Loading...
5.11. SR 01-05-2015 City of Elk - Request for Action River O. To Item Number Mayor and City Council 5.11 Agenda Section Meeting Date Prepared by Consent January 5, 2015 Suzanne Fischer,Director, CODD Item Description Reviewed by Rivers Edge Commons Park Paver Project Cal Portner, City Administrator Reviewed by Action Requested Approve,by motion,the quote from Greenscape Companies, Inc.,to replace the pavers in the crosswalk and the upper half of the alley at River's Edge Commons Park. Background/Discussion At the November 3, 20145 City Council meeting, staff presented four options to replace the deteriorated pavers at Main Street and Jackson Avenue and in the alley at River's Edge Commons Park. During the Work Session, a fifth option was added to replace the pavers on the upper alley and utilize the lower alley to expand the park. Permeable pavers were originally considered;however, the combination of practices in the fifth option addresses stormwater concerns and eliminates the high cost of the aggregate base for the permeable pavers. The project concept was also presented to the Downtown Business Group and to the Park and Recreation Commission in November. Both groups were supportive of the proposed improvements. As directed by Council, staff obtained the following quotes for the fifth option. • Greenscape Companies,Inc. $19,968 • Great Northern Landscaping, Inc. $25,560 Pending Council approval,work would begin as soon as weather permits and be completed by May 20, 2015. Financial Impact The project will be funded out the 2015 Street Maintenance budget as part of our normal operating budget for maintenance projects. Attachments ■ Quotes P a w E A E U s r Template Updated 4/14 INIM UREI Greenscape Companies Inc. Proposal Date Estimate# 11/7/2014 2898 Name/Address City of Elk River 13065 Orono Parkway Elk River,MN 55330 Chris Project Description Total * Proposal for Paver Replacement at: Main St Park Elk River MN - Removal.hauling and disposal of existing pavers 2,985.00 - 714 sq.ft.Pavers installed for cross walks 4,998,00 - 1,625 sq.ft.Pavers installed for Alley 10,985.00 - Traffic Control for crosswalks 1,000,00 Price includes: *removal of existing pavers *re screed bedding sand as needed *re install pavers supplied by Borgert *joint sand *compaction Sales Tax 0.00 Total $10.968.00 Customer Signature Signature E-mail Web Site chris algreenscapecompanies.com (reeascapeCompanies.coni Great Northern Landscapes, Inc. 4� 19720 Iguana St. N.W. Elk River, MN 55330 Ph. 763-274-2676 Fax 763-2742679 November 20,2014 Re: Down Town Paver Replacement/Main street Elk River, MN Attn: (Mark Thompson City of Elk River Mark, Here is the pricing you requested for the above mentioned prole,Our price includes all material, labor and applicable taxes to remove and reinstall 2,339 square feet of pavers supplied by the manufacturer and the City of Elk River. Our price includes a V sand setting bed,surface sand at joints and compaction as well as$1,000 for traffic control at the crosswalks, Paver removal and new installation $25,560 Please let me know if you would like us to proceed with this project in the spring. Thank you, J Todd Kleven Equal Opportunity Employer