Loading...
10.3. SR 07-07-2014 �i EOty lk Request for Action River To Item Number Mayor and City Council 10.3 Agenda Section Meeting Date Prepared by Work Session July 7, 2014 Justin Femrite, P.E., City Engineer Item Description Reviewed by Discuss 2015 Street Improvement Project Cal Portner, City Administrator Reviewed by Action Requested Provide direction, through consensus, on items pertaining to the 2015 Street Improvement project. Background/Discussion We have been working on preliminary design of the 2015 Street Improvement project. Staff is looking to take direction from the Council on a number of design-related options. Items to be discussed include refining of project areas, design elements and funding. Financial Impact None Attachments ■ 2015 Street Improvements CIP Worksheet ■ 2015 Street Improvements Location Map p 0 W I R I I a ATURE Capital Improvement Plan 2014 thru 2018 City of Elk River, Minnesota Project 4 Project Name Pavement Management Program a Type Improvement Department Infrastructure Improvements Useful Life 25 years Contact Engineer Category Street&Utility Const fiction Priority n/a Description Replace,overlay or rehabilitate aged and deteriorated streets,water mains,sewer mains,storm drainage,and pedestrian pathways. Projects will be completed every other year. Justification Individual street pavement conditions will dictate what pavement management technique will be utilized to extend the life of that specific street segment. These techniques may range from a full reconstruction of the surface and aggregate base to simply overlaying the existing pavement. As they are implemented,the prescribed techniques will continually be gauged to assure their performance is proper in extending the life of our pavements. Expenditures 2014 2015 2016. 2017 2018 Total Construction/Maintenance 4,000,000 4,330,000 8,330,000 Total 4,000,000 4,330,000 8,330,000 Funding Sources 2014 2015 2016 2017 2018 Total Municipal State Aid 2,500,000 1,000,000 3,500,000 Pavement Management Fund 1,350,000 3,180,000 4,530,000 Storm Sewer 150,000 150,000 300,000 Total 4,000,000 4,330,000 8,330,000 2014-1018 CAPITAL IMPROVEMENT PLAN Page 25 kl IJJJ�IJ�IJbIJ �IJ�_I�_I�� � Jdlel��I��I�JJ,I�IJ .I��I � �J�� � _I �� 31JJ�I �I,I�.IJJ���I JaI �I�IPIaIJ�_I�I_IJ�aIJ:I JeI,I�I_I \ / b T i- 0 A ae s Lill, b L 3 J - ,e � RECONSTRUCTION .� F OVERLAY WITH EDGE MILL FULL DEPTH RECLAIM WITH CURB PATCHING WEAR COURSE PAVING ON UNFINISHED DEVELOPMENT STREETS I An River � �� a 2015 &2,2.2°,E �"��� 8. ElDRAWN BY city STREET IMPROVEMENTS cML R7� w1 SCALE: iver NOT TO SCALE