Loading...
6.1.e. ERMUSR 12-16-2014 Elk River Municipal Utilities UTILITIES COMMISSION MEETING TO: FROM: Elk River Municipal Utilities Commission Eric Volk- Water Superintendent John Dietz—Chair Al Nadeau—Vice Chair Daryl Thompson—Trustee MEETING DATE: AGENDA ITEM NUMBER: December 16, 2014 6.1e SUBJECT: Staff Update DISCUSSION: • Delivered 4 new residential water meters. • Sealed the water meter and took curb stop ties from 5 water services. • Turned on 2 water services and 1 electric service. • Turned off 5 water services and 2 electric services. • Went on 13 Service calls. • Completed 25 BACTI/Total Chlorine Residual Samples; all confirmed negative for Coliform Bacteria. • Completed 20 routine fluoride samples. All samples met MDH standards. • I was notified by the Minnesota Pollution Control Agency(MPCA)that we were in violation for a third time. The Water Treatment Plant Residual Solids Annual Report had not been submitted in 2009, 2010, and again in 2013. I corrected the deficiency and we are no longer in violation. The report for 2014 has already been completed. • The work on the Twin Lakes Watermain Project has been wrapped up for the winter. The new watermain passed the pressure and bacteria tests and is now in service. We've held back a portion of the payment for work the contractor didn't completed; attached is the partial pay estimate from Elfering and Associates. The contractor was also overdue on the completion date so we have assessed them$6,500 in liquidated damages. • Troy Adams, Jennie Nelson, and I met with Suzanne Fischer and Matt Stevens to discuss the City adopting policy and revising wastewater rates to allow for rate consistency and to ensure wastewater rates are fair and equitable. • We shut off and drained the Johnson Street Water Tower for the winter. We'll refill it sometime in April. • The worn out and damaged pipes at Well#2 have been replaced. We added some vibration dampeners to the piping to reduce the effect the railroad has on the pipes. I've attached pictures of the new pipes. • The VFDs for Well#4 and Well#6 have been installed and started up. RBT1a PBWEBEO BY ITO Page 1 of 2 NATURE Reliable Public Power Provider P O V E R L D T o S E N V, 88 • The water operators have started their annual routine of repairing and conducting annual preventative maintenance on the wells and filters. ATTACHMENTS: • November Pumping By Well • Pictures of Well#2 Pipe Replacement • Partial Pay Estimate R r j_ P O W E R E D B 1 Page 2 of 2 NATURE Reliable Public Power Provider P O W E R E D To S E R V E 89 O OA C Q o E o N N a tes M w o v - RI- y co N N CD O cu d B m N . ri v E O. a c E = o O.. iv To e L9 o °J rn C G u %-4 o N o L. 4J -CI \ c E to a a rn T p O up e Z �-+ v 1-1-. < U ill te• c°) i* o To uo u oor 00 op 0 N CU Well #2 Pipe Replacement tot ' o f. 1. ' Vic:., 5' Repair �1 ;' i3. f Ni tai}' - - S4 R Jf: Clamp Holding % ` Broken ',., @ .. ... •,‘ Pipe P T ,,,::._., 1,v ,,,, -...,-: ogether. , _ \� . € A € J � I A :^. .10• #} s p 3 y p' Si r • New Vibration Dampener Worn Out Pipe I. , ‘4 , .. ° I ? ." h�. . ' _''''fir , .. K i gyp: i,irtil x r 91 PARTIAL PAY ESTIMATE#1 FROM:October 14,2014 TO:November 13,2014 CONTRACTOR:GM CONTRACTING,INC. ADDRESS:19810 515th Ave,Lake Crystal,MN 56055 OWNER:ELK RIVER MUNICIPAL UTILITIES PROJECT:TWIN LAKES ROAD NORTH WATERMAIN SUBSTANTIAL COMPLETION DATE AMOUNT OF CONTRACT ORIGINAL:October 31,2014 ORIGINAL: $ 361,431.72 REVISED: REVISED: ITEM I ORIGINAL CONTRACT THIS PERIOD I TOTAL TO DATE NO. ITEM DESCRIPTION UNIT QTY. UNIT PRICE QTY. TOTAL PRICE QTY. TOTAL PRICE SCHEDULE 1.0-WATERMAIN CONSTRUCTION • 1 2021.501 MOBILIZATION LS 1.00 $18,000.00 1.00 $18,000.00 1.00 $18,000.00 2 2101.502 REMOVE FILLING STATION LS 1.00 $3,500.00 1.00 $3,500.00 1.00, $3,500.00 3 2504.603 DIRECTIONAL BORING-12"WATERMAIN HDPE(DIPS) LF 2,575.00 $102.00, 2,400.00 $244,800.00, 2,400.00 $244,800.00 4 2504.603 6"WATERMAIN LF 25.00 $75.60 25.00 $1,890.00, 25.00 $1,890.00 5 2504.602 12"GATE VALVE EA 2.00 $4,225.00 2.00 $8,450.00 2.00 $8,450.00 6 2504.602 2"CURB STOP,ASSOCIATED PIPING,AND CONNECTI LS 1.00 $4,514.72, 1.00, $4,514.72, 1.00 $4,514.72 7 2504.602 4"GATE VALVE ASSOCIATED PIPING,AND CONNECT LS 1.00 $6,832.00 1.00 $6,832.00, 1.00 $6,832.00 8 2504.602 CONNECT TO EXISTING WATERMAIN EA 4.00 $6,500.00 4.00 $26,000.00, 4.00 $26,000.00 9 2504.602 HYDRANT AND VALVE EA 3.00 $4,865.00 3.00 $14,595.00 3.00 $14,595.00 10 2563.602 TRAFFIC CONTROL EA 1.00 $15,000.00 1.00 $15,000.00, 1.00 $15,000.00 SCHEDULE 1.0-WATERMAIN CONSTRUCTION--TOTAL $343,581.72 $343,581.72 SCHEDULE 2.0-LIQUADATED DAMAGES 1 SPEC LIQUADATED DAMAGES _ DAY 1.00 -$500.00_ 13.00 -$6,500.00 13.00_ -$6,500.00 SCHEDULE 2.0-LIQUADATED DAMAGES--TOTAL -$6,500.00 -$6,500.00 BID SUMMARY THIS PERIOD TOTAL TO DATE SCHEDULE 1.0-WATERMAIN CONSTRUCTION--TOTAL $343,581.72 $343,581.72 SCHEDULE 2.0-LIQUADATED DAMAGES--TOTAL -$6,500.00 -$6,500.00 TOTAL BID SUMMARY THIS PERIOD $337,081.72 TOTAL BID SUMMARY TO DATE $337,081.72 TOTAL THIS PERIOD TOTAL TO DATE AMOUNT EARNED $337,081.72 $337,081.72 AMOUNT RETAINED $16,854.09 $16,854.09 MATERIAL ON SITE $0.00 $0.00 MATERIAL DEDUCT. $0.00 $0.00 PREVIOUS PAYMENTS $0.00 AMOUNT DUE $320,227.63 $320,227.63 92 I hereby certify that all items and amounts shown by this pay estimate are correct for the work completed to date. CONTRACTOR: GM CONTRACTING, INC. BY: TITLE: DATE: Based on the ENGINEER'S on-site inspections as an experienced and qualified design professional and on review of application for payment and the accompanying data and schedules,the ENGINEER has determined,to the best of his knowledge and belief, that the quantities shown by this estimate are correct and that,based on such inspections and review,that the work has progressed to the point indicated(subject to an evaluation of such work as a functioning Project upon Substantial Completion,to the results of any subsequent tests required by the Contract Documents, and to any qualifications stated in his recommendation),and that payment of the amount recommended is due Contractor(s); but by recommending any payment,the ENGINEER will not thereby be deemed to have reviewed the means, methods, sequences,techniques,or procedures of construction or safety precautions or programs incident thereto or that the ENGINEER has made any examination to ascertain how or for what purpose any Contractor has used the monies paid on account of the Contract Price,or that title to any of the work,materials,or equipment has passed to the Owner free and clear of any lien,claims, security interests or encumbrances, or that the Contractor(s)have completed their work exactly in accordance with the Contract Documents. ENGINEER: ELFERING&ASSOCIATES BY: TITLE: DATE: Approved by Owner/Commission ELK RIVER MUNICIPAL UTILITIES BY: TITLE: DATE: END.xls 93