4.11. SR 04-21-2014 City of Elk - Request for Action River O. To Item Number Mayor and City Council 4.11 Agenda Section Meeting Date Prepared by Consent Aril 21, 2014 Justin Femrite, P.E. City Engineer Item Description Reviewed by Wastewater Treatment Facility Expansion Cal Portner, City Administrator Engineering Fees Reviewed by Action Requested Approve,by motion, $261,800 increase in professional services by Bolton&Menk, Inc. for the Wastewater Treatment Facility (WWTF) improvement project. Background/Discussion In June of 2013, Bolton&Menk,Inc.was authorized to complete design and construction administration services for the WWTF improvements. Their agreed upon fee of$880,050, or 7.7% of the total estimated project cost,included the design of an option to pump raw biosolids to Great River Energy for their use. As discussed at work session on January 21, 2014, this preferred option of sending biosolids to Great River Energy was fully evaluated but proved unfeasible. Direction was given to design additional improvements that will further process biosolids into a cake form at our site. The modified project scope resulted in a professional service fee increase detailed in the attached letter from Bolton&Menk, Inc. Financial Impact The increased engineering fee was accounted for and included in the revised project estimate of$15.4M that was reviewed at work session in January. The additional fees will increase the previously approved contract with Bolton&Menk, Inc. from$880,050 to $1,141,850 or 7.4% of the total estimated project cost. Attachments ■ Letter from Bolton&Menk,Inc. P a w E A E U s r NaA f RE] • BO L—TON 8� M B N K , I N C® Consulting Engineers & Surveyors 12224 NicolletAvenue • Burnsville, MN 55337 Phone (952)890-0509 • Fax(952)890-8065 www.bolton-menk.com April 10, 2014 Mr. Justin Femrite, P.E. City Engineer City of Elk River 13065 Orono Parkway Elk River, MN 55330 RE: Elk River WWTF WWTF Improvements Project Project No.: T21.106811 Dear Mr.Femrite: The purpose of this letter is to detail the scope change for the wastewater treatment improvements project and request additional engineering fees for these changes. As you are aware,the original scope of the project included a different design for both the liquid and biosolids portions of this project. The main liquid stream changes include repurposing the primary clarifiers for biological phosphorous removal and utilizing an extended aeration activated sludge process for the entire biological treatment process. These changes are similar in scope to our original design scope and because of this we are not requesting any additional fees for the liquid stream changes. The original biosolids scope included pumping the biosolids to Great River Energy(GRE)for use in the GRE system. The improvements for the original scope and the costs associated with this option are detailed below. Original Cost Estimate and Fees for Great River Energy Biosolids Option Item Cost Site Work/Site Piping $150,000 Pumps $125,000 Sludge Storage Aeration Equipment $175,000 Electrical/Controls $90,000 Total Construction Cost $540,000 Contingency $54,000 Engineering Fee per Agreement $82,045 Total Project Cost $676,045 GA\Elk River\T21106811\1_CorresVemrite ltr 10apr2014.docx DESIGNING FOR A BETTER TOMORROW Bolton&Menk is an equal opportunity employer Mr. Justin Femrite, P.E. OApril 10, 2014 Page 2 The selected option for biosolids treatment is to treat biosolids using aerobic treatment and produce a cake product using screw presses. The existing anaerobic digesters will be redesigned as aerobic digesters and the existing biosolids storage tanks will be converted to aerobic storage. The liquid product will be pumped to a building housing the screw presses where the biosolids will be dewatered and the City will land apply the cake product to their existing land application sites or landfill the cake product. The additional costs associated with the revised biosolids option are detailed below. Cost Estimate and Fees for Revised Biosolids Scope Item Cost Site Work $100,000 Site Piping $100,000 Building $615,000 Pumps/Piping $150,000 Dewatering Equipment $915,000 Sludge Batch Tank $50,000 Conveying Systems $50,000 Mechanical $200,000 Electrical $200,000 Total Construction Cost $2,380,000 Contingency $238,000 Engineering Fee $343,845 Less Engineering Fee Per Contract ($82,045) Additional Engineering Fee $261,800 Total Project Cost $2,879,800 As shown above, the additional engineering fee is $261,800. This will cover both the design and construction phases of the project. These additional fees have been included in previous cost estimates for the revised scope project. We appreciate your consideration of our request. If you have any questions regarding any of the above please do not hesitate to give me a call. Sincerely, BOLTON&MENK, INC. Seth A.Peterson, E. Principal Engineer G:\Elk River\T21106811\1_CorresVemrite ltr 10apr2014.docx