Loading...
8.1. SR 02-18-2014 City of Elk=' Request for Action River To Item Number Mayor and City Council 8.1 Agenda Section Meeting Date Prepared by General Business February 18, 2014 Justin Femrite, P.E., City Engineer Item Description Reviewed by Quiet Zone Notice of Intent Cal Portner, City Administrator Reviewed by Click here to enter text. Action Requested Approve,by motion,the attached Notice of Intent to establish a Quiet Zone, and further direct staff to distribute said notice with all affected agencies in accordance with Federal Quiet Zone rules. Background/Discussion On January 29, 2014, staff conducted a diagnostic meeting to review our proposed quiet zone improvements with affected agencies. The agencies represented at the meeting included BNSF,Federal Railroad Administration (FRA),Minnesota Department of Transportation (MnDOT), Sherburne County, Great River Energy,Amtrak, and Quietzone Technologies, our consultant. The improvements detailed in Option 2 as selected by the City Council at the meeting on September 3, 2013,were presented at the diagnostic meeting. These improvements included installation of a wayside horn system at Proctor Road, and supplemental safety measures (channelization devices/raised medians) at 1715`Avenue, 165`h Avenue, and Jarvis Street. Based on federal rules, these improvements alone reduce the overall risk index enough to qualify all of our crossings for a Quiet Zone. The representatives at the meeting made comments and suggestions of additional safety improvements they would like to see made at each of the crossings. The minutes from this meeting are attached. Based on the suggestions provided, staff reviewed our proposed improvements and further enhanced some of our proposed safety upgrades. These enhancements are reflected in the attached Notice of Intent. As proposed the quiet zone will include three Sherburne County roadway crossings. This will require the submittal of a joint Notice of Intent that includes signatures from both the city and the county. Staff is working with Sherburne County on obtaining their approval. The submittal of this Notice of Intent formally initiates the process for establishing a quiet zone and begins a 60-day comment period in which the agencies can provide additional comments. Financial Impact This approval will have no direct financial impact. Attachments • Diagnostic Meeting Minutes • Notice of Intent P O w E H E U A Y UREJ Q) W ay i n /`111 OC 4Uit Zo no Soiutioosn:J os HNO/ Elk River,MN Diagnostic Team Review Notes 1/29/14 Attendees: Michael Fields Amtrak Nathan Waller BNSF Rick Van Wagner MNDOT Rhonda Lewis Sherburne County Calvin Portner City of Elk River Justin Femrite City of Elk River Tammy Wagner FRA Paul Comstock FRA Dan Belair City of Elk River Bentley Tomlin BNSF Robert Albritton Quiet Zone Technologies Purpose: To discuss the desired treatments required to create a new 24 Hour Quiet Zone on the BNSF corridor in Elk River, MN. All participants of the Diagnostic Team Review met at City Hall where introductions were made and a summary of the City of Elk River's intensions to create a quiet zone at all crossings through the City. General comment made by the FRA that all of these items are recommendations by the FRA and not requirements. Zebulon Street(DOT 082951B) This is a Sherburne County roadway. Elk River stated that there had been a fatality at the crossing on 1/20/14. The City stated that an individual parked near the crossing and exited their vehicle and then walked down the railroad tracks and was struck and killed by a Northstar commuter train. The City stated that it was its intention not to treat this crossing with either a SSM or Wayside Horn. The BNSF stated that they do not like Wayside Horns. BNSF and FRA stated that they would prefer to see some sort of treatment implemented to improve the safety of the crossing, whether it is a four-quadrant gate system, three-quadrant gate and or short medians. BNSF also stated that since the crossing has two tracks, the situation may occur where a train is stopped near the crossing and another train approaches a motorist may precede across the crossing without viewing the approaching train. BNSF also stated that they would like to see"Do 7477 Benbrook Parkway . Benbrook,TX 76126 . T 817 820 63 SO . F817820 6340 . Qujet2 Ooe2 ec,6 .C'0117 Not Stop on Tracks" signs installed. All advance warning signs will have to have "No Train Horn" signs installed. Ogden Street(DOT 075713R) This is an Elk River roadway. The BNSF and FRA stated that they would like to see some sort of median installed. The City stated that it was its intention not to treat this crossing with either a SSM or Wayside Horn. FRA asked if the crossing could be closed and the City stated that they had previously studied that idea but due to the lack of good connecting roadways that it was not feasible to close the crossing. BNSF also stated that they would like to see "Do Not Stop on Tracks" signs installed. All advance warning signs will have to have "No Train Horn" signs installed. Meadowvale Road(DOT 082947L) This is an Sherburne County roadway. The City stated that it was its intention not to treat this crossing with either a SSM or Wayside Horn. The BNSF and FRA suggested that the crossing be treated with four-quadrant gates. BNSF also stated that they would like to see "Do Not Stop on Tracks" signs installed. All advance warning signs will have to have "No Train Horn" signs installed. E t Proctor Avenue(DOT 082946E) This is a Sherburne County roadway. The City stated that it was its intention to install Wayside Horns at this crossing. BNSF stated that they prefer SSMs over Wayside Horns. BNSF also stated that they are going to investigate the right-of-way limits of the crossing. It>appears that Beaudry's vehicles are utilizing a,driveway in the Northeast quadrant and exiting the Beaudry facility in the Southwest quadrant. The FRA stated that it would like to see both of these driveways closed or relocated. MNDOT stated that they are concerned about the current safety of the crossing since the two driveways are in such close proximity to the crossing that automatic gates and flashing lights should be installed, with or without a Quiet Zone. The FRA and MNDOT stated that they would prefer a four-quadrant gate system at this crossing. BNSF also stated that they would like to see "Do Not Stop on Tracks" signs installed. All advance warning signs will have to have"No Train Horn"signs installed. L i I Jackson Avenue(DOT 082944R) This is an Elk River roadway. The City stated that it was its intention not to treat this crossing with either a SSM or Wayside Horn. The BNSF stated that this crossing had a broken gate in 2013. BNSF stated that it would prefer to see a four-quadrant gate installed. MNDOT stated that the crossing has traffic signal pre-emption. MNDOT and BNSF stated that they are concerned with pedestrian safety due to crossing being double tracked and the limited sight distance due to the curvature of the track to the west and the close proximity of a building in the northwest C quadrant. BNSF and MNDOT stated that they would like to see some active warning device, either flashing lights or flashing lights and gates, installed for the pedestrians. MNDOT and BNSF stated that installing pedestrian mazes may also be appropriate. The FRA recommended that the City review a recent Volpe report on pedestrian safety. MNDOT and BNSF would also like to see the traffic signal located in the northwest quadrant relocated as its current location may obstruct visibility of the flashing lights. BNSF also stated that they would like to see "Do Not Stop on Tracks" signs installed. All advance warning signs will have to have "No Train Horn" signs installed. j Main Street(DOT 082943J) This is an Elk River roadway. The City stated that it was its intention not to treat this crossing with either a SSM or Wayside Horn. BNSF stated that there was a near miss in August 2013. The BNSF stated that it would like to limit access on the roadway located in the southeast quadrant which services Great River Energy to right-in, right-out. BNSF also stated that they would prefer to close or relocate Railroad Drive in the northwest quadrant. BNSF and FRA stated that they would prefer the crossing be treated with four-quadrant gates or an SSM/ASM raised median. A representative of Great River Energy stated that their trucks turn right onto the access roadway and the employees of Great River Energy turn left from the access road onto Main Street when leaving work. BNSF and MNDOT stated that they would like to see active warning devices be installed for pedestrians. BNSF also stated that they would like to see "Do Not Stop on Tracks" signs installed. All advance warning signs will have to have "No Train Horn" signs installed. Great River Energy-Private Crossing(DOT 101673S) I This is a private crossing located within the Great River Energy power plant. The representative of Great River Energy stated that tractor trailers, commercial vehicles and employee vehicles utilize the crossing. Great River Energy stated that approximately 50 tractor trailer trucks use the crossing on a daily basis. BNSF stated that they had concern with the stop sign located in the southeast quadrant. FRA stated that the crossing is acceptable in its current configuration as long i i I i as "No Train Horn" signs are installed. BNSF stated that there had been gate knockdowns reported in the past. BNSF suggested that the private crossing not be included in the Quiet Zone by breaking the Quiet Zone in half, the first half be Zebulon Street through Main Street and the second half consisting of 1715 Avenue, 165`' Avenue and Jarvis Street. Great River Energy and Elk River stated that they would like to have this crossing included in the Quiet Zone. BNSF stated that they will make additional comments at a later date. 171"Avenue(DOT 917432K) This is an Elk River roadway. The City indicated their intension to construct a trail crossing on the east side of this roadway in 2015. The BNSF stated they would like to see pedestrian mazes to force bicyclists to stop at the crossing. The City stated that it was its intention to utilize the pre-existing SSM, raised medians,as the treatment for this crossing. FRA stated that they need to know when the raised medians were installed. The FRA stated that if the raised medians were installed after August 2003, then the City would not receive credit for the raised medians. Amtrak stated that they had concern for pedestrians crossing the tracks due to the close proximity of the Northstar station stop located to the west of the crossing. The City stated that they would verify the height of the raised median to determine if it meets the minimum 6 inch height requirement. If the raised median has to be altered then it will be treated as a new SSM. BNSF also stated that they would like to see "Do Not Stop on Tracks" signs installed. All advance warning signs will have to have"No Train Horn"signs installed. The City of Elk River later confirmed that the raised medians were constructed in 2001. 165th Avenue(DOT 082938M) This is an Elk River roadway. The City stated that it was its intention to install either a raised median or channelization device at this crossing. The FRA stated that if the roadway speed is higher than 40 MPH then the City would have to petition the FRA for a waiver in order to install either raised medians or channelization devices. The BNSF stated that it would prefer a raised median over the installation of channelization devices. It was determined that the roadway located in the northeast quadrant served the railroad. There is another commercial driveway located in the southwest quadrant which will have to be relocated to a distance of at least 60 feet measured from the crossing gate. The City stated that there is a proposed roadway improvement project slated for 2015 for 1'65th Avenue. The BNSF stated that they would prefer that the City wait on implementing its Quiet Zone until this project is completed. BNSF also stated that they would like to see"Do Not Stop on!Tracks"signs'installed. All advance warning signs will have E to have"No Train Horn"signs installed. ! I f I i 1 Jarvis Street(DOT 082936Y) This is an Elk River roadway. The City stated that it was its intention to install either a raised median or channelization device at this crossing. The FRA stated that if the roadway speed is higher than 40 MPH then the City would have to petition the FRA for a waiver in order to install either raised medians or channelization devices. The BNSF stated that it would prefer a raised median over the installation of channelization devices. There is a commercial driveway located in the southeast quadrant within 60 feet of the gate. The City stated that it would extend the raised median or channelization device at least 60 feet. The City stated that there is a proposed roadway improvement project slated for 2015 for Jarvis Street. The BNSF stated that they would prefer that the City wait on implementing its Quiet Zone until this project is completed. BNSF also stated that they would like to see "Do Not Stop on Tracks" signs installed. All advance warning signs will have to have"No Train Hord'signs installed. E I i r E February 19, 2014 Associate Administrator for Safety Federal Railroad Administration Office of Safety, RRS-23 120 Vermont Avenue,NW Washington, DC 20590 Subject: Notice for Intent to Establish a Railroad Quiet Zone Under 49 CFR 222.43 Quiet Zone: City of Elk River Quiet Zone This letter and the attachments are a Notice of Intent for the creation of a quiet zone. This Notice of Intent is being filed jointly by the City of Elk River, MN and Sherburne County, MN. As required by the Federal Railroad Administration, the following information is provided to you and other parties. All public highway-rail grade crossings to be included within the proposed quiet zone are: Crossing D Street Name 082951B Zebulon Street 075713R Ogden Street 082947L Meadowvale Road 082946E Proctor Avenue 082944R Jackson Avenue 082943J Main Street 917432K 171St Avenue 082938M 165th Avenue 082936Y Jarvis Street All private rail grade crossings to be included within the proposed quiet zone are: Crossing D Street Name 101673S Great River Energy The quiet zone is proposed to restrict the routine sounding of locomotive horns 24-hours a day. The City of Elk River and Sherburne County's plan to implement a quiet zone at each crossing is: Zebulon Street: The crossing is equipped with active warning devices consisting of bells, flashing lights, automatic gates, a power-out-indicator and constant warning time circuitry. There is no plan to add SSM's, ASM's or Wayside Horns to this crossing. Elk River intends to install "No Train Horn" signs on each advance warning sign and "Do Not Stop on Tracks" signs at the crossing. Ogden Street: The crossing is equipped with active warning devices consisting of bells, flashing lights, automatic gates, a power-out-indicator and constant warning time circuitry. There is no plan to add SSM's, ASM's or Wayside Horns to this crossing. Elk River intends to install "No Train Horn" signs on each advance warning sign and a "Do Not Stop on Tracks" sign to the north of the tracks facing southbound traffic. Meadowvale Road: The crossing is equipped with active warning devices consisting of bells, flashing lights, automatic gates, a power-out-indicator and constant warning time circuitry. There is no plan to add SSM's, ASM's or Wayside Horns to this crossing. Elk River intends to install "No Train Horn" signs on each advance warning sign. Proctor Avenue: The crossing is equipped with active warning devices consisting of bells, flashing lights, automatic gates, a power-out-indicator and constant warning time circuitry. The City of Elk River intends to install a Wayside Horn that will comply with Appendix E to Part 222—Requirements for Wayside Horns. Elk River intends to install "No Train Horn" signs on each advance warning sign. Tactile strips, "No Train Horn" signs, and "Look"both way signs will be added on each sidewalk approach. Jackson Avenue: The crossing is equipped with active warning devices consisting of bells, flashing lights, automatic gates, a power-out-indicator and constant warning time circuitry. There is no plan to add SSM's, ASM's or Wayside Horns to this crossing. Elk River intends to install "No Train Horn" signs on each advance warning sign and a "Do Not Stop on Tracks" sign to the north of the tracks facing southbound traffic. Tactile strips, "No Train Horn" signs, and "Look"both way signs will be added on each sidewalk approach. Main Street: The crossing is equipped with active warning devices consisting of bells, flashing lights, automatic gates, a power-out-indicator and constant warning time circuitry. There is no plan to add SSM's, ASM's or Wayside Horns to this crossing. Elk River intends to install "No Train Horn" signs on each advance warning sign, a track parallel sign for Railroad Drive west of the tracks and a track parallel sign for UPA Drive east of the tracks. Tactile strips, "No Train Horn" signs, and "Look"both way signs will be added on each sidewalk approach. Great River Energy: The crossing is equipped with active warning devices consisting of bells, flashing lights, automatic gates, a power-out-indicator, constant warning time circuitry, "STOP" signs and cross-bucks. The City of Elk River, after having conducted a Diagnostic Team review, intends to install "No Train Horn" signs on each advance warning sign. Should we also be installing a do not stop on tracks sign for WB movements? 171St Avenue: The crossing is equipped with active warning devices consisting of bells, flashing lights, automatic gates, a power-out-indicator and constant warning time circuitry. There are also pre-existing SSM, raised median that complies with the requirements of Appendix A to Part 222 A 3 Gates with Medians or Channelization Devices. The existing raised medians where installed in 2001. Elk River intends to install "No Train Horn" signs on each advance warning sign. "No Train Horn" signs and "Look"both way signs will be added on each sidewalk approach. 165th Avenue: The crossing is equipped with active warning devices consisting of bells, flashing lights, automatic gates, a power-out-indicator and constant warning time circuitry. The City of Elk River intends to install a raised median that complies with the requirements of Appendix A to Part 222 A 3 Gates with Medians or Channelization Devices. Elk River intends to install "No Train Horn" signs on each advance warning sign. Jarvis Street: The crossing is equipped with active warning devices consisting of bells, flashing lights, automatic gates, a power-out-indicator and constant warning time circuitry. The City of Elk River intends to install a raised median that complies with the requirements of Appendix A to Part 222 A 3 Gates with Medians or Channelization Devices. Elk River intends to install "No Train Horn" signs on each advance warning sign. Name and title of person who will act as point of contact during the quiet zone development process: Justin Femrite City Engineer 13065 Orono Parkway Elk River, MN 55330 Phone: (763) 635-1051 Email:jfemrite @elkrivermn.gov See the attached list of each party receiving this notification. ACTION REQUIRED Please consider this notice as the beginning date of the required 60-day comment period in the Quiet Zone process. The 60-day comment period for this Quiet Zone will end on (date sent plus 60 days), or when written comments or a "no comment" statement is received from each recipient of this notice whichever comes first. Respectfully submitted, Justin Femrite Rhonda Lewis City Engineer County Engineer City of Elk River Sherburne County Notice for Intent to Establish a Railroad Quiet Zone Written Notice Recipients 1. Railroads operating over the grade crossings: Bentley Tomlin Manager Public Projects BNSF Railway Jan E. Ruby, Sr. Northstar Commuter Rail 19699 Co. Road 43 Big Lake, MN 55309 Dave Klouda Division Engineer Amtrak 500 W. Jackson Blvd., 2nd Floor Chicago, I160661 2. State agency responsible for highway and road safety, and State agency responsible for grade crossing safety: Rick Van Wagner Projects Manager Minnesota Department of Transportation Mailstop 470 395 John Ireland Blvd St. Paul, MN. 55155 3. Federal Railroad Administration Associate Administrator for Safety Federal Railroad Administration Office of Safety, RRS-23 1120 Vermont Avenue,NW Washington, DC 20590 Tammy Wagner Regional Manager for Grade Crossing Safety Federal Railroad Administration 200 West Adams, Suite 310 Chicago, IL 60606 4. Private Land Owner Contact Mark Lucas Manager, Facilities Services Great River Energy 12300 Elm Creek Blvd Maple Grove, MN 55369-4718 Quiet Zone Update February 18, 2014 Elk River Quiet Zone Option 2-as selected by the City Council on September 3, 2013. Install wayside horn system at Proctor Road • Install SSM’s (Supplemental Safety Measures) • at: 171Avenue st 165Avenue th Jarvis Street Held diagnostic meeting on January 29, 2014 • Quiet Zone –Zebulon Street Quiet Zone –Ogden Street Quiet Zone –Meadowvale Rd. Quiet Zone –Proctor Road Tactile Strips and Signs Wayside Horns Quiet Zone –Jackson Street Tactile Strips and Signs Tactile Strips and Signs Quiet Zone –Main Street Tactile Strips and Signs Quiet Zone –GRE Crossing Quiet Zone –171Avenue st Signs Existing Channelization (SSM) Quiet Zone –165Avenue th Proposed Channelization (SSM) Quiet Zone –Jarvis Street Proposed Channelization (SSM) Next Steps Approve and distribute Notice of Intent • Incorporate any final suggested changes from • affected agencies Finalize expected costs with estimates from • BNSF for their work Design and construct required improvements •