Loading...
5.4. SR 11-23-1998'ity of iver MEMORANDUM Item 5.4. TO: FROM: DATE: SUBJECT: Mayor & City Council Pat Klaers, City Adminis~jj November 23, 1998 Fees for Services Attached for your review is the 1998 city fee schedule. Generally the City Council likes to see the schedule prior to it being presented in late December or early January for the upcoming year. At this time I am still receiving input from various department heads on some possible changes for 1999. I hope to have some of this information available to present to the Council on Monday November, 23, but nothing, other than the current fee schedule is attached to this memo. Two issue that I believe will be presented for Council review include an increase in park dedication fees and an increase in building permit fees. Regarding building permit fees, the city follows the state fee structure as this eliminates any issues with applicants when discussing city fees. At this time I don't know if the building permit increase is going to be proposed to be implemented all in one year, or ff the building and zoning administrator is going to recommend implementation over a two year time frame, which has been done in the past. Regarding park dedication fees, the last resolution on this topic was adopted in late 1995 for fees collected in 1996, 1997, and 1998. The commission is currently reviewing its needs and fee schedules of other communities, and a recommendation is expected in the near future. In general, I just wanted to get the current fee schedule out to the City Council for review, and I hope to have some verbal updates for you on Monday evening. 13065 Orono Parkway * P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425 RESOLUTION 98-2 A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION ADOPTING FEES FOR SERVICES FOR 1998 WHEREAS, The council reviews the fees charged for services on a yearlY basis to ensure that the fees charged reflect services rendered; and VVHEREAS, the cost incurred to process various licenses, services, zoning, and planning requests has been reviewed by the City Council. NOW, THEREFORE, BE IT RESOLVED, that the attached fee schedule reflects the fees charged for services rendered by the City of Elk River in 1998. Passed and adopted by the City Council of the City of Elk River, Minnesota this 5th day of January, 1998. ATTEST: Sandra A. Thackeray, City Clc~rk ,/HenrY A. Duitsman, Mayor CITY OF ELK RIVER 1998 FEE SCHEDULE ASSESSMENT SEARCH/CERTIFICATION~ ANIMAL LICENSES Cat Dog Duplicate Cat or Dog License Residential Kennel Commercial Kennel AUDIO/VISUAL Dubbing Audio Tapes Dubbing Video Tapes Video Operator $15/each $5/2 yrs $10/2 yrs $2.00 $50/year $75/year $5 per tape (must provide own tape) $10 per tape (must provide own tape $75 first two hours then $25 per hour ($75 minimum) BOWLING ALLEY LICENSE: BUILDING PERMIT: Industrial, commercial, multifamily residential, single family homes, and additions State Residential Contractor License Search Miscellaneous Building Permits Heating, Ventilation, and Air Conditioning Gas Fitting Permit Fee Gas Fitter's License Plumbing Permit BURNING PERMITS - regular Special Residential Special to Clear Land Special Daytime $5/per lane State permit fee, UBC Table 1 A, plus 65% plan check fee (valuation based on current State of MN building valuation data) $5/permit City permit fee schedule Exhibit C plus State Surcharge City permit fee schedule Exhibit B City permit fee schedule Exhibit A $24/year City Permit fee Schedule D $0 $10 $25 $25 City of Elk River Fee Schedule Resolution 98-2 Effective January 5, 1998 COMMUNITY PROFILE: DOCUMENTS: Audit Budget City Code Copies Housing Maintenance Ordinance Meeting Packets Microfilm Document Sign Ordinance Subdivision Ordinance Zoning Ordinance FALSE ALARMS Fire Other FLAG- (CitY1 GARBAGE HAULER LICENSE: GRADING PERMIT: LIQUOR LICENSE: Club Intoxicating On Sale Intoxicating Sunday On Sale Investigation Fee Corporation Single Non-intoxicating Off Sale Non-Intoxicating On Sale Set Up Wine Temporary Non-Intoxicating Temporary Intoxicating MAPS: Aerial Photos Aerial Topography Maps Large Base, Zoning or Land Use Map Medium Base or Zoning Map Medium Base Ward Map Page 2 $.20/ea. $0 $75 $. 15~ea. $5 $7/packet $1/page $5 $5 $25 $150 for the 4th alarm $50 for each successive alarm after the 4th $50 for 5~h alarm $32 each $60 1st truck plus $15/each additional truck $25 plus City Consultant fees if required to process application $300/year $4,000/year $200/year $250 $~5o $75/year $225/year $75/year $650/year $20/day $20/day $6/sheet $15/per acre $3 $2 $2 MARKETING BROCHURE: $3/ea. City of Elk River Fee Schedule Resolution 98-2 Effective January 5, 1998 MASSAGE ESTABLISHMENT: Initial Fee (includes Investigation Fee) Single Corporation Partnership Renewal Fee MASSAGE THERAPIST: Initial Fee (Includes Investigation Fee) Renewal Fee MECHANICAL AMUSEMENT: Mechanical Rides Pin Ball Games Pool Tables (Coin Operated) Video Games MINERAL EXTRACTION: PARK DEDICATION FEE: (Resolution 95-89) Residential Commercial Industrial PARK RESERVATION FEE: Residents Arts Council Community Education School District Large Community Events PARKING FINES: (see Resolution 97-30) Overtime Parking Prohibited/improper Parking No Parking 2 a.m. to 6 a.m. Winter Parking Ordinance Other Fire Lane/Hydrant Handicap Parking Only PARKING STICKERS: Railroad Parking Lot Commuter Parking Page 3 $200 $3OO $3OO $150 $150 $100 $35/ride $35/machine $35/table $35/game $20/acre to be actively mined in forthcoming year or not reclaimed $5/acre approved but not actively mined $650/dwelling unit $2,000/per acre N/A $50 $100 $100 $1oo $500 (Deposits are refundable if the shelter and surrounding area is cleaned of refuse and debris prior to leaving the area.) $5 $10 $10 $10 $10 $15 $2OO $12/space 3 stickers/space maximum $12/space 1 sticker per space City of Elk River Fee Schedule Resolution 98-2 Effective January 5, 1998 PAWN SHOPS: Investigation Fee PINS: Plastic-Elk River Metal-Elk River RENTAL DWELLING LICENSE SEPTIC INSTALLATION: SEPTIC REPAIR: SEWER AVAILABILITY CHARGE (SAC): (Plant replacement interceptor) SIGN PERMITS Up to 100 square feet 101-300 square feet Over 300 square feet Yearly Advertising Structure (Billboard) Inspection SOLID WASTE FACILITY LICENSE: STREET DISRUPTION OR UTILITY HOOKUP PERMIT: SURFACE WATER MANAGEMENT IMPACT FEE: (3% annual increase) (see resolution 94-110) TOBACCO: TRANSIENT MERCHANT LICENSE: WATER ACCESS CHARGE: (Contact Municipal Utilities-441-2020) WATER CONNECTION CHARGE: (Contact Municipal Utilities-441-2020) WETLAND DRAINING OR FILLING PERMIT: ZONING/PLANNING APPLICATIONS: Administrative Subdivision Page 4 $12,000/year $~,500 $.35 each $2.50 each $12/dwelling unit $6O $3O $1,300 $30 $9O $~5o $10 $2,000 plus cost of reviewing license. Amount of annual cost incurred by the City for monitoring and inspecting the facility plus the license $25 $68.83 per residential lot (rural) $137.69 per residential lot (urban) $826.10 per acre (multifamily, commercial and industrial) $25/year $50/year $300 $1,050 $75 plus consultant fees if required to process application $150 plus Park Dedication if applicable City of Elk River Fee Schedule Resolution 98-2 Effective January 5, 1998 Conditional Use Permit Commercial/Industrial Residential Amendments and renewals requiring public hearings Easement Vacation General Zoning Requests Land Use Plan Amendment Nonconforming Sign Alteration Ordinance Amendment Plats Permitted Home Occupations Planned Unit Development (PUD) Site Plan Review Variance Zone Change s:document/fees.doc Page 5 $300 $100 $75 $15o $5o $3oo $~1o $3oo $500 + $5 per lot for each lot over 50. $15 Charge for whatever planning applications are needed for the PUD, i.e. CUP, Rezoning etc. $250 $150 $25o EXHIBIT A CITY OF ELK RIVER FUEL-GAS PIPING PERMIT FEES The Chief Building Inspector, before issuing any permit for the installation of any fuel-gas piping, shall require the payment by the apphcant for such permit of fees in the amount herein provided. Minimum Fee In no case shall the fee charged for any permit issued by the Chief Building Inspector be less than Eighteen Dollars ($18.00). Basic Fees The fees for aH fuel-gas piping permits shall be computed on the basis of the number of fuel-gas appliances. The fee for each apphance so provided for shaH, except as herinafter otherwise specifically provided, be Six Dollars ($6.00) for each fuel-gas appliance. (B) Where any such permit is issued for roughing in of fuel-gas lines for future apphances, a fee of Six Dollars ($6.00) shall be charged for each line or hnes. (c) In addition to the SIX Dollar ($6.00) charge for each fuel-gas apphance and future fuel-gas hnes run for appliance, a SIX Dollar ($6.00) charge for the main fuel gas supply in the building shall be charged. (D) For the purpose of this article, a gas appliance shall be taken to mean a furnace, range, water heater, dryer, £~replace, barbecue, etc. s:\b&z\ord-fuel, doc ORD-fue~bz EXHIBIT B CITY OF ELK RIVER HEATING, VENTILATION AND AIR CONDITIONING PERMIT FEES FEES REQUIRED The Chief Building Inspector, before issuing any permit for the installation, alteration, or repair of any heating, ventilation, and air conditioning appliance items, connections or appendages, shall require the payment by the applicant for such permit of fees in the amount herein. MINIMUM FEE In no case shall the fee charged for any permit issued by the Chief Building Inspector be less that $18.00. MAXIMUM FEE In no case shall the fee charged for any permit issued by the Chief Building Inspector be more than $100.00 for a single family home. PERMIT FEE FOR HEATING, VENTILATION AND AIR CONDITIONING APPLIANCE ITEMS, CONNECTIONS OR APPENDAGES For any permit for the installation, alteration or repair of the above- referenced items, the fee shall be one percent (1%) of the valuation of the work or as calculated under the Uniform Mechanical Code, whichever is greater. \kelkriver\sys\shrdoc\b&z\heatvent. doc EXHIBIT C CITY OF ELK RIVER MISCELLANEOUS PERMIT FEES Decks $8.00 per square foot for valuation for permit fee; plus state surcharge. Plan check is included with this price. Fences Under 6 feet no charge Over 6 feet - $15.00 plus state surcharge Fireplaces and Wood Stoves $20.00 plus state surcharge $15.00 plus state surcharge for a burning apphance installed into an existing chimney Garages and Basement Finish $10.00 per square foot for valuation, use building permit fee plus state surcharge. Plan check is included with this price. Re-Roof Residential - $35.00 plus state surcharge. Commercial/Industrial - $.50 per, square foot for valuation for permit fee plus state surcharge. Swimming Pools $35.00 plus state surcharge 3 Season Porches $40.00 (x) square footage = valuation for permit fee plus state surcharge. Plan check is included with this price. Moving Structures Moving structures in - $150.00 plus state surcharge Moving structures out - $35.00 permit fee \\elkriver\sys\shrdoc\b &zX. fees.doc EXHIBIT D CITY OF ELK RIVER PLUMBING PERMIT FEES The Chief Building Inspector, before issuing any permit for the installation of any plumbing work, fixture, or device, shall require the payment by the apphcant for such permit of fees in the amount herein provided. MINIMUM FEE In no case shall the fee charged for any permit issued by the Chief Building Inspector be less than Eighteen Dollars ($18.00) BASIC FEES (A) The fees for all plumbing permits shall be computed on the basis of the number of fixture openings, plumbing fixtures, or devices provided for in such permits, whether subsequently so installed or not, and the fee for each fixture so provided for shall, except as hereinafter otherwise specifically provided, be Six Dollars ($6.00) for each fixture installed or replaced or set only (no waste or vent piping), the fee for each such fixture shall be Six Dollars ($6.00). (B) Where any such permit is issued for roughing in plumbing openings only, providing for certain proposed fixtures, which are to be installed or set late~, a fee of Six Dollars ($6.00) shall be charged for each such opening, which fee shall be in addition to the fee charged for other plumbing work included in the same permit. (c) For the purpose of this article, a plumbing fLxture shall be taken to mean and include any sink, laundry tub, bathtub, wash basin, drinking fountain, floor drain, or any other plumbing device arranged to be connected with the sewer or plumbing system, either directly or indirectly, and required to be trapped. CITY UTILITY HOOK-UP PERMIT Building Sewer Plant ............................................................................. $18.00 Curb Stop Water Connection Permit ..................................................... $21.00 Abandoning or Repairing Water Service Permit .................................. $21.00 Storm Sewer Connection Permit and Inspection Fee ............................ $18.00 City of Elk River Plumbing Permit Fees-Exhibit D ALTERATIONS, REPAIRS Page 2 For each permit for the alteration or repairing of existing plumbing work not included above, the fee shall be Six Dollars and Twenty-five Cents ($6.25) for the first Five Hundred Dollars ($500.00) or fraction thereof in the estimated cost of such proposed work. For each additional Five Hundred Dollars ($500.00) or fraction thereof in such estimated cost, Six Dollars and Twenty- five Cents ($6.25) shall be added to the above described fee for such permit. \\elkriver\sys\shrdoc\b&z\ord-plum.doc