Loading...
5.10. SR 02-23-2004Item 5.10. Howard R, Green Company February 18, 2004 File: 822530J-0030 Honorable Mayor and City Council City of Elk River 13065 Orono Parkway Elk River, MN 55330 RE: YANKTON STREET Dear Council Members: A public informational meeting with the residents along Yankton Street is scheduled for Monday evening, February 23, 2004. Attached is a draft of the feasibility study ordered by the City Council by motion on October 27, 2003. I have left the feasibility study in draft form for two reasons. First, if the City does proceed to a construction project and an assessment of a portion of the costs, the feasibility needs to be ordered by resolution. The date of the actual feasibility study should not appear to be before the date of that resolution ordering the improvement. Secondly and more importantly is the issue of financing. Typically, a feasibility study is prepared and presented to the City Council for their review, comment and adoption prior to going to the public. With this project, we are going to hold an informational meeting with the public to discuss the improvements and the financial ramifications first. The financial ramifications of this project are that its estimated cost is $260,650. This amount contains some contingencies. The ability to assess the project cost is significantly less than the total project cost. There are 11 properties abutting Yankton Street. Three of the properties do not utilize Yankton Street for access, but rather access to the west. One individual owns two of the 11 properties, and approximately three of the properties are relatively close to Trunk Highway 10 and the owners may not perceive that there is an issue with the width of the road. I believe there is a significant funding issue relative to the number of properties that are assessable and how much assessment each of these properties can bear. Even if we assume that all 11 properties are assessable and could support an assessment of up to $10,000 each, that would leave approximately $150,000 to be funded by the City. I will be prepared to make a brief presentation of the proposed improvements, summarize the project costs, and discuss the assessment issues. After City Council and resident questions, if the City Council wants to proceed further with this project, I would recommend that you consider adopting the attached resolution, which would officially order the feasibility study. Secondly, I would request direction from the City Council relative to the financing of the improvements. If you have any questions, regarding this issue, please call. Sincerely, Howard R. Green Company T e rry J.~au~¢-~'¢'/¢'x'~ TJM:sw Enclosure Ltr-021804-Council.doc 2550 University Avenue West · Suite 400N ° St. Paul, MN 55114 · 651/644-4389 fax 651/644-9446 toll free 888/368-4389 RESOLUTION 04- A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION FOR THE CITY OF ELK RIVER ORDERING A PRELIMNARY FEASIBILITY REPORT IN THE MATTER OF THE YANKTON STREET IMPROVEMENT OF 2004 WHEREAS WHEREAS the City has determined that it should consider improving certain property by reconstructing Yankton Street from Trunk Highway 10 to the north (the Improvement); and Council must first secure a preliminary feasibility study in order to consider making the improvement; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: This matter shall be referred to Howard R. Green Company, who is requested to provide to the City Council a report advising, in a preliminary way, whether the proposed improvement is feasible and whether the improvement should thus be made as proposed or in connection with some other improvement and the estimated cost of the improvement as recommended. Passed and adopted this 23rd day of February 2004. ATTEST: Stephanie A. Klinzing, Mayor Joan M. Schmidt, City Clerk O:\PROJ\822530J\Feasibility\Res-021804-feasibility.doc Feasibility No. 822530J-0030 FEASIBILITY STUDY FOR YANKTON STREET ROAD IMPROVEMENTS ELK RIVER, MINNESOTA FEBRUARY 2004 FEASIBILITY STUDY FOR YANKTON STREET ROAD IMPROVEMENTS ELK RIVER, MINNESOTA FEBRUARY 2004 I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly licensed Professional Engineer under the laws of the State of Minnesota. Terry J. Maurer, P.E. License No. 15316 Prepared by: Greg Robinson Date Date Howard R. Green Company 2550 UNIVERSITY AVENUE St. Paul, MN 55114 Phone: 651/644-4389 Fax: 651/644-9446 Howard R. Green Company Project No. 822530-0030 Feasibility Study Yankton Street Road Improvements Elk River, MN I. Introduction At the October 27, 2003, regularly scheduled City Council meeting, Mark Olson of 18778 Yankton Street and Diane Thiesen of 18741 Yankton Street appeared at open mike to request that the City widen Yankton Street from Trunk Highway (TH) 10 to where it dead ends, in front of his property at 18784 Yankton Street. In response to Mr. Olson and Ms. Thiesen's request, the City Council authorized Howard R. Green Company to prepare this report to determine the feasibility of widening and reconstructing Yankton Street. Exhibit I shows the project location. II. Scope III. The purpose of this study is to examine the feasibility of widening and reconstructing approximately 1,450-feet of Yankton Street from TH 10 to a proposed cul-de-sac in front of 18748 YanktgmStreet. This report will include information on the existing conditions of th¢~,et, proposed improvements, estimated costs, and proposed assess~'~s t'~. e benefited properties using the City's Assessment Manual and past p~ as a guide. Existing Conditions ~ Presently Yankton Street is ~~f(~t dead end, rural section, gravel surfaced road with an average wi~- ~roximately 17 feet. It appears, based on the preliminary survey, that4~i~s'~f the road are located outside of the established right-of-way. ~rnents of the right-of-way are 66 feet wide, 20 feet wide and 40 feet wide as d~dicated in the Alderwood Plat and the Sixth Plat of Camp Cozy. There are no public utilities along the street. Homes in the area are served by private wells and septic systems. Storm Drainage System There is a ditch on the west side of the road that conveys storm water to two culverts (see Exhibit 2). One culvert outlets directly into the Elk River, and the other outlets into the front yard of 18741 Yankton Street, where storm runoff flows over land to the Elk River. IV. Proposed Improvements A. Street Improvements Yankton Street is proposed to be reconstructed to a 24-foot wide bituminous surfaced urban section with bituminous berm. A 24-foot section would not meet the City's minimum standard width of 32 feet. This report attempts to balance the impacts that widening the road and regrading the ditch would have on the environment by providing a road that two vehicles can easily pass each other on. A cul-de-sac would be constructed on the north end of the street. The proposed typical street section would be in accordance with the City standards and would consist of 1-1/2 inches of bituminous wear, 2 inches of Howard R. Green Company Project No. 822530-0030 Feasibility Study Yankton Street Road Improvements Elk River, MN bituminous base, and 6 inches of aggregate base. The cul-de-sac would be paved with a 45-foot radius. No soil borings have been obtained at this time, and the pavement section would be dependent on the findings of a geotechnical report. Driveways would be reconstructed as necessary to match the new street. B. Storm Water Drainaqe Improvements The reconstruction and widening of Yankton Street would affect the way storm water runoff is routed along the west side of the street. Portions of the embankment would be cut back and portions of the ditch would be filled in (see Exhibit 3). Most of the ditch along the west side of Yankton Street may need to be regraded to promote proper drainage to the proposed storm water runoff system outlined below and depicted on Exhibit 4. The proposed storm water runoff system would consist of the following: o A culvert under the new cul-dE the new cul-de-sac to the ditch A culvert with two catch basin: into the front yard at 18741 approximately 50 feet to the existing City additional rig flooding of the A culvert would be remove( rry runoff from the north under side of Yankton Street. existing culvert that drains Moving this culvert system allow it to be constructed within is would help reduce the amount of needs to acquire, and help eliminate the 18741 Yankton Street. installed to replace the existing culvert that the ditch being regraded. A culvert with two catch basins at 18646 Yankton Street conveying storm water from the ditch on the west side of Yankton Street and from the roadway to the Elk River. V. Design Issues The four primary issues involved with widening Yankton Street are: · Re-establishing the right-of-way. · Possible impacts to wetlands. · Obtaining additional easements and right-of-way. · Clearing of trees and brush along both sides of Yankton Street, and regrading the right-of way. This report examines each if these issues in the following sections: Preliminary surveys indicate some discrepancy in the relationship between the platted right-of-way, and the existing road. Parts of the existing road appear not to be within the platted right-of-way (Exhibit 2). Parts of the road appear to be too far east, encroaching on the properties on the east side of the street and parts of it appear to be too far west thus encroaching upon the properties on the west side of the street. If this project goes forward significant survey work will need to be done to determine exactly where the right-of-way is in relation to the existing road. 2 Howard R. Green Company Project No. 822530-0030 Feasibility Study Yankton Street Road Improvements Elk River, MN Once the relationship between the existing road and the existing right-of-way is determined there are two options for reestablishing the road within the right-of-way. One option would be building the new road within the existing right of way the other would be centering a new right-of-way on the existing road. The preliminary survey indicates that building a new 24-foot wide road within the existing right-of-way could have significant negative impacts on some of the front yards on the east side of Yankton Street and some of the backwards on the west side of Yankton Street. These impacts could include: 1. Moving the road closer to the houses. 2. Removing large trees that provide a visual barrier between the road and the houses. 3. Removing landscaping near the ro~ 4. Removal of a well. 5. Removal of driveways. 6. Removal a building Reestablishing the intrusive to the yards red on the existing road would be less :ies abutting Yankton Street. This report assum~ ~e property owners on Yankton Street would donate the new to the City, and therefore the expense of establishing a new right-of-way would primarily be for surveying and describing easement documents. There appears to be a wetland on the west side of Yankton Street just north of 187th Avenue (Exhibit 2). If this project goes forward, the City will need to have this area delineated to determine if it is classified as a wetland. Widening of Yankton Street would require that some of this area be filled in. Construction projects, which involve filling in of wetlands, require review by the Technical Evaluation Panel (TEP). The result of this permitting process will determine whether the wetland can be filled and what mitigation measures will be required. Co Widening of the road and upgrading the drainage ditch on the west Side of Yankton Street to urban standards would require obtaining additional right-of- way and easements for the storm water runoff system and the cul-de-sac. Approximately 36 individual trees along Yankton Street, plus approximately % acres of trees and brush will need to be removed in order to grade and build the new road and accommodate the storm sewer in the alley right-of- way. This will have a significant effect on the landscaping and change the overall "look" of Yankton Street. Howard R. Green Company Project No. 822530-0030 Feasibility Study Yankton Street Road Improvements Elk River, MN VI. Implementation Considerations Implementation of any construction project will have an impact on the environment of the area. Using appropriate erosion control methods and careful monitoring of construction activities can minimize the temporary, shod-term negative effects of construction. The primary environmental impacts associated with this construction would be potential erosion and loss of trees and vegetation. The potential erosion problems can be avoided through proper planning in the design phase of the project. Construction plans for the project would include an erosion and sediment control plan. During construction, it will be vital that sufficient observation of the contractor be maintained to identify and ensure correction to any potential erosion problems. VII. Permits The proposed improvements will agencies including: plan approval by various · National Pollution Discharge excavation and grading. · A Minnesota Board reconstruction ~mpa! · Minnesota De atural Resources, Public Waters Permit will need to be obtained be, ~e project would Impact Elk River. · Minnesota Department of Transportation right-of-way permit for work within the TH 10 right-of-way. System (NPDES) permit for site Resources (MBWSR) permit if the VIII. Estimated Project Costs The estimated project cost for these Improvements has been prepared and includes the following: Estimated Storm Sewer Construction Estimated Street Construction $ 29,600 $148,400 Total Construction Cost $178,000 Contingency (10%) Overhead (28%) Right-Of-Way Preparation $ 17,800 $ 54,85O $ 10,000 Total Project Costs $260,650 The overhead costs include funds for administration, legal, fiscal, engineering design, preparation of plans and specifications, and field surveying and inspection. The contingency costs are estimated at ten percent. The unit prices for construction costs are based on actual bid tabulations from recent local Howard R. Green Company Feasibility Study Project No. 822530-0030 Yankton Street Road Improvements Elk River, MN projects of similar scope. Project cost estimates provided reflect the estimated construction cost, which includes contractor costs for labor, equipment and materials. IX. Financing There are total of eleven properties that abut Yankton Street. Three of these properties, however, do not have access directly onto Yankton Street, but rather access onto Zebulon Street and 201st Avenue. The frontage of the 11 properties along Yankton Street ranges from a Iow of 112 lineal feet to a high of 611 lineal feet. There are typically two ways to assess these types of road reconstruction improvements. Most recently, the City Council has utilized a per residential equivalent unit assessment. The rational for utilizing residential equivalent units for the assessment method is an attempt to treat all homeowners the same regardless of how much frontage they have The other method of assessing these footage basis. According to the :y's time to time establishes a per front projects. The most recent rate was foot. Given the minimum and method of assessment, the to a high of $25,600. It is appeal at this hi( the reconstructed roadway. )rovements would be on a front policy, the City Council from ~ent rate for reconstruction in June 2001 at $42 per front footages and using a per front foot ares would range from a Iow of $4,700 that the City could sustain an assessment If it is assumed that the ¢ uitable way to assess this project would be on a residential equivalent unit basis and assumed that there are 11 residential units, the question then is what is the maximum assessment amount that could be sustained against an assessment appeal. If we assume that that number is up to $10,000 per unit, which is likely on the high end, that would mean that there is $110,000 generated by assessments. This would leave approximately $150,000 of the project cost to be funded by the City. X. Summary The proposed street improvements will provide residents with a safe and adequate public transportation system. The street reconstruction portion of this project is feasible from an engineering standpoint, and with the exception of the reduced street width, it meets all standards set forth by the City of Elk River. The total project cost for the Yankton Street Improvements project is estimated to be $ 260,650. The project would be funded through a mixture of special assessments to the benefited properties and City funds. APPENDIX A PID Name Property Address Mailing Address Front Footage 75 131 2210 Vandenhul Tern/ Marcia 16025 201st Ave NW 18720 187th Ave NW Elk River MN 55330 470 75 131 2211 Doncaster Robert J. Lois 18643 Yankton St. NW 18643 Yankton St. NW Elk River MN 55330 611.97 75 131 2300 Winkels Gerald Kathleen 18638Yankton St. NW 18638Yankton St. NW Elk River MN 55330: 171.37 75 463 0030 Olson Mark Donald Diane 18784 Yankton St. NW 18778 Yankton St. NW Elk River MN 55330 121 75 463 0060 Olson Mark Donald Diane 18778Yankton St. NW 18778 Yankton St. NW Elk River MN 55330 155 75 463 0080 Schwingle M ¥¥son D 18741 Yankton St. NW 18741 Yankton St. NW Elk River MN 55330 120 '75 463 0150 Moore Robert J. Linda K 18692 Yankton St NW 18692 Yankton St NW Elk River MN 55330 250.95 75 496 0110 Sinkler Kenneth Karen 18659 Zebulon St. NW 18659 Zebulon St. NW Elk River MN 55330 112.3 75 496 0120 !Williams Sherie Marie 18655Zebulon St. NW 18655 Zebulon St. NW Elk River MN 55330 378.21 75 496 0130 Arnold Patrick L Nancy 18646 Yankton St. NW 18646 Yankton St. NW Elk River MN 55330 207.16 75 131 2215 Sendzik Jason Gilles, An 18712 Yankton St NW 18712 Yankton StNW IEIk River MN 55330 220 ........ ~/ //.~ ~ ~ ~ ~ ~..J~,~ T ~ 1 //G~~ ~ ~ i ~ u- : ~. ~ ~ I ~ I ~ ~v~N~_~- ~,---~-.~_ _~ T"-'~--~-~ ................................. ~"~-'-;;'- -h-~-~-.-~-~ ................... '~ - 5~.~__J...__.L.. ~,~ / ~ i _~l.~-- ~ P I /~/~ { ~ ~~.. HigHWAY NO. 52 :~~C~~~' ._,_ ~,,~,,, j~, ! , ~,.~oo~ I I. , / ~.o?~ ~ Ltl'~,, ~ ~~~~ ' -~ iii ~ / I 8°il'1 I /~t 2004 lh12:0~ mm. ~ YANKT~ SmE~ EXHIBIT L~A~ON MAP 1 ~..~~ Ri~~ / '"" .... ' .......... "'"'< '";:-i-_'.-_ii- DESIGNED BY: D£SiGNE.~D B__Y DRA~I BY:. RKId ~PROVED BY:APPROVED BY JO() NUMBER 822§30J C~) DAT~: Februor¥ ~, 2004 9:~:21 o.m. ICAO FILE: 82255OJ\Dwos\C\E2.DWG (TELGAAR) EXISTING TURN AROUND '" '. EXISTING '~'-- CULVERT '--.. 15025 201S1 ^~. YA NKTON STREET EXISTING CULVERT ~"-8 7 41 YANKTON 8645 YANKTON ST) 8712 YANKTON ST) ., 187TH AVE. 2.~,50 UNIV[RSIIY AVENUE W. SUITE 40ON ST. PAUL. MN .55114 PHONE: 651-644-4.389 -b.,vard R. Green Company EXI~llNG RIGHT O~/WAY / / / / / / / / · -iii' - 2,. 86,38 YANKTON ST) EXiSTed/86 59 ST}~ ZEBULON ~ YANKTON STREET IMPROVEMENTS ~ OF ELK RIVER 8692 YANKTON ST) 8655 ZEBULON ST) EXISTING RIGHT O~' WAY 0 50 EXlSIINO ~ YA,NKTON STREET 2 898 i 898 896 - '~. i 896 894 894 892; , I ~ ! i 892 890 ~ 890 888 i'~' 888 886 884 ~ '- 884 882 882 880 ~ 880 878 ~ ~ 878 876 : ~ i '- ~ , 876 874 ~ ;874 872 872 870 870 -50 -40 -50 -20 -10 0 10 20 50 40 50 898 898 896 ~ .- ~ ~I 896 894~ ~ 894 892; ~ ; .,,,~. - _ _ _ 892 890 , L J ~ '~--. . 890 888 I ; I i ~ ½ ~ ~ 888 886 ~- 886 884 I ~ '. 884 882 ~ 882 880 ! i i 880 878 878 -50 -40 -30 -20 -~0 0 10 20 30 40 50 880 ~ ~ .' ..... ~_ ~ ......... ~ . 880 '~. 1878 878 . /J /_, '~ - - - / \ 876 876 i { ~ 874i 874 872 872 -5O -4O -3O -20 -10 0 10 20 30 40 50 ~ebruory 09, 2004 9:53:58 o.m~ 822530J~Owgs~C\E3.OWG (TELC~R) ~.~ YANKTON STREET z EXHIBIT TYPICAL CROSS SECTIONS ~t CUTS AND FILLS ..' '-8784 YANKTON (~8778 YANKTON ST/~ IDE.~GNE]) BY: DESIGNED _ELY_ DRA~ BY: RKM APPROVED By:APPROVED BY JO~ NUMBER 822530J CAD DATE: Fel:xruarv 09. 2004 10.15:55 o,m. CN:) FILE: 822550J\OwQs\C\E4.OWG (TELGAN~) YANKTON STREET 8646 YANKTON ST) CULVERT WITH -- 2 CATCH BASINS / / / / / / / / / ~MTH 2 CATCH BASINS '7' 187TH AVE. 2550UNIVERSITY AVENUE W, SUITE 400N ST. PAUL. MN 55114 PHONE: 651-644--4389 R. Green Company.. 8643YANKTON ST) / / ~..8655 ZEBULON ST) ZEBULON ST, 0 30