Loading...
8.1. SR 10-20-2014 Ells -Wft _ Request for Action River To Item Number Mayor and City Council 8.1 Agenda Section Meeting Date Prepared by General Business October 20,2014 Justin Femrite, P.E., City Engineer Item Description Reviewed by Twin Lakes Road Intersection Analysis Cal Portner, City Administrator Reviewed by Action Requested Provide staff direction for intersection analysis on Twin Lakes Road. Background/Discussion On September 15,2014, staff attended a meeting at the Chamber of Commerce to discuss the future plans for a roundabout at the intersection of Twin Lakes Road and 171"Avenue. The Chamber set the meeting to open a dialog about concerns they had fielded from the trucking operations run by the LeFebvre Companies and Morrell Companies. Other local companies with representatives at the meeting included Alliance Machine, Central Bank,Novco,and Preferred Powder Coating. The participants expressed much reservation and opposition to the idea of a roundabout at this location. The meeting ended with the participants requesting the city study alternative intersection options at this location. Some indicated they cannot move forward with continued investment into their businesses in Elk River with the idea of a roundabout being installed in this location. The proposed roundabout is neither a new topic nor one of immediate consideration for construction. It was identified and approved in the transportation section of the 171"Avenue Focused Area Study (1715` FAST). Construction would not be considered before a new connection of Twin Lakes Road and TH10/169 is completed,which is estimated to occur in 4-5 years, and possibly later. The 1715` FAST is a long-term plan with many variables, time lines,and moving parts. More development will help define the character of the area and its ultimate traffic needs. In addition to this roundabout, the 1715` FAST identifies another roundabout on the same corridor at the existing intersection of Twin Lakes Road and 175`h Avenue and yet another one further to the south. The topic of the roundabout is larger than the single intersection that was discussed at the Chamber meeting. Staff is looking for direction from the Council toward one of the following paths: 1. Amend the 171"FAST to remove all roundabouts and replace with language stating only standard intersections will be considered with signal systems used as warranted by traffic demands. 2. Take no action at this time. With traffic generators better established, complete a corridor study in the future before the connection with TH 10 is fully designed. A corridor study would analyze solutions at all intersection on the Twin Lakes Road from Main Street to TH 10/169. 3. Complete the corridor study at this time. P 0 w E R E 0 0 Y Template Updated 4/14 INAWR Financial Impact If the first option is chosen, the amendments to the 171"FAST can be completed by staff and the topic of roundabouts in this area will be done. A corridor study, to be completed now, or in the future,would require staff to define a scope and prepare a request for proposal to hire an outside consultant to complete the analysis. If it is directed to complete the corridor study at this time, the proposals and associated costs will be brought back for approval of the Council before the end of the year. Attachments ■ Transportation Figure, 1715`FAST N:\Public Bodies\Agenda Packets\10-20-2014\Final\x8.1 sr TLR Intersections.docx DEVELOPMENT FRAMEWORK Transportation inFrastructUM DiaGram Downtown Elk River GRE Plant Hillside Park + �f. Potential future *,� ---- frontage read f 5,,�...= Kllever, Connection »: Marsh over Hwy.169 , ,., ,,, j connecting to i Carson Street 1 f- Investigate additional rail line crossing and extension of Future trail connection 4--A 173rd.Avenue to Twin Lakes along river - Parkway.Investigate grade Alternative overpasses 7,ta separated rail crossing,either opportunities at 173rd.and 171st. r at Twin Lakes Parkway or f Avenues to support uses west o rn 173rd.Avenue Hwy la/169.Investigate lowering 1 •� Hwy 10/169 to facilitate overpass 11 r ElkRi tation construction and reducing impacts .:D J of overpass . I Create a north/south connection at , 3_ Potential future rail spur Yale - Extension of Twin Lakes Parkway Explore trail alignments along river or °° through Cargill property along the frontage road y' .�1 \ Maintain contact points Adjust road alignment for 8 Future interchange improved parcel dimensions Ail access closed '~ '` o } Standard radius and design ` 165th avenue '1. �'- _ fsd speed converted to cul-de- sac f - RDr Plant i Extension of Twin Lakes Legend. ; Parkway to southern elk River border"Subregional collector" TRAFFIC SIGNAL l Tru"ktlarrIL 16501.Ave. ROUNDABOUT , Cargill FULL PARCEL ACCESS i` YouthAthletit PARTIAL PARCEL ACCESS 0�, Complex (RIGHT-IN/RIGHT-OUT) MEDIAN Future trail Connection �.,..` TRAILS along fiver SIDEWALKS NORTHSTAR STATION f --- GATEWAY PROPERTY 0 Figure 54 Transportation Infrastructure Diagram 4 1718t. clvenue Focused Area STudy