridors that run through Elk River. Recently the Minnesota Department of Transportation (MnDOT) authorized long-range studies by professional consulting firms on major transportation routes in the state including the two listed above. A Corridor Management Plan on each highway corridor has resulted from these studies. The Elk River City Council has established a public information meeting for citizens and business owners to attend. The meeting will take place Monday, July 8 in the Elk River City Council Chambers at City Hall. The purpose of the July 8 meeting is to present information to those affected in Elk River; citizens, property owners and business owners that may be significantly impacted by any of the recommended plans and changes that could occur in the future. Given the current status of transportation funding in Minnesota, there are many questions related to the funding and the timing for implementation of the recommendations that are identified in these two corridor management plans. These plans are long-range in nature and it is likely that recommendations will be implemented gradually based on funding and community input. The Highway 101 / 169 Corridor Management Plan will be presented at 7 p.m., and the Highway 10 Corridor Management Plan will be presented at 8 p.m. The presentation on each plan will be made by the consulting engineering firm_ and MnDOT personnel with a question/answer/discussion period following the presentations. Please attend this important and informational meeting. The Highway 101 / 169 and Highway 10 corridors are vital to our area's economic future. Your input is needed in order to make an impact on any plans that are being considered. Visit us on the web at www.erstarnews.com · Wednesday, July 3, 2002/Elk River Star News / 5 [ELK RIV[R Meetings set to address MnDOT ,hig The Minnesota Depart- ment of Transportation is looking for feedback on its long-range studies on seven mai or 'transportation routes in the state, includ- ing the Highway 101/169 and Highway 10 corridors that run through Elk River. The corridors were the subject of a Corridor man- hway studies agement plan (CMP) Because they were identi- fied as being at risk of not meeting Mn/DOT perform- ance objectives relating to things like number of acci- dents and average travel speed. The CMPs for both the Highway 101/169 and the Highway 10 corridors will be presented at a public information meeting Monday, July 8. Businesses and residents who may be affected by changes to the ~ransporta- ~ion routes are invited to the meeting to give input on plans being considered. The meeting Will' be in the Elk River City Council chambers at City Hall. The Highway 101/169 CMP ,will be presented at 7 p.m., and the Highway 10 CMP will be presented ac 8 p.m. The presentation on each plan will be made by the consulting engineering firm and Mn/DOT. A question- and-answer period will fol- low the presentations. City's highways to be discussed Elk River City Council has scheduled an informa- tional meeting on the Highway 101/169 and Highway 10 transportation comdor management plans. The meeting, set for 7 p.m. July 8 at the Elk River City Council chambers, will feature presentations by the proJect's consulting engineering firms and the Minnesota Department of Transportation The 101/169 corridor presentation will begin at 7 p.m.. and the Highway 10 presentation is scheduled for 8 p.m. The council is looking for feedback from Elk River citizens and business own- ers on the ~mpact of the plans and recommenda- tions for changes. --~' C~ty Council Minutes Page 13 April 15, 2002 ~ "~--- 1zo-UNcILMEMBER DIETZ MOVED TO ACCEPT THE BID FROM VISU- SEWER CLEAN & SEAL, INC. IN THE AMOUNT OF $7,560. COUNClLMEMBER KUESTER SECONDED THE MOTION. THE MOTION CARRIED 5-0. 7.4. Consider Funding and Timing of the 175th Avenue Improvement Watermain Construction City Engineer Terry Maurer stated that Elk River Utilities has already taken action on this item. He stated that the Utilities Commission has asked that the 175th Avenue watermain be bid as alternate and Nh:. Maurer suggested that half of the trail be bid as an alternate also'. The Council concurred with Mr. Maurer's suggestion. 7.5. Consider Resolutions Regarding Waco and Hwy. 10 Signal Project City Engineer Terry Maurer stated that he has completed a feasibility study for the signalization of the intersection of Highway 10 and Waco Street. He stated that three commercial properties would be assessed one-quarter of the cost for installation of the signal and a public hearing must be held. COUNCILMEMBER TVEITE MOVED TO ADOPT RESOLUTION 02-31 ORDERING A PRELIMINARY FEASIBILITY REPORT, RESOLUTION 02-32 RECEIVING THE FEASIBILITY REPORT AND ORDERING A PUBLIC HEARING ON THE IMPROVEMENT, AND RESOLUTION 02-33 DETERMINING ASSESSED COST OF IMPROVEMENT AND ORDERING PREPARATION OF PROPOSED ASSESSMENT ROLL IN THE MATTER OF THE TRUNK HIGHWAY 10/WACO STREET INTERSECTION SIGNALIZATION IMPROVEMENT OF 2002. COUNCILMEMBER MOTIN SECONDED THE MOTION. THE MOTION CARRIED 5-0. Consider Resolutions Regarding tntetre~onal.~rridor Studies? (,Highway 10 and Highway 169) City Engineer Terry Maurer stated that Elk River is the only community that hasn't adopted the Highway 10 and Highway 169 [nterregional Corridor resolutions. He discussed three options for Council consideration. Mayor Klinzing stated that she did not want to adopt any resolutions until MnDOT could speak to the Council and the public at a City Council meeting. She would like to receive public comment from Elk River residents, as these two studies would have a big impact on the city. City Administrator Pat K_laers suggested that a letter be sent to MnDOT acknowledging Elk River's participation in the study and stating that the city is willing to sign the resolutions at a later date after the city receives input from citizens. The Council concurred on delaying consideration of these two resolutions until a later date. Howard R. Green Gompany Item 7.6. April~,2002 Files: 809230J-0325 809235J-0325 Honorable Mayor and City Council City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330-0490 RE: TH 10 INTERREGIONAL CORRIDOR STUDY TH 169 INTERREGIONAL CORRIDOR STUDY RESOLUTION IN SUPPORT OF INTERREGIONAL CORRIDOR MANAGEMENT PLAN Dear Council Members: Mn/DOT is requesting that the City of Elk River adopt a resolution for both the TH 10 and TH 169 Interregional Corridor Management Plans. City staff had originally anticipated that the City Council would not consider these resolutions until there was an opportunity for the City Council to hold public headngs with Mn/DOT and the consultants for the studies available to present the plan and the City Council to take feedback from the public. However, recently City staff has been informed that the City of Elk River is apparently the only governmental jurisdiction involved in the studies that has not considered adopting the resolutions regarding the Corridor Management Plans. Therefore, staff has decided to bring these resolutions forward at this time. There are several different ways the City Council can approach this issue. City Council could consider one of the following options or a variation. The options staff sees are as follows: Take no action on the resolutions and let the final Corridor Management Plans be published without a resolution from the City of Elk River. Adopt a resolution that simply states that the City of Elk River was a participant in the planning process and does or does not agree with the vision statement or goals of the plan. Adopt the resolution in the format suggested by Mn/DOT with a list of issues that need further discussion. These issues could be as specific as commenting directly on portions of the plan recommendation, or as generic as identifying segments that need further discussion and planning before the City is willing to accept them. Attached to this Correspondence are the following items from each Interregional Corridor Management Plan: 1. Draft resolution presented by Mn/DOT. Ltr 4.-11-02 Council2 1326 Energy Park Drive · St. Paul, MN 55108 · 651/644-4389 fax 651/644-9446 toll free 888/368-4389 Honorable Mayor and City Council Apdl 11, 2002 Page Two 2. Vision Statement/Goals. 3. Sections of the plan that discuss proposed improvements pertaining to the City of Elk River. 4. Tables dealing with the pdodtization of projects and costs relative to improvements within the City of Elk River. I will be available at your April 15, 2002, meeting to discuss this issue further and answer questions relative to the two Interregional Corridor Management Plans. Sincerely, Howard R. Green Company Terry J. Maurer, P.E. TJM:tw Attchs. Ltr 4-11-02 Council2 Howard R, Green Company CONSULTING ENGINEERS TH 101 -TH 169 CORRIDOR MANAGEMENT PLAN (DRAFT) FEBRU^R¥2002 Rogers, Elk River, Princeton and Milaca. The second round of public open houses was held March 18 and 19, 2002 at two locations: Princeton and Elk River. Members of the CMP project team were available at each meeting to answer questions and obtain input. 1.3 Corridor Vision Statement and Need for Action 1.3.1 Corridor Vision Statement Developing a corridor vision for 2025 involved several steps, including the early development of a Vision Statement (see box below). The Vision Statement established the basic goals of the corridor planning process, included 2025 performance goals, and outlined the roles that Mn/DOT and other corridor partners can expect to play as the planning process moves toward implementation. The vision statement was developed with input from the corridor partners after a process of issue identification, preliminary traffic forecasting, and early performance predictions: The corridor partners considered how the highways serve their communities, what they perceived as an acceptable level of service, and what they felt was an acceptable level of impact to local and through transportation systems. Corridor partners desires and concerns about future performance of the corridor were addressed through a continual refinement of the vision statement. The following steps outline the process used to refine the vision statement: · Review corridor issues, deficiendes, and objectives · Identify alternative strategies or improvement concepts · Analyze and discuss advantages and disadvantages of the improvement concepts · Determine short- and long-term consensus approaches by corridor partners ,,i TH 101 -TH 169 Corridor Vision Statement 1. CORRIDOR MANAGEMENT PLAN GOALS The CMP will be developed to achieve a balance between the needs and visions of individual communities and the safe and efficient movement of people and goods. Specifically, the planning process will strive to minimize adverse community effects while maintaining or improving both interregional and local traffic operations. 2. HIGHWAY PERFORMANCE GOALS Mn/DOT and its corridor partners have established the future highway performance goals (2025) for the TH 101-TH 169 IRC as follows: · Improve travel time performance and predictability to meet the target speed of 60 mph for the high priority segment from Rogers to Zimmerman, minimizing delays on TH 101-TH 169 and on intersecting roadways. · Maintain or improve travel time performance and predictability to mee[ the target speed of 55 mph for the medium priority segment from Zimmerman to Garrison, minimizing delays on TH 169 and on intersecting roadways. · Improve safer7 to achieve crash rates better than the statewide average, limiting conflicts between the various vehicle tTpes and pedestrians. 3. IMPLEMENTATION APPROACHES AND ROLES These goals will be achieved by focusing highway project investments, guiding future land use patterns, and managing highway access points. Mn/DOT and its corridor partners will provide leadership toward the achievement of corridor goals by sharing their visions, promoting projects or initiatives, and protecting or enhancing community image and natural resources. 1-7 . 22~ st St ~ Project #8 New interchange at 221 st Avenue ~ Currant Design Project New interchange:at C, SAH ~CSAH 33 (2003 Elk River New interchange ~ (possible split diamond) Jackson Ave , ,, at Jackson and 197th Avenues Project #6 School St. O New interchange at Main Street :-, Overpass at School Street . ~ Main St ~ Project #5 O Improved interchange at TH 10 Project #4 I CSAH 39.:~ New interchange at CSAH 39 otsegO ' 0~¢/,/ ~ Project #3 _CSAH 37 ~ ~-~ New interchange at CSAH 37 Overpass at CSAH 42 Project #2 St. Michael New interchange at CSAH 36 Legend Existing Interchange Current Design Project Proposed Interchange Proposed Overpass Roads Project Boundary m Rogers CSAH 144 ROgers Drive Project #1 Improved interchange at 1-94 New interchanges ar overpasses at CSAH 144 and Rogers Drive Potential Highway Improvement Projects 0.500.51 Miles Figure 5-1 Page 1 of 2 TH 101 -TH 169 CORRIDOR MANAGEMENT PLAN (DRAFT) FEBRUARY 2002 the monetary value of both advantages (benefits) and disadvantages (costs) of various highway projects. The result of a benefit-cost analysis is a ratio that indicates the economic desirability of a project from a monetary point of view. Generally, an investment is considered economically viable when the benefits exceed the costs--in other words, when the benefit-cost ratio is greater than one. While the benefit-cost ratio is a valuable toot, it is also important to weigh the results of the analysis against additional factors such as environmental, social, and other community impacts. The results of the benefit-cost analyses for the 13 potential projects are sttmmarized in Table 5-3. TABLE 5-3 Highway Improvement Projects Benefit-Cost Ratios and Cost Estimates Construction Project Number and Name (all project costs include frontage roads and 20% of project c.ost right-of-way estimate) 4-lane Freeway Conversion Upgrade to 6-lane Freeway Cost Estimate Benefit- Cost Estimate Benefit- (million $) Cost Ratio (million $) Cost Ratio 1' Rogers (growth area 1) - Improved and new interchanges from 1-94 to CSAH 144 2: St. Michael (growth area 2) - New interchange at CSAH 36 3: Otsego A (growth area 2) - New interchange at CSAH 37; overpass at CSAH 42 4: Otsego B (growth area 2) - New interchange at CSAH 39 5: Elk River A (growth area 3) - Improved interchange at TH 10 6: Elk River B (growth area 3) -New interchanges at Main Street; overpass at School Street 7: Elk River C (growth area 3) - New interchange (possible split diamond concept) at Jacksorv'197th, south of future CR 33 interchange 8: Elk River D (growth area 4) - New interchange at 221st Avenue 9: South of Zimmerman (growth area 5) - New interchange at CR 36/CR 45 10: Zimmerman (growth area 6) - New interchange at CSAH 4 11' North of Zimmerman (growth area 7) - New interchange at 277th Avenue 12: South of Princeton A (growth area 8) - Future CSAH 9 interchange 13: South of Princeton B (growth area 8) - New interchange at CR 38 $66 5.3 Add $15 4.4 million $16 19.4 Add $4 million 15.0 $17 8.0 Add $6 million 5.9 $11 6.8 Add $3 million 5.2 $29 3.3 Add $5 million 2.8 $13 9.1 Add $3 million 7.38 $16 15.4 Add $6 million 10.61 $12 O..8 $15 0.9 $21 2.7 $17 O.5 $7 1.4 $9 0.8 5-8 TH 101 - TH 169 CORRIDOR MANAGEMENT PLAN (DRAFT) FEBRUARY2002 planning and development reviews, and would prevent new signals from being installed. A possible final stage of project development would be the 6-lane seg-ment from north of Rogers to Elk River. Planning for fids last phase would begin in 15 to 20 years. To further its project prioritization work for multiple IRCs, Mn/DOT has categorized various IRC projects as follows (with reference to fire projects identified in this CMP): · Category I Projects. Already prOgrammed--includes: (a) the Sherburne CR 33 interchange project, (b) the Sherburne CSAH 9 interchange project, (c) safety improvements at Mille Lacs CSAH 11, and (d) the upgrade of TH 169 to four lanes from Onamia to Garrison. These projects are already included in the State Transportation Improvement Program (STIP) or the Work and Studies Plan. · Category II Projects. Strategic Projects to Reach IRC Performance Targets--includes: (a) seven potential projects to upgrade TH 101-TH 169 to a 4-1ane freeway from 1-94 in Rogers through Jackson/197th Street in Elk River; and (b) the development of a new interchange at CSAH 4 in Zimmerman. As previously discussed, these projects are considered the top priorities for further study and development because they will be necessary to achieve IRC speed and safety performance targets. · Category III. Long-Term Vision Projects to Achieve Other Goals--~ncludes: (a) potential expansion of a future four-lane freeway to slx lanes from Rogers through Elk River; (b) five potential future upgrades (new interchanges) to achieve a continuous freeway from Elk River to Princeton; and (c) access consolidation and related actions along unsignalized expressway from Princeton to Onarrda. The above-referenced projects are also listed individually by category, with estimated costs, in Appendix D--see Table D-4, page D-10. The recommended process to actually manage the corridor in the future, discussed in Section 5.4 below, is built around these project priorities. 5.4 Corridor Management Recommendations Several recommendations have been developed based on preliminary project performance evaluations and prioritiz~,tion work. The.recommendations are structured to identify the highest priorities for foLlow-up actions to be taken as the planning process concludes. The responsibilities of corridor partners relative to each of these recommendations are also discussed. Mn/DOT will play the largest role in the implementation of these recommendations; however, the corridor vision could not have been successfully developed, nor can it be successfully implemented, without the cooperation of city, county, and township governments. Additionally, environmental stakeholders, such as the Minnesota Department of Natural Resources and the Minnesota Pollution Control Agency, have participated in the CMP process and will undoubtedly continue to do so in the future. 5-10 SAMPLE CMP RESOLUTION WHEREAS., Minnesota's State Transportation Plan recogaxizes the sigxM_fdcance of interregional highway corridors in providing citizens and businesses throughout the State of Minnesota with high quality access to recreational, educational, employment and health care opportunities, and to the transport of products and services produced by our local economy to.reg/onal, national and global markets; and, WHEREASj TH 101-TH 169 has been identified by the Minnesota Department of Transportation as a High Priority I_nterre~onal Corridor from Rogers to Zimmerman and a Medium Priority I_nterregional Corridor from Zimmerman to Garrison that enhances the economic vitality of the state and provides essential access for central Minnesota counties and cities to major economic markets and cultural centers including the St. Paul-Minneapolis metropolitan area and, WHEREA~ the continued growth of the region is leading to increasing travel demand in the ~orridor and development pressure adjacent to the corridor which, ff un_managed, can negatively affect the level of performance, safety and congest/on experienced by users of the corridor; and, WHERAS, community leaders, motorists and road authorities have identSfied this growing travel demand and development pressure as a concern with potential negative consequences for mobility and safety in the corridor, with the potential to degrade the performance level now provided by the corridor, and the resulting implications for the economy and quality of life of the region; and, WHEREAS, the Minnesota Department of Transportation, recognizing the potential impact of continued growth pressure on the corridor, has completed an Interregional Corridor Management Plan in partnership with its partners along the corridor to look at the long-term role that TH 101-TH 169 will play in meeting t_he transportation needs of central Minnesota; and WHEREAS, it is imperative at this critical t/me that a long-term vision for the type of service that the TH 101-TH 169 corridor needs to be established and that the steps are identified and initiated to: 1. Preserve the function of the corridor through advance planning, not only for the TH 101- TH 169 corridor but local supporting street systems and land use and development patterns; and, 2. Secure the needed famding to pursue the vision established for the corridor; and, 3. EstabLish a plan of action for the development of planning and programming activities that will proactively address the needs identified. NOW THEREFORE BE IT RESOLVED~ the (City, County, Township, etc.) of (insert name of City, County, Township, etc.) endorsed the vision and corridor management plan for TH 101- TH 169. I I FURTHERMORE BE IT RESOLVED, the (City, County, Township, etc.) of (insert name) endorsed the concept that an adequate network of supporting roads is necessary to attain the TH 101-TH 169 corridor vision and that the roadway networks identified in the TH 101-TH 169 Corridor Management Plan will be considered as interim g~.ddes until such time as refinements to these improvements are identified. FURTHERMORE BE IT RESOLVED, the (City, County, Township, etc..) of (insert name) recogrdzed the regional significance of the corridor in supportLng the re~onal economy and intends to reflect the TH 101-TH 169 Corridor Management Plan vision, strategies and policies through updates to the (insert name of City, County, Township etc.) land use and transportation plans as well as subdivision ordinances. FURTHERMORE BE IT RESOLVED, the (City, County, Township, etc.) of (insert name) is committed to working in partnership with Mn/DOT and the other partners along the corridor as a member of the TH 101-TH 169 Corridor Management Team in order to achieve the vision and implement the recommendations of the TH 101-TH 169 Corridor Management Plan. BE IT FURTHER RESOLVED, the (City, County, Township, etc.) of (insert name) intends to bring forward the following issues for resolution and discussion with the TH 101-TH 169 Corridor Management Team: List issues here Signa~lre Block 1.3 Vision Statement The development of the Vision Statement for the TH 10 corridor has been an evolving process. The overall draft Vision Statement was presented to the study's Policy and Technical Advisory Committees for their review and comment. With their input, the Vision Statement was revised and has guided the development of the application of the vision by subarea. The TH 10 overall vision for the corridor follows. TRUNK HIGHWAY (TH) 10 INTERREGIONAL CORRIDOR TH 24 to 1-35W (Clear Lake to Mounds View) VISION STATEMENT A Focus on Mobility, Safety, Balance, and Partnership The Vision for the TH 10 Interregional Corridor is to achieve a balance betwee; regional mobility and local circulation. The balance point will be dynamic along corridor and responsive to interregional connectivity goals and local commur~? needs. The Vision is to achieve interregional system goals for speed and safety as well improve local circulation. Mobility should be addressed by providing a high qua of traffic flow and better managing access from adjacent land uses with a pr/ority on safety. Consistency with local land use plans is critical to implementatio: The path from Vision to Reality is dependent on a partnership among alt stakeholder:, to achieve a balanced mobility. Townships, cities, counties, Mn/DOT, other state aox local agencies, and the corridor stakeholders will need to plan and work together achieve intra-city access and intercity mobility. Subarea workshops were held to enlist the help of the two advisory committees in developing the application of the vision to the subareas. See Chapter 2 for a further discussion of the subarea workshops. TH ]0 Corridor Management Platt: TH 24 in Clear lake to 1-35W January 2002 ] -6 1NTROD UCTION Table 6.1-2 Prioritization of Projects by Timeframe Project No. 2 4 4B 4C 5 6 Project TH 24 to CSAH 8 CSAH 8 to CSAH I 1 CSAH 11 to Waco Street - CSAH 11 to Waco Street w/o CSAH 14/15 Interchange3 - CSAH 14/15 Interchange Waco Street to TH 169 - Waco Street to 600' west of Proctor - 600' west of Proctor to 950' east of Main St. - 950' east of Main St. to TH 169 TH 169 to Sunfish Lake Blvd Sunfish Lake Blvd to Round Lake Blvd Round Lake Blvd to TH 610 TH 510 to 1-35W Short-Term: 2002-2010 X X Project Timeframe IMedium-Term: 2010-2018 X X X X Long-Term: 2¢?~ 8-2025 X X X * Interim improvements should be completed in the short-tenn. TH I0 iRC Study Corridor Management Plan No. 813260J 6-4 January 2002 Alternative Staging and Implementation Table 6.1-3 Breakdown of Year 2001 Project Costs by Estimated Timeframe and Jurisdiction Project Timeframe, Jurisdiction, and Estimated Costs Short-Term Medium-Term Long-Term Projecti Costs: Costs: Costs: No. [ Project 2002-2010 2010-2018 2018-2025 1 TH 24 to CSAH 8 $13,944,000 (D3) 2 CSAH 8 to CSAH 11 $13,397,160 (D3) 3 CSAH 11 to Waco Street - CSAH 11 to Waco Street w/o '$51,448,960 (D3) CSAH 14/15 Interchange3 -CSAH 14/15 Interchange $5,500,000 (D3) 4 Waco Street to TH 169 4A - Waco Street to 600' west of Proctor 1525,998,767 (D3) - 600' west of Proctor to 950' east of $21,283,489 (D3) 4B Main St. 4C - 950' east of Main St. to TH 169 $5,754,240 (D3) I $114,720,489 5 TH 169 to Sunfish (Metro) ~ $95,025,767 6 Sunfish to Round Lake Boulevard (Metro) Round Lake Blvd to TH 610 · $101,495.375 7(8-lanes) ~ (Metro) 8TH 610 to 1-35W (8-lanes) · $14,_50,~38 (Metro) Total by Timeframe: Metro Division $95,025,767 $114,720,489 $115,745,713 Total by Timeframe: District 3 $5,500,000 $78,486,689 $53,339,927 Grand Total by Timeframe $100,525,767 $193,207,178 $169,085,640 * Cost estimates for short-term, interim improvements have not ~een developed. However, the long- term cost estimates provided for projects 7 and 8 assume that NO nterim improvement projects have been completed. ,TH 10 IRC Study Corridor Management Plan No. 813260,1 6-5 January 2002 Alternative Staging and Implementation (Insert City, County, Township, etc.name) RESOLUTION NO. ACCEPTING, SUPPORTING, AND ADOPTING THE TH 10 INTERREGIONAL CORRIDOR MANAGEMENT PLAN WHF. REAS, Minnesota's State Transportation Plan reco~tmizes the significance of interregional highway corridors in providing citizens and businesses throughout the State of Minnesota with high quality access to recreational, educational, employment and health care opportunities, and to the transport of products and services produced by our l°caI economy to regional, national, and global markets; and, WHEREAS, the TH 10 Interregional Corridor haS' ~ id'entitled by the Minnesota Department of Transportation as a High Priority Corridor fi0m I£35W to TH 169 and as a Medh~m Priority Corridor fi.om TH 169 to TH 24 in Clear Lake!ffi~ ~Ces the economic vitality of the state providing essential access for the central regi6h °f the state in Sherbume, Anoka, and Ramsey Counties to major economic markets ~d cultural Centers including the h/fmneapolis-St. Paul metropolitan area; and, :: :;~ WHEREAS, the continued gr6~h ofth~region is leading to increasing travel demand in the corridor which, ifunmanaged~can ne~tively affect the level of performance, safety, and congemon expcrien d bye corridor; and, WHF. REAS, community leaders, motorists, and road authorities have identified this growing travel demand and development pressure as a concern with potential negative consequences for mobility and safety in the corrrdor, with the potential to degrade the performance level now provided by the corridor, and the resulting implications for the economy and quality of life of the region; and, WHEREAS, the lVfmnesota Department of Transportation, recognizing the potential impact of continued growth pressure on the corridor, has completed an Interregional Corridor Plan in partnership with its partners along the corridor to look at the long-term role that the TH 10 Corridor will play in meeting the transportation needs of the central region of Minnesota; and, WHEREAS, it is imperative at this critical time, with continued growth occurring in the region, that a long-term vision for the type of service that the TH 10 Corridor needs to provide be established and that the steps are identified and initiated to: 1. Preserve the function of the corridor through the advance planning, not only for the TH 10 Corridor but for the local supporting street systems and land use and development patterns; and, 2. Secure the needed funding to pursue the vision established for the corridor; and, 3. Establish a plan of action for the development of planning and programming activities that will proactively address the needs identified. NOW THEREFORE BE IT RESOLVED, the (insert City, County, Township, etc of__ endorses the vision and corridor management plan for the TH 10 Corridor. FURTHERMORE BE IT RESOLVED, the (insert City, County, Township, etc of ) endorses the concept that an adequate network of supporting roads is necessary to attain the TH 10 Corridor vision and that the roadway networks identified in the TH 10 Corridor Managemem Plan will be considered as interim guides until such time as refinements to these improvements are identified. FURTHF. RMORE BE IT RESOLVED, the (insert City, County, Township, etc of ) recognizes the regional significance of the corridor in supporting the regional economy and intends to reflect the TH 10 Corridor Management Plan vision, strategies, and policies through updates to the (insert City, County, Township, etc of ).land use and transportation plans as well as subdivision ordinances. F[JRTHERMORE BE 1T RESOLVED, the (insert City, County, Township, etc of ) is committed to working in partnership with Mn/DOT and the other partners along the corridor as a member of the TH 10 Corridor Management Team .in order to achieve the vision and implement the recommendations of the TH 10 Corridor Management Plan. BE IT FURTHER RESOLVED, the (insert City, County, Township, etc of , ,) intends to bring forward the following issues for resolution and discussion with the TH 10 Corridor Management Team: :' : .. 1. List Issues Here 2 0 CH2MHILL TH 101-TH 169 Corridor Management Plan (I-94 in Rogers to TH 18 in Garrison) Public Hearing CORRIDOR PLAN Elk River City Council Chambers July 8, 2002 Corridor Management Plan Progress Summary May Jun Jul Auq Sep Oct Nov Dec Jan Feb Mar Apr Identify Issues Develop Improvement Alternatives Plan for Project Implementation TH 101-TH 169 Corridor Vision Statement 1. CORRIDOR MANAGEMENT PLAN GOALS The CMP ~ll be developed to echieve a balance beiweon the ~ and visions of individual communities and the safe and efr~ant movement of peo~e and ~. S~y, the planning prOCeSS will slrive to minimize adverse community effects Mlile maintaining or im~ng bofh interregional and local traffic 2. HIGHWAY PERFORMANCE GOALS Mn/DOT and its corridor parmem have established the f~ high~ performance goals (2025) fOr the TH 101 - TH 169 IRC as ~of~: · Improve trlWel tiwte pe~fomlance arKI predictability to ~ the targel speed of 60 rnph for the high prtorltY~ ~ Rogers to Zimmermon~ mtl~tmlzlng delays on TH 101oTH169 and on intemecting mae'ways. mph fo~e ~m i:.t~ ~ from ~ to Ga~son, minimizing ~ on TH 't 69 andon ~ng roadways. · Improve saf~ to anhieve crash rates better than Ihe ~de average,'tlmlting ~icts 3. IMPLEMENTtqT~N APPROACHES AND ROLES These goals will be achieved by fonusing highway pro~ect inv--, gukf. ng future lapel Un patterns. and managing highway access points: MM:)OT and corrid0r pa~ will provide leede~hip ~rd achievement of ~ ~.J~y ~g their ~siofls, pmmofing I~ Or i~tiativas, and ~g or enhancing CommUnity ~ and natu~ resoumes. Population Growth Projected Population Growth from 2000 to 2025 Future Transportation Performance Peak Period Weekday Travel Speed Performance Alternative Strategies to Achieve the Vision Alternative - Expand to a 6-Lane Signalized Arterial Cedar Avenue, City of ~ Valley Alternative Strategies to Achieve the Vision Alternative,- Expand to a Freeway Diamond ~, c~ ~ R~.~ ~-- Alt. Strategies to Achieve the Vision Elk Rive r 2025 4-la ne Freeway Elk River (84,000 A DT) 61 mph (32,400 Al 37 mpa Elk River 2025 -- 6-lane (84,000 A DT) 34 m ph Elk River 2025 4-lane (84,000 ADT) 9 mph · An expanded signalized expressway would fail to satisfy the visions of improved safety, improved speed, and improved local traffic operations. · Peak-hour speeds would not be improved and signalized intersections would continue to fail (ddvers waiting through cycles). · The desired performance simply cannot be achieved by expanding the highway while leaving the signals in place (p. 4-4). · A four-lane freeway would accommodate future volumes while improving speeds Alternative Strategies to Achieve the Vision Key Findings · The speed and safety performance goals stated in the corridor vision cannot he achieved without highway capacity improvements. · The speed performance goals stated in the corridor vision can be achieved by improving the highway to a freeway from Rogers through Elk River. · The safety performance goal stated in the corridor vision can be most readily achieved by eliminating signalized intersections and by addressing crash problems at other selected intersections. · Proper management of TH 169 as a four-lane expressway between Princeton and Onamia is sufficient to achieve the speed goals staled in the corridor vision. · Upgrading TH 169 to a four-lane rural expressway hetwsen Ooamta and Garrison is necessary to achieve the safety and speed objectives stated in the corridor vision. Alternative Strategies to Achieve the Vision Overall Corridor Performance with 4-Lane Freeway through Elk River Overall ccxTIdo~' apeed ff 4-lane freeway through Elk RI~ ~llt by 2015. / / Target Speed '~ / (High priority IRC) ~ ~ I1 1 ,s ~ overm~ cm'r~dor ~peed ~ ff ElS Improvemef~ta from · ~ ~.~...~bum by 2OlO. completed. ;,'~:~'; ~,,*., ~; ~ I O 2015 20 ,~ ?3?5 Year Action Plan for Corridor Management Key Recommendations · Mn/DOT and the corridor partners should complete ongoing project development work. · Local governments should update comprehensive plans and should consider updating local zoning ordinances (such as setback requirements). · Soon after this CMP is completed, Mn/DOT should develop a scoplng document, to apply the appropriate early level of National Environmental Policy Act (NEPA) review, capture the CMP effort, and conduct an agency Input and review cycle. · Mn/DOTandcorrldorpartnersshouldplanfortbephaseddevelopmentofhighwayimprovement · To maintain highwayperformance on the existing tour-lane expressway in Mille Lacs County (from Princeton to Onamta), planning should be focused on development patterns at primary and secondary development nodes. · Mn/DOT and corridor partners should seek opportunities to enhance multimodel opportunities along the corridor, Including transit services, freight oparatlons, and other multimodal ~ opportunities. Action Plan for Corridor Management Proposed Projects Action Plan for Corridor Management Planned or Programmed Projects · TH 169 at CSAH 9 · Interchange, construction 2002 · TH169 at CR 33 · Interchange and frontage roads, construction 2003 · TH169 at CR11 · Intersection safety Improvement, construction 2004 · TH 169 Onamia - Garrison · Work Plan - FY 2006 to 2010 funding · DEIS published and circulated · Public Hearing on March 4th · Preferred Alternative selection Action Plan for Corridor Management Strategic Projects Necessary to Meet IRC Targets · System Interchange TH 101 / 1 94 · Improve 1-94 Interchange and separate through and local movements. · Interchange at Hennepln CR 144 · Eliminate Other Signals (through Elk River) · CSAH 36, CSAH 37 & CSAH 39 Interchanges · CSAH 42 overpass · Improve TH 10 Interchange · Main Street interchange · School Street crossover · Split diamond - Jackson Street to 197~h Street · Replace CSAH 4 Intersection (Zimmerman) with Interchange (highest crash rate/severity intersection) Action Plan for Corridor Management Long-Term Vision Projects · Possible upgrade to a six-lane freeway from Rogers through Elk River · Not needed by 2025 to achieve targets; maybe later? · Keep In mind for design of bridges · Complete a continuous freeway from Rogers to Princeton · Consolidate and ultimately eliminate access points · Additional Interchanges (4) from Elk River to Princeton · Access and safety management for the four-lane expressway from Princeton to Onamia · Focus on primary and secondary development nodes · Guide growth, consolidate access, set priorities for possible interchanges vfhich projects are planned to be built soon? A number of projects described in the Corridor Plan are currently underway. These projects are already included in the State Transportation Improvement Program (STIP) or the Work and Studies Plan Process. The following table identifies these projects that are already programmed. Project Cost Status CR 33 intemhange (Elk River) $12 million (budgeted cost) Construction planned for 2003 GSAH 9 interchange (North of Zimmerman) $4 million (let cost) Construction in 2002 CSAH 11 Safety Improvement (North of Milaca) $1 million (budgeted cost) Construction planned for 2004 Upgrade to 4-lane expressway between TH 27 (Onamia) and TH 18 (Garrison) Estimates for this project range from $50 to $100 million. It is not possible to provide an accurate estimate for this project at this time. Draft ElS published; public hearing March 4th Which projects should be started next? Projects necessary to achieve IRC speed and safety performance targets are considered the top priorities and are included on the following table. Proiect Improved and new interchanges from 1-94 to CSAH 144 New interchange at CSAH 36 New interchange at CSAH 37; overpass at CSAH 42 New interchange at CSAH 39 Improved interchange at TH 10 New interchange at Main Street; overpass at School Street New interchange (possible split diamond concept) at Jackson/197th New interchange at CSAH 4 Location Estimated Cost Rogers $66 million Otsego/St. Michael $16 million Otsego $17 million Otsego $11 million Elk River $29 million Elk River $13 million Elk River $16 million Zimmerman $21 million The corridor partners worked together to reach consensus that upgrading TH 101-TH 169 to a freeway between Rogers and Princeton is strongly supported as the long-term vision for an improved corridor. The most favorable projects for achieving the vision (listed in order from south to north) are: · Rogers through Elk River -Upgrade to a 4-lane freeway (6-lane freeway possible long-term vision) · Elk River to Princeton - Upgrade to a 4-lane freeway as long term vision Princeton to Onamia -Access m~nagement and consolidation toward development nodes to maintain performance of existing highway · Onamia to Garrison - Upgrade to a four-lane expressway (current EIS project) What are some of the Issues? Several factors have been identified by Mn/DOT and its corridor partners that demonstrate a need for action along the Highway 101/169 corridor, including: * Population Growth -- The corridor is in a rapidly growing part of Minnesota. For example, Sherburne Cotmty is projected to have the highest percentage increase in population of any county in the state (92% in the next 25 years). · Traffic Volume Growth -- Traffic volumes are expected to double by 2025 along the entire corridor. Greater increases will occur in the developed areas of Rogers, Elk River, Zimmerman, and Princeton. Traffic Speed Performance~The current high Priority IRC portion of the corridor between Rogers and Zirnmerman has an 1 2000 2025 2026 AADT 23,900 65,400 $5,400 i SPEEC 71 67 67 average weekday peak period speed of 52 mph. If no changes are made to the corridor, the average weekday peak period speed would be 12 mph in 2025. (Note: The figure to the right shows the Average Annual Daily Traffic (AADT) and the forecasted speeds for the four segments of the high priority portion of the corridor under the no build alternative, as well as the three build alternatives that were considered. The table to the right shows the actual and forecasted speed performance for the entire high priority segment of the corridor which extends from Rogers to Zimmerman). Safety -- Eleven intersections currently have crash rates and crash costs that are higher than the statewide norm. Traffic signals contribute to the higher rates, especially at Highway 4 in Zimmerman - the most dangerous intersection in the corridor. Access WRIGHT 2000 2025 2025 2025 2025 AADT 32,400 64,0~0 84,000 84.{3{30 84,li!] SPEED 37 9 34 61 64 2000 2026 2025 2025 2025 AADT 34,500 72,000 72,000 72.{3D0 72,000 SPEED 53 11 41 64 6S Travel Speed Performance The statewide IRC program emphasizes planning to maintain reliable travel speeds under typical weekday peak hour conditions and to improve highway safety. For this plan, the IRC speed performance goals are based on the IRC priority (shown on the map and below). IRC Priority Segment Target Actual Forecast Speed Speed (2001) Speed (2025) High Priority - Rogers to 60 mph 52 mph 12 mph Zimmerman Medium Priority- 55 mph 67 mph 60 mph Zimmerman to Garrison The studies completed for the plan show that the average peak period speed for the high priority segment would drop dramatically by 2025, while the medium priority segment would remain above its target speed. points to the highway are also safety risks. ISee the Corridor Management Plan on the web! http://www.dot.state.mn.us/movin.qminnesota/101 169corridorplan.html