Loading...
08-26-2014 PC MIN ilkMeeting of the Elk River Planning Commission River Held at the Elk River City Hall Tuesday, August 26, 2014 Members Present: Chair Eric Johnson, Commissioners Andrew Cook,Jeremy Johnson, Mike Keller, Mark Konietzko,Jill Larson-Vito and Thomas Petschl Members Absent: None Staff Present: Deputy Director CODD Jeremy Barnhart, Park Planner/Planner Chris Leeseberg,Planner Zack Carlton and Recording Secretary Debbie Huebner I. Call Meeting to Order Pursuant to due call and notice thereof, the meeting of the Elk River Planning Commission was called to order at 6:30 p.m. by Chair Eric Johnson. 2. Pledge of Allegiance The Pledge of Allegiance was recited. 3. Consider 8/26/2014 Planning Commission Agenda Moved by Commissioner Keller and seconded by Commissioner Petschl to approve the August 26, 2014, Planning Commission agenda with the following addition: 8.2—Discuss Gravel Mining Motion carried 7-0. 4. 7/22/2014 Planning Commission Minutes Motion by Commissioner Konietzko and seconded by Commissioner Larson-Vito to approve the July 22, 2014, Planning Commission minutes. Motion carried 7-0. 5.1 Request by Starbucks for Conditional Use Permit to Amend PUD Agreement— Signage, 19171 Freeport St NW, Case No. CU 14-15 — Public Hearing, continued from July 22, 2014 The staff report was presented by Chris Leeseberg. Mr. Leeseberg noted that staff revised Item 4 of the PUD amendment language to address building signage facing arterial roads. Planning Commission Minutes Page 2 August 26,2014 Chair Johnson opened the public hearing. There being no public comment, Chair Anderson closed the public hearing. Motion by Commissioner Jeremy Johnson and seconded by Commissioner Keller to recommend approval of the request by Starbucks for a Conditional Use Permit to amend the Elk Park Center PUD Agreement,with following language: Wall Signs (Multi-Tenant Building) 1. Fascia signs for individual retail tenants shall be for store identity only. 2. Capital letters shall be no larger than 32" high; lower case letter shall be no larger than 24" high. Signs shall be centered over the entrance doors to the tenant space, or the leased area, but in no case shall they extend closer than 3'-4' from the projected lease line. 3. These signs shall be internally illuminated, individual letters placed on a 4" square electrical raceway,painted to match the brick facia. 4. No signage shall be permitted on the sides or rear of the building, other than that required for delivery identification or traffic control. For sides of buildings facing an arterial road, one sign not exceeding 20 square feet shall be allowed. 5. Attachment D illustrates a typical wall sign. Motion carried 7-0. 5.2 Request by Brian Brehmer for Conditional Use Permit for Car Wash at Ralphie's Victory Lane, 13784 Highway 10, Case No. CU 14-18 — Public Hearing, continued from July 22, 2014 The staff report was presented by Zack Carlton. Staff recommended approval with the three conditions listed in the report. Chair Johnson opened the public hearing. There being no comment, Chair Johnson closed the public hearing. Chair Johnson stated he did not see any issues with the request. Motion by Commissioner Jeremy Johnson and seconded by Commissioner Konietzko to recommend approval of the request by Brian Brehmer for a Conditional Use Permit for a car wash,with the following conditions: 1. The Conditional Use Permit is not a building permit and the applicant must apply for and receive approval of required building and sign permits before construction may begin. 2. Staff approval of a revised landscape plan prepared by a landscape architect. 3. Staff approval of revised site, drainage, and utility plans Motion carried 7-0. 6. General Business —None Planning Commission Minutes Page 3 August 26,2014 7.1 City Council Liaison Update —No update 9. Adjournment There being no further business, Commissioner Jeremy Johnson moved to adjourn the meeting. The meeting of the Elk River Planning Commission adjourned at 6:42 p.m. 77 (C Tina Allard City Clerk Eric Johnson, Chair, Planning Commission