Loading...
9.1. SR 11-17-2014 City of Elk Request for Action River To Item Number Mayor and City Council 9.1 Agenda Section Meeting Date Prepared by Worksession November 17, 2014 Tina Allard, City Clerk RaeAnn Gardner, Communications Coordinator Item Description Reviewed by Wayfinding Program Cal Portner, City Administrator Reviewed by Action Requested 1. Direction on design concept. 2. Review the project schedule. 3. Provide staff direction with the Wayfinding Program. Background/Discussion At the October 6, 2014, meeting, Council stated they would like a worksession to discuss the design of signage for the Wayfinding Plan. Council is asked to reference attached staff report dated January 21, 2014,which explains why staff has requested this program. Many of our long-term development plans call for the need of connections and wayfinding. All city signage should be tied to a theme established through a Wayfinding Program. The Wayfinding Program will help tie all development plans together so they are not being completed as silos. Currently, staff in various departments complete signage projects on their own with no consistency and sometimes done incorrectly because they are not technical experts in this field. Having this plan would create a consistent signage family that fits with the city's branding,beautification and fit proper standards for design readability. The Wayfinding Program is a long-term guiding document.Visual will put together a full spec plan and projects will be bid out as they're needed and budgeted. The current value of our city street/park signage system is approximately$1.2 million. Financial Impact Wayfinding maintenance is already included in annual budgets of various departments. Other wayfinding projects have been budgeted in the Capital Improvement Plan by departments based on Council's vision, goals, and adopted development plans. Attachments • January 21, 2014 Staff Report • Project Schedule P a w E A E U a r Template Updated 4/14 INIM UREI CK of �._ Request for Action River To Item Number Mayor and City Council 8.3 Agenda Section fleeting Date Prepared by General Business )anuary 21,2014 RaeAnn Gardner, Communications Coordinator Item Description Reviewed by Wayfinding Signage Program Tina Allard, City Clerk Reviewed by Cal Portner, City Administrator Action Requested Approve, by motion, the hiring of Visual Communications to create a wayfinding signage program for the city. Background/Discussion On January 6, 2014, the Council heard a presentation from Visual Communications regarding wayfinding signage. Staff recommends a global,long-term,Wayfinding Master Plan Program for the following reasons: • The Master Plan would provide an inventory of current signage to determine areas that need to be improved and/or where signage needs to be de-cluttered (such as the downtown parking lot). • A plan is consistent with the Council's Beautification Goal in the adopted 2014 Visioning Plan. A task under the Beautification Goal is to Provide Consistent and Expanded Signage. • It would meet the Council and FDA's goals in the Powered by Nature Branding Program. A wayfinding program would create a similar, more cohesive look and feel throughout the community and strongly emphasize Elk River's unique identity.This would highlight and make it easier for visitors to locate our parks and our downtown;provide for more connectivity to our amenities. Examples would be signage along the major highways to direct people to such amenities as the Youth Athletic Complex,Hillside Park, the downtown, etc. • From the currently Council adopted Comprehensive Plan regarding Community Image, Public signage is an important element of image. Directional and infonvational sigrrage can r efl ea community image and herztage. These public improvements should be park of broaderplan for corridor enhancements If conidonr atter?apt to draw people into Elk liver, signage must support'this objective. Signage srsggests that them are points of interest not htim edwleyl risible f vm the edge orgaten ay. Effective signage helps visitors navigate around the community. • Assist in meeting the objectives of the Council adopted Mississippi Connections Redevelopment Framework Plan. A strategy outlined for the Core Downtown is to,Develop and implement a w gyfw ing signage plan, as an added connection between the core dart ntoivn aria and other neighborhoods in the study area. Transition existing regulatory and infoimathv signage to the theme established by the signage plan. Short-term priority Projects (0-2 years) outlined in the Framework Plan are: o Implement a Downtown District signage plan,including parking and directional signage p 0 W I a E 9 B ONATURE] o Establish historical point of view context signage. Mid-term projects (3-5 years): o Create interpretive signs highlighting historic occurrences along the Mississippi River trail after trail is installed. ■ City staff doesn't have the technical resources to create a wayfinding program. Signs in the past have been created on an as needed basis with no uniform look.This can sometimes result in the need to go back and fix signage,which can cost more in the long run. With a Wayfinding Master Plan Program, signs requested by departments would be required to meet certain standards before being created and placed. Once a program is in place the city would have the means to create some of the smaller signs with the new printer/cutter that the Street Division purchased in 2013. The city could also move forward with the signs for the downtown area and Bailey Point Nature Preserve. Visual Communications would team up with HKGi who will do the research on funding sources that might be available for the fabrication and placement of future signs. Finan6al Impact The Council has designated $65,000 from the Development Fund,which is outlined in the Capital Improvement Plan. Attachments ■ Capital Improvement Plan Worksheet NAPu61ic Bodies\clgendg Packets\01-21-14\Fina1\x$.3 sr Wsyfinding Hiang.docx. Wayfinding Plan Schedule Completed May 13 Wayfinding Committee Meeting • Determine wayfinding concerns and common areas • Collection of city marketing and development plans May 14 Visual Communication City Tour ■ Tour of city to understand wayfinding challenges, parks, history, culture June 3 Visual met with Council Appointed Fact-finding Committee ■ Receive information on areas of concern and design elements. SWAT Analysis June Visual Creates Design Concepts June Visual Presents Preliminary Design Options June-October Visual's own analysis projects • photographic inventory • definable destinations • traffic decision points • sight lines June July Various Concepts Rendered/Combined August Presented Final Options 1 &2 August 25 Presented Sign Options on Facebook for Public Comment August 28 Public Open House for Options 1 &2 ■ Fact-finding&Wayfinding Committees invited to attend October 6 Present Options to Council ■ Staff directed to provide costs of two options October 20 Ballpark cost estimates presented to Council ■ Council asked for design review/discussion at worksession Projected Schedule November 17 Council worksession discussion on design concepts ■ Council to provide input on a design concept they'd like to see December Council to select design concept. December Visual to create new or revised options based on Council intent January Visual to mock up full design schematics ■ Detailed schematics review with Visual&Wayfinding Committee. Schematics will consist o£ ❑ Sign types (sizes, shapes, colors, materials,poles, and hardware) • Size of letters, fonts,heights, spacing, and style • Menu of signs and specifications laid out in a draft plan. • Develop installation locations by sign size and type. Map out via GIS. ❑ Develop terminology and design icons for primary and secondary destinations (landmarks,public facilities, retail, and dining destinations) ❑ Material performance specifications February Proposed plan schematics presented to Council ■ Council to recommend changes for incorporation into plan March Proposed plan schematics presented to Council ■ Council adoption of Wayfinding Plan April Once the city is ready to begin fabricating and installing certain components of the system,Visual will assist with vendor selection and monitoring of the production process May Staff to begin process for proposed 2015 budgeted projects Wayfinding Plan Schedule 1) Economic Development—Downtown Signage (As directed in the Mississippi Connections Plan document) 2) Economic Development—Downtown Parking 3) One Gateway welcome sign a. Pull together partnership opportunities b. Complete any paperwork permitting process c. Costs/location/final design presented to Council 4 Parks and Recreation Capital Improvement Plan Items Ongoing Routine maintenance of signage as budgeted by departments 2016 Projects may be budgeted based on Council Vision Plan