Elk River Municipal Utilities Commission Eric Volk-Water Superintendent
John Dietz—Chair
Al Nadeau—Vice Chair
Daryl Thompson—Trustee
MEETING DATE: AGENDA ITEM NUMBER:
May 20, 2014 5.6
SUBJECT:
New Motor and Variable Frequency Drive (VFD) for Well#5
BACKGROUND:
On Tuesday,April 13th it was determined by ERMU and E.H. Renner staff that the well motor
for Well#5 had shorted out.
DISCUSSION:
The well motor at Well#5 shorted out prematurely. The motor was rebuilt 2 years ago. Though
we are not sure exactly why this happened, we do believe that the soft start is partially to blame.
The soft starts are inherently bad for submersible motors. With the upcoming summer, and no
doubt increasing demand for water,we need to install a new well motor as soon as possible. It's
our intent to replace the soft start with a VFD as the VFD has programming built into it so the
chances of this happening again are much slimmer. We also have to purchase a dV/dT filter
because the well motor is approximately 300 feet away from the power source.
We are conducting assessments on Wells 2, 3, 4, and 6 to replace the soft starts with VFDs
before any damage is done to the motors that are currently in place. Wells 7, 8, and 9 already
have VFDs installed. We'll come back to the commission in June with a recommendation.
ACTION REQUESTED:
Staff requests Commission approval for the purchase and installation of a new well motor, VFD,
and dV/dT filter for Well #5.
ATTACHMENTS:
• Motor Quote
• Filter Quote
POWERED BY
3 Page 1 of 1 NATURE
Reliable Public
Power Provider P O W E R E D T O S E R V E
116
Irco N:crated WE LL DRILLING FOR FIVE GENERATIONS
15688 Janis Street NW*Elk River,Iltinnesote 55330
Phone(763:427-3103 Fax(763)-127-0533 * Toil Free(800)-409-fntELL
May 14,2014
City of Elk River
Eric Volk
322 King Avenue
Elk River, MN 55330
Subject:Well No 05
Re: Cost Estimate to Remove Pump, Replace Motor and Reinstall
Dear Eric
As requested the fallowing is a quote to remove, relace Motor and Wire and Reinstall Submersible No 05
Description Qty Units Price Extension
Labor to remove pu p and motor. (Not to Exceed) 1 L.S. $ 2,100.00 $ 2,100.00
Wire#3-0/3 Jackete• with Ground 195 L.F. $ 22.00 $ 4,290.00
SME 100 Hp 460/60 4 Pole Submersible Motor 1 Ea. $ 23,130.00 $ 23,130.00
Misc. 1 L.S. $ 140.00 $ 140.00
Labor to install pum• and motor. (Not to Exceed) 1 L.S. $ 2,100.00 $ 2,100.00
Total Amount of This Estimate $ 31,760.00
Invoices will be base. on actual amount required and approved.
If you need additiona information or have questions, I can be contacted at my office 763-427-6100
or on my cell phone -t 651-755-3200.
Sincerely
a
Jerry Aljets Project anager
E.H. Renner&Son Inc.
Ideal Service, Inc. Service Estimate 25596
P.O. Box 244
Alexandria, MN 56308 Date 12/9/2013
Phone# 763-360-5514
Fax# 763-322-8813
www.idealsc.com
Name/Address
City of Elk River Municipal Utilities
1705 Main Street
Elk River,MN 55330
P.O. No.
Terms Net 30
Description Qty Cost Total
DANFOSS AQUA DRIVE, 125HP,460V,NEMA 1 9,425.00 9,425.00T
12
dV/dT FILTER,NEMA 3R 1 2,175.00 2,175.00T
Field Service Travel,ESTIMATED 0.5 105.00 52.50
Field Service Labor,ESTIMATED, 4 115.00 460.00T
PROGRAMMING AND STARTUP
TAX, SHIPPING NOT INCLUDED
Looking forward to working with you. Subtotal
$12,112.50
Sales Tax (6.875%) $829.13
Total $12,941.63
118
Well #5 Rehabilitation
Contractor Product Cost
'was s'Ei` ;se;= ?`,1.�,rii-.. t, �.,,..e.: p , .�.. :�i t,_.e ..,,t�..I'..�.t... �..� . t ._ ._ k»L&:G 04 aii9 i `:�v._- __..,,,ael
E.H. Renner Well Motor 31,760.00
Variable Frequency
Ideal Electric Drive (VFD) 12,941.63
Boe Electric Electrician 2,440.00
47,141.63
1�Dishim l Cimino= Estimate
• 20975 Elk Lake Road NW
Elk River, MN 55330 Estimate Date: 5/20/2014
763-241-8922 763-274-1336 fax Estimate#: 1359
E-mail: chris @boeelectrical.com
Estimate Submitted To: Job Location:
Elk River Utilities Elk River Utilities
1705 Main Street 1705 Main Street
Elk River MN 55330 Elk River MN 55330
Quantity Description Rate Total
Furnish and install electrical for new well #5 controls as follows: 2,440.00 2,440.00
Remove existing starter, controls from MCC
Install new VFD, DVDT filter(provided by others)
Install new wiring from MCC to VFD, DVDT filter
Terminate wiring in MCC with new terminal blocks
Install control relay for stop/start signal to VFD
i
Total $2,440.00
Signature
• Note-This estimate may be withdrawn by BOE Electrical Contractors if not accepted within 30-days.