Loading...
4.3. SR 10-06-2014 City of Elk=' Request for Action River To Item Number Mayor and City Council 4.3 Agenda Section Meeting Date Prepared by Consent October 6, 2014 Justin Femrite, P.E., City Engineer Item Description Reviewed by Memorandum of Understanding with Sherburne Cal Portner, City Administrator County Soil and Water Conservation District for a Reviewed by Lake Orono Sub-watershed Assessment Action Requested Approve,by motion,a Memorandum of Understanding with the Sherburne County Soil and Water Conservation District (SWCD) for the completion of a Lake Orono Sub-watershed Assessment. Background/Discussion Similar to the Mississippi sub-watershed assessment completed in 2011, staff proposes we again work with the Sherburne County SWCD to complete an assessment of the area draining to Lake Orono. The goal of the study will be to analyze and prioritize system retrofits that can enhance stormwater treatment before sending water to Lake Orono. Analyzing and having recommendations made through this formal study allows us future opportunities to qualify for clean water type grants to complete the improvements. The study further shows our continued progress toward meeting the post construction stormwater management requirement (Minimum Control Measure 5) of our MS4 permit. Financial Impact The total cost for the study as estimated by the SWCD is $13,750. The city share of the cost will be up to $2,750. The SWCD has secured the remaining funding through a state grant. Attachments ■ Memorandum of Understanding P a w E A E U s r Template Updated 4/14 INIM UREI MEMORANDUM OF UNDERSTANDING AGREEMENT BETWEEN SHERBURNE SOIL AND WATER CONSERVATION DISTRICT AND THE CITY OF ELK RIVER FOR ORONO LAKE SUBWATERSHED ASSESSMENT TOTAL PROJECT COST $13,700 SWCD GRANT $11,000 CITY MATCH $2,700 (cash or in-kind) A. PURPOSE The purpose of this project is to identify and rank projects that will improve water quality in the urban service area of the Lake Orono watershed. These projects may include retrofitting existing practices, treating street runoff via the use of infiltration practices or other innovative practices as identified. Potential projects will be ranked by the amount of pollutants kept out of the lake per dollar spent, thereby prioritizing the use of limited financial resources. After completion of this study the Soil and Water Conservation District and The City of Elk River will pursue installation of the most favored projects. The study will provide information needed to write competitive grant applications for this purpose. B. COST In full consideration for services under this Agreement, the City shall provide the required 25% match not to exceed $2,700. City staff time for assistance with tasks listed and agreed to in Exhibit A and/or payment to the District from the City, for its services to complete the study. C. ROLES AND RESPONSIBILITIES TASK DESCRIPTION RESPONSIBILITY: STEP 1: PROJECT SCOPING TASK 1: Document how Subwatershed was selected Complete (via June 26th meeting): Orono Lake Urban Service Area(OLUSA) STEP 2: DESKTOP ANALYSIS TASK 1: Delineate stormwater catchments from within the OLUSA City 2014 ORONO LAKE SUBWATERSHED ASSESSMENT AGREEMENT TASK 2: Compile a comprehensive list, identify locations on map, City(HDR is doing this for the and provide specs for existing stormwater treatment in entire City and they were going OLUSA to focus in this area first per our last meeting:correct?) TASK 3: Model existing OLUSA using WinSLAMM(existing District conditions) and select highest ranking catchments for further analysis based on 1)potential loading or prioritize catchments based on proximity and estimated delivery(i.e. prioritize catchments based on direct connection without treatment or 3) select all catchments within selected subwatershed for further analysis. TASK 4: Conduct desktop search for retrofit sites District/City TASK 5: Prepare maps for field reconnaissance of retrofit sites District STEP 3: FIELD RECONNAISSANCE TASK l: Visit each site to 1)confirm remote data and 2)confirm District/City applicability of assigned retrofit area type (from previous step)or modify plan TASK 2: Choose which BMP(s)to employ District/City a) Storage Retrofits: • Extended Detention • Wet ponds • Wetlands b) On-site Retrofits: • Bioretention • Filtration • Infiltration • Swales • Other TASK 3: Gather site specific data that will either/both limit or District/City improve BMP design performance TASK 4: Assign priority ranking for individual parcels in terms of District/City retrofit applicability and expected performance as determined by their location in the watershed and site- limiting factors STEP 4: COSTBENEFIT ANALYSIS TASK 1: Model OLUSA with identified retrofits using WinSLAMM District 2014 ORONO LAKE SUBWAi iED ASSESSmL�� AGREEMENT TASK 2: Rank catchments based on pre- and post BMP installation District modeling estimate TASK 3: Refine/develop cost estimates (there are some standard costs District/City but they can be refined based on local information) TASK 4: Rank catchments using cost/benefit analysis District/City STEP 5: FINAL REPORT Target Fall 2015 TASK 1: Contents of final report include: District a) Executive summary: include cost/benefit ranking table (ranking catchments,not individual BMPs); using standardized format b) Required maps: subwatershed and all catchments(one overview map); individual catchments (one map for each priority catchment- can be within individual catchment descriptions section); catchment connectivity(one map or diagram showing flow routing between all catchments and receiving water) c) Catchment descriptions: profile for each priority catchment must include pertinent catchment characteristics (such as model inputs),written description of existing conditions, catchment overview map showing potential BMP locations, and description of potential BMP's d) Cost table using standardized format(local cost modifications allowed) e) Appendix: model descriptions,protocol/methodology, definitions references TASK 2: Presentation at a workshop hosted by City(Optional) City/District STEP 6: IMPLEMENTATION Not a deliverable of MOU TASK 1: Obtain landowner approvals(if applicable) City TASK 2: Put together site-specific final design package City TASK 3: Secure retrofit funding City/District TASK 4: Conduct bidding for construction City 2014 ORONO LAKE SUBWATERSHED ASSESSMENT AGREEMENT D. SIGNATURES IN TESTIMONY WHEREOF the parties have duly executed this agreement by their duly authorized officers. APPROVED: CITY OF ELK RIVER SHERBURNE SOIL AND WATER CONSERVATION DISTRICT By: By: Its: Mayor Its: Date: Date: By: Its: City Clerk 2014 ORONO LAKE SUBWATERSHED ASSESSMENT AGREEMENT