Loading...
8.1. SR 06-02-2014 City of Elk - Request for Action River O. To Item Number Mayor and City Council 8.1 Agenda Section Meeting Date Prepared by General Business June 2, 2014 Zack Carlton, Planner I Item Description Reviewed by Concept Review: River Park Subdivision Re-plat Jeremy Barnhart,Deputy Director, CODD Reviewed by Cal Portner, City Administrator Action Requested Provide informal, nonbinding feedback on the proposed re-plat of nine townhome lots,48 units, to approximately 17 single-family lots. Background/Discussion The River Park plat was approved in 2005 and included 80 townhome units (configured in 4 and 6 unit back to back fashions) and 36 single-family lots. To date, 32 townhome units and 23 single family homes have been constructed. The applicant is proposing to re-plat the remaining nine townhome lots to accommodate approximately 17 single-family lots. Planning Commission The Planning Commission felt that the reduction in density would be less impactful to the neighborhood, expressed support for the project, and liked seeing development in the area again. They also said they would be interested to know the comments of the neighborhood. City staff noted a public hearing would be held if a formal platting application is submitted,and property owners would be notified at that time. Financial Impact None Attachments ■ Planning Commission Packet dated May 27, 2014 P a w E A E U s r Template Updated 4/14 INIM UREI C of Rive,�._r Request for Action To Item Number Planning Commission 5.4 Agenda Section Meeting Date Prepared by Planning Items May 27,2014 Zack Carlton,Planner I Item Description Reviewed by Request by Source Land Capital for a concept Jeremy Barnhart,Deputy Director, CODD review of a proposed re-plat in the River Park development Reviewed by Action Requested Provide informal,nonbinding feedback on the proposed re-plat of nine townhome lots, 48 units,to approximately 17 single-family lots. Background/Discussion The River Park plat was approved in 2005 and included 80 townhome units and 36 single-family lots. To date, 32 townhome units and 23 single family homes have been constructed. Single-family lots have become more marketable,and the applicant is proposing to re-plat the remaining nine lots to accommodate approximately 17 single-family lots. Analysis Plat There are two oudots,outlots B &C, that cover portions of two of the shared drives serving existing townhomes. These oudots should be removed and included in the adjacent townhome parcels, ensuring the driveways remain under common ownership. Required wetland setbacks and drainage easements will need to be included on the proposed single-family lots. Property line adjustments will require easement vacations. The lots vary in size from 69.5'wide to 99.7'wide and the proposed lots are consistent with the neighborhood character and the approved PUD. Utilities Staff received a letter from Centerpoint Energy objecting to the proposed plat. They have existing lines and easements that would need to be relocated or abandoned. Centerpoint requests that the applicant reimburse them for the cost of relocating the existing gas lines. Impacts and costs associated with moving utilities will be the developer's responsibility and should be coordinated with the appropriate agency as needed. This response is similar to the Kliever Lake Fields 4th addition project that was approved in 2013. The developer and ERMU continue to evaluate utility service requirements. Template Updated 4/14 1AXTWSRE Landscaping The River Park Developer agreement included a condition that street trees shall be planted along all streets at a minimum of 30 feet on center.These trees should be included in future plans and planted by the developer.Additional screening to reduce the headlight glare from vehicles entering and exiting adjacent townhomes should be provided where a shared driveway is adjacent to a new single family lot. Formal actions Should the project move forward,a preliminary and final plat will be needed to modify the River Park development as proposed. A PUD amendment to modify the approved site plan will also be required. Financial Impact None Attachments • Location Map • Applicants Narrative dated April 28,2014 • Comment letter dated May 19,2014 • Proposed plat received April 29,2014 • Utility Plan received April 29, 2014 • Single-Family Home Concepts • CenterPoint Energy Comment Letter received May 5,2014 NADepartments\Community Development\Planning\Case Files\Concepts\Rivcr Park 21114\Concept Recioc SR River Park PC 5-27-2014.docx f l + 1 t � � i r , R _ f ,.e �A M • 1 �pr NW ~ �+. y Ilk Ir blip ^9 CONSTRUCTION CAPITAL 18215 45th Avenue North • Suite D • Plymouth, Minnesota 55446 • ph. 763.551.0100 • fax 763.551.4999 April 28,2014 City of Elk River 13065 Orono Parkway Elk River,MN 55330 Concept Review Source Construction Capital would like to present the City of Elk River with a re-plat concept for the existing Townhome pads in the River Park development.After speaking with city staff last week, they have encouraged us to present the planning commission and council with this sketch plan application for review.Since these lots are currently developed for TH's,this new request would require a zoning change to PUD.The PUD zoning change will allow us to work together to better refine our development plans. The intent of this project is to plat over the existing TH pads and create 17 new single family lots.These lots would vary in size; however they would be consistent with the current product.The proposed sketch plan calls for a Front setback of 25',side at 10',rear setback at 25'all with a minimum building pad of 50'x50'.Possible home sizes would range from 2,100-2,500 sqft.We have also spoken with staff about possibly using the existing services on site to serve these new lots.According to our utility plan,there are 10 services stubbed to the property. Ideally,we would like to use these 10 and add an additional 8-10 to serve the new lots.It is clear that every lot would need to be individually served.In order to make this project work,we will need to find the most cost effective ways to do this conversion. We hope we can work together with staff on finding creative solutions during this development process. Please keep in mind that allowing the redevelopment of this site into single family homes will bring life back into the River Park neighborhood.We are confident that this conversion from TH to SF is the best use of the site and also the quickest way to get this development to the finish line. Thank You, Q�4 9) Chase Peterson Source Construction Capital City of Elk River 13065 Orono Parkway Elk River,XfN 55330 May 19,2014 Chase Peterson VIA EMAIL. ChaseP @sourceland.com Source Land Capital 18215 45th Ave N,Suite D Plymouth,MN 55446 RE:Staff Comments and Recommendations—Concept Review for River Park Re-plat Dear Mr.Peterson, Staff conducted a review of the materials submitted on April 28,2014, to re-plat nine townhome lots to 17 single-family lots. The Planning Commission and City Council will review the proposal on May 27,2014,and June 2,2014,respectively. The following comments and recommendations are intended to identify some issues,but should not be considered as complete comments for your project. As more detailed plans and information are submitted, staff will provide comments based on applicable city ordinances and codes. The approved zoning for the property is Planned Unit Development(PUD).The PUD agreement governing the property was signed by the previous owner,and lists single-family homes as a permitted use.A copy of the PUD agreement is attached for your reference. Based on your proposal, a preliminary and final plat will need to be approved by the City Council. The PUD Agreement will need to be amended as well. Site Plan 1. Combine outlots B and C with the adjacent townhome lots and adjust the property line to ensure that the driveway is of common ownership with the townhome building,and the minimum driveway setback of 5'is met. 2. The boundaries of outlot A may be adjusted to provide additional flexibility in laying out the single-family lots. Retention ponds and required buffers should be included in a Phone:763.635.1000 Fax: 763.635.1090 P O / E R E 0 R www.delk-river.mmus INATURil drainage and utility easement on affected properties.Adjustment of property lines may require a formal vacation of existing easements. 3. Include vegetative screening on the south side of the two driveways serving the townhomes,providing headlight and visual screening for the proposed single-family homes. 4. Submit a landscape plan that includes at least two deciduous shade/overstory trees in the front yard of each single-family lot. One of the two trees should be a boulevard tree and will be the developer's responsibility to install. Utilities 5. Elk River Utilities has concerns that stagnant water may develop if residential services are attached to the end of the existing 6" stubbed water service.They suggest the stubs be capped at the main and new lines run to serve the residences. Please identify alternatives for review. 6. Impacts and costs associated with moving existing gas,electric,phone,and cable lines will be the developer's responsibility and you should coordinate with the appropriate agency(s) as needed. 7. The housing options seem consistent with the neighborhood character. This letter will be provided to the Planning Commission and City Council as a starting point for the concept review discussion. Please be prepared to discuss your comments and concerns during the meetings. Contact me with any questions. Sincerely, Zack Carlton,Planner I City of Elk River zcarlton @E1kRiverMN.gov 763.635.1035 r � z`CSrC d t FryM.' W W z A °a W W S s , o C F ' yy!! I i—-—1332i1S 63AOH M \\ �\ JI 1 U Iz co, O l- 1 I� I L J it E g |§|\ q ■ //} ] , � . , . L rn \Hum H.l�;|. ]a E! ] ■ ] !||!§;§) |§; ! r \ 5 \ w a )` a , � \§ H / } �§ §\ P. \ « � \ �-—133�US a n -�- - L d 'I , - - j A_ ■■■- Illf m � - I � Int NEI II I ' ■■ 111 I ■ ■■■I � AMR.; mmt�uud i_-i_w�. . ( .....................� 0Umm-■■ ■_� ■■■ I Illlllllllllllllll�lli �i�■iii! -�==�=�� �:�-�-► Ilillllllllllll� �� - �' �'� �IIIIIIIII� III ` �miimi�mum�r -: I - • • 111 NO �anuunnnn I I��l�1�f i I Illllllllllllllll' "� ■■■ !II � IIIIIIIIIIIIiIII S=T= • LMM WOMEN rEll= '���, I�I�I�I Illllllllllllllllll�'i�lii�1! I��IIIIIIIIIIIII IIIIIIIIIIIIIIIII on III �■� � � ���_ ; � � IIIIIIIIIIIIIIIIII .................■■ `' Itlnnnnmluntl , � � 111111111111111111111 � lip■ II►i��►I�I� t O O O � r 11 O � Q � a W � J � W � H m uIll 0 t U U. n I �U LL LL a N Lo C,� to co �N N N t 0 O �O O OOJ 00 OJQ LLLL JLLH M J LL W D a. O of 0 O 1 r w a ® 0 w U O 0 W W J ° 0 W w � m Z 0 0C ® LL Q 111111 ua 00 0 00,0 �I 4 Ps I W tz LL IJs II 1 1 r I1 \ 00 LL i�o II 1• � eew�/+tee / �♦ II ♦e � 1 W � Z F I I, I, II II � Q CO LL m F- LU /, CL CL LL Li y U w� I z o , UX ' Q LL O Cl) cn ---- LO II � a, — X � 'L � U w Z ~ x Q x J a � z c� w W ❑ Z o DO CO v L d Z a d�I a ® � o i x i - LL •nX � � o � W N r ) II CD W N r ww Ld D Z � 0 00 00 J 0 LL m LU CL a ; I II III I I 03um3A c:3Ij as 01nOHS SIOWSO TIV 31va 213a11n8 ampa�iip tV w d0 SNOLLVO010NV S1NamnSv3W TIV SNOLLVU301SNOO 01313 RLVO 1N3110 TT TC�1 Z 213H10 ONV ONIWVtld vniov 3 .LLS axO3a�xg 31v0 1N3110 I��LL �``��77''\CC77 a� O LL 013n0 NOLLOn2LLSNOO 1VnlOV 3Hl NI .1 Q NVSS3O3N IS SSo sv A-i3Snf0V 3WOS �aJ T TO� ZQ w '31BISSOd SV A131viInOOV SV Nb-(d� �.L Ig J Q 03OVld N33S 3AVH SlO3f80 TN 30 � O 0 SNOIIVOOI N339 al SIOWSO T" 0 �� .3WOH NOJ,-dON 0996-££9-£9L W W 2 N - o� o W LE I Ill o J o LU " z ® ® 09- — L I w c3umm O'31j as ainoHS S1O3ruo Ilv 31Va M3allns ad npal ypiV w JO SNOI1VO01 ONV SiN3WNnSV3W MY SNOLLVM301SNOO 01313 31Va 1N3113 TTQTC�� M3Hlo aNV ONIV Md IVMniOnNiS I..LL�(C.3ll``Sw77 ,7 v LL Z 013na NouonUSNOO IVnIOV 3H1 NI �O3Q��g 31Va 1N31IO \ MVSS303N 3B.kM SINswisnfaV 3WOS Ti a wr Q 3181SSOd SV A131VMnOOV SV 1 I ONb-f "�O1]"' J Q 033Vld N33S 3AVH S1OMO llV d0 I CL o SNOIIVOOI ONV S1N3w3MnsV3w i-N O O aIS FlWOH NO,L-dON 0996-££9-£9L W W LLI 2 N U �S O ' m J U x Q W Q I �t�yy/I J I I \\ O O II � J a31dIH3A a:31d 38 a1nOHS S1O3n30 11V 31Va a3ollne a,111��a.�11f�d� w d0 SNOI1V001 aNV S1NawNnSV3W 11V SNOUVIdMSNOO a13Id 31Va 1N3110 TT TC� N3H10 aNV ONIVM.4 wunimus �..ii LL as Z 013na NOLLOnH SNOO 1Vn1OV 3H1 NI � ll V oa Q Q 31Va 1N3110 \ 1L 2NSS303N 38 AVW S1N3W1SnrGV 3WOS > T T Z ul '3 SISSOd SV A131VHnOOV SV O �ryb-(d, "'�0�� IL Q a3OVld N33S 3hVH W38n 011V d0 L1Y YOn l�O��Ol� Od, SNOI1VOOl aNV S1N3W3ilnSV3W TV a 0996£E9£9L y�'o W W 2 N ---------------------- ------------------------ d ° �I x cn GO zo II � W x LU U C L) M Z Q a J^ Z LL S2 W � LL x o o pz o O Q 0 u x o J F -- LL _ r, Z o • � O o �c, x 0 x I� ■ d It 03131H3A 0:31d 38 aInOHS S103f80 TIV 31va Hann8 ad n pd4 il(.JdTj7 w d0 SNOI1VOOl aNV S1N3WHnSV3W ca llV SNOLMMISNOOal31j 31Va 1N3110 H3H10 aNV ONivm.A wuni omas L�u L TSa Q Z 31va 1N31IO \ 0 013n0 NOIlOnH1SNOO l'dnlOV 3H1 NI W Q HVSS309N 38 AVW S1N3W1SnfaV 3W OS Q v Q a QvX Q Z 0 �J•yTO�A g 030YId N338 3AVH S103801V j0 �V 1 IL 0 SNOIlVOOI aNV S1N3W3HnSV3W IlV 0 3j1 gy�[OH NO.L2IOI�I 0996-££9-E9L W W U) r------------------ I I I I I I L-� Q I I x $ I � Q I r N I -------------- N � I r w I Z � I 10 - a � a � Z w v Oo Oo Z x }0 L 0 a ; a U D j X 0 O �a* O i II 81� ® it Z � Ot Ica ® 0 0 z w0 0 00 Minn F- m z � O U ffff.... O LLLL a �,I ' 3A09Vi / i_39NVH�%3 MM J 3 � X W N 4 O J ~ W / o Ir _j o (� v I I q ---------------- ---------- ---------------- 4 No X M II X 10 - w --------------- W o x Oy m E L Z > a CQ � G ® X , N ___________________ Qx x I Oj N O LO 1 p- r y I' M -Q 'V-- w Z U � � F ' M ' o z � z i Oo O ° Z J °> LL m 11 �/ i 'V W or or a a x N CenterPoint 700 West Linden Avenue Wr PO Box 1165 Energy/ Minneapolis,MN 55440-1165 May 5, 2014 Chris Leeseberg Park Planner/Planner 13065 Orono Parkway Elk River, MN 55330 RE: Site Plan Review Meeting, May 2nd, 7 line items. Dear Mr. Leeseberg: With reference to the 7 line items your requesting, Items 1, 2,3,5,6 CenterPoint Energy has no objections. Line items 4 Re-plat of River Park and Line item 7 Site plan approval for expansion, case No. SP 14-05, CenterPoint Energy has natural gas mains and services in both line items mentioned above. The proposed plat shows the developer planning to plat over the existing pads and create 17 new single family lots; CenterPoint Energy has services line in easement throughout the plat that will need to be relocated or abandoned at the cost of the developer. Line Item No. 7 will have to relocate the gas main in easement within the new expansion project. I am working with our engineering department who is in contact with the City of Elk River in putting a new easement in place to relocate the existing gas main. Since this gas main and service is an important part of the distribution system for this development we must object to this re-plat and to the expansion project unless suitable easement rights are reserved to CenterPoint Energy pursuant to MnSta 160.29 & MnRule 7819.3200. Please reserve an easement to CenterPoint Energy, created by and within RIVER PARK ADDITION establishing the easements and filed with the Hennepin County Recorder's office. We may consider removing our objection should the petitioner wish to reimburse CenterPoint Energy the cost of relocating the existing gas main and service lines. Please inform the petitioner to contact Andrew Balgobin, Administrative Engineer, at 612- 321-5426 to discuss this and any other options that may be available. Thank you for the advance notice and please send me a copy of the "final action" on this proposal. Respectfully, CENTERPOINT ENERGY Chuck Mayers RWP Right-of-Way Specialist • 700 West Linden Avenue CenterPo/nt PO Box 1165 Energy Minneapolis,MN 55440-1165 pc: Andrew Balgobin, Administrative Engineer Scott Lehner, Area Manager Mark Johnson, Area Supervisor Operations Jim Carlson, Master Tech ADV Foreperson Steve Guhanick, Rehab Designer I i