6.4. SR 11-19-2001R3ver
Item #
6.4.
MEMORANDUM
TO:
FROM:
DATE:
SUBJECT:
Mayor and City Council
Scott Harlicker, Senior Planne~
November 19, 2001
Case No. LU01- II
Request by the City of Elk River for a Land Use Plan
Amendment to Include Certain Property in the Urban Service
Oistrict
Request
Consider a request by the City of Elk River to amend the Comprehensive Plan to include
approximately 80 acres in the Urban Service District.
Location
South side of 175th Avenue east of Twin Lakes Road.
Zoning/Land Use
Rla (Single Family Residential) / LR (Low Density Residential)
Attachments
· Location map
· Air photo of the area.
· Map showing existing urban service boundary
· Parcel map which identifies the affected properties and the property owners
· Map showing approximate location of wetland
Memo to Mayor and City Council/LU 01-11
November 19, 2001
Page 2
Overview
Existing Conditions
The proposed land use amendment includes 8 different property owners and 11 separate
parcels. The area under consideration totals about 80 acres.
The property, located on the south side of 175th Avenue, consists of 8 single family
residences. All of the residences are on individual wells and septic systems. The property is
fairly level, mostly open with scattered trees planted around the residences. A substantial
portion of the area is wetland (see attached map). The buildable land is located in the
northern half and western two-thirds of the area.
Zoning
The property to the south is zoned Rla (Single Family Residential) and the property to the
east is zoned AR (Agricultural Research). To the north is 175th Avenue and the properties on
the north side of 175th are zoned Rle (Single Family Residential); Twin Lakes Road is on the
west and the property on the west side of it is zoned BP (Business Park).
Land Uses
The property to the east is a wood lot and wetland owned by Cargill. Their long range plans
are to maintain the property as it currently is. The property to the south is proposed to be a
mixed use planned unit development. Proposed uses include apartments, townhouses, senior
housing and office/retail space. The development proposal is currently before the Council
for consideration. The application has been tabled pending submittal and approval of an
EAW (Environmental Assessment Worksheet). The properties to the north are single family
residential and a 20 acre parcel owned by the Department of Transportation. The
Department of Transportation's plans include possible mineral excavation. The City owns
the property to the west. It is currently undeveloped and the development plans include
business park development and the possible siting of a YMCA or other community service
facility.
Urban Service District
The properties on the north side of 175th Avenue are in the Urban Service District. On
October 20, 1997 the City Council amended the Comprehensive Plan to include the
property on the north side of 175th Avenue in the Urban Service District. Included as part of
this amendment was a condition that urban services would not be extended to this area prior
to 2007. The property to the south was included in the Urban Service District in August
2001 and the property to the west is also within the Urban Service District. Cargill's property
is not in the Urban Service District and there are no plans to include it in the Urban Service
District.
S:\PLANNING\SCOTT\lu01-1 lcc.doc
Memo to Mayor and City Council/LU 01-11
November 19, 2001
Page 3
Analysis
These properties, which are large lot single family residences, total about 80 acres and
include all the parcels south of 175~ Avenue, west of Cargill's property, east of Twin Lakes
Road and north of the proposed Elk River Station project. The following changes that are
occurring in the area should be evaluated as to how they impact these properties:
· The Northstar Corridor commuter rail station/MnDOT park and ride facility
· The proposed Elk River Station development
· The construction of Twin Lakes Road and the reconstruction of 175~h Avenue
· The possible extension of utilities along 175th Avenue
Northstar Corridor commuter rail station/MnDOTpark and ride facility
This development will have a significant impact on surrounding properties. The City has
been asked by the NCDA to look at land uses within a ½ mile radius of the station/park &
ride and consider possible transit oriented uses (uses that are higher density, walkable, etc.).
Since this area is within a ~ mile of the station site, transit oriented uses are an option that
should be considered. It is staff's opinion that sewer and water are needed if this area is to
develop in a way that is transit oriented.
Elk River Station development and nearby land uses
The proposed Elk River Station development includes a mix of commercial, office and
residential uses and is about 65 acres in size. The developers of Elk River Station, as part of
their proposal, requested an amendment to the Comprehensive Plan to include the property
in the Urban Service District. On August 27, 2001 the Council approved the amendment to
the Comprehensive Plan to include the property in the Urban Service District and changed
the land use designation from LR (Low Density Residential) and LI (Light Industrial) to MR
(Medium Density Residential) and CC (Community Commercial).
The 20 acre parcel located on the north side of 175~h that is owned by MNDOT is zoned
residential, and will likely be developed at a residential density that can be supported with
sewer and water. The remaining properties on the north side of 175~ are large lot single
family residential. These property owners will have the option to further subdivide their
property once sewer and water are available. The property on the west side of Twin Lakes
Road is zoned Business Park and will be developed with sewer and water. Only Cargill's
property to the east will be outside the Urban Service District and will remain undeveloped
for the foreseeable future.
S:\PLANNING\SCOTTMu01-1 lcc.doc
Memo to Mayor and City Council/LU 01-11
November 19, 2001
Page 4
Twin Lakes Road and 175th Avenue
In fall 2001 Twin Lakes Road was opened, providing a connection between east Elk River
and Highway 10/169. This will allow local traffic to by-pass Highway 169. Twin Lakes Road
is designed to function as an arterial street and is expected to carry over 20,000 cars per day.
In spring of 2002, 175th Avenue is scheduled to be reconstructed. This street will be designed
to be a collector street. It will provide a connection between Twin Lakes Road and the
residential developments to the north and east.
With the construction of Twin Lakes Road and 175th Avenue, the area under consideration
for municipal sewer and water will be bounded by a north/south arterial road on the west
and a collector street on the north. Both of these streets will have enough capacity to handle
traffic generated by the development of this area at a density that can be supported with
municipal sewer and water.
Sewer and Water along 175~ Avenue
A 93 lot single family residential development is proposed for the Scott Mitchell property,
located on the north side of 175th Avenue east of this area. As part of this project the
developer proposes to extend sewer and water along 175th Avenue. If sewer and water are
installed along 175th, the properties on the south side of the street could benefit from it in
that it could be extended to their properties.
Planning Commission Meeting
At the October 23rd Planning Commission meeting two property owners spoke at the public
hearing. Gerry Graham spoke against the request. She liked the existing rural character of the
neighborhood. Ijaz Osman stated that he like the neighborhood as it is. The Planning
Commission discussed future development in the area, including the influence of the
wetland complex on development, and the timing of providing sewer and water to this area.
They talked about future plans for sewer and water along 175:h Avenue and assessments.
They also brought up the idea of reviewing this request in the context of a general review of
the Comprehensive Plan.
Recommendation
The Planning Commission recommended denial of the land use plan amendment to include
certain property on the south side of 175:h Avenue in the Urban Service District based on
the following findings:
· The wetland area located on the properties.
· The proximity of the Cargill property.
· The uncertainty of the future development of the property to the south.
S:\PLANNING\SCOTT\lu01-1 lcc.doc
Memo to Mayor and City Council/LU 014 1
November 19, 2001
Page 5
Staff recommends that the City Council approve the land use plan amendment to include
certain property on the south side of 175th Avenue in the Urban Service District based on
the following:
The proximity to the proposed NCDA commuter rail station and the MNDOT park
and ride facility. In order to best utilize these facilities the city should encourage
transit supportive development, which require municipal sewer and water. Land use
analysis done as part of the commuter rail service has indicated that properties within
¼ mile radius of the station should be developed in a way that is transit oriented and
will encourage transit ridership. This area is within ½ mile of the proposed station
and park and ride facility.
The area under consideration is surrounded on 3 sides by land that is within the
Urban Service District. Only the Cargill property to the east is not within the Urban
Service District. Including these properties in the Urban Service District is the logical
extension of the urban service boundary. Sewer and water are currently available for
extension into the area on the west from Twin Lakes Road. When trunk sewer and
water are extended east along 175th Avenue, urban services will also be available from
the north.
The construction of Twin Lakes Road, the extension of utilities and the construction
of the park and ride facility have changed the conditions in the area to support
including it in the Urban Service District. The proposed development of the former
Eul! property to the south, the planned construction of the commuter rail station,
and the proposed extension of utilities along 175th Avenue also lend support to
including this area in the Urban Service District.
The subject properties, under consideration for municipal sewer and water, will be
bounded by a north/south arterial road on the west and a collector street on the
north. Both of these streets will have enough capacity to handle traffic generated by
the development of this area at a density that can be supported with municipal sewer
and water.
The Council has the option of including a condition that services would not be extended to
this area for a set number of years or until a specific event occurs. A similar condition, a 10
year time frame, was included when the Council extended the urban service boundary to
include the area north of 175~h Avenue and south of County Road 12. If a property owner
wanted to develop their property before the established time frame, it would require an
amendment to the Comprehensive Plan.
S:\PLANNING\SCOTT\lu01-1 lcc.doc
l
1715T
170~-t
169'n.t
168TH
1671'H
166'~
165TH
Hit t ~.IDE
17 Ave
Site
LU 01-11
Location Map
175th & Tyler Street Area
N
EXISTING URBAN
ICE BOUNDARY
17~'TH
'!~ :~73RD
Area under Consideration
172N0
1715T
170TH
169TH
16E1~-~
167TH
166'~H
165TH
164TH
16~RO
2i. 32
N., R. 26 W.
12~.7B'
75--OO2-310~
C:C~N TY
7 5--002- 4,3~0
7.5--0(}2-4.,505
N 8g"lT,3~' w
513. S0'
",13.~0' ~ 'c;'t
513.63'
:296.02'
75--0C~-4~:5
7~--002~,~4t0
~§9.7~'
75-- 0~2 -,4-415
12~ 7.40'
8.5 ',,. ',2'
7g4. gg'
r~
SHERBURNE COUNTY SURVEYORS OFFICE
SHERBURNE COUNTY ADMINISTRA~ON BUILDING
,327 KING AVENUE, BOX #.320
EL.K RIVER, MINNESOTA 55530
PHONE t (612) 24.1-2860
GRAPHIC SCALE
THIS DRA'MNC {~ A COMPILATION OF' RECORDS AND DATA LOCATED
IN VARIOUS CJDUNTY OF'FICF~, AND 1S TO BE USeD FC~ RF'F"EREN~
PURPOSE~S ONLY. SHERBURNE COUNP¢ IS NOT RES~ONS~3t_£ FOR ANY
INAC,~,J RAC~E~.
Geraldine Graham
17451 Tyler Street N. W.
Elk River, MN 55330
763/441-5762
November 19, 2001
Dear Mayor Klinzing and Council Members:
I had planned to attend tonight's Council meeting and comment, but an event that
I must attend at my children's school has arisen, so I'm hoping you'll consider the
following written comment for the record.
This concerns the 80 acre neighborhood where I live at the southeast corner of
the intersection of 175th Avenue and Tyler Street N.W. During October 2001, the
Elk River Planning Commission considered whether or not this neighborhood
should be included in the urban service district. After study of the issue, visits to
the area, and hearing testimony from affected residents, the Planning Commission
voted not to include this 80 acre area in the urban service district at the present
time.
I'm writing to tell you that I support the Planninq Commission's decision and urqe
you to accept the Planninq Commission's recommendation. There are several
reason's why the Planning Commission's decision is a sound one:
1) This 80 acre neighborhood is a buffer between a wetland and a Cargill
property, both rich with wildlife, and the rapidly changing eastern areas of Elk
River, where a business park and higher density residential development are being
promoted. Allowing the 80 acre neighborhood in question to maintain its current
land use pattern helps protect the natural areas that border it, and provides a
transitional space between the natural area and the nearby business/higher
density residential areas.
2) The current land use in our 80 acre neighborhood includes single family
homes, most of which have from three to ten acre lots. Most of these residences
have large, farm-type outbuildings; some of the residences have large or small
livestock - all of which is allowed in the current land use designation of the
neighborhood. However, if this 80 acres were to be included in the urban service
district, an immediate result will be high density residential development, which
will not be compatible with the current residences, outbuildings and livestock.
Conflicts will arise between new homeowners who come into the newly built high
density areas, and neighboring, long-established properties that may have horses,
chickens, etc. regarding animal noise, safety, aromas, etc. All of the current
homeowners in this area (many of whom have lived here for a long time) chose Elk
River and this neighborhood because of the current land use designation. It
seems wrong and rather arbitrary to change the rules of the game now, after the
neighborhood has been established for so long.
(continued on page two)
3) This 80 acre neighborhood, with its current land use, provides a lovely,
natural, prairie landscape GATEWAYto Elk River, which will be noticed and
admired by people traveling up and down Tyler Street as they go to work, to shop,
or as they travel down 175'h to residential neighborhoods in the nearby area. Even
now, many people who come to my home have commented about what a feeling
of "oasis" they get as they travel through the area. This ambience will be
completely lost if the neighborhood becomes included in the urban service
district, which will lead immediately to high density residential development.
4) Allowing this neighborhood to keep its current land use pattern helps
contribute to %mart growth" of Elk River. As you know, our city is growing faster
than any of our infrastructure can keep up with. Our library, our schools, and
many other components of the city's infrastructure are being overwhelmed,
detracting greatly from quality of life in this area. It's time to slow things down,
so that city infrastructure and rising population can become more coordinated.
I have admired the thoughtful and thorough way that the Planning Commission
considered the question about whether or not to include this 80 acre
neighborhood in the urban service district. They studied the information provided
by the city staff, they listened to the opinions of the people who live in this area,
and many of the Commissioners viewed the area firsthand. The Planning
Commission placed all of this input into the context of the big-picture vision for
Elk River before deciding not to include the 80 acres in the urban service district.
I encourage you to value the process they undertook and accept the Planning
Commission's recommendation. You'll be strengthening and preserving Elk
River's quality of life.
Thank you.
Sincerely,
Geraldine Graham