Loading...
10.0. PRSR 07-14-1999 -Q �-\ i C°- \via MEMORANDUM ity of , River all TO: Park and Recreation Commission - :� , FROM: Michele McPherso : -!rector of Planning DATE: July 8, 1999 SUBJECT: Information/Update Items for July 14, 1999 Meeting A. Land Use Cases: 1. Trott Brook Farms To date, we have not been able to establish a meeting on site to review the park location and condition. We continue to try to schedule this. An update to the park dedication fees that are to be paid by the developer: the developer is paying $900 per unit for 600 units ($540,000 in land and cash); in the future, if there are more units built over 600, those units will pay whatever the current park dedication fee is. 2. Elk River Country Club Land/Easement Exchange, Building Location The surveyor for the Elk River Country Club has identified the easement area for the winter ski trail use. The total easement area to be dedicated to the City will be 62.22 acres, and will extend approximately 885 feet into the eastern portion of the golf course. An additional .86 acres of easement will encompass the entry road to the new maintenance building. The land exchange is approximately the same (1.2 acres of park for 2.82 acres of golf course). After much discussion regarding the location of the road after the last Country Club Board meeting, it was agreed to leave the road in the location previously reviewed by the Park and Recreation Commission members (map attached). The Planning Commission will have reviewed the final plan at its July 13, 1999 meeting, with Council review on July 19, 1999. A landscape plan has been submitted as part of the development plans, and the road will be paved to the crest of the hill, with the remainder remaining gravel. 13065 Orono Parkway • P.O. Box 490 • Elk River, MN 55330 • TDD &Phone: (612) 441-7420 • Fax: (612) 441-7425 Information Memo-July 14, 1999 Park and Recreation Commission Page 2 3. Administrative Subdivisions AS 99-2, Waletzko This Adminstrative Subdivision is located at the intersection of 197th Avenue and Ulysses Street. The property owner is proposing to create a second buildable lot from his property. AS 99-3 &AS 99-4, Foster This Administrative Subdivision is located near 223rd Avenue and Meadowvale Road (west of Meadowvale Road to the city limits). The applicant proposes to create two buildable lots in additon to a third for an existing dwelling. A portion of the subject property is actually in Big Lake Township, so it is unknown if the request will be approved as proposed. As proposed, $3900 in park fees will be collected from these two requests ($1100 park, $200 trail for each lot (3) created). The subject parcels are not located near existing park or trail facilities. B. Park/Trail Developments 1. Lions Park Shelter The Lions Park Shelter has become an "attractive nuisance" in that it provides an opportunity for kids to climb the roof and provides a "smokers hangout. Staff has brainstormed a number of possible solutions short of reconstructing the entire structure. Items that are proposed to be implemented include planting of prickly shrubs around the structure, installation of a fence, and installation of motion detector lights. 2. County Road 12 Realignment At the last meeting, the Commission requested that staff provide an update on the County Road 12 road and trail construction plans. According to the City Engineer, the road will consist of an urban road section with (4) lanes and a detached 10 foot trail on the north side to the east limits of the Trott Brook Farms plat (see attached section drawings). The remainder of the road improvements will consist of a rural road section with (2) 12 foot lanes and 8 foot paved shoulders to the city limits. As part of the Trott Brook Farms plat, the additional County Road 12 right-of-way needed for the urban section and trail was acquired. When the properties east of Trott Brook Farms develop, additional right-of-way will be acquired to complete the urban section road and trail construction to the city limits. 3. BMX Facility Since the June meeting, staff has prepared the lease agreement for the BMX facility. The lease agreement has been reviewed by staff from Fire, Streets, and Parks. The Information Memo-July 14, 1999 Park and Recreation Commission Page 3 City Attorney still needs to review the document, and we have not heard from the BMX • organizers regarding their comments. We hope to have the lease approved by the City Council on July 19, 1999. 4. Community Recreation On June 28, 1999, Charlie Blesener presented information to the City Council regarding Community Education providing recreation services as they did in the late 80's, early 90's (see attached information). No decision was made by the City Council. The next Community Recreation Board meeting is July 19, 1999, and an update may be shared with the City Council at that evening's meeting. 5. Trail Standards On Tuesday, July 6, 1999 Terry Maurer, Phil Hals, Stephen Wensmen, and Dave Anderson met to discuss trail standards. The following items are proposed to be implemented: • Establish preconstruction meetings with developers and contractors to set performance expectations in regards to surface voids and smoothness. • Revise standard specification with an additional cross section shoing curb cut, change in mix with smaller rock, smoothness tolerance of 1/8" per 10' of trail, and • minimum standards for finish grading. Terry Maurer will develop cost estimates for trail construction based on the new standard. At a future meeting, the Park and Recreation Commission should discuss the trail reimbursement/credit policy. 6. Park Dedication Ordinance Based on the June meeting discussion, changes have been made to the working draft of the park dedication ordinance. The City Attorney is now reviewing the draft, and we will schedule adoption of the ordinance as soon as his comments are received. The Commission will receive an adoption schedule as one is made available. On a related note, we have received a copy of the Park Dedication Fee Study information from Dahlgren, Shardlow, and Uban (letter attached). It appears that St. Cloud cancelled the study. We will review the information received and organize it into a format that the Commission can easily review. We propose to review park dedication fees in October in order for them to become effective prior to January 1, 2000. 6. Letter from Aaron Veek • We received the attached letter from Aaron Veek and have responded by sending him a copy of the Master Park Plan and the concept plan for the park in question. Information Memo-July 14, 1999 Park and Recreation Commission Page 4 • 7. Article re: Eagan Water Park Attached please find an article about the new Eagan water park, Cascade Bay for your information. M99-15.DOC • •