Loading...
4.9. SR 12-15-2014 City of Elk Request for Action River To Item Number Mayor and City Council 4.9 Agenda Section Meeting Date Prepared by Consent Agenda December 15, 2014 Michael Hecker, Parks and Recreation Director Item Description Reviewed by Support for the Lake Orono Trail. Cal Portner, City Administrator Reviewed by Action Requested Adopt,by motion,a resolution acknowledging support for the Lake Orono Trail project. Background/Discussion Staff has identified an opportunity for partial funding of the Lake Orono Trail through the Transportation Alternatives Program (TAP) administered through MnDOT. A Letter of Intent was submitted in October by the city engineer and the city received a recommendation in early November. The project was discussed and recommended by the Parks and Recreation Commission at their December 10, 2014, meeting. The trail is identified in the draft Parks and Recreation Plan on page 45 which states "provide trail access along south side of Hwy 10 from Proctor to Orono Park when the Highway 10 bridge will be replaced scheduled for 2017." The preliminary design of the new bridge includes a trail, and this project will make trail access across the bridge to Orono Park possible. TAP projects receive federal transportation funds for the construction,planning and design of trail facilities for pedestrians,bicyclists and other non-motorized forms of transportation. The year of construction for the TAP is Fiscal Year 2019 (July 1, 2018—June 30, 2019). This project has not been discussed by City Council. Staff is recommending approval of the resolution to complete the application requirements by the deadline date of December 30, 2014. Further discussion and approval of funding for this project will need to be discussed by City Council in 2015. Financial Impact The City is requesting 80% of the eligible construction costs be funded through the TAP ($640,000). We will need to provide the matching 20%local share currently recommended at$160,000. The exact funding source for the city's share will need to be discussed later by City Council. In addition,local city funds will need to be used for the engineering and administration costs estimated at$200,000. The total project cost is estimated at$1,000,000. Attachments • Resolution Acknowledging Project Support • Preliminary Orono Path Layout P a w E A E U s r Template Updated 4/14 INIM UREI City of Elk River Resolution 14- A Resolution of the City of Elk River Supporting and Agreeing to Maintain a Trail Segment along TH 10 from Orono Park to Proctor Road Resolution of Support from Sponsoring Agency BE IT RESOLVED that the City of Elk River is the sponsoring agency for a "Transportation Alternatives" project identified as Take Orono Trail and has reviewed and approved the project as proposed. Sponsorship includes a willingness to secure and guarantee the local share of costs associated with this project and responsibility for seeing this project through to its completion,with compliance of all applicable laws,rules and regulations. BE IT FURTHER RESOLVED that Michael Hecker, Elk River Parks and Recreation Director,is hereby authorized to act as agent on behalf of this application. Agreement to Maintain Trail WHEREAS, The Federal Highway Administration (FHWA) requires states agree to operate and maintain facilities constructed with federal transportation funds for the useful life of the improvement and not change the use of right-of-way or property ownership acquired without prior approval from the Federal Highway Administration; and WHEREAS, Transportation Alternatives projects receive federal funding; and WHEREAS, The Minnesota Department of Transportation (MnDffl) has determined that for projects implemented with alternative funds, this requirement should be applied to the project proposer. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Elk River,Minnesota, as follows: the sponsoring agency hereby agrees to assume full responsibility for assuring the operation and maintenance of property and facilities related to the aforementioned Transportation Alternatives project. row € R10 8 NATUREI Certification I hereby certify that the foregoing resolution is a true and correct copy of a resolution adopted by the City of Elk River on this 15"'day of December 2014. John J. Dietz,Mayor ATTEST: Tina Allard, City Clerk POWERED 0Y 1`4 U J C .T-2 � v > a w J .x:13❑ 3 MN 3AV NO1�ONd 2 h O O z I.... ,^ MN 3AVN I U 2 N3 VNN 11 y z . - - S roOUR AVE NW 3�V ONV7dN �1N'�s �b ONN3A ^ Q ti 3 � h z a = 7RNPtE OR 0 P2 MN 3AV VIN3X 3 2 MN 3AV 37bA ��'' 61� ,ylA.l F �N 3AV)IMOA �N01 MNIS ONAWlIZ MN 3AV ON8WlIZ 3 i x ti MNISANV87V ; z U O r MNIS NOl508 ,�2 � .NN1SNOlsO9 2�2 �O �P O 0� MNl'S O2/OON09 L 3 a 2 �b 0y \ K O � 3 m 0 0