4.3. SR 04-19-2004Item# 6.3. MEMORANDUM TO: FROM: DATE: SUBJECT: Mayor and City Council Scott HarlJcker, Senior Planne~ April 19, 2004 Northstar Corridor Update At the NCDA meeting held on April 1~ received an update on the negotiations with BNSF. Those negotiations are moving forward. No new information regarding state and federal funding. The authority also heard a presentation regarding the feasibility studies of potential future stations at Ramsey and Sauk Rapids. The Ramsey site would have a positive affect on the Cost Effectiveness Index (CEI) and the Sauk Rapids site would have a negative affect. The CEI is the measurement that the FTA uses to rate the feasibility of transit projects. NCDA Meeting Agenda April 1, 2004 4:30 p.m. Sherburne County Government Center Elk River, MN Action Requested Minutes of the January 22, 2004 NCDA Meeting* Executive Committee Follow-up: a. Approval of Local Contributions to Northstar Capital Cost* b. Amendment #1 to Green Espel Legal Services Agreement* Legislative Update a. State b. Federal Update on BNSF Negotiations Report on Feasibility Studies of Potential Future Stations: Ramsey and Sauk Rapids Report on Northstar Commuter Coach Operation* Public Information Activities Other *Documentation Enclosed Approval Information Approval Discussion Information Presentation Information Information Next Meeting: May 6, 2004 (tentative) NORTHSTAR CORRIDOR DEVELOPMENT AUTHORITY Annual Meeting Minutes January 22, 2004 The Northstar Corridor Development Authority met on January 22, 2004, in special session at the Sherburne County Government Center, Elk River, Minnesota. Attendees included: Duane Grandy, Tim Yantos, Scott Harlicker, Woody Bissett, Ewald Petersen, Terry Nagorski, John Weaver, Pat Cairns, Art Daniels, Kaye Becktold, Dan Lieser, David Elvig, Paul McCarron, Steve Billings, Dennis Berg, Arne Engstrom, Ken Paulson, Bruce Nawrocki, Tom Garnet, Jeanne Mason, Dan Erhart, Mark Stenglein, Mary Richardson, John Himle, Lona Schreiber, Mark Stenglein, Rhonda Sivarajah, Patrick Wussow, Jim Barton, Dean Michalko, Jeanne Mason, Jean Keely, Robert Kirchner, Brian Bensen, Jay McLinden, Jeff Dehler, Bill Schreiber, Peg Aho 1. Minutes of the December 18, 2003 and January 8, 2004 Meetings: Ewald Petersen made a motion that the minutes of the December 18, 2003 and January 8, 2004 meetings be approved as submitted. The motion was seconded by Pat Cairns and passed unanimously on a voice vote. 2. To Consider Governor's Bonding Proposal and Allocation of Capital and Operating Costs: Paul McCarron presented a draft resolution for consideration by the NCDA. Mr. McCarron stated three positive things with regards to the Project: 1) Norm Coleman issued a statement saying that he is on our side; 2) Congressman Mark Kennedy is making a public statement in favor of the Project; and 3) there are 16 daily newspapers in Minnesota out of 15 that back the Project. Paul McCarron noted that Resolution 2004-02 is designed to show that NCDA members support the negotiations that took place in January at the Governor's office. The resolution states that the members support the commitment of $37,500,000 in the next biennium for the Project and strongly recommends that the Northstar Capital Funding partners adopt resolutions committing their proportional share of the $37,500,000 with the understanding that' 1)The total local share will not exceed one-third of the non-federal share of funding; 2) that the NCDA will seek new funding partners to share in the costs of the Hiawatha LRT Corridor connection and other project elements; and 3) that the NCDA will be the delegated construction authority and have the right to participate in the operations of Northstar. The Resolution further notes that the NCDA directs staff to work with Governor Pawlenty's administration to develop alternatives for local governments to use in funding operating costs. Dan Lieser asked if project costs are broken out. Tim Yantos reviewed the preliminary capital cost estimates based on the Governor's proposal: 63.5% of the costs would be covered by Anoka County, 15% by Sherburne County; 14.5% by I-Iennepin County and 7.0% by Benton County. Chair Grandy asked when these costs would need to be paid. Mr. Yantos noted over the next 30 years. Mark Stenglein made a motion that the Resolution as presented be adopted by the NCDA. The motion was seconded by Arne Engstrom. Discussion followed. o Patrick Cairns stated that Phase I has little benefit to Benton County and the city of St. Cloud, why then is Benton County expected to pay 7% of the costs. He asked if the NCDA will would continue its support of the Project after the first Phase has been complete? Paul McCarron noted that at its last meeting the NCDA passed a resolution that stated that the whole membership would support al__]_l phases through completion. Mark Stenglein made a of the Northstar Project from beginning motion that the resolution be amended by adding another resolve resolving that the NCDA reaffirms its commitment to the entire Northstar Corridor Project, including its financial commitment to eventually include service to the greater St. Cloud area. Dennis Berg seconded the motion that the resolution be passed as amended, the motion carried unanimously on a voice vote. Dan Lieser suggested that each individual jurisdiction along the Corridor needs to pass a resolution in support of funding the Northstar Project. Chair Grandy noted that such a resolution should go before each NCDA member county board for approval. Dan Lieser suggested that someone put the pressure on Stearns County to become a funding partner to the Northstar Project. Paul McCarron noted that from the very beginning of this Project this Board has been in contact with Stearns County. Jean Keely noted that the reason the City of Blaine became a member of the NCDA is because of the possibility of a Foley station location. She asked if there is a possibility that the Foley station may be added back in. Chair Grandy noted that feasibility studies done in the future may say that the Foley and City of Ramsey station sites should be developed. Legislative Update: a) State: Bill Schreiber noted that it is a good feeling to be part of a team working with a Governor's Administration that supports the Project. Bill noted that Dean Johnson is now in majority leaders office. First hearing was held yesterday on the Northstar Project. o o b) Chair Grandy, noted that the All Board Committee is working with the Elk River All Aboard Committee to attempt to get at least 100 people at their Rally which is going to be the same day as the Transportation Alliance Rally - February 26 at the Capitol. Federal: Lona Schreiber noted that the Northstar Project is included in the draft of the federal bonding bill. Resolution of Continuing Support passed by City of St. Cloud: John Ellenbecker noted that a resolution had been passed by the City of St. Cloud whereby St. Cloud pledged its continuing support for the Project. Next Meeting: After discussion, Chair Grandy announced that there would be no NCDA meeting the month on February 5, 2004 but that the next NCDA meeting would be set for March 4, 2004, Jeanne Mason made a motion that the meeting be adjourned. Art Daniels seconded the motion. The meeting adjourned 5:50 p.m. Duane Grandy, Chairperson ~ Date NCDA Agenda Item #2a MEMORANDUM March 26, 2004 TO: FROM: RE: NCDA Staff Approval of Local Contributions to Northstar Capital Cost Attached are copies of the resolutions passed by the Sherburne and Anoka County Regional Railroad Authorities approving their share of the Projects costs by contributing to payment of debt service on bonds to be issued by Anoka County Regional Railroad Authority for the purpose of financing the acquisition, development, construction and equipment of railroads and railroad facilities. Also attached are drafts of the resolutions that are being considered by the Hennepin County and Benton County Regional Railroad Authorities. Action Requested: Information Northstar Corridor Develop~nent AuthoriO, 2100 3'" Avenue, Anoka. Minnesota 55303-2265 (763) 323-5700 Fax: (763) 323-5682 www. northstartrain.org Resolution ,March 9, 2004 DATE Sherburne County Regional Rail Authority 030904-RRA-03 NUMBER SHERBURNE COUNTY REGIONAL RAILROAD AUTHORITY RESOLUTION INTENT TO ISSUE BONDS TO FINANCE LOCAL SHARE OF COMMUTER RAIL PROJECT SUBJECT TO CERTAIN CONDITIONS SET FORTH HEREIN, WHEREAS, the Sherburne County Regional Rail Authority (the "Authority") is a regional railroad authority organized and existing as a political subdivision and local government unit pursuant to Minnesota Statutes, Section 398A.03; and WHEREAS, the Authority has entered into a Joint Powers Agreement with various other counties, county regional railroad authorities, cities and towns for the purpose of addressing transportation needs along the Northstar Corridor, and such joint powers entity is known as the Northstar Corridor Development Authority; and WHEREAS, by Resolution #110999-AD-613, adopted November 9, 1999, the Authority approved a funding plan for the Northstar Corridor including an agreement to contribute a share of the debt service costs on bonds to be issued to finance project costs; and WHEREAS, on January 8, 2004, the Northstar Corridor Development Authority (NCDA) approved the concept of undertaking the Northstar Corridor project in two phases, by adoption of Resolution 2004-1 Approving Phase One of the Northstar Commuter Rail Project that includes the portion of the corridor between Big Lake and Minneapolis with stations in Big Lake, Elk River, Anoka, Coon Rapids - Riverdale, Fridley, and downtown Minneapolis; and WHEREAS, Northstar Phase One includes the connection to the Hiawatha Light Rail Transit (LRT) corridor in downtown 'Minneapolis; and WHEREAS, on January 13, 2004, Governor Pawlenty announced his support for Northstar Phase One; and WHEREAS, Governor Pawlenty is proposing that the State of Minnesota contribute an amount equal to 33.3% of the total Phase One project cost, an estimated $88.3 million, and that the Northstar Capital Funding Partners (Hennepin, Anoka, Sherburne, and Benton Counties or County Regional Railroad Authorities) contribute an amount equal to 16.7% of the total Phase One project cost, an estimated $44.2 million; and WHEREAS, on January 22, 2004, the NCDA adopted Resolution 2004-02 approving in concept Governor Pawlenty's funding proposal; and WHEREAS, the Authority is authorized to issue bonds for the purpose of financing the acquisition, development, construction and equipment of railroads and railroad facilities including but not limited to terminal buildings, roadways, crossings, bridges, causeways, tunnels, equipment and rolling stock. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COMMISSIONERS OF THE SHERBURNE COUNTY REGIONAL RAILROAD AUTHORITY: The Authority hereby confirms its approval of the plan for financing the project costs of the Northstar Corridor project, including the plan as presently proposed for Anoka County Regional Railroad Authority to initially issue bonds for the purpose of financing the local (non-state) share of the cost of developing Phase One of the Northstar Commuter Rail Project, such bonds to be issued in an amount to equal 16.7% of the total project cost, an estimated $44.2 million. The bonds are intended to be payable from proceeds of taxes levied by the Authority, and from contribution agreements to be entered into between Anoka County Regional Rail Authority and other participating counties and rail authorities, pursuant to which contribution agreements such other counties and rail authorities will be responsible for payment of a portion of the debt service on the bonds. The share of the debt service to be contributed by this Authority is up to 15.00%. The bonds shall bear a term to maturity of 30 years. The respective share of local (non-state) costs of the participating counties and rail authorities, including the Authority, shall be reduced by the value of any funds or property contributed by such county or rail authority, or any city located within its jurisdiction, in which case the maximum principal amount of the bond, and such county or rail authority's respective share of debt service shall be reduced accordingly. Enhancements to the system requested by a local government unit shall be financed by the local government unit and shall not reduce the county or rail authority's respective share of debt service. The total share of local (non-state) costs of the participating counties and rail authorities, including the Authority, shall be reduced by the value of any funds or property contributed by any public or private entity for the purposes of payment for the Hiawatha LRT connection, in which case the maximum principal amount of the bond shall be reduced accordingly. o The agreement of this Authority to contribute to payment of debt service on the bonds to be issued by the Anoka County Regional Railroad Authority is subject to the availability of state and federal funding for the remaining 83.3% of project costs, and to receipt of contribution agreements from the other participating counties and rail authorities in an aggregate amount sufficient to pay the balance of the debt service on the bonds. As previously approved, the terms and conditions contained herein shall also apply to the funding of Phase Two of the Northstar Commuter Rail Project, extending the service to the Greater St. Cloud Area. The percentage share of the debt service of each county may be revised to reflect the most current U.S. Census population data available at the time of the financing of Phase Two. Brian Bensb, r/ County Ad~i/nistrator /Date / I{.P_..;Li. IOi~AL RAILROAD AUTHORITY ] Anoka County, Minnesota I D~TE: March 9, 2004 RESOLI..rrlON g2004-:~ OFFERED BY: Commissioner Dennis D. Berg _ / ANOKA COUNTY REGIONAL RAILROAD AUTttORITY RESOLUTION OF INTENT TO ISSUE BONDS TO FINANCE LOCAL SHARE OF COMMUTER RAIL PROJECT SUBJECT TO OgRTAIN CONDITIONS SET FORTH ItEREIN WI--IF, REAS, the Anoka County Regional Railroad Authority (ACRRA) is a regional railroad authority organized and existing as a political subdivision and local government unit pursuant to Minnesota Statutes, Section 398A.03; and, WI-~REAS, the ACRRA has entered into a Joint Powers Agreement with various other counties, county regional railroad authorities, cities, and towns for the purpose of addressing transportation needs along the Northstar Corridor, and such joint powers entity is known as thc Northstar Corridor Development Authority (NCDA): and, WI-ZEREAS, by Resolution #1999-4, adopted August 24, 1999. the ACRRA approved a funding plan for the Northstar Corridor including an agreement to contribute a share of the debt service costs on bonds to be issued to finance project costs; and, WHF.,RF. AS, on January 8, 2004, the NCDA approved the concept of undertaking thcNorthstar Corridor project in two phases, by adoption of Resolution 2004-1 Approving Ph~e One of the Northstar Commuter Rail Project that includes the portion of the corridor between Big Lake and Minneapolis with stations in Big Lake, Elk River, Anoka, Coon Rapids - RiverdaIe, Fridley, and downtown Minneapolis; and, - WI-I~RBAS, Northstar Phase One includes the connection to the Hiawatha Light Rail Transit (I.,RT) corridor in downtown Minneapolis; and, WIqF2~A$, on January 13, 2004, Governor Pawlenty announced his support for Northstar Phase One; and, WHEREAS, Governor Pawlenty is proposing that thc SI.ate of Minnesota contribute an amount equal to 333% of the total Phase One project cost, an estimated $88.3 million, and that thc Northstar Capital Punding Panners (I-Iennepin, Anoka, Sherburne, and Benton Counties or county regional railroad authorities) contribute an amount equal to 16.7% of the total Phase One project cost, an estimated $44.2 million; and. WHEREAS, the ACRRA is authorized to issue bonds for the purpose of financing the acquisition, development, construction, and equipment of railroads and railroad f~ilities including but not limited to terminal building, roadways, crossings, bridges, causeways, tunnels, equipment, and rolling stock: NOW, THERP_PORE, BE 1T RESOLVED BY THt~ BOARD OF COMMISSIONERS OFTHE ANOKA COUNTY I:~OlONAL RAILROAD AUTHORITY: The ACRRA hereby confirms its approval of the plan for financing the project costs of the Northstar Corridor project, and further expresses its in tent to initially issue bonds for thc purpose of financing the local (non-stale) share of thc cost of developing Phase One of the Northstar Commuter Rail Project, such bonds to be issued in an amount equal to 16.7% oft. he total project cost, an estimated $44.2 million. The bonds are intended to be payablc from proceeds of taxes levied by the ACRRA, and from contribution agreements to be entered into with other participating counties and rail authorities, pursuant to which contribution agn:cmen~s such other counties and rail authorities will be responsible for payment of at least 36.5ot, of debt service on the bonds. The share of thc debt service to be contributed by ttais ACRRA is up to 63.5%. The bonds shall bear a term to maturity of thirty years. The respective share of local (non-state) costs of the pattie/paring counties and rail authorities, including the ACRRA, shall be reduced by the value of any funds or property contributed by such county or rail authority, or any city located within its jurisdiction, in which case the maximum principal amount of thc bond, and such county or mil authoritfs respective share of debt service shalJ be reduced accordingly. Enhancements to the system requested by a local government unit shall be financed by the local government unit and shall not recluce the coumy or rail aulhority's respective share of debt service. The total share of local (non-state) costs of the participating counties and rail authorities, including the ACRRA, shall be reduccd by the value of any funds or property contributed by any public or private entity £or the purposes of payment for thc I-'U swaths LRT connection, in which case the maximum pnncipal amount of thc bond shall be reduced accordingly. The issuance of the bonds by the ACRRA is subject to the availability of state and fedora funding for the remaining 83.3 % of project costs, and to receipt ofcon~bution agreements from the other participating counties and rail authorities in an aggregate amount sufficient to pay 36.5% of debt service on the bonds. As previously approved, the terms and conditions contained herein shall also apply to the funcling of Phase Two of the Northstar Commuter Rail Project, extending the service to the Oreater St. Cloud Area. The percentage share of the debi service of each county may be revised to reflect the most current U.S. Census population data available at the time of the financing of Phase Two. STATE OF MINNESOTA) COUNTY OF ANOIL4 ) I, Tim Yantos, r~x~udve Dlt~:lor, Anoka County l-Iau~ing ~d Redcvclopn-,,-nt Authoth.,, Anoka Coullty, Minnesota, hereby certify thnt have compared thc forc§oing copy of the rcsolutlO~ of sa.id Authority of snid County wit~ the original rceorfl th~eof on fi]~ in Admtnismtdon Office, Atmka Coumy, Minnesota, as stated in ~e minutes of the proc~ed~ng~ of said Authority a~ a meeting duly l~eld on March 9, 200~,, and flint the same is a ttuc and correct copy of anid orlg~nal record alld of the whole then:o[, and ~hat ~uld rc,~o~ut~on wu duly p~sed by ,,,id Authority at said meeting. Witness my head anti seal thi~ 9th day of March 200~. NO RESOLUTION NO. 2004-__ HENNEPIN COUNTY REGIONAL RAILROAD AUTHORITY RESOLUTION INTENT TO ISSUE BONDS TO FINANCE LOCAL SHARE OF COMMUTER RAIL PROJECT SUBJECT TO CERTAIN CONDITIONS SET FORTH HEREIN. WHEREAS, the Hennepin County Regional Railroad Authority (the "Authority") is a regional railroad authority organized and existing as a political subdivision and local government unit pursuant to Minnesota Statutes, Section 398A.03; and WHEREAS, the Authority has entered into a Joint Powers Agreement with various other counties, county regional railroad authorities, cities and towns for the purpose of addressing transportation needs along the Northstar Corridor, and such joint powers entity is known as the Northstar Corridor Development Authority; and WHEREAS, by Resolution #71-HCRRA-99, adopted November 30, 1999, the Authority approved a funding plan for the Northstar Corridor including an agreement to contribute a share of the debt service costs on bonds to be issued to finance project costs; and, WHEREAS, on January 8, 2004, the Northstar Corridor Development Authority (NCDA) approved the concept of undertaking the Northstar Corridor project in two phases, by adoption of Resolution 2004-1 Approving Phase One of the Northstar Commuter Rail Project that includes the portion of the corridor between Big Lake and Minneapolis with stations in Big Lake, Elk River, Anoka, Coon Rapids - Riverdale, Fridley, and downtown Minneapolis; and WHEREAS, Northstar Phase One includes the connection to the Hiawatha Light Rail Transit (LRT) corridor in downtown Minneapolis; and, WHEREAS, on January 13, 2004, Governor Pawlenty announced his support for Northstar Phase One; and, WHEREAS, Governor Pawlenty is proposing that the State of Minnesota contribute an amount equal to 33.3% of the total Phase One project cost, an estimated $88.3 million, and that the Northstar Capital Funding Partners (Hennepin, Anoka, Sherburne, and Benton Counties or County Regional Railroad Authorities) contribute an amount equal to 16.7% of the total Phase One project cost, an estimated $44.2 million; and WHEREAS, on January 22, 2004, the NCDA adopted Resolution 2004-02 approving in concept Governor Pawlenty's funding proposal; and WHEREAS, the Authority is authorized to issue bonds for the purpose of financing the acquisition, development, construction and equipment of railroads and railroad facilities including but not limited to terminal buildings, roadways, crossings, bridges, causeways, tunnels, equipment and rolling stock. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COMMISSIONERS OF THE HENNEPIN COUNTY REGIONAL RAILROAD AUTHORITY: 1. The Authority hereby confirms its approval of the plan for financing the project costs of the Northsar Corridor project, including the plan as presently proposed for Anoka County Regional Railroad Authority to initially issue bonds for the purpose of financing the local (non-state) share of the cost of developing Phase One of the Northstar Commuter Rail Project, such bonds to be issued in an amount equal to 16.7% of the total project cost, an estimated $44.2 million. 2. The bonds are intended to be payable from proceeds of taxes levied by the Authority, and from contribution agreements to be entered into between Anoka County Regional Railroad Authority and other participating counties and rail authorities, pursuant to which contribution agreements such other counties and rail authorities will be responsible for payment of a portion of the debt service on the bonds. The share of the debt service to be contributed by this Authority is up to 14.50%. 3. The bonds shall bear a term to maturity of 30 years. 4. The respective share of local (non-state) costs of the participating counties and rail authorities, including the Authority, shall be reduced by the value of any funds or property contributed by such county or rail authority, or any city located within its jurisdiction, in which case the maximum principal amount of the bond, and such county or rail authority's respective share of debt service shall be reduced accordingly. Enhancements to the system requested by a local government unit shall be financed by the local government unit and shall not reduce the county or rail authority's respective share of debt service. 5. The total share of local (non-state) costs of the participating counties and rail authorities, including the Authority, shall be reduced by the value of any funds or property contributed by any public or private entity for the purposes of payment for the Hiawatha LRT connection, in which case the maximum principal amount of the bond shall be reduced accordingly. 6. The agreement of this Authority to contribute to payment of debt service on the bonds to be issued by the Anoka County Regional Railroad Authority is subject to the availability of state and federal funding for the remaining 83.3% of project costs, and to receipt of contribution agreements from the other participating counties and rail authorities in an aggregate amount sufficient to pay the balance of the debt service on the bonds. 7. As previously approved, the terms and conditions contained herein shall also apply to the funding of Phase Two of the Northstar Commuter Rail Project, extending the service to the Greater St. Cloud Area. The percentage share of the debt service of each county may be revised to reflect the most current U.S. Census population data available at the time of the financing of Phase Two. RESOLUTION NO. 2004- BENTON COUNTY REGIONAL RAILROAD AUTHORITY RESOLUTION INTENT TO ISSUE BONDS TO FINANCE LOCAL SHARE OF COMMUTER RAIL PROJECT SUBJECT TO CERTAIN CONDITIONS SET FORTH HEREIN. WHEREAS, the Benton County Regional Railroad Authority (the "Authority") is a regional railroad authority organized and existing as a political subdivision and local government unit pursuant to Minnesota Statutes, Section 398A.03; and WHEREAS, the Authority has entered into a Joint Powers Agreement with various other counties, county regional railroad authorities, cities and towns for the purpose of addressing transportation needs along the Northstar Corridor, and such joint powers entity is known as the Northstar Corridor Development Authority; and WHEREAS, by Resolution , adopted , the Authority approved a funding plan for the Northstar Corridor including an agreement to contribute a share of the debt service costs on bonds to be issued to finance project costs; and WHEREAS, on January 8, 2004, the Northstar Corridor Development Authority (NCDA) approved the concept of undertaking the Northstar Corridor project in two phases, by adoption of Resolution 2004-1 Approving Phase One of the Northstar Commuter Rail ¢roject that includes the portion of the corridor between Big Lake and Minneapolis with stations in Big Lake, Elk River, Anoka, Coon Rapids - Riverdale, Fridley, and downtown Minneapolis; and WHEREAS, Northstar Phase One includes the connection to the Hiawatha Light Rail Transit (LRT) corridor in downtown Minneapolis; and, WHEREAS, on January 13, 2004, Governor Pawlenty announced his support for Northstar Phase One; and, WHEREAS, Governor Pawlenty is proposing that the State of Minnesota contribute an amount equal to 33.3% of the total Phase One project cost, an estimated $88.3 million, and that the Northstar Capital Funding Partners (Hennepin, Anoka, Sherburne, and Benton Counties or County Regional Railroad Authorities) contribute an amount equal to 16.7% of the total Phase One project cost, an estimated $44.2 million; and WHEREAS, on January 22, 2004, the NCDA adopted Resolution 2004-02 approving in concept Governor Pawlenty's funding proposal; and WHEREAS, the Authority is authorized to issue bonds for the purpose of financing the acquisition, development, construction and equipment of railroads and railroad facilities including but not limited to terminal buildings, roadways, crossings, bridges, causeways, tunnels, equipment and rolling stock. NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF COMMISSIONERS OF THE BENTON COUNTY REGIONAL RAILROAD AUTHORITY: The Authority hereby confirms its approval of the plan for financing the project costs of the Northstar Corridor project, including the plan as presently proposed for Anoka County Regional Railroad Authority to initially issue bonds for the purpose of financing the local (non-state) share of the cost of developing Phase One of the Northstar Commuter Rail Project, such bonds to be issued in an amount equal to 16.7% of the total project cost, an estimated $44.2 million. The bonds are intended to be payable from proceeds of taxes levied by the Authority, and from contribution agreements to be entered into between Anoka County Regional Railroad Authority and other participating counties and rail authorities, pursuant to which contribution agreements such other counties and rail authorities will be responsible for payment of a portion of the debt service on the bonds. The share of the debt service to be contributed by this Authority is up to 7.00%. 3. The bonds shall bear a term to maturity of 30 years. The respective share of local (non-state) costs of the participating counties and rail authorities, including the Authority, shall be reduced by the value of any funds or property contributed by such county or rail authority, or any city located within its jurisdiction, in which case the maximum principal amount of the bond, and such county or rail authority's respective share of debt service shall be reduced accordingly. Enhancements to the system requested by a local government unit shall be financed by the local government unit and shall not reduce the county or rail authority's respective share of debt service. The total share of local (non-state) costs of the participating counties and rail authorities, including the Authority, shall be reduced by the value of any funds or property contributed by any public or private entity for the purposes of payment for the Hiawatha LRT connection, in which case the maximum principal amount of the bond shall be reduced accordingly. The agreement of this Authority to contribute to payment of debt service on the bonds to be issued by the Anoka County Regional Railroad Authority is subject to the availability of state and federal funding for the remaining 83.3% of project costs, and to receipt of contribution agreements from the other participating counties and rail authorities in an aggregate amount sufficient to pay the balance of the debt service on the bonds. As previously approved, the terms and conditions contained herein shall also apply to the funding of Phase Two of the Northstar Commuter Rail Project, extending the service to the Greater St. Cloud Area. The percentage share of the debt service of each county may be revised to reflect the most current U.S. Census population data available at the time of the financing of Phase Two. MEMORANDUM NCDA Executive Committee Agenda Item #4 NCDA Agenda Item 2b Date: To: From: Subject: March 26, 2004 Northstar Corridor Development Authority / Executive Committee/Capital Budget Committee Staff Amendment #1 to Green Espel Legal Services Agreement In November, 2003, the NCDA retained Cliff Greene to lead negotiations with the BNSF to narrow the gap in capital costs estimates. While considerable progress has been made, an additional month of work is necessary to finalize this phase of work. Staff recommend that the Executive Committee/Capital Budget Committee made a recommendation that the NCDA authorize the Chair to finalize negotiations and execute a contract amendment with Greene Espel extending the contract term to April 30, 2004 and increasing the contract amount by an additional $20,000.00 Action Requested: That the NCDA Executive Committee / Capital Budget Committee recommend that the NCDA authorize the Chair to finalize negotiations and execute a contract amendment with Greene Espel extending the contract term to April 30, 2004 and increasing the contract amount by an additional $20,000.00. Northstar Corridor De velopment Authority 2100 3'~: Avenue, Anoka, Minnesota 55303-2265 (763) 323-5700 Fax: (763) 323-5682 www. northstartrain.org NGDA Agenda Item #6 MEMORANDUM March 26,2004 TO: FROM: RE: NCDA Staff Report on Northstar Commuter Coach Operation The following is some updated information on the Northstar Commuter Coach Operations. You will note that since the Metro Transit bus strike has begun, ridership has increased dramatically filling additional buses that the NCDA added to handle this increase (see attached chart). Also attached is a summary of recent passenger communications regarding the Northstar Commuter Coach service. Action Requested: Information Northstar Corridor Development Authority 2100 3" Avenue. Anoka. Minnesota 55303-2265 (763) 323-5700 Fax: (763) 323-5682 www. northstartrain.org Run Time Jan Average Avg Third Wk March % Change 5:25 AM 40 '.'~ 47 57 51 51 31 47 19% 5:55 AM ', '~,,~ ,35 -,~, 70 71 72 64 63 68 94% 6:10AM ~ · '4G: ,' - 60 58 65 60 50 59 47% 6:25 AM ! , 61 53 61 60 48 57 20% 6:45 AM !,:,,: ~, 46, i~ ~; 74 76 75 69 66 72 57% 7:05AM i,:?~ ~· 25':;~!:/: 65 64 54 64 38 57 119% 7:20AM ~; ": 5':,'-:¥ :' 61 60 46 50 44 52 9% 7:55AM ~; 27 ; ,:.- 36 36 42 41 36 38 41% Total AM · 548 564 667 544 460 535 73% 3:30 PM '30 68 64 57 56 59 61 103% 3:55 PM ; ~ ; 52 54 45 50 52 51 49% ,. '29 60 56 63 63 53 59 103% 4:10 PM :. 60 62 73 64 58 63 4:30 PM .. $~ : ', 24% 4:50 PM i:i~ ;~ ~';'' 61 66 63 63 50 61 38% 5:15 PM ~, 2 ~ $ -. ~1 70 70 70 64 47 64 23% 5:30 PM i ~ -31' ~-- 62 72 71 64 43 62 101% 6:00 PM ~ "'21 - 33 49 49 50 32 43 103% Total PM ~ ~2 526 553 547 530 437 519 78% Total riders :', 601[ 1074 1117 1104 1074 897 1053 75% Run Time Jan Average Avg Second Wk March % Change 5:25 AM I, 55 55 55 45 30 48 20% 5:55 AM 72 78 74 75 56 71 103% 6:10 AM 57 64 57 44 44 53 33% 6:25 AM 62 60 69 61 60 62 33% 6:45 AM 75 76 74 55 60 68 48% 7:05 AM ~ 60 61 58 48 45 54 109% 7:20 AM 49 58 43 45 47 48 1% 7:55 AM ''27 33 42 39 38 37 38 40% Total AM :309 563 580 565 503 467 536 73% 3:30 PM 30 66 67 66 57 68 65 116% 3:55 PM 51 57 50 49 46 51 49% 4:10 PM 67 66 58 53 56 60 107% 4:30 PM 73 71 74 56 52 65 28% 4:50 PM 57 60 61 49 44 54 23% 5:15 PM 68 68 66 67 58 65 26% 5:30 PM 75 68 66 60 47 63 104% 6:00 PM 33 52 49 54 33 44 110% Total PM 292: 547 561 543 496 448 519 78% Total riders 601 1110 1141 1108 999 915 1055 75% Run Time Jan Average i23-Fe i , 2s- eb:I Avg Last Wk Feb 1% Chan~le 5:25 AM 45 49 43 36 39 I 42 I 6% 5:55AM 45 44 40 41 32 l_.. 40 / 1~5% 6:10 AM 40: 40 35 39 43 35 6:25 AM 52 47 57 38 46 6:45 AM 46 46 48 58 57 43 7:05 AM 26: 32 29 20 20 18 7:20 AM 48 45 48 54 48 42 :~' ~ 7:55 AM 32 27 16 27 20 Total AM , 337 327 327 310 275 I 315 I 2% 3:30PM 30 ; :: 32 32 33 25 32 ! 31 ! 3% 3:55 PM 35 27 33 37 40 4:10 PM 37 30 32 23 22 54 5% 4:30 PM 62 48 56 50 53 ! 4:50 PM ~, 44 59 45 45 26 5:15 PM 59 53 59 57 45 I 55 ! 5% I 5:30 PM 35 41 39 42 23 / 36 / ~6% I 6:00 PM 2~ 17 20 22 17 8 I T°talrideml~ ~ I 658 637 646 606 524 I 6~4 / 2% I Jan Avera( FimtWeek March % Chan¢ 41% 5:55 AM 34 44 43 78 72 54 55% 6:10 AM 53 53 39 65 42 50 26% 6:25 AM 50 47 52 47 55 50 7% 7:20 AM 50 50 58 36 50 3% Total AM 326 354 346 540 468 407 32% 3:30 PM 30 33 39 36 67 66 48 61% 3:55 PM 36 37 34 63 42 42 25% 4:10 PM 36 32 33 62 44 41 43% 4:30 PM 59 54 57 65 59 59 15% 4:50 PM 39 56 55 48 49 49 12% 5:15 PM 52 65 62 65 55 53 60 15% 5:30 PM 41 43 34 50 51 44 41% 6:00 PM 18 22 16 14 10 Total PM 327 345 330 606 415 385 32% Total ridem :601 653 699 675 1046 883 791 32% Run Time Jan Average Avg Third Wk March % Chan~le 5:25 AM ~ 40' ~,~,,,,~ 37 41 41 40 -1% 5:55 AM 35 ' 66 74 62 67 92% 6:10 AM -40 62 68 67 66 64% 6:25 AM , 47 65 52 60 59 26% 6:45 AM 46: 75 76 64 72 56% 7:05 AM , 26 49 55 51 52 99% 7:20 AM ', ' 48 , 54 56 52 54 13% 7:55 AM ' 27, 34 30 32 32 19% Total AM 309 528 536 515 0 0 526 70% 3:30 PM , 30 56 65 61 102% 3:55 PM , 34 , 39 38 39 13% 4:10 PM /, 55 55 55 90% 4:30 PM ~$~ , ', 65 63 64 25% 4:50 PM ~,,~ : ~44 57 61 59 34% - 52 ' ' 72 72 72 38% 5:15 PM i ~ 57 65 61 97% 5:30 PM 31 ~'" 6:00 PM ' '!'2~' 47 37 42 100% Total PM :~ 292 498 512 0 0 0 505 73% Total riders 6Ot 1026 1048 515 0 0 1037 73% Run Time Jan Average ~~ ~ :Av~] Second Wk March % Chan~ie 5:25 AM ~40, 47 57 51 51 31 47 19% 5:55 AM 70 71 72 64 63 68 94% 6:10 AM 60 58 65 60 50 59 47% 6:25 AM 61 53 61 60 48 57 20% 6:45 AM 74 76 75 69 66 72 57% 7:05 AM 65 64 54 64 38 57 119% 7:20 AM 61 60 46 50 44 52 9% 7:55 AM 27 36 36 42 41 36 38 41% Total AM ,309 548 564 557 544 460 535 73% 3:30 PM 30 68 64 57 56 59 61 103% 3:55 PM 52 54 45 50 52 51 49% 4:10 PM 60 56 63 63 53 59 103% 4:30 PM 60 62 73 64 58 63 24% 4:50 PM 61 66 63 63 50 61 38% 5:15 PM 52 70 70 70 64 47 64 23% 5:30 PM 62 72 71 64 43 62 101% 6:00 PM 33 49 49 50 32 43 103% Total PM ~ 292 526 553 547 530 437 519 78% Total riders 60~/ 1074 1117 1104 1074 897 1053 75% + Higher Average Recent Passenger Communication April 2004 Thank you very much for making adjustments to the bussing schedules... Please understand I GREATLY appreciate the bus service and I have NEVER before sent in feedback. In fact, some positive feedback ..... clone William Kelly (driver)...he is the BEST!!!!!! Thank you and "Go Northstar"!!!! Pat Schuler I love your service. Your drivers are courteous, helpful and smiling, in spite of the current stresses. The passengers who ride the Northstar Con~-nuter Coach are also among the most polite folks in the metro area. We actually have male riders who will stand for a female passenger! How often do you see that anymore? During the strike EVERY bus I have been on has been standing room only. I just needed to let you know how much I personally appreciate your service to us in the Northland - who cannot wait for light (sic) rail :o) Susan E. Holmes I wish prior to the strike, something would have been done to recognize the true supporters of the Northstar route as now we are lumped in with the other people who will leave the route once the strike is over. Perhaps you could use this opportunity to spread the word about why the Northstar buses exist so that we get more support for the rail system that is behind the route. Thanks for listening - I will continue to ride after the strike is over. Jill Claggett Thanks for the WONDERFUL job you are doing during the MTC strike. You guys are the best, and I really appreciate all the efforts you are making to get us all to and from downtown so smoothly during the strike. I believe I will even continue to ride the NorthStar AFTER the strike is sealed. Thanks so much! Brenda Cich Page 1 of 2 I just wanted to express my thanks for the extra bus at Riverdale this morning 5:45am. I'm a regular rider of this bus and as you know there was no standing room available when the bus left the park & ride. I appreciate you accommodating the extra people riding the coach so us regular riders can continue our route, too. ' ;r; i ;: 'd ...... "'"'"'"""'"'"""'"' ..... ' ...... '"' ..... ' ......... Hello. I am a regular Northstar commuter. I take the 5:45 am bus from Coon Rapids. First offI want to say THANK YOU for adding additional buses to help with all of the stranded MT riders. I have to say that I love taking the bus and really appreciate your service. Julia Tremaine I am a regular patron of your Fl'NE bus service! Your buses are truly a blessing to the fast- growing areas of Coon Rapids and Elk River. I cannot fathom having to drive my car from Zimmerman to downtown Minneapolis five days a week! THANK YOU A BILLION for your services! Personally, I feel that $3.50 (fare from Elk River) is a very reasonable amount, too Iow actually, as it would take at least two gallons of gasoline in most cars to get from Elk River to Minneapolis and at the prices of gasoline these days, that's easily $3.00 each way - not to mention the wear and tear on your vehicle, your nerves, etc. AND paying for parking! Riding for free should not be an option to anyone. Personally, I feel that $5.00 each way would be more like it. Again, ALL OF YOUR DRIVERS ARE WONDERFUL AND I FOR ONE APPRECIATE THEM VERY, VERY MUCH! Callie Parker I'm not sure of the name of the gentleman (Darrell??) who drives the direct from Elk River that leaves at 6:25 a.m., but he did one fine job this morning getting us downtown. (I sat in the front seat and can't believe how inconsiderate drivers are of the busses -- there is no way I could drive a bus). I hope other riders let you know how much the Northstar drivers are appreciated and what a privilege it is to have such excellent bus service in our area. Now that I've moved from Andover (where I use to catch the bus at the Coon Rapids Park 'n Ride) to Elk River I would love to see more direct routes to Elk River!! (I know I'm being selfish but that's a long way for people who sometimes have to stand). Please tell the drivers to keep up the good work and reward them with a nice bonus!! Lynn Bartel