Loading...
9.B.6. PRSR 09-08-1999 Item #: 9.B.6. ityof lk River MEMORANDUM TO: Park and Recreatio Commission 5 FROM: Michele McPherso , irector of Planning DATE: September 1, 1999 SUBJECT: Park Dedication and Trail Reimbursement Fees Request Staff requests that the Commission discuss the current park dedication and trail reimbursement fees. Attachments • Chart— Land Dedication Amounts, St. Cloud Study • Bid Summary Park Dedication We received the information collected by DSU for the St. Cloud park dedication study, which was cancelled by St. Cloud. Based on a review of the information, St. Cloud must be in the process of establishing a new or revising an old policy. Very little information was useful for the discussion of fee amounts. Attached is a comparison of land dedication amounts that the Commission may find useful. It is my understanding that the park dedication fees were recently increased to the current level. As with any expense, costs will go up with inflation each year. In good markets, as the current labor market, costs have increased dramatically due to labor cost as opposed to material cost increases. The Commission may want to consider a policy in which the fees are increased a minimum of 5% or to the next even $100 increment each year or every other year. For the current fees, the park fee would increase to $1,155 or $1,200, depending on what the commission selects. Trail fees would increase to $210. Or they could be considered together, in which case the increase would be to $1,365 or $1,400. There is any number of variables to consider, but they should be increased slightly on an annual basis in order to continue to cover costs. The Commission, at an annual review of fees could recommend a larger increase based on changes in market, park development goals, or other factors. • 13065 Orono Parkway • P.O. Box 490 • Elk River, MN 55330 • TDD &Phone: (612)441-7420 • Fax: (612)441-7425 Park and Recreation Memo/Park&Trail Fees September 1, 1999 Page 2 Trail Reimbursement We have included a bid schedule for the construction of a 100' long bituminous trail based on the new trail section developed by Terry Maurer, Phil Hals, and Commissioner Dave Anderson. The total construction cost including a 5% contingency is $13.75 per linear foot. The previous reimbursement policy was for $10.00 per linear foot. Developers have approached staff regarding reimbursement for "extraordinary" costs associated with trail construction. It is staffs opinion that the reimbursement should be kept at a standard level. The Commission and staff would have to evaluate what makes a site more difficult or"extraordinary" to construct a trail on from another site. In addition, the eligible "extraordinary" costs would need to be identified which could pose difficulty. Recommendation Staff recommends that the Park and Recreation Commission recommend to the City Council the adoption of the following fees and trail reimbursement policy, effective January 1, 2000: 1. Adopt an increase in the park dedication fees to $1,400, with $1,150 for • park dedication and $250 for trails. 2. Adopt a trail construction reimbursement policy of$13.75 per linear foot. No "extraordinary" costs will be reimbursed. It is also recommended that the trail construction costs be evaluated every 2-3 years to ensure that the policy is reasonable. Item #: 9.B.6. riof � • MEMORANDUM R River TO: Park and Recreatio Commission FROM: Michele McPherso , irector of Planning DATE: September 1, 1999 SUBJECT: Park Dedication and Trail Reimbursement Fees Request Staff requests that the Commission discuss the current park dedication and trail reimbursement fees. Attachments • Chart— Land Dedication Amounts, St. Cloud Study • Bid Summary • Park Dedication We received the information collected by DSU for the St. Cloud park dedication study, which was cancelled by St. Cloud. Based on a review of the information, St. Cloud must be in the process of establishing a new or revising an old policy. Very little information was useful for the discussion of fee amounts. Attached is a comparison of land dedication amounts that the Commission may find useful. It is my understanding that the park dedication fees were recently increased to the current level. As with any expense, costs will go up with inflation each year. In good markets, as the current labor market, costs have increased dramatically due to labor cost as opposed to material cost increases. The Commission may want to consider a policy in which the fees are increased a minimum of 5% or to the next even $100 increment each year or-every other year. For the current fees, the park fee would increase to $1,155 or$1,200, depending on what the commission selects. Trail fees would increase to $210. Or they could be considered together, in which case the increase would be to $1,365 or $1,400. There is any number of variables to consider, but they should be increased slightly on an annual basis in order to continue to cover costs. The Commission, at an annual review of fees could recommend a larger increase based on changes in market, park development goals, or other factors. 13065 Orono Parkway • P.O. Box 490 • Elk River,MN 55330 • TDD &Phone: (612)441-7420 • Fax: (612)441-7425 Park and Recreation Memo/Park&Trail Fees September 1, 1999 Page 2 Trail Reimbursement • We have included a bid schedule for the construction of a 100' long bituminous trail based on the new trail section developed by Terry Maurer, Phil Hals, and Commissioner Dave Anderson. The total construction cost including a 5% contingency is $13.75 per linear foot. The previous reimbursement policy was for$10.00 per linear foot. Developers have approached staff regarding reimbursement for"extraordinary" costs associated with trail construction. It is staffs opinion that the reimbursement should be kept at a standard level. The Commission and staff would have to evaluate what makes a site more difficult or"extraordinary" to construct a trail on from another site. In addition, the eligible "extraordinary" costs would need to be identified which could pose difficulty. Recommendation Staff recommends that the Park and Recreation Commission recommend to the City Council the adoption of the following fees and trail reimbursement policy, effective January 1, 2000: 1. Adopt an increase in the park dedication fees to $1,400, with $1,150 for park dedication and $250 for trails. • 2. Adopt a trail construction reimbursement policy of$13.75 per linear foot. No "extraordinary" costs will be reimbursed. It is also recommended that the trail construction costs be evaluated every 2-3 years to ensure that the policy is reasonable. • Land Dedication Amounts Differentiated by Density Lino Lakes Residential 0-3 units/acre 10%of land Residential 3-5 units/acre 12%of land Residential 5-7 units/acre 14%of land Residential 7-9 units/acre 16%of land Residential 9+units/acre 18%of land Commercial and Industrial None Mankato For parks,playgrounds or other open space: Residential up to 10 units/acre 5%of gross area Residential in excess of 10 units/acre 7%of gross area Commercial and Industrial 5% of gross area Plymouth For park,playground, and public open space purposes: Residential up to 2 units/acre 10%of total land Residential 2-12 units/acre 10%+(actual density-2) Residential more than 12units/acre 20+(1/2 actual density-6) Commercial and Industrial 10%of total land area less any • floodplains or wetlands Rochester For neighborhood park purposes: Residential 0-1.9 units/acre 6%of gross area Residential 2-4 units/acre 10%of gross area Residential 4.1-5.9 units/acre 12%of gross area Residential 6-11.9 units/acre 14%of gross area Residential 12 units and greater 16%of gross area Commercial and Industrial None St Peter For parks: 1.1 acres per 100 persons according to the planned population of the subdivision. Recommended population densities as follows: Single family(detached) 4.0 persons per dwelling unit Single family(attached)/& duplexes 4.0 persons per dwelling unit Apartment and Townhouses Efficiency 1.0 persons per dwelling unit 1 bedroom 1.5 persons per dwelling unit 2 bedroom 2.5 persons per dwelling unit • 3 bedroom 3.5 persons per dwelling unit 4 bedroom 4.0 persons per dwelling unit Commercial and Industrial Up to 5%of gross land area Differentiated by Other Criteria • Apple Valley When a proposed park,trailway,ponding or open space area shown on the City's Comprehensive Plan,park development guide, storm sewer plan or official map is located in a subdivision: All the developer will be required to dedicate the area shown on the map For bus stops,parks,playgrounds,or public open spaces: Commercial and Industrial To 5% of gross land Burnsville Residential 10 acres/1000 population computed on proposed number of dwelling units multiplied by the average population for dwelling unit type Commercial and industrial 5%of gross land area Eden Prairie For parks,playgrounds, or open space: All "reasonable portion"up to 10%* 411 *Uses a formula to arrive at the percent for residential. Commercial is typically around 5%of the parcel's value. In addition,for mini-parks: Residential subdivisions of more than 50 units 1 acre/50 units Farmington Residential 12.5%of land Commercial/Industrial 10%of land Hutchinson For schools,conservation areas,bike/pedestrian paths, open spaces and parks: R-1 Zoning District 71.5%of land R-2 Zoning District 12%of land R-3 and R-4 Zoning District 15%of land Commercial I/C-1 Zoning District Negotiated Business Park or Industrial Zoned None 1110 x � Stillwater • For parks,playgrounds,wetlands,trails and open space The greater of 1)proposed units per acre or 2)zoned density: Residential, 0-1.9 units/acre 9%of net developable land Residential,2.0-3.5 units/acre 10%of net developable land Residential, 3.6-5.9 units/acre 11%of net developable land Residential, 6-10 units per acre 12% Residential, 10+units/acre Additional .5%for each unit over 10 Commercial 7%of net developable land Not Differentiated Alexandria For parks,playgrounds,public open space,trail systems and/or water holding ponds: All 5%of gross area Brainerd For public recreation, school sites or other public use (in addition to the amount dedicated for streets, alleys, easements, or other public ways): • All 7%of gross area Centerville For public recreation space: All 10%of gross land area Edina For parks,playgrounds,trails,wetlands or open space: All "Reasonable portion" Elk River For parks,playgrounds,trails,or public open spaces: All To 10%of gross land Little Falls For public recreation space, school sites,or other public use: All 7%of gross land area Marshall For schools,conservation areas or other public or semi-public recreation areas,or open spaces and parks: All, except Commercial or Industrial Zoned Property 5%of land area St. Cloud's Subdivision Ordinance Relating to Park Dedication Requirements ill 2.9 Public Open Spaces: p 2.9-1 All residential subdivisions shall dedicate land for public use such as parks, playgrounds,open spaces,natural sites,or other uses according to the following schedule. The plans will be reviewed by the Park and Recreation Department. 1 Family 2 or More Family Development Development 610 sq. ft./lot 480 sq. ft./unit 2.9-2 For subdivisions incorporating a mixture of uses and/or densities,the public use areas shall be determined by applying the appropriate dedication requirement for each use listed in this section. 2.9-3 Where a proposed public site or open space as shown on the Master Plan of the City is located in whole or in part in a subdivision,the Planning Commission may require the dedication or reservation of such within the subdivision in those cases in which the Planning Commission deems such requirements to be reasonable. 2.9-4 Land reserved for public sites and open spaces shall be of a character and location • suitable for the intended use as determined by the Planning Commission. Public sites and open spaces shall have a total frontage on one(1)or more streets of at least two hundred(200)feet, and no other dimension of the site shall be less than two hundred(200)feet in depth unless otherwise approved by the Planning Commission. 2.9-5 Under Minn. Statute Section 462.358 Subd. 2.b guidelines, in the event the Planning Commission determines a subdivision is too small, and/or does not include a park area as shown on the Master Plan, and/or the need for funds to develop existing park land in the area is more important,the owner or subdivider shall pay unto the city of St. Cloud such sum of money as set out in Section 520:00 of City Ordinance Code. 2.9-6 The City Finance Director shall establish a separate fund into which all cash contributions received from owners and developers in lieu of conveyance of dedication of land for such public purposes shall be deposited. The deposit shall be used by the City for acquisition of public site/open space that will be available to and benefit the persons in the subdivision for which payment was made. O:\JOBS\3932.9\EXAMPLES.WPD • BID SCHEDULE FOR:BITUMINOUS TRAIL SECTION CITY OF ELK RIVER,MINNESOTA • ITEM NO. ITEM UNIT QTY UNIT PRICE TOTAL PRICE'.'. SCHEDULE 1.0-TRAIL 1 COMMON EXCAVATION CY 23 $15.00 $345.00 2 TYPE 41 WEA 50055Y BITUMINOUS TON 13 $30.00 $390.00 3 AGGREGATE BASE,CLASS 5 TON 30 $12.00 $360.00 4 SEEDING ACRE 0.02 $1,000.00 $20.00 5 SEED MIXTURE 50A LB 1 $19.00 $19.00 6 COMMERCIAL FERTILIZER ANALYSIS 6-24-24 LB 4 $4.75 $19.00 7 MULCH,TYPE 1 TON 0.04 $500.00 $20.00 8 WOOD FIBER BLANKET SY 90 $1.50 $135.00 T SCHEDULE 1.0-COUNTY ROAD 1 SIDEWALK-TOTAL $1,308.00 5%CONTINGENCIES $65.40 BID SUMMARY-TOTAL $1,373.40 THIS ESTIMATE IS FOR A TRAIL 100'LONG X 10'WIDE. COST PER LINEAR FOOT OF TRAIL IS$13.75 • COMMON EXCAVATION(12'WIDE) (100 X 12 X 6/12)/27 TYPE 41 WEA 50055Y BITUMINOUS(10'WIDE) (100 X 10 X 2/12)/27 X 1.98 AGGREGATE BASE,CLASS 5(12'WIDE) (100 X 12 X 4/12)/27 X 1.86 SEEDING (2 SIDES X 4 X 100)/43560 SEED MIXTURE 50A 0.2 ACRES X 50 LBS/ACRE COMMERCIAL FERTILIZER ANALYSIS 6-24-24 0.2 ACRES X 200 LBS/ACRE MULCH,TYPE 1 0.2 ACRES X 2 TONS WOOD FIBER BLANKET (2 SIDES X 4 X 100)/9 • \trail-est.xls 4A