Loading...
6.1.e. ERMUSR 11-18-2014 Elk River Municipal Utilities UTILITIES COMMISSION MEETING TO: FROM: Elk River Municipal Utilities Commission Eric Volk-Water Superintendent John Dietz—Chair Al Nadeau—Vice Chair Daryl Thompson—Trustee MEETING DATE: AGENDA ITEM NUMBER: November 18, 2014 6.1e SUBJECT: Staff Update DISCUSSION: • Delivered 6 new residential water meters. • Delivered 2 new 1 '''/"commercial water meters. • Sealed the water meter and took curb stop ties from 13 water services. • Turned on 1 water service and 1 electric service. • Turned off 10 water services and 8 electric services. • Went on 13 Service calls. • Completed 12 fire hydrant repairs. • Completed 25 BACTI/Total Chlorine Residual Samples; all confirmed negative for Coliform Bacteria. • Completed 20 routine fluoride samples. All samples met MDH standards. • Mike Langer and Angela Hauge provided an operational tour to our Customer Service Representatives. The CSRs said that it was very interesting to learn about some of the things the water department is involved with. • The water department had 2 interns last month. Andrew Clark interned with us October 20-24. Andrew is a student at St. Cloud Technical College in the Water Environmental Technologies (WET)Program. Jerry Tveit was our other intern who was with us October 27-31. Jerry is also a student with St. Cloud Technical College in the WET Program and he attends the program at the Eden Prairie Water Treatment Facility. • The effluent pipe at Well#3 was replaced by Horwitz NS/I. The pipe they replaced was an old original that was severely corroded by injected fluoride. The new pipe is a huge improvement and should last for many years. I've attached a picture of the new pipe. • The Twin Lakes Watermain Extension(North)has been slower than we would have liked. The contractor had until October 31st to finish the project, after which they would start to incur liquidated damages of$500.00 per day. As they were not going to be able to finish on time, we gave them a week extension as long as they covered any incidentals that came up throughout the project. The new deadline was November 7th. As the contractor also failed to get the project completed by the new deadline, they started ■w P-OWEOED 01 ■ r3 Page 1 of 2 NATURE Reliable Public Power Provider P O W E R E D To S n E 135 incurring liquidated damages on November 8`h. I will give an update at the commission meeting. • The contractor working on Natures Edge Business Park Phase 2 has completed installing the watermain but has not pressure tested the main or had it tested for bacteria yet. • Mike Langer and Pete Neilsen cleaned out and reformed the drainage swale at Well#6. • Angela Hauge has been working with Christy Schallock and Jennie Nelson, to identify and repair all of the stopped and non-reading water meters. This involves Christy going through the entire high/low report, and the zero use report,to identify the water meters that need attention. Angela then contacts the homeowners so she can gain access to the water meter for repairs. • I went out and hand delivered private hydrant letters and policies to all of the businesses that have not yet signed up for the private hydrant maintenance program. Since delivering the letters, we've had 10 more businesses sign up for the program; adding 22 private hydrants that will receive annual preventative maintenance. The 2015 program will service 158 private hydrants for 66 separate businesses. • Attended the Minnesota Municipal Utilities Association(MMUA) Firstline Supervision Program October 8-10 at Central Lakes College in Brainerd, MN. The education report is attached. ATTCHMENTS: • October Pumping By Well • Pictures of Well#3 Effluent Pipe Replacement • Eric Volk Education Report Wiae►. POWERED Dr ■Lr$ Page 2 of 2 NATURE Reliable Public Power Provider P OWE RED T O S E 0.V E 136 ,4- to Ln N. c N n Q1 N a_ 41 on 0 a) N c !'1 U CO 4# a as a, E Q a E c 0 — ti c 2 vs To Cr icr w 1p o c N N c o O N v V ca 0 u :zi_4J o o =NJ N CD N > d' M 00 M l0 F - - - \ r • - ' 1'Lit__ , __„,„ . . 4111,..i*.: - -- - ,. ., 0, ,,,,,, _ . , _ . .....„ ... • _ , ....., , . , _ , ...,„,„,....„-,,,:',,,,,,,r,:.,..- -,-:,.-.-, . ,,_ , . _ ._ , , . ...._ , ,,,, , ,_ , , _ . , . ..._. _. ,,,..7 '-'-'- '-'-'-'''-'-Vi -t-'''-'1-ti_ia'-';''---',-1,-.--C2;;•---4--_--=-.2i..-,*-. ..!;.-2--,:--_ • „,•-'-..7-',--_,..„'.'---_4 -,„: _ ,,,,,,,,,,.. . , •.„---„„ , , ,,,,,_ 4„ , op ,,,,, ...., r,,,..,_. .,. ... , ..,... . . ,„,,,,,, „,,,_ • ,„ ,... ---= ..,,„;„,,„„,,,, -,, •• - _ 1 „..,, ,, •,, .. ,,„ . ..,„ . . „, -„ : , , , . , . . , ._, ..,_ , , _- , - .,,,,..„ , _ . , ,, .= AP � � - � . .. i I r Notice the patches that have'ben ei--!'' - , .� nrelded in over the years. Also the leaking fluoride. a , 4077 --- - _ ___, y t Th a` or 4.:,, a ... `j 4, F , i, � $:� .. �° .,,,,it, ......-...-,-.... ,1 w I1 �#3 Effluent Pipe Rep lacement ELK RIVER MUNICIPAL UTILITIES EDUCATION / SEMINAR REPORT DATE 10/15/2014 EMPLOYEE NAME Eric Volk TITLE OF EDUCATION/SEMINAR MMUA Firstline Supervision ORGANIZATION SPONSORING EDUCATION SEMINAR MMUA/Central Lakes College DATES ATTENDED 8-10 October 2014 LOCATION MMUA Office Plymouth WHY DID EMPLOYEE CHOOSE TO ATTEND To further develop his leadership strengths and to help Elk River Municipal Utilities perform at a higher level. WHAT INFORMATION WAS LEARNED BY ATTENDING Eric learned about the importance of recognizing your employees for doing a good job and the necessity of letting your employees know that they need to do a better job or improve their attitude/outlook at work. WAS INFORMATION CONVEYED TO SUPERVISOR AND CO-WORKERS AND TO WHO Eric shared with Troy how well we handle recognizing our employees for a job well done and dealing with oui employees when there is an individual performance problem. SIGNATURE 139