Loading...
6.13. SR 04-19-2004Howard R, Green Company Item 6.13. April 15, 2004 File: 822550J-4000 Honorable Mayor and City Council City of Elk River 13065 Orono Parkway Elk River, MN 55330 RE: WVVTP DIGESTER COVER REPLACEMENT Dear Council Members: We have tabulated the bids received on Wednesday, April 14, 2004, for the Replacement of the Digester Cover at the Wastewater Treatment Plant. The major components of the project wore to replace a steel digester cover, install a new mixing system, make electrical improvements and other miscellaneous piping and concrete facility repairs. There wore a total of four bids received. The following list provides the name of the bidder and their total bid. A copy of the entire bid tabulation is attached. Municipal Builders, Inc. Robert LCarr, Inc. Magney Construction, Inc. Gridor Construction, Inc. $609,75O.0O $616.000.00 $629,500.00 $637, OOO.OO The Engineer's Estimate for all the work involved with this project was $810,000.00. The Iow bid received from Municipal Builders, Inc. is substantially below the engineer's estimate. It should be noted howover, that the amount of work needed inside the digester once the cover is removed has been estimated and could be more or less than the estimate. Municipal Builders, Inc. has previously, successfully completed projects at the City's wastewater treatment plant. Therefore wo would recommend award to them as the Iowost responsible bidder in the amount of $609,750.00. Attached is a Resolution for the City Council's consideration which would award the project to Municipal Builders, Inc. If you have any questions regarding this project I will be in attendance at your April 19, 2004 City Council meeting. Sincerely, Howard R. Green Company Terry J. Maurer, P.E. TJM:ac Enclosures Ltr- 822550J-4000 -City Council 2550 University Avenue West · Suite 400N · St. Paul, MN 55114 · 651/644-4389 fax 651/644-9446 toll free 888/368-4389 PROJECT: WWTP PRIMARY DIGESTER IMPROVEMENTS OWNER: CITY OF ELK RIVER, MINNESOTA OPENING DATE: Apd114, 2004 ENGINEER: HOWARD R. GREEN COMPANY SCHEDULE 1.0 1 Vortex Mixing System, 11386 LS 1 70000 2 Fixed Digester Cover, 13232 LS 1 256000 3 Complete Project, except items listed above LS 1 484000 T SCHEDULE 1~ - TOTAL UNIT PRICE ADJUSTMENT 1 Concrete Crack Repair, 03900 LF 150 60.00 MANUFACTURER QUESTIONAIRE I Vortex Mixing System, 11386 2 Fixed Digester Cover, 13232 Shop Drawing Delivery (weeks) Fabrication and Delivery to Site (weeks) 70,000.00 60000 80,000.00 3,000.00 3,000.00 100,000.00 100,000.00 57,000.00 57,000.00 256,000.00 200000 200,000.00 164,000.00 164,000.00 280,000.00 280,000.00 480,000.00 480,000.00 484,000.00 349750 349,750.00 449,000.00 449,000.00 249,500.00 249,500.00 100,000.00 100,000.00 8~0,0g0.00 609,750.00 616,000.00 629,500.00 637,000.00 9,000.00 50.00 7,500.00 100.00 15,000.00 40.00 6,000.00 30.00 4,500.00 Vaughan Vaughan Vaughan Veughan En~rodyne Westec En~rodyne En~rodyne 2 4 6 4 14 TO 16 13 18 AFTER APPROVAL 18 I HEREBY CERTIFY THAT THIS IS AN ACCURATE TABULATION OF THE BIDS RECEIVED FOR THE ABOVE MENTIONED PROJECT. NAME: T~ M~a~u, .E.~~'~'Z~'4~ DATE: April 14, 2004 MN REG. NO.: 15316 O:/ProJ/822550J/S PEC/Bid -041404-bid tabulatlon.xls 1 RESOLUTION 04- A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION ACCEPTING BID AND AUTHORIZING EXECUTION OF CONTRACT IN THE MATTER OF THE WASTEWATER TREATMENT PLANT DIGESTER COVER REPLACEMENT IMPROVEMENT OF 2004 WHEREAS pursuant to a City Council direction competitive bids were solicited and received for the Wastewater Treatment Plant Digester Cover Replacement improvement as set forth in the bid tabulation attached hereto and under incorporated herein by this reference; and WHEREAS the City Council has considered the amount of the bids and the responsibility of the bidders and determined the Municipal Builders, Inc., is the lowest responsible bidder; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River, Minnesota: The Mayor and City Administrator are authorized and directed to execute, on behalf of the City, such contract with Municipal Builders, Inc., as is approved by the City Attorney, for the completion of the Wastewater Treatment Plant Digester Cover Replacement improvement according to the approved plans and specifications. The City Administrator is authorized and directed to forthwith return to all bidders the deposits made with their bids upon execution of the contract specified above. Passed and adopted this19th day of Apdl, 2004. ATTEST: Stephanie A. Klinzing, Mayor Joan M. Schmidt, City Clerk resolution.a12-41404.doc