Loading...
3.0. SR 04-26-2004MEMORANDUM TO: FROM: DATE: SUBJECT: Mayor and City Council Pat Klaers, City ~strator April 26, 2004 ~ Special City Council Meeting A special City Council worksession is scheduled for 3:00 p.m. on Monday, April 26, 2004 at City Hall in the Upper Town Conference Room. The purpose of this special meeting is to begin work on the governance section of the City Administrator/City of Elk River work program as developed by Jim Brimeyer. Attached for your information is the City Administrator/City of Elk River work program dated December 2003 and the planning process outline as prepared by Mr. Brimeyer for work on this governance issue. The City Council has hired Mr. Brimeyer to facilitate this planning process. Also attached are the January 20 and February 17, 2004 Special City Council meeting minutes when this governance and goal setting/strategic planmng process was discussed by the City Council. At the meeting on February 17, the City Council requested information on existing goals that are identified in our approved planning documents. Attached for your information is some material on goals, policies, and action steps for various existing plans as provided by Director of Economic Development Catherine Mehelich and Director of Planning Michele McPherson. This material comes from: the Economic Development Strategic Plan, the Marketing Strategic Plan, the Downtown Project Outline, the draft Comprehensive Plan, the draft Transportation Plan, and the City Parks and Recreation Plan. Goals for all city departments are also included in the recently distributed 2003 Annual Report. A final attachment that I am including for your information is the fzrst few sections of the City Financial Management Plan. S: ~C ouncil~Pat\2OO4~specialccmtg426.doc City AdmJnistramr & City of Elk River December, 2003 ORGANI. ZATION,&L NbMNAGEMENT · Develop a plan which provides 1hr more feedback and eva/uarion of staffpefformancc. Init/are 1/01/2004, Evaluate every 30-90 days · Assist senior sr~ff in developing Nd/vi. dual goat and depa_,-Xnent goals to ensure .personal and pro~hssional ~ov<h and department effectiveness. 1st Quarter 2004 With staff assistance and Council input, propose options for preferred orgm:nzafional st~crm-e, stat:lng leveis, reporting relationships and a timetable Ibr ulrimare implementation over 2-3 yom- period. Initial report - Quarter 2004; Final plan 2"d Quarter 2004 C OU ~4CLL/STA.FF RELATIONS · With Council input, develop a system for more "informal" Council discussions to evaluate proposals andpolicies prior to formal Council approval. 4'h Quarter 2003 · Work ,with the City Council on "acceptable rules of behavior" for Council, suaff and Administrator interaction and communications - formal and informal..4~ Quart'er 2003; 1" Quarter 2004 · An'ange for goal setting/strategic planning session for Council and sta~: ,l" and 2'd Quarters 2004 · Assess and provide options to the Council for the preferred governance model to guide policy, development, options, and gu/delmes for decision making..2"d Quarter 2004 T~TAI P bid SPECIAL MEETING OF TIlE ELK RIVER CITY COUNCIL HELD AT THE ELK RIVER CITY HALL MONDAY, JANUARY 20, 2004 Members Present: ~,[embers Absent: S ta ff Pres ent: Mayor Klinzing, Councilmembers Dietz, KL~ester (5:30 p.m.), Motin (5:35 p.m.), and Tveite None Cit7 Administrator Pat I~aers, Finance Director Lori :Johnson, City Attorney Peter Beck, and Recording Secretary Tina Allard CaLl MeeLing To Order Pursuant to due call and notice thereof, the meeting of the Elk River City Council ~vas called to order at 5:25 p.m. by Mayor ICiinzing. 2. Work Program Mayor I-,52dnzing stated that the Council is having this worksession to discuss the ~vork program for the city ad~-ninistrator and the City of Elk River as recommended by Jim Brirneyer, The Brimeyer Group, Inc. T?~e Council discussed organizational management, council/staff relations, and governance. Oc~_~aniza tional ]klana~em er~ t The Council stated that more feedback and evaluation of personnel performance should be completed. The Council questioned and discussed lxow department goals could be established prior to cityxvide goals or a city-wide strategic plan being adopted. The Council directed the city adir2mstzator to get input from staff and the Council and then to propose opdons for a preferred organizational structure for the city, including staffing levels, reporting relationships, and a twnetable for imptementador~. Co uncil/Sta££Rel:~tfot~s The Council e*ett that the establishment of a ~vorksession meeting each month would provide for a more informal meeting setting tl~at would help to improve relations between Council and staff and would help in the evaluation of city, proposals and policies. The Council agreed to discuss "acceptable rules of behavior" at a foLlow up meeting. The Council was unsure l~o~v they would Like to proceed with goal struc~_~ring for the city. Tl~ey diso.~ssed departmental goals versus citu,vide goals. It was the consensus of the Council that they are responsible for setting the goals, visioning, and the policymaking for the city. Discussion was l~eld on l~ow i~nuch the Council should become involved ~vith day- to-day activities at staff level sucl: as more co~22rmttee involvement, corrUng to Cit7 Hall a couple o~' hours each ~veek, review of budget requests, etc. City Council M. mutes JaliualT~ 20, 2004 Page 2 It was the consensus of the Council to hold a ~vorksession on February 17, 2004 for the Council to discuss their goals for the City. of Elk River. The Council noted that the work program needs further discussion and revie~v and that the dmetables need to be established for the various work areas when the ~vork program is adopted. Adjournment There being no further business, Mayor K2inzing adjourned the meedng of die E~ ~ver Ci~ Counc~ a~ 6:20 p.m: Nfinutes pz'epared by Tina AHard Joan Sch~mdt, Ci~ Clerk MEETING OF THE ELK RIVER CITY COUNCIL HELD AT THE ELK RIVER CITY HALL LUNCHROOIq MONDAY, FEBRUARY 17, 2004 Members Present: Mayor I<linzx g, Councilmembers Dietz, Kuester, Mot_in, and Tveite Members Absent: None Staff Present: City Admimstrator Pat I,~laers, Finance Director Lori Johnson, City Clerk Joan SchroSdt, Building and F~nvironmental Administrator Steve Rohlf, and Recording Secretary Tina Allard Call Meeting To Order Pursuant to due call and notice thereof, the meeting of the Elk 1Liver City Council was called to order at 5:10 p.m. by Mayor I42inzing. 2. Consider 2/17/2004 Agend¢ MOVED BY COUNCILMEMBER TVEITE AND SECONDED BY COUNCILMEMBER KUESTER TO APPROVE THE AGENDA. MOTION, CARRIED 5-0. Discussion on Ci .r?vide Goals and Continue Planning on Work Program for Council and Staff Development Each Councilmember was assigned a different community's visioning process, mission statement, and goal setting plan, to review and then to report on that plan during this worksession. Councilmember Kuester-City of Becker Councilmember Kuester discussed dae process used in the City of Becker to create their visioning process. She discussed the definidons of the terms: vision statement, mission statement, and goals. Overall, Councilmember Kuester liked Becket's visioning plan. Mayor I(flinzing stated that she liked fl~e visioning ideas in the first plan but felt that d~e follow up plan was too detailed. Councilmember Tveite-Ciw of Mounds View Councilmember Tveite staied that he liked fl:e City of Mounds View's vision plan. He stated flaat the plan discussed long term/short term goals, citywide/departmental goals, and yearly action steps/long term action steps. He stated that the pfioritization of goals was missing from flae plan and that staff needs direction in this area. He also stated flaat dais visioning process needs to determine the city's target market. He stated that the target may not always be the citizen, but could include staff, developers, etc. City Adininistrator Pat I42aers stated that staff presents goals in their annual report and is loo'kmg for feedback from Council regarding priorities and how these goals fit into the citywide vision of Council. City Council iv[mutes Page 2 Februaz3, 17, 2004 Councihnember Motin stated that Elk River has al_ready completed its visioning process through the Comprehensive Plan, the Transportation Plan, and other plans the city has created. He stated that staff needs to bring any goal conflicts to the Council. He stated that the worksessions scheduled to begin in April will help resolve the issues regarding lack of staff direction from the Council and lack of staff information brought forth to Council prior to decisions needing to be made. Councilmember Tveite stated that guidelines need to be established to assist staff in determining how to prioritize resources. Counciimember I-2uester stated that individuals have different priorities on which goals are most important. She stated, as an example, that when an applicant has to come before the Park and Recreation Commission, the Planning Commission, and then the Council, they may get three different answers or comments from these boards, which creates confusion to staff and the 'applicant. Councilmember Motin-Cities of Plymouth and Minnetonka Councilmember Motin stated that the vision plan for these two cites were, for the most part, identical. He stated that any city could agree with either of these plans and adopt them. He stated that the plans were altruistic and that a city can't follow all of them or lived up to them. Councilmember Motin stated that staff needs to follow the various plans already adopted by Elk River and if there are any conflicts; bring them to Council attention. Mayor IClinzing-Citv of St. Louis Park Ma~or IOinzing staied that the vision plan for St. Louis Park would not apply to Elk River as St. Louis Park is an established city with no gro~vth issues. Councilmember Dietz-City of Willmar Councilmember Dietz stated that WLllmar worked xvith the school district and the county on their visioning plan. He stated that they did not prioritize their goals and the plan is basically common sense statements about what is good or beneficial for the city. Councilrnember Kuester suggested that each Counciha~ember list some of their goals for the city. Mayor Klinzing suggested that staff compile and present to the Council the city's current goals from the Comprehensive Plan, Transportation Plan, Financial Plan, Economic Development Strategic Plan, Annual Reports, etc. She also suggested that staff respond to questions regarding what goals and visions they would like to see for Elk River and what additional direction they need from the Council. Mr. IClaers stated that city boards and commissions also need direction from Council. Mr. I<laers offered some examples of issues that staff would like clarified by the Council. Building and Environmental Administrator Steve Rohlf stated that some of the goals can be conflicting with each other and staff needs direction on how to prioritize them. He stated that the city needs to determine what it needs to do before considering the budget rather than looking at the budget f~rst and determining what can fit into it. Citw Clerk Joan Schmidt suggested that Council and staff get together for an all day Saturday wo~'ksession to brainstorm a comprehensive list of ideas for cit3~ goals and vision and then Cit3~ Council lVimutes Page 3 February 17, 2004 prioritize these ideas. Finance Director LoriJohnson stated that she a~eed and felt that this would help to set the tone for helping everything fall into place afterwards. Mayor I<linzing stated daat it ~vould be appropriate to have consultant jun Brirneyer facilitate this worksession. Staff will try to set up a meeting on Saturday, May 15, 2004. Mayor I-.Zlinzing requested that the new City Council schedule be held off to be~n in May so that Council can have a special worksession on Monday, April 5, 2004 to discuss the city organizational structure. Mr. I~aers stated that the Chamber's State of the City address will be held on Tuesday, March 16, 2004 in the Public Safety facility in the EOC. Adjournment There being no further business, Mayor I<linzing adjourned the meeting of the Elk River City Council at 6:45 p.m. Minutes prepared by Tina Allard Joan Schmidt, City Clerk Objectives: · City o£ Elk River Planning Process Detern2ne preferred process for Council decision mald_ng/Governance · Refine City Mission/Vision · Develop list of pnoritT goals '~vid2 a long term strategic emphasis · Adopt m~plementadon model and Action Plan for Council and staff achievement Methodology Three Sessions -Appro:~mately 3-4 hours Session I - Council/A&r2mstrator/Staff (optional) 4/26/04-'3:00 pm Expectations Governance Model Mission Strategic Planrm~g Model Issue Discussion Session II - Council/Admimstrator/Staff 5/10/04 - Review Govez-nance Model - Mission - SWOT Analysis - Identif7 Issues - Establish Priorities 6:30 pm Session III - Council/A&-ninistrator/Staff - Revie~v Pnonties - Implementation Model/Action Plan - Council AccountabilitT Process - Staff performance - Process for evaluation - Governance discussion 5/24/04 5:30 pm 2004 GOALS The Economic Development Strategic Plan will be updated jointly by the EDA, HRA, and the City Council in early 2004 for implementation years 2004 - 2007. The most recent (1999) Economic Development Strategic Plan includes the following major goals: Industrial Base · Attract new business to increase the city's industrial base II. Business Retention and Growth · Retain and grow the city's existing business/industry III. IV. Marketing Strategy · Create and implement an industrial strategy to develop the city's business parks Develop/Redevelop East Highway 10 and the Central Business District · Undertake activities that facilitate development/redevelopment on East Highway 10 and in the Central Business District The Strategic Industrial Marketing Plan will assist the city in addressing several major issues and goals identified in the City of Elk River Economic Development Strategic Plan. CITY OF ELK RIVER STRATEGIC INDUSTRIAL MARKETING PLAN GOALS 2002 - 2004 MARKET STRATEGY, OBJECTIVES AND POSITIONING · To establish the City of Elk River as the hub for light manufacturing firms in the northwest metro region of the Twin Cities by 2005. · To build out East and West Business Parks with a range of building sizes that meets the City of Elk River's design standards by 2010. · To target the following Standard Industrial Classification sectors: Industrial Machinery, Fabricated Metal and Electronic Equipment. CORE STRATEGIES Product Offering To provide excellent location site services, attra~ve land locations, and pricing that reflects a good-value and competitively priced product. Competitive Strategy To collect and maintain current information on key competitive communities including land price, available land with utilities, and local incentives. Key Account and Lead Generation Strategy To establish the City of Elk River as the place to site a light-manufacturing firm with economic development key influencers, leaders, and providers. Promotion and Advertising Strategy To promote that the City is "Open for Business" and to generate leads for the East and West Business Parks. Public Relations Strategy To create awareness that the City of Elk River is a business-friendly community for light manufacturing firms. Strategic Partnership Strategy To establish strategic partnership to support long-term Economic Development in the oreo. Business Retention Strategy To retain and expand the current industrial base in the City of Elk River. Downtown Revitalization Project Project Goal & Objectives Purpose For more than 30 years, various studies and proposals have examined the need to redevelop Elk River's downtown business district. Investment in the downtown has stagnated and area businesses and residents alike are concerned about the need to revitalize downtown and attract people there. Neighborhoods age, and change will occur whether or not the city intervenes. Controlling that change through revitalization and redevelopment will ensure that the types of changes that occur in downtown Elk River are the ones people want those that will keep our community vital and flourishing. Primary Goal To assure the long-term viability of downtown by making a connection to the rest of the community and by utilizing the riverfront location. Redevelopment will enhance downtown Elk River's role as a residential, retail, and commercial area and also revitalize investment in the downtown business district. Development Objectives · Mixed Use (residential/retail/service) · Consideration of the historic context study results · Strengthen connection to the community · Traditional downtown design elements · Brick, stucco, stone materials with visual breaks in the building design · Increased residential density · Pedestrian orientation · Increase exposure to the riverfront · Recognize those buildings that have potential for rehabilitation · Replace market/economic obsolete buildings · Multiple types of housing products (i.e. townhomes, senior rental coops, market rate apartments) Importance of aVision According to an old story, txvo stonecutters were asked what they were doing. The first said, "I'm cutdng this stone into blocks." The second replied, "I'm on a team that is building a cathedral." This story illustrates the role of a vision in managing the growth and development of a city. Without a vision, development management works much like the first stonecutter with new pieces added without a clear picture of what is being built. The Comprehensive Planning process has been described as building the future Elk River. The cornerstone of that building is the Vision Statement, which provides a larger picture of the "cathedral" that Elk River seeks to become by offering a broad and enduring view of Elk River. Each development and redevelopment project, therefore, must help to build the future, not just fit cleanly with the next "stone block". The Vision serves several purposes: · The Vision serves as a tool for evaluating proposals, projects, ideas and new directions. How does this action fit with the Vision? · Creating a Vision Statement allows a shared understanding of community desires for the future. · The Vision encourages the community to consider the future, even a future that is twenty years distant. · The Vision provides an anchor in times of conflict and change - a way of finding common ground and shared values. · The Vision encourages imagination, recognizing that the direction it sets will be the realitT of the future. · The Vision creates energy and enthusiasm for maintaining the commitment to the Comprehensive Plan. Vision Statement The vision for the future of Elk River consists of several themes. Maintain a distinct identity for Elk River. · Elk River will keep an identity and character all its own. · Natural, cultural and historical resources of the community are essential ingredients of Elk River's identity · Elk River seeks to grow in a manner that preserves the qualifies of its "small town" heritage. Create and maintain strong neighborhoods. · Neighborhoods are the basic building blocks of Elk River and shape Vision for Elk River Building the Future -A Comprehensive Plan for Elk River 2,1 our views and attitudes about the community. · Residential development is judged on both aesthetics and function. Keep Elk River a "safe" place. · Elk River is a place where people feel comfortable and secure. · Traffic safety is an important factor in all aspects of community development. · A system of streets, sidewalks and trails allows safe and convenient movement throughout the city. · Municipal services (police, fire, water treatment) create both the perception and reality of safety. Preserve and maintain the environment. · Elk River seeks to promote clean air and water in the management of development and the delivery of municipal services. · Development must be served by well maintained and reliable infrastructure. · Development seeks to incorporate and blend the built environment with the natural environment. · Rural, undeveloped areas are part of the Elk River environment. · As Energy City, Elk River seeks to promote sustainable and energy efficient forms of development. Make Elk River a complete place. · Community and economic development policies will seek to attract employment opportunities and goods and services needed by the community. · The expansion of local employment creates more opportunities for people to bye and work in Elk River. · Planning and decision making must recognize that the population of Elk River is not a single commodity. Differences in age, economic status and ethnicity must be considered in planning for future development, facilities and services. · Recreational and cultural opportunities are important elements of a complete place. A quality education system attracts and keeps people in Elk River. Work to achieve the vision. · Everyone shares responsibility for achieving the vision. sole responsibility of city government. It is not the Building the Future - A Comprehensive Plan for Elk River Vision for Elk River 2,1~2 · The City will seek collaborative efforts with other partners who have shared interests in achieving this vision. All aspects of the Comprehensive Plan work to achieve this vision for Elk River. Vision for Elk River Building the Future - A Comprehensive Plan for Elk River 2,1~3 Comprehensive Plan Initiatives and Policies Capital Improvements Plan Future capital improvement plans should be coordinated with the Comprehensive Plan using the project evaluation criteria described earlier in this element of the Plan. Sanitary Sewer Capacity Undertake a more detailed analysis of current plant capacity Evaluate the options for extending the sewer collection system to the gravel mining area Conduct prelimin~ studies of plant expansion. Street System Establish key street corridors. Undertake financial planning. Interchange area planning. Greenways The Comprehensive Plan proposes to establish a greenway system throughout Elk River. Identify key properties Conduct NRI. Expand subdivision data. Establish a fmance plan Old Town Designating a land use is only the first step in this effort. Subsequent actions must work to achieve community objectives for this area. Focus future planning on a broader area. Build connections. Maintain public facilities. Promote housing maintenance and revitalization. Intergovernmental Collaboration The vision for the future of Elk River cannot be achieved without the cooperation and support of other units of government. Strong working relationships and collaborative Comprehensive Plan Initiatives and Policies Page 2 solutions are essential to the success of this Plan. Some of the key governmental elements of the Plan include: The quality of local schools is an important element of the Vision. The school system is one factor in attracting and keeping people to Elk River. The School District provides recreational facilities for the community. · School facilities influence traffic patterns and street systems. · The reuse of school facilities provides important community development opportunities. · Many of the key roadways in the Transportation Plan are under the jurisdiction of Sherburne County. · The County and School District are major employers in Elk River. · The Minnesota Department of Transportation controls the development of Highway 10 and Highway 169. · The Minnesota Department of Natural Resources plays a role in managing land uses along the Mississippi River. Intergovernmental collaboration can help build successful solutions in a time frame that meets local needs and makes the best use of the full range of financial resources available for each project. General Land Use Policies 1. Provide a balanced land use pattern that supports a sustainable mix of jobs and housing. 2. Encourage the integration of small scale neighborhood commercial services within larger development projects in developing areas. 3. Guide the scale of development to be consistent with surrounding land uses and general character. 4. Guide commercial land uses to areas that can utilize an appropriately designed transportation system without infringing upon residential neighborhoods. 5. Allow commercial areas to develop where they can be designed to be compatible with surrounding land uses. 6. Maintain and encourage the continuation of well-designed employment and business opporttmities in close proximity to the urban core of the community. 7. Direct future commercial development to sites that support and strengthen the existing downtown area. Comprehensive Plan Initiatives and Policies Page 3 8. Include adequate buffering of commercial and industrial development when adjacent to non-compatible land uses. 9. Encourage alternative land use patterns that offer opportunities for residents to work from their home, while maintaining the integrity of the Old Town area and other commerdal and industrial areas. 10. Support a land use pattern in the Old Town area that mixes residential and commercial uses and complements the historic downtown character. 11. Require adequate transition and buffers between differing, non-compatible land uses, making use of natural land characteristics, whenever possible. 12. Encourage "cluster developments" in rural areas in order to preserve the semi-rural character of the community, help implement the greenway concept, and maintain private property rights interests. 13. Ensure that development occurring within the undeveloped areas of the urban service district and within the Urban Reserve area is planned with the intention of providing munidpal services at some point in the future. 14. Encourage the use of Planned Unit Development (PUD) zoning which allows for creative residential development that balances the desires of the city and development community. 15. Require development proposals to consider the impacts on transportation and natural systems beyond the boundaries of their individual projects. Transportation 1. Build and maintain a local street system that provides for safe and efficient movement within Elk River, and minimizes the potential for unintended use of local streets. 2. Upgrade all primary local streets to hard-surface, all-weather roads. 3. Require that developers provide roads to City standards, prior to or during development, before the City assumes ownership and maintenance. 4. Work with other jurisdictions to achieve an effident transportation system, good long range planning, and effective use of finandal resources. 5. Provide a system for non-vehicular movement throughout the City based on sidewalks, trails and bike lanes. 6. Evaluate the opportunity to create or improve sidewalks, trails and bike lanes in conjunction with every street improvement project. 7. Support a regional transportation system which offers convenient and adequate service within and through the area. Comprehensive Plan Initiatives and Policies Page 4 Encourage a high level of efficiency, productivity, and quality of service in modes of transportation between Elk River, surrounding communities and the metropolitan areas. 9. Consider reducing access points along major thoroughfares and providing alternative means of individual property access. 10. Provide appropriate collectors and local streets as links to the existing system. 11. Recognize the needs of the central business district by offering flexible parking and other traffic design standards. 12. Be sensitive to existing residential developments, environmental areas, wetlands, existing public parks, and open space when building new, expanded or improved roadways. 13. Support roadway projects that will help alleviate anticipated traffic problems from roads or corridors that have been identified as being deficient in the transportation system. 14. Locate industrial development next to adequate transportation systems and provide transportation systems that complement industrial development. 15. Encourage akemative land use patterns that create the potential for making better use of alternative travel modes. 16. 17. 18. Preserve right-of-way through the development process, in anticipation of corridor needs identified in the Transportation Plan. Support regional transportation planning initiatives that help further more efficient traffic flows through Elk River while minimizing assOciated visual and economic impacts on the community. Support regional initiatives that provide choices in commuting to regional destinations. 19. Work cooperatively with regional agencies to plan for roadway improvements that balance local and regional transportation needs. 20. Operate a pavement management program to ensure good physical condition of all local streets. Housing 1. Encourage a mLxuu'e of housing opportunities in terms of costs and size while encouraging a high degree of architectural and site planning integrity. 2. Review residential housing standards and regulations regularly to ensure that neighborhoods maintain integrity and avoid deteriorating market value. Comprehensive Plan Initiatives and Policies Page 5 Evaluate housing stock on a regular basis to assess the housing conditions and needs of the community. Ensure that persons or groups of persons of similar income levels have a wide range of housing choices available to them, regardless of their race, color, creed, religion, sex, national origin, marital status, and without regard to public assistance, or familial status. 5. Provide a Fair Housing Statement to all developers who request approvals from City Hall. 6. Support the integration of affordable housing into larger housing developments (aka inclusionary housing) 7. Preserve the integrity and affordability of existing housing stock near or within the Old Town area. 8. Provide ample opportunities to accommodate the full spectrum of life-cycle housing. 9. and well Work with homeowner's associations to promote financially stable maintained neighborhoods. 10. Focus public actions on housing needs not met by the market place. Utilities 1. Coordinate preparation of utility master plans for municipal sanitary sewer, electric, storm sewer and water systems with the Comprehensive Land Use Plan and accompanying development projections. 2. Encourage the full utilization of existing infrastructure systems by supporting infill development within the existing urban service area. 3. Ensure adequate capacity within, and support maintenance and improvements of older facilities in and around, the Old Town area. 4. Ensure capacity is reserved for potential high demand industrial or office uses that may provide positive economic development oppommities to the community. 5. Maximize the use of rainwater gardens, wetlands or other natural systems to manage storm water runoff in an environmentally sound manner and reduce unnecessary construction of storm sewer infrastructure. Provide storm sewers to those areas no longer adequately drained by natural systems. Apply fair and equitable assessment written polities for the extension of water and sewer lines to accommodate new development. The policy shall provide for equitable assessment of the improvement costs while protecting the City's taxpayers and financial commitment. Comprehensive Plan Initiatives and Policies Page 6 8. Evaluate the impacts of all commerdal development proposals on the munidpal utility system. 9. Allow the extension of sewer and water infrastructure systems only after presently serviced areas have been developed to near capacity. 10. Develop and maintain, on a continuing basis, a five year capital improvements program and budget for the development, expansion, upgrade, and replacement of municipal systems (sewer, streets, water, storm sewer), municipal equipment (street maintenance, fire, office space), and park and recreation. 11. Coordinate with Sherburne County the jurisdictional responsibility of the current county ditch system. 12. Require that all developers provide utilities to city specifications before the City assumes ownership and maintenance responsibilities. Parks See Park Element Goals and Objectives Environmental Resources 1. Evaluate all proposals for industrial development in order to minimize the impacts on munidpal and natural systems. 2. Encourage preservation and protection of shoreland, wetlands and drainage ways. 3. Restrict inappropriate alteration of significant natural contours and soils. 4. Preserve natural systems through acquisition, dedication or easements. 5. Require that development plans demonstrate a compatibility with natural features and systems. 6. Establish tree preservation and protection standards to maintain the integrity of the City's natural vegetation. 7. Preserve public access to wetlands, lakeshore or other natural preservation areas through purchase, easement, dedication or other instrument. 8. Work with developers to preserve existing natural open space areas and areas that help implement the Greenway concept. 9. Develop, preserve and protect environmental resources within the area, such as forest, wetlands, water bodies and shorelines, with respect to open space, recreational uses, water and air quality, and natural ecosystems. 10. Encourage the preservation of shorelands, wetlands, and drainage ways. 11. Encourage the preservation of natural contours and soils, and preservation of natural vegetation. Comprehensive Plan Initiatives and Policies Pa§e 7 12. Preserve natural systems through acquisition, dedication, or easements. 13. Require that development plans demonstrate a compatibility with natural features and systems. 14. Work with developers to preserve existing natural open space areas. 15. Allow the transfer of densities on a ske in order to preserve site features that otherwise might not be preserved. 16. Encourage energy effident housing and business construction and operations. 17. Encourage urban design strategies that utilize the natural environment to save heating and cooling costs (solar energy), snow removal expenses (living snow fence) or storm sewer development (rainwater gardens, cisterns, rooftop gardens.) 18. Use the development process to obtain information about natural land features. Community Facilities 1. Provide adequate public facilities to protect the health, safety and welfare of the C ornlTlunity. 2. Cooperate with regional agencies to achieve efficiencies in the provision of services that may cross jurisdictional boundaries. 3. Cooperate and facilitate the planning and development of school facilities to serve growth in the community and better integrate school facilities with neighborhoods. 4. Work with the School District to reuse facilities no longer needed for public education. 5. Support collaborative solutions for local facility needs. Community Development 1. Prioritize the allocation of community resources towards inffll development, redevelopment of blighted or depressed areas, and revitalization of existing neighborhoods. 2. Promote the creation of a variety of new empl6yment opportunities that allow people to live and work in Elk River. Community Image 1. Utilize the Mississippi River as an attraction and focal point for the downtown 2. Adhere to controls for the size and placement of signage and landscaping for commercial applications within the City limits. 3. Establish a common theme for design standards and other infrastructure improvements to strengthen the character of the Old Town area. Comprehensive Plan Initiatives and Policies Page 8 4. Encourage the clustering of industrial uses to avoid the appearance of "strip" or scattered industrial operations along the City's major roadways. 5. Establish controls for the size and placement of signage, screening, noise and other visual concerns for industrial operations within the City limits. 6. Encourage well designed buildings that are visually consistent with the surrounding o Preserve, maintain, and/or strengthen the cultural, social, historical, physical and visual qualities unique to the community. Work with other public and private agencies to identify, preserve and protect sites of historical, architectural, and cultural significance. Park System Mission, Goals Park System Mission parks, trails avd faxilities that preserte unique ~s, where possible, and that are well ~ to neighkvtxxzts, places of work, and corrvrmm Goals Provide and maintain park, trail and recreational facilities that meet residents' needs within the community. Preserve, enhance and protect environmental resources and natural ecosystems, such as forests, native plant communities, wetlands, water bodies and their shorelines. Preserve, enhance, and protect the cultural, social, historical and scenic qualities unique to the Community. Promote ownership of park development and maintenance through collaboration of the City and volunteers. Develop public and private collaborations to assist in funding the acquisition and development of parks, trails and facilities. Emphasize the importance of connecting parks and open space resources to promote public access and develop a broader user base. Transportation Plan Goals A list of roadway improvement actions was developed for Elk River by examining the existing and/or forecast traffic operations, safety, and functional class issues and deficiencies identified in the previous chapters. Improvement actions were developed that are expected to alleviate these issues and generally improve traffic mobility and safety. Table 10 describes the improvement actions recommended and the objectives that each action is expected to achieve. TABLE I SUMMARY OF RECOMMENDED ROADWAY IMPROVEMENT ACTIONS Roadway Improvement Action Recommendation Objective Work with Mn/DOT to implement improvements identified · Eliminate/reduce existing TH 10 from east in TH 10 CMP or to develop a new improvement vehicle crashes and city limits to west alternative(s). Likely improvement candidates include congestion. city limits, conversion to 6-lane expressway or 4-lane freeway. A TH 10 · Eliminate/reduce future bypass is not a likely option, congestion. Work with Mn/DOT to implement improvements identified · Eliminate/reduce existing TH 169 from north in TH 169 CMP or to develop a new improvement vehicle crashes and city limits to south alternative(s). Likely improvement candidates include a 4-lane congestion. city limits, freeway. A TH 169 bypass is apotentid option. Bypass may · Eliminate/reduce future join existing TH 169 alignment in northern Elk River. congestion. · Eliminate/reduce existing CSAH 1 Expand roadway to a 4-lane divided arterial with right and left vehicle crashes. (Proctor Ave) from turn lanes at key intersections. · Eliminate/reduce expected CR 77 to TH 10 future congestion. CSAH 13 Expand roadway and add right and left mm lanes at key (Twin Lakes Rd) intersections. Number of additional lanes constructed may · Eliminate/reduce existing from Twin Lakes vary depending on completion of adjacent roadway vehicle crashes and expected Road to CR 31 improvements. Conduct a corridor study to specifically future congestion. (Viking Blvd) determine what improvements should be implemented. Expand roadway and add right and left mm lanes at key CR 31 intersections. Number of additional lanes constructed may (Viking blvd) vary depending on planned improvements for continuation of · Eliminate/reduce expected from CSAH 13 to roadway in Anoka County. Conduct a corridor study to future congestion. east city limits specifically determine what improvements should be implemented. Transportation Plan Goals Page 2 TABLE 10 (cont.) SUMMARY OF RECOMMENDED ROADWAY IMPROVEMENT ACTION Roadway Improvement Action Recommendation Objective · Expand existing system of 165t~ Ave from TH Classify as a Minor Collector functionally classified roads 10 to Jarvis St to improve mobility. Convert School Street in to a Mane roadway with a center left · Eliminate/reduce existing School Street from turn lane and implement intersection improvements identified vehicle crashes and CSAH 1 to TH 169 in previously completed safety study, congestion. Classify roadway as a Minor Arterial and develop east-west connections into Big Lake Township and Anoka County. CR 33 Roadway could be direcdy connected to 211th Avenue in Big · Expand existing system of (Ranch/205th/209th) Lake Township and CR 31 (Viking Blvd) in Anoka County. functionally classified roads from west city Coordination efforts with both Big Lake Township and to improve mobility and limits to east city possibly safety (if improved). limits Anoka County would be needed. As indicated in Table 3, consider completing a safety study. Safety study may recommend improvements. · Eliminate/reduce existing CSAH 12 vehicle crashes and expected (181~ Ave) from Expand roadway to a 4-lane divided arterial with right and left future congestion. CSAH 13 to east turn lanes at key intersections. · Provide design continuity city limits with roadway to the east. Expand roadway and add right and left turn lanes at key CR 30 intersections. Number of additional lanes constructed may (Mississippi/Main) Eliminate/reduce expected vary depending on traffic volumes forecast and the "context" o from Naples St to provided by the adjacent land use. Conduct a corridor study future congestion. TH 10 to specifically determine what improvements should be implemented. Expand roadway and add right and left turn lanes at key CR 77 intersections. Number of additional lanes constructed may (Proctor Ave) vary depending on completion of adjacent roadway · Eliminate/reduce expected from CSAH 1 to improvements and "context" provided by adjacent land use. future congestion. CR 33 Conduct a corridor study to specifically determine what improvements should be implemented. · Expand existing system of CR 35 Classify roadway as a Minor Collector. As indicated in Table functionally classified roads (192na Ave) 3, consider completing a safety study. Safety study may to improve mobility and from CR 72 to CR recommend improvements, possibly safety (if improved). Transportation Plan Goals Page 3 TABLE I 0 (cont.) SUMMARY OF RECOMMENDED ROADWAY IMPROVEMENT ACTION Roadway Improvement Action Recommendation Objective 193rd/198th Identify future corridor alignment for construction. Create an · Expand existing system of Corridor from maproved continuous east-west roadway that would cross over functionally classified roads CSAH 1 to CSAH TH 169. Classify roadway as a Major Collector to improve mobility. 13 CR 44 · Expand existing system of (Meadowvale Rd) Classify roadway as a Minor Collector. Roadway design functionally classified roads From CSAH 1 to (shoulder and lane width) may be improved, to improve mobility. TH 10 · Expand existing system of Tyler St Complete corridor study to determine if and how Roadway functionally classified roads FromcR 33CSAH 13 to design (shoulder, lane width, access) should be improved, to improve mobility. School St/Elk Hills Dr Identify future corridor alignment extensions for construction. · Expand existing system of Extensions Create an improved continuous east-west roadway that would functionally classified roads From CR 44 to CR cross over TH 169. Classify roadway as a Major Collector to improve mobility. 77 and from Line Ave to CSAH 13 CR 32/CR 72/ Create a continuous north-south roadway that would cross the · Expand existing system of /Zebulon/Waco Elk River and connect to Waco Street at the current TH 10 functionally classified roads From north city intersection. Classify roadway as a Major Collector. to improve mobility. limits to CR 30 Identify future corridor alignment for construction. Expand existing roadway to a 2-lane paved roadway with left and right CR 40 mm lanes at key intersections and shoulders. Construct a · Expand existing system of (Cleveland/Jar, As) roadway connection between CSAH 12 and 165th Ave/Jarvis. functionally classified roads from CSAH 13 to Classify road segment as a Minor Arterial. Roadway upgrade to improve mobility. TH 10 should coincide with adjacent development. Connection to 165th/Jarvis is dependent on redevelopment of Cargill holdings. · Expand existing system of CSAH 1 Classify roadway as a Minor Arterial. As indicated in Table 3, functionally classified roads (Elk Lake Rd) consider completing safety study. Safety study may lead to to improve mobility and from north city roadway improvement recommendations, possibly safety (if improved). limits to GR 32 Transportation Plan Goals Page 4 TABLE I 0 (cont.) SUMMARY OF RECOMMENDED ROADWAY IMPROVEMENT ACTION Roadway Improvement Action Recommendation Objective CSAH 21/221~t Identify future corridor alignment for construction. Create a continuous east-west roadway that would cross and · Expand existing system of Ave from west to ftmcdonally classified roads interchange with TH 169. Roadway may connect to CR 33. east city limits Classify roadway as a Major Collector or Minor Arterial. to improve mobility. Create a new connection between 171st Ave and 165th Ave on 171~t Ave to 165t~ corridor located between TH 10 and the BNSF Railroad · Expand existing system of Ave Connection tracks. This connection would be dependent on the functionally classified roads development of the Cargill holdings, to improve mobility. Identify future corridor alignment for construction. Create a Tyler St Extension · Expand existing system of new connection north from existing CR 33 to CSAH 21 and from CR 33 to new classify as a Major Collector. Connection probably should not functionally classified roads CSAH 21 roadway be built unless a new CSAH 21/221~ Ave connection is built, to improve mobility. CR 77 Extension Identify future corridor alignment for construction. Create a new connection north from existing 213:h Ave to 221~ Ave · Expand existing system of from 213th Ave to and classify as a Major Collector. Connection probably functionally classified roads new CSAH 21 should not be built tmless a new CSAH 21/221st Ave to improve mobility. roadway connection is built. Consider restriping existing bridge span in future to a 4-lane CR 42 Bridge facility if bridge width permits. A second bridge span could be considered to widen facility to 4-lanes. Bridge · Eliminate/reduce expected from CR 30 to improvements would be dependent on corresponding future congestion. south city limits roadway improvements on Main Street and CSAH 42 in Otsego. Chapters 1-3 create a case for implementing a number of roadway improvement actions by documenting existing and forecast future roadway conditions. Chapter 4 describes and prioritizes the roadway improvement actions developed. Chapter 5 provides guidance on how the city should proceed with some of their day-to-day transportation planning functions. This chapter provides general recommendations on what Elk River should do in order to successfully implement the roadway improvement actions identified. The general recommendations are as follows: Complete the corridor studies identified in Chapter 4. In order to determine more precisely what types of roadway improvement actions should be implemented, corridor studies on many of the major roadways in the city should be completed. In general, these studies would look at environmental, land use, engineering, and financial Transportation Plan Go~ls Page S constraints/opportunities as well as consider public input to determine how many lanes can be added to exisdng roadways and where new roadway alignments should be located. Work with Mn/DOT, Sherburne County, and neighboring jurisdictions. The nature of furore improvements to TH 10 and TH 169 in Elk River will likely have enormous impacts on how the city functions and grows. Mn/DOT, having identified these roadways in Elk River as high and medium priority interregional corridors, has already developed future highway improvement concepts as part of the TH 10 and TH 169 Corridor Management Plans. Also, improvement actions implemented on TH 10 and TH 169 in adjacent communities will likely affect future highway improvements in Elk River. For example, TH 101 in Otsego will be converted to a freeway by 2006. Mn/DOT has recently completed an environmental scoping document defining a potential corridor for a future TH 10 bypass of Big Lake. The city of Ramsey is pursuing a future alignment change and freeway conversion for TH 10. As these actions are implemented, they begin to narrow the improvement actions that can be taken by Elk River. The city should be proactive and work with Mn/DOT and neighboring communities on deciding what future improvements might take place on these two highways. Working with Sherburne County on future roadway improvement actions is equally important to working with Mn/DOT. Several of the major roadways identified for improvement in the city are under county jurisdiction. It is crucial for the city to work with the county to determine the timing, funding, and nature of these improvements. Also, Elk River should work with Sherburne County to determine if some existing and future city roadways should become county roadways and vice versa. Roadway jurisdiction affects how roadways function and how they are maintained and financed. Make the public and developers aware of the transportation plan. As developers approach Elk River with development proposals, city staff and officials should examine the transportation plan to see if the proposals are consistent with the plan. They should make the plan's improvement actions visible and readily available to developers and interested members of the general public so they can make decisions in accord with the plan. If stakeholders know what is in the plan in advance of making key decisions, opposition to the plan should be minimized. Use available planning and regulatory tools to help implement the plan. The city's authority over planning and zoning can help guide the implementation of the transportation plan. For example, the city can use official mapping to identify the corridor location of future roadways. It can also request that developers dedicate a portion of their land for roadway fight-of-way. Another example that could be used if appropriate is interchange area planning and zoning. If it is determined that all or portions of TH 10 and TH 169 should be converted to freeway, the city could develop interchange area plans and/or overlay zones to guide development around future interchanges. That way, future development along TH 10 and TH 169 would have to be consistent with the respective improvement plans for the highways. In addition, Section 5.1 of the plan discusses access and signal spacing guidelines that should be utilized when determining future access and signal locations on major roadways in the city. This section also refers to sample access management ordinances that are found in Appendix Transportation Plan Goals Page 6 C of this plan. With this information as a guide, the city should implement an access management ordinance so that traffic safety and mobility can be maintained on their functionally classified road system (arterials and collectors). As stated in the introduction to this plan, the main purpose of the transportation plan is to assist the city in determining what roadway infrastructure the city may need to serve their future vision and to maintain a high level of traffic safety and mobility. If the information and recommendations found in this plan are used and followed, then that goal should be achieved. Identify future corridor and potential westerly connection to Big Lake Township. ~ ~ ' Identify corridor for future connection. Identify corridor to connect CSAH I to Tyler St. Identify corridor for -~ ~i ~!i~' future c°nnecti°n' / ~ ~L~) 't ~ Identify corridor for future connection. ~' 209th Ave // Identify corridor for future connection into Anoka Count. Identify corridor Identify corridor to for future connect CR 44 to connection. CR 77. ~Recommended Improvement Actions m Roadways Identified for Improvement i Land Area Containing Future Roadway Note: See Table I 0 in Transportation Plan for more detailed improvement descriptions. Identify corridor to connect School St to CSAH 13. Identify corridor for future connection to Jarvis (if Cargill land is developed). 0.5 0 I 2 ~ Pfiles Improve roadway and develop east-west connections into Anoka County and Big Lake Township that were established during short-term time frame. 1~ ~/ 221st Ave Expand roadway section and add turn lanes at key intersections. Conduct corridor study to determine improvements. Create a continuous east-west roadway connecting CSAH I to Tyler St using corridor identified during short term time frame. Implement road improvements established with Mn/DOT during the short-term time frame. Create new CR 33 connection to Viking Blvd that was identified during the short term time~ frame. Ave Conduct corridor study to identify potential improvements. Create 2-lane paved roadway with turn lanes at key intersections. Classify as Minor Arterial. Examine crashes to determine if safety study is needed. Classify roadway as a Minor Collector. -t[School St i Create connection identified during the short term time frame between School St and CSAH 13. Classify roadway as a Minor Collector. Make road section improvements as needed. Create connection identified during the short term time frame between CR 44 and CR 77. Expand roadway section and add turn lanes at key intersections. Conduct corridor study to determine improvements. Expand roadway to 4-lane divided and I add turn lanes at I key intersections ] Recommended Improvement Actions m Roadways Identified for Improvement , , Land Area Containing Future Roadway Note: See Table I 0 in Transportation Plan for more detailed improvement descriptions. dement road improvements established with Mn/DOTduring the short-term timeframe. I 0.5 0 I 2 I Miles Create connection identified during short term time frame. Create connection identified during short term time frame. Create connection identified during short term time frame. Create a continuous east-west roadway using corridor identified during short term time frame. Classi~ roadway as a collector or arterial. ,! ~.~.~J Create a connection .." from CSAH 21 to CR l~ ~ i ~133 using corridor ~! ~, ~ identified during short · ~ i t term time frame. Classi~ , <~t as a ~alor Collector. Create a connection between 171 st Ave and 165th Ave. Corridor is already identified. 175th Ave rRecommended Improvement Actions~ I Roadways Identified for Improvement [ i Land Area Containing Future Roadway Note: See Table 10 in Transportation Plan for more detailed improvement descriptions. Create a 2-lane paved roadway with turn lanes connecting TH 10 to CSAH 2. C assi~ as Minor Arterial. Jl 0.5 0 I 2 I Miles City of River FINANCIAL MANAGEMENT PLAN Elk River, Minnesota Adopted: January 28, 2002 CONTENTS INTRODUCTION KEYS 6 Growth and Development 6 Le~slarive Action .................................................................................................... 6 Non-Tax Revenues ................................................................................................... 7 Capital Investment ................................................................................................... 7 General Fund ............................................................................................................ 8 ACTIONS 10 CIP .............................................................................................................................. Facilities .................................................................................................................... lC) Storm Sewer ...................................... : ...................................................................... 11 ?avemenr Rehabilitation ...................................................................................... 12 GASB 34 .............. ...12 Bond Rating .............................................................................................................. 12 U rilities ...................................................................................................................... 13 Property Taxes . . ..... 13 Landfill Surcharge .................................................................................................. 14 POLICIES 16 1. Revenues .................... 16 2. Property Taxes ............................................................................................... 17 3. Utilities .................. 17 .4. Investments ........................................................... ~ ........................................ 18 5. Purchasing ...... . .20 6. Budgeting ........................................................................................................ 21 7. Accounting, Auditing and Financial Reporting ................................. 22 8. Reserves .......................................................................................................... 23 9. General Fund Balance ................................................................................. 23 !0. Capirallnvesrmenr ................... , ............................................. ~. ................ :..24. 11. Debt ............... .. 25 DATA 28 Trends ........................... 28 Projections ............. 45 Capital Improvements .......................................................................................... 47 Page 2 Financial management is the on-going effort to ]~alance the competing forces of revenues and expenditures. The revenue side of the equation focuses on affordabiliry. The expenditure side addresses community needs and desires. Financial management attempts to make the best use of available revenues to serve the community. Planning examines the current and future ability to meet this objective. Elk Privet has a long history of excellent financial management. The City's financial condition is sound. The City has managed its finances in an environment of community and legislative change. If current financial practices work, why plan? Comprehensive financial planning brings several benefits: Long-term view Many aspects of financial management cover a limited rime frame. Annual financial reports look back one year. Operating budgets plan for the upcoming },ear. Effective financial planning requires a broader view. Many important trends evolve over a number of years. Looking back at a single year often misses the context of changes. Looking into the future creates increases the ability to identify opportunities and obstacles that he ahead. Build a better understanding Municipal finance is complicated and ever-changing. The planning process provides an opportunity ro learn and to ask questions. A better understanding of finance leads to better decisions. Look at whole puzzle, not just pieces Many elements of municipal finance are interconnected. Capital improvements may affect operating costs. Use of reserves for one project may yield an unexpected gap for another. Financial planning creates a means for identifying these relationships and considering the ripple effects of financial decisions: Increase continuity Financial management often relies on informal pohcies - an understanding between staff and City Council on financial practices. In the short-term, this approach can be very effective. It is difficult to maintain over the long run as staff and Council members change. Written plans and policies provide a common understanding and basis for continuity. During 2001, the City of Elk River has undertaken a financial management planning process. Through a series of interactive workshops, the City Council examined the key financial aspects of municipal government. The workshop topics were (1) Trends and Projections, (2) Operating Projections, (3) Capital Improvements, and (4) Policies. The results of this planning process are summarized in this report. The results fall into four key financial strategies: INTRODUCTION Page 4 Financial management is the on-going effort to balance the competing forces of revenues and expenditures. The revenue side of the equation focuses on affordability. The expenditure side addresses community needs and desires. Financial management attempts to make the best use of available revenues to serve the community. Planning examines the current and future ability to meet this objective. Elk River has a long history of excellent financial management. The City's financial condition is sound. The City has managed its finances in an environment of community and legislative change. If current financial practices work, why plan? Comprehensive financial planning brings several benefits: ,,% Long-term view Many aspects of financial management cover a limited time frame. Annual financial reports look back one year. Operating budgets plan for the upcoming },ear. Effective financial planning requires a broader view. Many important trends evolve over a number of years. Looking back at a single year often misses the context of changes. Looking into the future creates increases the ability to identify opportunities and obstacles that he ahead. Build a better understanding Municipal finance is complicated and ever-changing. The planning process provides an opportunity to learn and to ask questions. A better understanding of finance leads to better decisions. Look at whole puzzle, not just pieces Many elements of municipal finance are interconnected. Capital improvements may affect operating costs. Use of reserves for one project may yield an unexpected gap for another. Financial planning creates a means for identifying these relationships and considering the ripple effects of financial decisions. Increase continuity Financial management often relies on informal policies - an understanding between staff and City Council on financial practices. In the short-term, this approach can be very effective. It is difficult to maintain over the long run as staff and Council members change. Written plans and policies provide a common understanding and basis for continuity. During 2001, the City of Elk River has undertaken a financial management planning process. Through a series of interactive workshops, the City Council examined the key financial aspects of municipal government. The workshop topics were (1) Trends and Projections, (2) Operaning Projections, (3) Capital Improvements, and (4) Policies. The results of this planning process are summarized in this report. The results fall into four key financial strategies: INTRODUCTION Page 4 Identify the Keys that will shape the future financial condition of the Cit~7. Describe Policies that institutionalize a decisiontmaking framework and provide continuity. List Actions to be taken to address financial management issues identified in the planning process. Compile Data to serve as a reference point for future planning and decisions. Page 5 The financial management planning process in Elk RAver has been called "Key Financial Strategies". Through this process, several issues areas emerged as key factors for the financial future of ELk RAver. No single factor will influence the future of Elk RAver more than. growth. · Growth creates property valuation. · Growth adds homes, businesses, and institutions that produce the demand for municipal services and [acihdes. · The City builds streets, sanitary sewer, water, and electric systems needed to serve new development. · Devdopment creates capital charges and user fees used to support debt and capital investment for utility systems. A key financial strateg-y for the City will be forecasting future growth and understanding the factors that may cause changes in these projections. State Law controls many elements of city finance. The results of the 2001 Legislative Session showed how legislative actions affect city finances and impair long-term planning. The lack of legislative stability increases the importance of planning. Although it is impossible to predict future statutory constraints, planning forces the City to consider how State Law influences decision-making. It also provides an opportunity to create contingency plans as a buffer to adverse legislative change. · Property Tax Changes. Given the slo~ving of the Stare economy and the extent of past class rare compression, it is difficult ro imagine further reductions in tax capacity. In 2001, we were reminded of the speed, magnitude and unpredictability of changes in the property tax system. Forecasts of future property values should use conservative assumptions. Levy Limits. The current law imposes levy bruits for only the next two years. The on again/off again nature of levy Emits shows the risk of planning for a future without some form of limitation on the City's ability to levy property taxes. New Limitations. The Legislature has periodically considered new lirmtations on the ab&try of cities to levy taxes or incur debt. The most common form of new lirnitanon is a reverse referendum petition. Residents could petition a city to conduct a referendum on certain matters. Non-Tax Revenues. The impacts of Legislative change are not limited to property taxes. In 2001, the Legislature reduced HACA, but increased Local Government Aid allocations to Elk River. It is impossible to predict the future of State Aid. The City should anticipate discussions KEYS Growth and Development Legislative Action Page 6 on legislation that affect other traditional local revenues. Caps on building permits fees, connection charges, and other development fees could significantly impact Elk River's financial capacity. A financial strength of the City is the diversity of its revenue base. This diversity has allowed the City to keep pace with services and facilities without overburdening the taxpayer. Landfill revenues. Revenues collected from the landfill surcharge have been an essential part of capital improvement finance. The long-term status of this revenue is one of the most important financial planning issues facing the City. When this revenue goes away, the City may face the need to delay capital improvements and/or to increase use of other revenues. Development fees. Elk River derives a variety of revenues directly from new development. A slowdown in the pace of development reduces revenues and presents financial consequences. Some development revenues (i.e. - building permit fees) help to support the General Fund. Connection charges are used to pay capital improvements and debt. The City should continue to forecast future gro;vth and to monitor growth capacity. Special assessments. The ability to assess the costs of public improvements to benefited properties reduces the demands on property taxes, utility revenues, and other sources. Tax increment. The City has been able to use tax increment financing to encourage development and finance infrastructure. The 2001 changes in the property tax system will reduce the amount of tax increment revenue received by the City. The capacity of tax increment financing to support current obligations and new initiatives is a 'key financial strategy. Capital investment was a key topic of the financial planning process. The ability to provide capital improvements in a timdy and affordable manner is an essential function for the City. The planning process illustrated several key financial strategies for capital investment: Monies from the landfill surcharge are needed to finance planned expansions of the Library and City Hall. Surcharge revenues should be earmarked for this purpose. The Government Buildings Reserve does not contain enough money to support al2 potential facility needs. In addition to the Library and City Hall projects, other potential facility investments include one or more fire stations, community center, second liquor store and ice arena Non-Tax Revenues Capital Investment Page 7 improvements. Funding plans for each of these projects is needed make most effecnive use of revenues and reserves. The City has created a Pavement Management Program to provide for the reconstruction of the municipal street system. CurrenQy, the Program draws funding from the landfill surcharge, assessments to benefiting properties and general property taxes. Careful planning will be needed to mimrnize the impacts on property taxes. It is anticipated that utility reserves and annual revenues will be used to pay for the related costs of street reconstrucnon projects. Planning for sewer, water and electric system improvements must be coordinated with the Utilities Coramission. The City needs to create a long-term plan for funding construction and maintenance of the storm sewer system. Some money has been set aside in the Storm Sewer Project Fund. The current situation does nor provide an ongoing source of revenue or a means of Borrowing. If a storm water utility is not acceptable, then the City has three alternatives: (1) establish one or more storm sewer improvement districts; (2) assess 20% or more of the improvement costs to benefited properties; or (3) reallocate other revenues and undertake on a pay-as-you-go Basis. The City needs a long-term plan for funding the acquisition and development of the municipal park system. Monies from park dedication fees and the NSP/RDF Fund are available for this purpose. The City can borrow for this purpose upon obtaining voter approval to issue bonds or proceeding under M.S. Chapter 429 to issue improvement bonds. Future facility and infrastructure projects increase the potential for capital improvements to compete with the General Fund for limited property tax revenues. Careful planning will help the City meet capital and service needs while managing the tax impacts. The General Fund is the heart of City financial operations. The General Fund finances most non-utility public services. The General Fund produces the largest demand on property taxes. Planning for the General Fund has led ro the following key financial strategies: Personnel and related costs are the largest source of General Fund expense. The addition of staff will be a key to future expenditures. It is anticipated that the City will add a public works employee or police officer every other year to maintain adequate service levels. In the near term, the City has budgeted for additional staffing in cable 'l-V, information management, and finance. Planning for these additions and their expense helps to manage the financial implications. General Fund Page Contracts for service provide an alternative approach. The planning process identified custodial and engineering services as areas for further study. Revenues are the primary constraint to long-term planning. Services cannot be provided without adequate revenues. Making ~ffecrJve use of non-tax revenues will buffer the City from legislative change and enhance the ability to meet service needs. Growth, legislative change, inflation, and other factors are beyond control of the City. These uncertainties increase the need to maintain strong reserves in the General Fund. Page 9 Financial plarming is a process, not an event. The preparation o[ a [mancial management plan and the adoption of policies lay the foundation. The City builds on this foundation by underta 'ldng additional financial planning actions set forth in the plan. , This section lists the financial planning Actions to be undertaken by the City. Some actions will be undertaken in 2002. Other actions have longer time frames. Progress on the Actions should be reviewed annually as part of the budgeting process. Completed actions can be removed. Actions in progress can be updated. New actions can be added. ACTIONS ClP Recommended ... Action Proposed Timetable Comments Update and adopt a five-year capital improvements plan. Prepare in conjunction with annual operating budget beginning in 2002. The City collects much of the data required for a CIP, but has not prepared a comprehensive plan. The CIP is a document that will evolve over time. The initial CIP should be a simple and functional document. The initial collection of project data and the organization of the Plan can be a time consuming task. In subsequent years, data collection becomes more routine and additional details can be added. The follov4ng steps can be taken to initiate the CIP process m 2002: · Determine the types of capital improvements and the minimum cost to be included in the Plan. · Determine the information required for each project. · Determine if projects v¢21 be prioritized and, if so, the method to be used. · Create aproject worksheet. · Establish a calendar for preparation and submission of project worksheets by Department Heads. Facilities Recommended Action Proposed Timetable Update plans for facilities improvements and funding, specifically addressing the use of Government Buildings Reserve. Prepare in conjunction with Capital Improvements Plan. Page 10 Comments Recommended .,.,Action Proposed Timetable Comments One key financial strategy is that financial decisions are o[ten interrelated. This strate~ is especially true for facilities. The financing of building projects often compete for the same, limited funding sources. The expansion of the City Hall Campus sends ripples into other parts of City finance. The use of reserves will reduce monies available for future projects. Debt incurred for the project creates obligations for property taxes or other revenues. Establish storm sewer improvement district to finance activities under the Surface Water Management Plan. Estabhsh district(s) in 2002 and consider initial tax levy in 2002 for taxes payable 2003. Through the financial planning process, the use of a storm sewer improvement district was identified as the best option for financing the construction and maintain of the storm sewer system. The steps to be undertaken in 2002 include: Storm Sewer · Contact County (or State) to determine if levy for district without bonds is subject to levy limitations. I£ levy 1Lrmts apply, consider corrective actions in Legislature. · Determine if one or more districts will be established. · Obtain the tax capacity value of property with the district(s). · Determine projects funding needs in years 2003 through 2007. · Estimate other public and private revenues available to finance improvements. · Undertake process to establish district(s), pursuant to Minnesota Statutes, Sections 444.17 through 444.21. · Include levy (if an~) m steps for taxes payable 2003. Page 11 Recommended Action Proposed Timetable Comments ' ' ' ': ReEommended Action Proposed Timetable comments Recommended Action Proposed Timetable Comments Create and adopt a funding plan for Pavement Rehabilitation Program. Finalize funding plan prior to initial public heanngs, currently scheduled for September 2002. The Pavement Rehabilitation Report proposed improvements and assessments. This information needs to be expanded into an overatl funding plan to include issues raised in the financial planning process: · What is the projected 12/31/01 balance in the Street Improvement Reserve Fund? · WiLl monies in the Reserve be needed for any other purposes? · How much of the LandfL12 Surcharge w~ be committed to this Program? · W21 the City issue bonds to pay for annual improvements and does the $5,000/unit proposed assessment exceed the 20% threshold needed to issue G.O. Bonds? · WiLl the City establish a permanent improvement revolving fund for pavement rehabilitation? · How will the City f~ance rehabLlkadon of sanitary sewer lines? · Is the Utilities Commission prepared to finance water and electric system improvements related to pavement rehab~tadon projects? Initiate process for compliance with GASB 34. Complete compliance actions by 12/31/03. It is likely that planning for comphance with these new financial reporting requirements will be influenced by the demands of other financial management projects. One way to stay on track is to hst the steps requLred for comphance and track progress for each step. Devdop strategies for obtaining a rating upgrade. Undertake in 2002 in conjunction with debt issuance. The City's current bond rating includes positive Pavement Rehabilitation GASB 34 Bond Rating Page 12 Recommended Action ,,', Proposed Timetable Comments RecOmmended Action Proposed Timetable COlTllilents outlook. The oudook signals the potential for raring changes in the foreseeable future. Two key steps in seeking a rating up,adc will be: Scheduling a visit to Elk River by a Moody's analyst. Evaluating options for mitigating the impacts of the overlapping debt of the Elk River School District. Review and coordinate key financial strategies with Utilities Commission. 2002 and ongoing. Several aspects of financial management have direct implications for the Municipal Utilities. · Ongoing review and adjustment of water system capital charges. · Ongoing review and adjustment of water system user fees. · Fund balance amounts and policies for water and electric funds. · Issuance of debt andbond rating. · Plans for funding water and electric system improvements in conjunction with pavement rehabilitation projects. Prepare updated projections of property valuation and tax rares. First half of 2002. The 2001 Legislature made sig-mficant changes to the property tax system. Final tax capacity values and tax rates will be known soon. This information is needed to make revised projections of future tax rates. The questions to be answered include: · Will levy limits in 2003 and potentially beyond impair the ability of the City to meet current and future staffing needs? · What are the tax rate implications of tax levies to support for capital improvements? · Is the projected total tax rate (operations plus debt) acceptable? Utilities Property Taxes Page 13 Recommended Action Proposed Timetable CornlTlenEs Update projections of revenues from Landf2l Surcharge. 2002 and ongoing. The Landfill Surcharge is second most important sources of revenue (behind property taxes) for the City of Elk River. The amount and duration of this revenue source has significant nmplications for capital improvements and tax planning. Landfill Surcharge Page 14