4.10. SR 05-05-2014 City of Elk Request for Action River To Item Number Mayor and City Council 4.10 Agenda Section Meeting Date Prepared by Consent May 5, 2014 ustin Femrite, P.E., City Engineer Item Description Reviewed by Approve 2014 Seal Coat Plans and Authorize Mark Thompson, Street Superintendent Advertisement for Bids Reviewed by Cal Portner, City Administrator Action Requested Approve,by motion,2014 Seal Coat Improvement plans and authorize staff to advertise the project for bids. Background/Discussion Elk River has had a successful sealcoat program for many years. In the last 6 to 8 years,we have experienced continued premature pavement deterioration throughout our system. These problems range from rock shedding off the surface to the formation of multiple shallow potholes along streets that have been previously seal coated. Numerous other cities within the metro area are experiencing the same problems. MnDOT has studied the problem and feels the condition is resulting from poor compaction of the original pavement. Many local agencies contend the MnDOT mix designs are not providing the needed durability. In any case, many cities have discontinued seal coating and are experiencing improved road longevity. Other agencies have continued with their seal coating program with a different variation of rock. To address the conditions that are developing,we propose modifying our approach. We propose to continue the process of crack filling all streets on an 8-year rotation. This is our primary defense from water penetrating the roadway. We re-evaluated all of the roadways originally scheduled to be seal coated with this year's project and have reduced the project to concentrate seal coating on segments that, without treatment,would be subject to excessive premature failure. A more costly aggregate,which other communities are having better experience with,will be used. Upon approval, staff will advertise the project for bidding and bring the lowest responsible bid back to the City Council for consideration and final approval. Financial Impact There is no cost associated with the requested action. The budget for 2014 preventative maintenance is $379,650. Once bids are received for seal coating, staff will evaluate the remaining budget to determine how many deteriorated areas on our system can be treated with a more comprehensive mill and overlay. Attachments ■ 2014 Seal Coat Plans P a w E A E U s r Template Updated 4/14 INIM UREI I 1 a , , 1 o i 2014 Seal Coat Improvements DOUBLE SEAL COAT City Elk SEAL COAT R1Ver CRACK FILL ONLY N \ 0 0.4 0.8 1.6 Miles