3.0. SR 04-05-2004City ~ Elk _. River MEMORANDUM Item TO: FROM: DATE: SUBJECT: Mayor and City Council Michele McPherso~?Director of Planning April 5, 2004 Public Informational Meeting - Sherburne County Justice Center Expansion, Case No. SP 04-02 ~3 Request The Council is asked to conduct a public informational meeting regarding the Sherburne County Justice Center expansion. Overview The proposed Justice Center expansion is comprised a two-story 120-bed jail expansion with a training facility and gun range located in the addition's basement. Also included in the expansion is a free-standing maintenance structure which will house the boiler and chillers for the building, as well as a small area to store the grounds maintenance equipment for the site. Attachments · Location Map · March 17, 2004 memo from the City Engineer · Existing Site Plan · Proposed Ske Plan · Partial Landscape Plan · Grading and Drainage Plan · Elevation History In reviewing the files, the first Sherburne County facility was built on the site in 1979. The initial building permit indicated a structure 250'x175' (43,750 square feet), two stories in Memo to Mayor and City Council/SP 04-02 April 5, 2004 Page 2 height. Since that time, multiple permits for a variety of interior alterations have occurred, however substantial additions occurred in 1993 (15,981 square feet), 1999 (180 jail cells were added), and the current request for additional 120 jail cells. The proposed building addition includes areas within the existing administration offices that will be remodeled that do not have exterior impacts. Analysis A site plan review analysis typically is conducted internally with staff from Engineering, Building & Environmental, Fire, Police, Planning and Public Works. Issues that are typically reviewed and evaluated include zoning requirements (setbacks, parking requirements, landscaping), grading and drainage, utility connections, Fire Department access, and impacts to adjacent properties. The following is an analysis of the proposed expansion of the Justice Center in terms of staff review. Zoning Requirements Setbacks The property is zoned Business Park and guided light industrial. The Business Park building setbacks are as follows: Front yard- 35 feet; Side yard - 20 feet; Rear yard - 30 feet. The building meets the above setbacks in the following way: Front setback - 244 feet; Side yard setback - 40 feet on the east and 183 feet on the west; Rear yard setback - 72 feet Parking setbacks in the Business Park District are as follows: Front yard - 25 feet; Side yard - 20 feet; Rear yard - 20 feet. The drive and parking isles have the following setbacks in the expansion areas: Side yard - 32 feet on the east and 210 feet on the west Rear yard- 20 feet S:~xPLANNING\Case Files\2004\SP 04-02 Sherbum Co Justice Ctr\4-5 CC memo.doc Memo to Mayor and City Council/SP 04-02 April 5, 2004 Page 3 There is a portion of the entry drive in the northeast corner of the ske that does not meet the setback requirement of 20 feet. Parking Offices must meet a parking ratio of one space for every 300 square feet of floor area; however, the Justice Center has a large amount of square footage is dedicated to jail space which would not generate parking spaces other than those for the maximum number of staff on duty at any given time. The Development Regulations do not identify a parking ratio for jail cells. Per the architect's calculation, the administration building square footage is 151,037 square feet, which generates a need of 503 parking spaces. There are a total of 400 jail cells (this includes dormitory spaces), of which 360 can be double-bunked. The total number of parking spaces after expansion will be 566 regular spaces and 17 handicapped spaces. Landscaping The City's ordinance requires one tree for every 40 linear feet of site perimeter. For the Justice Center site, 103 trees would be required; 52 overstory, 26 ornamental, and 25 evergreen. A detailed landscape plan was not submitted, however, on a site inspection, the following trees were observed: 67 overstory, 24 ornamental, and 16 evergreen. In addition to the above number of trees, the ordinance requires that screening at 80% opacity be provided for adjacent residential uses and zones. The County has installed a six foot high black vinyl-dad chain link fence with slats along the east property line. In addition, there are evergreen trees planted in the adjacent properties along the entire length of the fence. Grading and Drainage As part of the expansion plans, the existing detention pond located in the southwest corner of the site will be modified and expanded to contain the additional storm water generated from the additional impervious surface. The comments in the March 17, 2004 City Engineer's memo have been submitted to the applicant and revisions have been made to the plan. The City Engineer verbally indicated that the revisions to the plan meet the City's requirements, that there are no further issues to address regarding the drainage and grading plan. Building Materials The building materials and design is consistent with the existing facility and this complies with the Business Park building design standards. A detailed lighting plan should be submitted for staff review. S:\PLANNING\Case Files\2004\SP 04-02 Sherbum Co Justice Ctr\4-5 CC memo.doc Memo to Mayor and City Council/SP 04-02 April 5, 2004 Page 4 Conclusion The expansion plans as presented meet the Development Regulations of the City with the exception that a few more ornamental and evergreen trees are required to meet the letter of the ordinance. The County should also provide an asbuilt landscape plan for the City's files. S:~PLANNING\Case Files\2004\SP 04-02 Sherburn Co Justice Ctr\4-5 CC memo.doc ~FL1 BUSINE 5S CENTER DRIVE COUNTY COURT HOUSE SITE BUSINESS CEh OU TLOT A SECOND ADDI 185RD AVENUE TOWNHOMES THIRD ADD, COUh FAI GROU ORONO P OAK SA RAver Case Number: Location Map N SP 04-02 SHERBURNE COUNTY JUSTICE CENTER EXPANSION Howard R. Green Oompany March 17, 2004 File: 823320J-0240 Ms. Michele McPherson Director of Planning City of Elk River 13065 Orono Parkway Elk River, MN 55330 RE: SHERBURNE COUNTY JUSTICE CENTER EXPANSION Dear Ms. McPherson: As requested, we have reviewed the site civil portion of the Sherburne County Justice Center expansion. The plans we reviewed were prepared by Loucks and Associates and were marked as 95 percent complete with a date of January 23, 2004. Based on our review and comments received at the staff review meeting, we would offer the following comments: A. Storm SewerlPonding 1. The existing storm drainage pond located in the southwest corner of the site is proposed to be reshaped and moved slightly further west. In this move of the pond, the proposed side slopes are proposed to be steepened from a 4:1 to a 3:1. Best Management Practices, which the City has adopted and follows, requires that the side slopes remain at a 4:1 slope. In addition, no drainage calculations have been provided to determine first of all if the same capacity is provided in the reconfigured pond, and secondly, if additional storage volume has been added for the additional impervious area caused by this Justice Center expansion. 2. Much of the existing storm sewer system is being abandoned and removed to make way for the Justice Center expansion. The revised storm sewer system is now extended down the roadway on the east side of building around the south side of the building and into the pond. The City has a 40-foot drainage and utility easement along the east side and south side of the property. Within that easement is contained trunk sanitary sewer and watermain. The sanitary sewer is approximately 18 feet deep. The new storm sewer placed on the east side of the road on the east side of the building is within five feet of the sanitary sewer. We would recommend that the storm sewer line be placed on the west side of the roadway to provide more separation from the existing sanitary sewer. 3. There will be three new outlets into the reconfigured drainage pond. There is a standard plate showing riprap at the outlet of these pipes. In addition, there should be a Storm Water Pollution Prevention Plan (SWPPP) submitted with the project, which would detail all of the sediment and erosion control along with turf establishment requirements for the project. As you are aware, the City is in the Ltr-031704-McPherson.doc 2550 University Avenue West · Suite 400N · St. Paul, MN 55114 · 651/644-4389 fax 651/644-9446 toll free 888/368-4389 Ms. McPherson March 17, 2004 Page Two process of preparing a standard SWPPP for use on projects. If Sherbume County desired, it would be appropriate to use the City's standard SWPP for this project. Is there a setback requirement for ponding from property lines, parking lots, and buildings? The proposed reconfigured drainage pond has 3:1 side slopes that begin immediately adjacent to the property line on the west and parking lot and new building on the east. We would strongly suggest that this is an undesirable situation. B. Sanitary Sewer/Watermain 1. There are two new proposed hydrants to be installed near the south side of the Justice Center expansion: one on the east and one on the west. The proposed hydrant on the east is situated on the south side of the new read surrounding the expansion. We would recommend that that hydrant be moved to the north side of the road. 2. Fire Chief indicated he thought there was an existing hydrant not shown on the plans that would be approximately just north of the building expansion on the west side. The fire department would like that hydrant relocated, or a new one placed if that hydrant does not exist, on the green space behind the sidewalk between the existing building and the expansion. 3. Water service and fire protection is proposed to be provided by six-inch water stub from the existing eight-inch water line along the west side of the expansion. 4. Sanitary sewer service is proposed to be provided into both sides, east and west, of the expansion. On the east side of the building, this is proposed to be accomplished by constructing a new sanitary sewer manhole over the existing line with a six-inch stub to the building. On the west side, there is proposed to be an eight-inch stub out of an existing manhole extended northerly to a new manhole with six-inch stubs into the west side of the Justice Center expansion and the south side of the new maintenance building. Because City Ordinance requires each individual building to have its own service, this entire line from existing sanitary sewer will have to be considered a private service. If you have any questions regarding any of these issues, please call. Sincerely, Howard R. Green Company T~.E. TJM:sw Ltr-031704-McPherson.doc Howard R. Green Company -'7 i I I I I I ' I L .... ...................................... i i i ,, I KK architects minneapolis newport beach pasadena KKE Architects, Inc. 300 first avenue north minneapolis, mn 55401 phone: 612/339-4200 fax: 612/342-9267 TM LL Key Plan No, Date Revision Description SHERBURNE COUNTY JUSTICE CENTER EXPANSION ELK RIVER MINNESOTA SITE PLAN Check_e~ by i / I ./ i i i KK architects minneapolis newport beach pasadena KKE Architects, Inc. 300 first avenue north minneapolis, mn 55401 phone; 612/339-4200 fax: 612/342-9267 TM / : Key Plan No. Date Revision Descdptio~ E L SHERBURNE COUNTY JUSTICE CENTER EXPANSION ElK RIVER MINNESOTA SITE PLAN D~r a~wn by . Checked by F~LANTIN~ ~HE~ULE AN~ NOTE~: I KK architects minneapolis newport beach pasadena minneapolis, mn fax: SHERBURNE COUNTY JUSTICE CENTER EXPANSION ELK RIVER MINNESOTA PLANTING PLAN CONTOURS FROM PHASE 2 CONSTRUCTION PLANS (FIELD 'vERIFY) 0 30 60 $CAL~ IN FEET KKr' architects minneapolis newport beach pasadena 300 first avenue nMth fa= SHERBURNE COUNTY JUSTICE CENTER EXPANSION BI( KIV~ MINN~OTA GRADING, DRAINAGE & EROSION CONTROL PLAN Sherburne County Justice Center Expansion architects