9.0. SR 11-19-2001l ver TO: FROM: DATE: SUBJECT: MEMORANDUM Mayor and City Council Pat Klaers, City Administrator November 19, 200 I City Hall- Police Station Expansion Item 9. Thc city hall- police station expansion committee met on Thursday, November 15, 2001. The committee reviewed the material and information that Gary Tushie put together since receiving feedback from the Council on September 24, 2001. The committee recommendations to the City Council on building options and on funding and timing issues are at the end of this memo. Building Layout Options The following building layout options are attached for your review. Page 1 Page 2 Page 3 Page 4 Page 5 Existing site plan. Existing floor plan of city hall and the police station. Option one: police and city hall each doing a two-story addidon onto the existing facility. Option two: police constructing a new facility across the parking lot and administration moving into the police department after remodeling. Option three: police constructing across the parking lot, and part of this construction would be a two story facility, and administration moving into the old police area once it is remodeled. This option includes a fire satellite station being connected to the EOC and police station to make a "public safety facility." It should be noted that all three building options include the utilities in the city hall complex with some joindy shared spaces (bathrooms, conference room, lunch/break room). GkIy flall- Police Station E:~ansion Committee Page 2 Expansion Program Analysis This information shows the requested additional space at city hall through 2013 to be 18,800 sq ft and another 10,400 sq ft being needed to address the needs through 2023. The requested police expansion needs for 2013 is almost 19,500 sq ft with another 2,600 sq ft being requested to meet the police needs through 2023. If money is available, police should build to address their 2023 needs since it is only an additional 2,600 sq ft. Under option one, which is a two story expansion on our existing site, no cuts in the program have been made. This assumes that we can afford all the space that is being requested. Under option two, which moves the police across the parking lot, some space adjustments are being made. Administration needs to live within the existing 27,600 sq ft facility and will have to cut out approximately 8,200 sq ft of requested space. These items would have to wait until an expansion in 2013. The committee questioned whether or not this reduction in option two was the best approach considering the current low interest rates and attractive bidding environment that we are experiencing. In this regard, the committee wanted to consider not only adding onto City Hall this 8,200 sq ft but also wanted to consider building (as a shell) the 10,400 sq ft that is needed through 2023. The concern of the committee related to how soon City Hall would need additional space for such things as the park and recreation department and what the cost of this space would be in the future as compared to the current good bidding environment. The committee thought that this project may end up on the tax leW and; therefore, couldn't offer any firm recommendation on this issue until it gets some data on the potential impact on a typical homeowners tax bill. Proposed Bud~et All of the costs estimates do not include furniture, fixtures, or equipment (FFE) expenses or architectural fees. The cost estimates are preliminary and a more complete and accurate cost analysis will be done in the design phase. Option one is the most expensive and this is to be expected as this provides for all the requested space. Option two, the separate building option, is less expensive but this is mainly due to administration eliminating 8,200 sq ft from its 2013 needs and living within the existing 27,600 sq ft building footprint. If administration added 8,200 sq ft to the existing city hall and police constructed across the parking lot, then the cost for both options would be similar. Police are building for 2023 in both options. City Hall is building for 2013 in option one and, at this time, less than the 2013 space needs in option two. Please note that the possible deductions for the garage and gun range would apply to both options, although not all of the garage space can be eliminated due to the ERU garage needs. The second page of this attachment shows in rough figures what the fire station and the utility buildings would cost. Ci(y Hall- Police Station Ex]oansion Committee Page 3 The government building reserve has funding for part of the project but has nowhere near 5-7 million dollars for a public safety complex. If the public safety complex is not put into the tax levy, then the project will either need to be downsized or delayed. The city can put the project in the annual tax levy by either a public referendum vote (November 2002) or they can have this expenditure take place at any time by working with the EDA on a lease purchase plan. One reason to pursue the public safety complex now (by way of a lease purchase plan) is to take advantage of the good bidding environment and the low interest rates that we currently see. If we move forward now with a spring bidding, then the next big issue will be... how much does the project cost and how much of a project can we afford? In this regard the finance director will have some information to present relating to the tax impact of a 5, 7 or a 9 million dollar lease purchase facility going on the annual tax levy over twenty years. Committee Recommendations At the committee meeting on November 15, 2001, the committee agreed to a number of recommendations. These recommendations are as follows: 1. Pursue option three. 2. Pursue the entire public safety complex at once. 3. The City Council should seriously consider the tax levy and lease/purchase approach for a spring bidding of the project (requires working with the EDA). 4. Consider expanding the existing City Hall complex to include the missing 8,200 sq ft and possibly to address the 10,400 sq ft of needs for 2003 as a "shell". 5. If possible include a basement in all new construction. 6. The EOC be constructed in a basement setting and it not be used as a meeting space available for the public. 7. Support the two story police concept in option three and not a one story police station. 8. Offered no comments on down sizing the police until debt information is known. Option three was selected due to the desire to have fire at the municipal complex and to have it attached to the EOC and Police Station. Option three was also preferred because it allows for the staging of construction. Once the public safety facility is completed, then police move out of their existing space; that space is then remodeled and certain departments then move into that area followed by the rest of City Hall being remodeled. Option three also lays out the best for future expansion opportunities or for new facilities that may be needed in 20 or 30 years in this municipal campus area. The police department will have some information available for the City Council to review regarding justifying the gun range from a cost/benefit point of view. Additionally, we need to look at reducing the 12-14 police garage and to provide some cold storage construction for items that are currently in the police garage (i.e.: snowmobiles, all terrain vehicles, bicycles, etc). The data on the tax levy impact to the homeowners will have a big impact on these type of issues. Ci[y Hall- Police Station E~,cpansion Commiltee Page 4 There are a number of issues for the City Council to discuss. Hopefully some decisions will be made at the Monday, November 19, 2001, meeting. At a minimum we'd like to get a decision on building layout options and resolve the fire department location issue. Ideally, we would make some decisions about how to fund the police facility and whether or not we should move forward with a police/fire hall facility together at one time. Another decision to consider relates to the public safety complex and whether the facility should be funded with tax monies and if the project should be considered now or next fall. The next step in this building project process is to have the City Council authorize Tushie Montgomery to move forward into the design phase. This would be part of the architectural contract for the project. Architectural services generally run in the 7.5% range. This design work will get the city to the point of being able to go out for construction documents and this design work will give us good cost estimates for the project. The cost for the design services may need to be adjusted if the fire department is included in the proposal. Also, a separate proposal will most likely be needed for the utilities facility. It is appropriate for the Utilities Commission to consider this information and provide an indication to the City Council on how it wants to proceed. A joint meeting with the commission may also be appropriate. We will need to move forward soon if we are going to try for a spring building project. As previously discussed with the City Council, the city can stop the project at any time including after the design phase due to lack of funds being available or the need to downsize the project. Attachments · September 24, 2001, CouncilMinutes · Site Options · Program Analysis · Budget · Schedule · Original Tushie-Montgomery Proposal for Design Services MEMORANDUM TO: FROM: Mayor and City Council Lori Johnson, Finance Director DATE: November 19, 2001 SUBJECT: City Hall - Police Station Expansion Item 9. At the recent city hall/police station expansion committee meeting, the committee discussed the benefits of proceeding with this construction project earlier than originally planned to take advantage of a favorable bidding climate and low interest rates. Before the Council can make a decision on project size and timing, project financing needs to be considered and finalized. The Council has briefly discussed financing, but in concept only. Without some idea of the construction cost, it was difficult to discuss anything but general concepts. Now that construction estimates are available and a time frame has been proposed, there is enough information to begin working on a detailed financing plan. One way to finance the construction is through reserve funds. Although funds have been reserved in the Government Buildings Reserve fund for future city hall and police station expansion needs, it was never expected that the entire project could be financed through reserves. There will be approximately $1,750,000 available in this fund at year-end depending upon landfill surcharge revenues, the main source of revenues for this fund. However, this is also the source that has been discussed for the city's contribution to the YMCA. A decision on how much of this reserve should be used for this project (including how much is needed to cover furniture and equipment costs) and how much should be reserved for the YMCA needs to be made in order to finalize the expansion project financing. There are two methods of debt financing for the balance of the project not funded by reserves. General Obligation bonds can be issued with voter approval. Lease purchase bonds can be issued without voter approval. Both bonds allow for a tax levy to fund the debt. The tax levy for a voter approved issue is based on market value while the tax levy is based on net tax capacity for lease purchase bonds. In 1991 when lease purchase bonds were used to finance the city hall and police station construction, the concept was relatively new and interest rates were significantly higher for lease purchase than general obligation bonds. Interest rates on lease purchase bonds are now only around 50 basis points higher, perhaps because so many lease purchase bonds have been issued and bondholders understand that cities are going to make the annual lease payment each year so debt payments will be made. Lease purchase bonds do, however, require a debt service reserve fund equal to one year of debt service unlike general obligation bonds that do not. The 1991 lease purchase bonds are being repaid through several different sources including NSP Reserve, Liquor Fund, Government Buildings Reserve, and General Fund transfers. Unfortunately, these sources are not sufficient to fund a second bond issue; a tax levy will be needed to fund most, if not all, of the debt issued for this project. Based on very rough preliminary information, a $5,000,000 project would require an annual tax levy of approximately $470,000 and a $9,000,000 project would require an annual tax levy of approximately $845,000. This equates to an annual tax increase of approximately $45-$50 and $80-$90 respectively on a $125,000 house. The approximate increase for a $1,000,000 commercial/industrial property is $750 to $1,350 respectively. These estimates will be fine tuned later when the type of bond issue and project size have been determined. In conclusion, there are several financing decisions that need to be made by the Council on this project including the amount of reserves to be used and the type of debt that will be issued. Of course, determining the amount to be financed is probably the major issue. Once these decisions are made, a financing plan will be presented to the Council for consideration. Action Requested No action is required at this time. Prior to proceeding with bidding this project, the Council will be asked to approve a financing plan. City Council Minutes September 24, 2001 Page 3 COUNCILMEMBER MOTIN MOVED TO PURCHASE LOT 1, BLOCK 2, COUNTRY CROSSING BUSINESS CENTER (PIN #75-575-0205) WITH FUNDING TO COME FROM THE NSP FUND, AND WITH THE INTENTION THAT THE PURCHASE PRICE BE REPAID FROM TAX INCREMENT FINANCING MONEY PLUS A MARKET INTEREST RATE. COUNCILMEMBER DIETZ SECONDED THE MOTION. THE MOTION CARRIED 5-0. 4.3. Consider Funding Options for School Theater The City Administrator discussed the proposed source of funds for payment to the school for the school theater. He noted that the Council agreed to pay the school district $112,600 per year for 5 years. Pat K2aers recommended that the 2001 payment be taken from excess revenues from the 2001 operating budget. He further suggested that the 2002 and 2003 payments be taken from the NSP fund if excess revenues are not available. The Council concurred with the City Administrator'.s recommendation. 4.4. Community. Recreation Update Counci.haaember Motin updated the Council on the August 20 and September 24 Community Recreafon Board meetings. He discussed the community recreafon asset list put together by Michele Bergh and reviewed the $74,000 defidt that the School Disthct claims exists. 4.5. Consider Liquor License for Dick's Main Tap The City Clerk indicated that Mr. Mitch Miller has purchased Dick's Riverfront Bar and Grill. She noted that Mr. Miller is requesting an on-sale liquor license, a Sunday license, and a 3.2% percent malt liquor off sale license. COUNCILMEMBER TVEITE MOVED TO APPROVE AN ON-SALE LIQUOR AND SUNDAY LIQUOR LICENSE AND AN OFF SALE 3.2 PERCENT NLkLT LIQUOR LICENSE FOR MITCH MILLER'S OLDE TOWN TAVERN & GRILL LOCATED AT 651 MAIN STREET. COUNCILMEMBER DIETZ SECONDED THE MOTION. THE MOTION CARRIED 5-0. 5. Open Mike No one appeared for open mike. City Hall Expansion Committee Update City Administrator Pat I43aers updated the Council on dae progress of the City Hal] Expansion Committee. He noted that Council_members Mot_in and Kuester are members of the committee. The City Administrator explained that the committee has identified dae needs of the city and put these needs into building space terms. He further explained that these space requirements have to be prograrmned into a new, expanded or remodeled facility. The City Administrator reviewed several issues reladng to the expansion including department expansions, new departments, police department needs including a shooting City Council Nfinutes September 24, 2001 Page 4 range, an expanded emergency operations center, and large meeting room. The City ActtrUnistrator reviewed the options for expansion discussed by the committee, which include expanding the existing city hall to include all departments, or building a new facility for due police department with the other city departments utilizing flue e~sting facility. He noted that if a new police department were built, it could be built across the parking lot from city hall creating a campus environment. Gary Tushie of Tushie-Montgomery Architects discussed the advantages and disadvantages of expanding the existing facility or building a new facility for the police department. The Council discussed the issue of splitting the police department away from city hall. The Council majority concurred that a campus setting is a good idea if financially feasible. Discussion pursued regarding the issue of including large meeting room space in the facility. It was noted that due to funding concerns, the large meeting room space is not included in the project. It was stated that if the meeting room space doesn't occur now at city hall, there would still be the opportunity to consider meeting room space at other locations (with other projects) or in the future at city hall. Discussion was held regarding the possibility of having a combined police department/f~re department in the same building with an EOC connecting the departments. The Council discussed the corner of Joptin Street and Business Center Drive as a locadon for the satellite £zre stadon. The City Administrator indicated that the EOC could be used for other purposes such as smaller meeting room space for community activities. The Council discussed the possibility of the Elk River Utilities locating at City Hall. It was the consensus of the Council that the Utilities should be located at City Hall for customer service purposes. Councilmember Dietz suggested that the Council should also consider asking the deputy registrar's office if it would be interested in locating at city hall. The City Administrator indicated that the committee would begin to finalize the numbers and provide cost estimates based on different scenarios. Other Business Councilmember Tveite stated that Tom Salzmann, a member of the community, recently passed away. Councilmember Tveite recognized Tom Salzmann for his contributions to the community and to the fair board. 8. Staff Updates The City Clerk informed the Council of the Homecoming parade on October 5. Adjournment There being no further business, Mayor Fdinzing adjourned the meeting of the Elk River City Council at 8:20 p.m. Sandra Peine City Clerk V£OSHNNIH 'H[~AIH I IVH X2ID HHAIH ,/ / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / ,/ / / / / / / / \ \ \ 1 / / 1 I I \ \ \ \ \ \ \ \ \ \ / \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ 'x \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ z \ \ \ \ \ \ \ (~,~ECOND LEVEL FLOOR PLAN FINANCE D~P.. KITCHEN ~.~ HALTING QFIF~S'F LEVEL FLOOR PLAN ", __a.~f ~:-~ ~=:~~- -~ ..... 0 LC~Y LOC.~D 5TOR. GAP, AGE CZ]RRIDOR COUNQL 04A~IBER -® EXERCISE ROOI1 .-I TmU S~' H I E Checke~ By GIIT, TL Project N'chitect GF umber 2010~1 Revisions & /~ldendum$ FLOC)P. PLANS V£ 0 :2 N NIIAI / / / / / / / / / / / / / / / / / / / / / / / / / / / / t 1 / ,/ / ,/ / ./ ./ / ./ ,/ / / ./ / / / ,/ ,/ / ,/ ./ ./ / / / ,/ \ \ \ \ \ \ \ \ \ ,,, \ \ / ,/ / / / / ./ / \ \ \ \ \ \ \ ,,,, \ \ \ X \ \ \ \ I I II I I \ \ \ \ \ / / / / / / / X \ \ \ \ \ \ \ \ / / / / / / / / / / / / / ,/ / ./ / / BITE PLAN- ,'-"',OPTION 2 J N LAKE ORONO T U S H I E MONTGOMERY ARCHITECTS IO-e.-o~ GRIT, TL GF · becked By Project Architect ~ 2010~ Revisions & Acldendums SITE PLAN OPTION 2 ,/~ ~¥ SECURITY V, IAL.L \ \ FIRE DEPT. OFFICE / / / / / / / / J / > \ /, / ,/ / / / / / / / / / / / / ./ / / / N T U S H I E MONTGOMERY ARCHITECTS 7645 LYNDN. E AV[NU~ SITE PLAN OOPTION LAKE ORONO Pr eporedg.~~ For: l~"~r · Dote IO-&-OI Drown By A~ Checked By GPr/', TL Project Arch~t ect CaF Project Number 2010~1 Revisions & ,N:ldendu~n$ ,SITE PLAN OPTION 3 TUSHIE MONTGOMERY 612 861 9632 P.01x04 7645 Lyndale Avenue South, Suit~ 100 Minneapolis. Minnesota 55423-4084 612,861. 9636 Fax: 612. 861 . 9632 www . tmiarchitects . eom TRANSMITTAL To: Patrick D. Klaers City Administrator City of Elk River 13065 Orono Parkway, Box 490 Elk River, MN 55330 T U $ H I E MONTGOMERY ARCHITECTS Date: i 1/13/01 Project Number: 20105 IA Project Name: Elk River City Hall Expansion Phone: 763-441.7420 Fax: 763-441-7425 WE ARE SENDING YOU VIA: [] Fax - Total Pagcs: 4 [] Picked Up [] U.S. Mail [-]Mcs~ng~ [] Hand Delivery [] Overnight Delivery THE FOLLOWING ITEMS: [] PRINTS [] SPECIFICATIONS [] SHOP DRAWINGS ~ OTItER COPIES DATE NO.SHT$ DESCRIPTION 1 9/24/01 3 Space Needs Assessment - Expansion Program Analysis [] YOUR USE [] APPROVAL REMARKS: [] AS REQUESTED [] BIDS DUE [] REVIEW AND COMMENT [] DISTRIBUTION TO OTHERS COPY TO: File FROM: Gary Tushie Kindly notify us if you have any questions or concerns regarding this transmittal. NOU-l~-2001 13:51 TUSHIE MONTGOMERY 612 861 9632 P.04×04 ELK RIVER CITY HALL SPACE NEEDS ASSESSME~IT ELK RIVER MINNESOTA EXPANSION PROGRAM ANALYSIS SEPTEMBER 24, 2001 T U S H '[ E MONTGOMERY ARCHITECTS ADDITIONAL TOTAL S.F. EXPANSION EXISTING NEEDS NEEDS AREA BUILDING S.F. THROUGH 2013 THROUGH 2023 TOTAL Council Chambers 2,050 2,461 ! ,899 4,360 Common Areas 8,231 12,347 4,144 16,491 Administration 6~798 21,063 4,369 25,432 Police 10~548 TOTALS 27~627 35,871 10,412 46~283 Police 10~548 30,015 2,589 32~ 604 Option One: Option Two: Expand City Hall to accommodate expansion needs through 2013 as follows: Existing Citv Hall & Police Soace .27.627 s.f. City Hall Expansion needs Police Expansion needs 18,792 s.f. 19,467 s.f. Total Expansion 38,259 s.f. Move Police out of City Hall into a separate building and expand City Hall spaces into remodeled existing Police space to accommodate 2013 need: Existing City Hall Remodeled Police Space City Hall Building Addition Needs (35,871 - 27,626) 17,079 s.f. 10,548 s.f. 84244 s.f. Total New Police Station 3s.87!_s_f 30,015 s.f. TOTRL P.04 NOU-13-2001 1~:51 TUSHIE MONTGOMERY 612 861 9632 P.03×04 Elk River City Hall Space Needs Analysis September 24, 2001 Page 2 of 3 Under Option One if the Police garage were eliminated except for a two-stall sally port the overall Police expansion could be reduced as follows: Garage Add for walls & circulation Sally port Add for walls & circulation 4,000 s.f. 1,620 s.f. 5,620 s.f. 900 s.f. (15' x 30' x 2) 365 s.f. Total 4,355 s.f. If a Sally port and vehicle garage are not required the overall building addition space can be reduced as follows: Existing garage Add for walls & circulation 2,682 s.f. 1,086 s.f... 3,768 s.f. Additional Police space needs through 2013 19,467 s.f. Less garage space - 5,620 s.f. Less Existing garage converted to office space - 3,768 s.f. Total Building Addition Needed for Police 10,079 s.f. Under Option Two the Building/Zoning garage is partially converted to office space (see additional list below) and a small addition is proposed for shared space with utilities which reduces the total Programmed Space as follows: Programmed City HalJ Building Addition Space Needed 8,244 s.f. Less Shared Addition -1,200 s.f. (936 s.f. x 1.26 = 1,200 s.f.) Total 7,044 s.f. In addition, Programmed space that can be possibly deferred to a later expansion is as follows: Do not expand: Wellness Room 400 x 1.14 -- 456 s.f. Sitting Area 337 x 1.14 = 384 s.f Parks & Recreation Director's Office 192 x 1.46 = 280 s.f. Parks & Recreation Workstations 256 x 1.46 -- 374 s.f. Building Inspection Vehicle Garage 1,584 x 1.46 = 2,313 s.f. (Reduce from 8 spaces to 2) Parks & Recreation Counter 128 x 1.46 = 187 s.f. Election Equip. / Training Room 400 x 1.14 = 456 s.f. 2013 Expansion Do not expand large copy room 31 x 1.14 = 35 s.f. NOU-13-2001 13:51 TUSHIE MONTGOMERY 612 861 9632 P.02×04 Elk River City Hall Space Needs Analysis September 24, 2001 Page 3 of 3 Do not expand (continued): Quiet Employee Break Room 180 x 1.14 Wellness Men's Locker Room 81 x 1.14 2013 Expansion Wellness Women's Locker Room 81 x 1.14 2013 Expansion General Storage Room 200 x 1.14 Admin. Recept. Waiting Area 196 x 1.46 -- Eliminate Planning Secretary 64 x 1.46 = Workstation (included elsewhere) Workroom - no expansion 56 x 1.46 = Finance Director, Asst. Finance Din, 148 x 1.46 -- Mayor & Council Office and City Admin. Office - no expansion Eliminate Hotel Workstation 48 x 1.46 = Reduce by 50% Storage Rooms for 300 x 1.46 = Admin. & Economic Dev., Building Inspect. & Engineering Eliminate I small Conference Room 168 x 1,46 = Reduce large Conference Room Expansion by .50% 122 x 1.14 = Reduce Resource Library size from 14' x 18' to 10' x 15' 102 x 1.14 = Do not increase size of U.S. State Representative Office 21 x 1.46 = Reduce size of Engineering Plotter Room to 10' x 10' 68 x 1.46 = Total = 205 s.f. = 92 s.f. = 92 s.f. = 228 s.f. 286 s.f. 93 s.f. 82 s_f. 216 s.f. 70 s,f, 438 s.f. 245 s.f. 139 s.f. 116 s.f. 31 s.f. 99 s,f, 7,055 s.f. NOU-O?-2001 11:37 TUSHIE MONTGOMERY 612 861 9632 P.02×07 CONSTRUCTION coMpANy. NOVember 5, 2001 Gary Tushie Tushie Montgomery Archi ,t~rts 7545 Lyndate Aventm South Miun6apolis, Ml'4.55423-4094 ·. We ar~ pleas~ to provide the preliminary b~dget for th~ proposed expansion of the Elk Riv~' City Hall and Police D~artment p~' your requesL This bffd§et is based on the Site Plan Option One dated 8/11/01, the Site Plan Option Two dated I018101 and the Expansion Program da. ted 9/13/01: The preliminary budgets are as.follows: : , Option One: $ 5,849,7.13 - 41..rO00-s,f,~stor~addilicm toeki~g.~--ity haii-gvith 20i500 s.£.lgr'floor. -.. (includes all.necessary site work), The 1,200 thc total cost. $1,525,388 - 20,000 s.f. remodel of~isting City I-bll ~d Police Station as indicated on shaded portion .of'plan. htclud~s demolition. $ i71;2i i- ' 'The 1,200 S.f.' addition for slimed .spaces ( Ifthid~tifa is taken 50% ofthese'costs are . the resp0ns~i'lity of~e City I-Iall and 50% Utilities.) -.$ 7,546,312 $ 442,~00- $ 350,000- TOTAL Almmate No.' 2. (deduct Gun Range) · . o~h¥4 S Option Two: $ 5,121~162 - 32;600 saY.. fr~ standing single story slab on grade Police Station, on iot across from street to be Vacated.. Includes all necessary site Work, 1,413,122- $ 171,21!2' 18,500 s.f- remodel off existing Ci~ Ilar and Potice Station as indicair~l.on shaded portion of plan. Includes 'demolition. The 1,200 s.£ addition.for shared .spaces ( If this option b taken 50% of these cogs are 'the mspons~ility.of the City Hall and 50% Utilities0 II1---"ill $ 6,?0~,495. TOTAL 1221 East Fourth'7~venue, Suite 110 Shakopee, Minnesota 55379 ' Equal OpportUnity . Employer/Contm;ctor · Telephone: 952-496-2227 Fax.- 952-445-4191 NOU-O?-2001 11:38 TUSHIE MONTGOMERY 612 861 9632 P.03×07 Option three: Please note that thc Utilkie~ Building i-~ not included in ~ above Options. ~smac~ we ha~c [~ovidcd'a aepar_~e'budget for it'per your request.' .The associated ske co~ for the Utilities Building, as it relaIes to each option, ~e included ir/the above options.' . '$ 811~198 - 6,700 ,.f. free stand~i~g:Sinslo ~trx-y slab' Qn .grade Utilitie~'buiidi~g. ' ' · A.+mchedPl~t.~¢fi~da~/temiZe. dcostbyDivisionsoftheOptiomaslistedabov~.· cS ~ Ct , [)'; ~-i ¢..4 We thank you for ~is opPo .rtcnity, and hope tb assist You fm-ther, ~o insure tlia[dtis project is an overwhelming success.. .. .. ProjeCt Manager, Grey,ne Construction Cornl~any' Elk River City Ilar and Police Station Preliminsry Budget Olrt'ION ON]E (41,000 S.F.) 11105/01 Division I - General Conditions Division 2 - Sitmvork Division 3 ~ Concrete Division 4 -.Masonry Division $ - MOals Division 6 - Carpentry Division 7 - Thermal & Moisture Division g - Doors & Windows Division' 9 - Finishes Division 10 - Specialties DiviSion 11 - Equipracnt Division 12 - Furnishings · .~. D..iv. ision 13- Special Construction Diyision 14 - Conveying systems Division 15 -. Mechanical Division 16 - Electrical Special Conditions Building Permit SAC/WAC Charges Contingency - 20% SUBTOTAL Pzofit & Overhead - 5%. TOTAL BUDGET AMOU1WI Afteman- NO. I - Deduct vehicle garag~ (5,200 sO Alternate No. 2 - Deduct gun range (2,683 sf) , $1S4,350.00 $381,219.00 $308,689.00 g"221,59S.00 s31s,ogo.oo .$30,450.00 $194,100.00 $122,950.00 $11224,9ss.oo s2o, s o. oo ~,O00.OO $350,000.00 $65,000.00 $637,650.00 $495,000.00 $'27,000.00 $29,696.00 $30,000.00 $928,526.00 $5,591,156.00 $278,557.00 ss,s49,m.oo . $(3so, ooo. oo) MOU-O?-2001 ll:E@ TUSHIE MONTGOMERY 612 861 Elk River City l~ail and Police Prelim/nary Budget OPTION TWO (32,600 11/05/01 Division 1 - C-earl Conditi°.s Division 2 - Sitework Division 3 --.Concrete Division 4 - Masonry, Division ~ = Me~ds .Division. 6 - Carpenlry DiviSion 7 - Thermal & Moisturc ,Division 8 -Doors & Windows .... ~. ,~. ~ . . Division 9 - Finishes Division 10 - SpeCialties Division I 1: l~-quipment Division 12 - Furnishings D/vision 13 - Special Coristrucdon Division 14 - COnveying Systems · Division 15 - M~chanical Division 16 - Electrical. Sp~ial Conditions Building P~mit SAPAC Charge~ Coufin~enCy - 20% 8UBTOT~L Pzo£t & O~e.r.~ead - $% $17i,400 $476,189 $173,703 $186,745 $226,7.50 $23,800 $140,000 '$122,950 $1,057,398 52o;45o $4,000 $350,000 ss6s?so $465,000 $25,333 $24,847 $'3O,000 $812,883 $4,877,298 $243,864 $5,121~162 liB iiiii IIiii lllll NOV-O?-2001 ll:E? TUSHIE MONTGOMERY 861 9632 P.01/07 7645 Lyndale Avenue South, Suite 100 Minneapolis, Minnesota 55423-4084 612. 861. 9636 Fax: 612. 861. 9632 www . tmiarchitects . corn TRANSMITTAL To: Patrick D. Klacrs City Admimstrator City of Elk River 13065 Orono Parkway, Box 490 Elk River, MN 55330 T U S H I E MONTGOMERY ARCHITECTS Date: 11/7/01 Project Number: 201051A Project Name: Elk River City Hall Expansion Phone: 763-441-7420 Fax: 763-441-7425 WE ARE SENDING YOU VIA: [] Fax - Total Pages: 7 [] Picked Up [] U.S. Mail [] Hand Delivery ['"l Overnight Delivery [] Messenger TFiE FOLLOWING ITEMS: ['-] PRINTS [] SPECIFICATIONS [] SHOP DtLa, WING$ [] OTI-~R COPIES DATE NO.SHTS DESCRIPTION 1 7 Proposed Budget fi:om Greystone ~ YOUR USE [~APPROVA£ REMARKS: I-]ASREQUESTED [--]BIDSDUE [] REVIEW AND COMMENT [] DISTRIBUTION TO OTHERS COPY TO: File FROM: Gary Tushie Kindly notify us if you have any questions or concerns regarding this transmittal. NOU-O?-2001 11:38 TUSHIE MONTGOMERY 612 861 9632 P.06×07 Elk R~ver City Hall and Police Station Prel/minary Remodel Budget 11/05/01 ' Rem~lel OPTION ONE (20,000 s.£) Division 1- Geumeral Conditions D/vision 2- Sitework ('Demolotion) Di~sio~ 3- FJnbh~s. DiviSion 13- (Accoustical panels in council) Division t5- Mechanical DJ%sion 16- Electrical · Conthgeney %. ~ 20% SUBTOTAL · Profit & Overhead % ~ 5% TOTAL BUDGET A1VIOUNT .....a, ..'.....-..~ '~...,:.~. ...... :~,o .oo~., .... $ 50,000 $155,625 $ 5OO,O00 $ 75,000 $ 240,000. $190,000 $242,125. $1~b'~,750 $ 72,638 $1,525~3SS ·. Remodel OPTION TWO (18,450 $.F.) Division 1- General Conditions Division 2- Sitback ( D~nolition)... Division 9- F/nish~ Division 13- Acoustical panels ha Council D/vis/on 15- Mechanical Division 16- Electriml Contingency % ~ 20% SUBTOTAL Prof'a & Overhead TOTAL BUDGET AMOLrNT $ 50,0O0 $142,875 $ 461;250 $75,000 $ 221,400 $171,000 $ 224,3 $ 1,345,830 $ 67,292 $ t,413~122 NOU-O?-2001 11:38 TUSHIE MONTGOMERY 612 861 9632 P.07×07 ~:lk RiVer Cit~ Hal! and PoliCe St:dion '- Preliminary l~udget UTILITIES BUILDING (6,700 11/05/01 Division 1 - General Cond. iti°ns Div{sion 2 - Sitewotk Division 3 - Concrete Division 4 - Masonry Division :5 - Metals. Division 6 - Carp~nl~y Division 7 - Thermal & Moisture Division 8 2 ~ & Windows Division 9 - Finishes " Division 10 '- 'sPecialties Division I! - Equipment Division 12 - Furnishings .. Division Division . Division 13 - Special ConstrUCtiOn 14 - Conv~Ting Systems 15.- Mechanical Division 16 ~- ElectriCal" Special Conditions. Bailding Permit SAC/WAC Charges · Contingtacy - 20% SUBTOTAl: TOTAL BUDGET · Added cost ~ot full basement $66,293.00 .$32,685:00 $33,601.00 $47,738.00 $59,399.00 $6,529.00 $27,83Z00 .'$33,845,00 $146~795.00 $5,669.oo $116,996,oo $ ,qo6.oo $41,896.00 '$4,639.00 .. '$~062.00 $128,878.00 $773~.63.00' $38,635.00 $81.1.,898,00" TOTAL P.O? ELK RIVER CITY HALL COMPLEX EXPANSION k I/!~1 )1 ELK RIVER, MINNESOTA . PROJECT SCHEDULE T U S H ! E MONTGOMERY May 22, 200t A R C H I T E C T S Revised June 2001 2001 2002 2003 2004 ACTIVITY June Juh/ Audi Sept Oct Nov Dec Jan-Apr Ma¥-Jne Jl¥-Sept Oct-Nov Dec Jan-Apr Ma¥-Jne Jub/-Sep Oct-Dec Jan Feb PHASE I ~mves TMI Contract Constm~on Sud ~jt~' Pm reFinelRe ~ l'~ Preliminary Design PHASE III Desi n Deveto t Phase /i~ j Crop am ~onstmction Documonts Update ConstnJction Budget [] Financing Options/Secure Submittal for Building Permit · Value Engineering Bidding ~Const~Oon Complete Punchlist Items Owner Move - In City Staff Review/Approvals I I I I I · · · I I · CH Council Review/Approvals I I ·· · · Design TeamMeetings · I · · · · · · · · · '· · · · · · · · Plannin~l Commission Review/Approval T U S H I E MONTGOMERY ARCHITECTS June 12,2001 Patrick D. Klaers City Administrator City of Elk River 13065 Orono Parkway, Box 490 Elk River, Minnesota 55330 Re: City Hall Complex Space Needs Assessment Study Dear Pat: As you requested, attached is a revised proposal for the above referenced project. It reflects the changes we discussed in our meeting today. Tushie-Montgomery & Associates, Inc., has considerable experience in similar scale developments, as well as a diverse background in most building types. While we have had a great deal of experience in municipal facilities, we do not pretend to be "experts" at any one thing, but approach each project as a challenge to provide the best design for the budget dollars. The business of government is to serve its constituents, and as such, the taxpayers investment in staff, equipment and facilities warrants efficient, cost effective, functional facilities in a convenient and appropriate location that allows for change as the community changes. It is our responsibility to assist the City Staff and Council in making the necessary decisions to meet the City' s mission and goals. We are looking forward to working with yourself, the City Council, and the City's Design Management Team and strengthening our working relationship with the City of Elk River. This is an important project for our fu'm and we are very excited about it. We are committed to dedicating our primary energy to assist you in this project. Sincerely, TUSHIE-MONTGOMERY & ASSOCIATES, INC. 7645 Lyndale Avenue South, # 100 Minneapolis, Minnesota 55423 612. 861 . 9636 Fax: 612.861 . 9632 PROPOSAL FOR PROFESSIONAL SERVICES CITY HALL COMPLEX SPACE NEEDS ASSESSMENT STUDY FOR THE CITY OF ELK RIVER, MINNESOTA MAY 22, 2001 REVISED JUNE 12, 2001 Having met and discussed the project with the City of Elk River's Design Management Team, Tushie- Montgomery & Associates, Inc., proposes the following scope of work as a recommended procedure for the preparation of a City Hall Space Needs Assessment Study for the City of Elk River. PROJECT DESCRIPTION: Prepare a City Hall Space Needs Assessment Study for the existing City Hall complex to determine the short term and long range needs for the existing building including City Hall functions, Emergency Operation Center, Police Department, Senior Center, large public meeting room, and public activities. SCOPE OF SERVICES: The professional services of Tushie-Montgomery & Associates, Inc., shall be as follows: I. PROGRAMMING: A. Field verifying, in general, the accuracy of the as-built documents for the existing building and prepare CAD drawings of the existing conditions to be used in determining actual square footages for each area of the building. Using the as-built plans determine existing space allocations for each department and document space deficiencies, building systems appropriateness, potential barriers, circulation, public access, and Handicap Accessibility Compliance. Review all information, reports, documents, and drawings the Owner may have related to this project. Review the current and projected future needs for the building with the City Staff Design Management Team and prepare a space needs program to be used in developing site and building reuse and expansion plans with respect to the following: Projected needs by department including current needs, needs by 2005, 2010, and 2020 based upon population change, redevelopment goals, general assumptions pertaining to future operational and service philosophies and characteristics specific to individual departments. Design limitations and opportunities Existing floor plan traffic patterns between departments Existing site and building conditions City zoning requirements Expansion capabilities including campus approach Council Chambers HC accessibility concerns Meeting rooms Site parking requirements Building access points Private offices vs workstations (determine standard work space requirements based upon job responsibilities and function) Proposal for Professional Services City Hall Complex Space Needs Assessment Study City of Elk River May 22, 2001 Revised June 12, 2001 Page 2 of 6 Delivery/loading docks Cable TV production studio Computer room Larger locker rooms Election equipment storage and setup Public counters - various departments Conference rooms - small and large Secured outside storage Shooting range Vehicular garage Police Building and Zoning Hazardous waste storage Natural lighting techniques Employee breakrooms Bathrooms Reuse of existing spaces Community meeting rooms Senior center activities Existing mechanical and electrical systems Existing structural systems Technology needs Resource center Storage Prepare a memorandum to City Council Members requesting their input, from a policy standpoint, on broad range program elements such as should all city hall functions remain in the principal building or can some functions be located in separate buildings in a campus configuration, or should the program include public facilities such as a Community Center or Senior Center, etc. Process the information developed in B. above into the various City Hall department needs as follows: Finance Planning Economic Development Administration Building and Zoning Engineering Parks & Recreation Building Maintenance Public Spaces Large Meeting Room Senior Center Emergency Operations Center Police Department City Attorney Proposal for Professional Services City Hall Complex Space Needs Assessment Study City of Elk River May 22, 2001 Revised June 12, 2001 Page 3 of 6 Based upon the approved program develop a design criteria for evaluating alternative facility possibilities including: New possible community functions Adjacency requirements Possible reuse of existing spaces Miscellaneous requirements Proposed parking layouts Building entrances Existing Site Improvements Proposed building additions Existing parking areas Long term appropriateness of each department being located in City Hall versus campus design approach Meet as necessary with City Staff during the entire process to finalize the Space Needs Assessment Program and present conclusions. Conduct a building code analysis for the existing building to determine compatibility with any proposed building expansion and/or remodeling. I1. IMPLEMENTATION: A. Provide plan implementation strategies to include: 1. Recommended locations of new/expanded/relocated City facilities, if any. Recommended space requirements for existing and potential City needs by department. 3. Generalized cost estimates for recommendations. 4. Possible funding sources. 5. Phasing/timing and priority of any recommended changes. Determine if any complimentary private sector development can be incorporated into any future plans. C. Incorporate implementation recommendations and include in the text of the finalized report. II1. DESIGN: Based on the mutually agreed upon Space Needs Assessment Program, prepare a site plan showing the layout of the existing and proposed building expansion, parking expansion, trees, open space, landscape features and adjacent public improvements. Proposal for Professional Services City Hall Complex Space Needs Assessment Study City of Elk River May 22, 2001 Revised June 12, 2001 Page 4 of 6 Identify design themes and specific recommendations for public places, architectural features, decorative lighting, plantings, benches and other public improvements related to the overall site master plan. Prepare standard work space layouts for private offices, workstations, conference rooms, reception spaces, etc. including generic furniture layouts. Evaluate existing HVAC, plumbing and other building mechanical systems for compatibility to the building expansion program. E. Evaluate the existing electrical systems for compatibility to the building expansion program. Prepare floor plan alternatives reflecting the program requirements utilizing the standard work space layouts. Prepare exterior building elevations for the existing building and any proposed building expansions. H. Meet as necessary with City Staff during the entire process to finalize design solutions. Prepare presentation drawings to graphically illustrate design solutions to City Staff members, the City Council and the public. Prepare proposed preliminary construction cost estimate for the purpose of determining the total financial scope of the project. K. Be present at public hearings to assist the City in obtaining approvals for the project. Prepare a final report documenting conclusions and design solutions from the Programming and Design phases. Report will include a summary of each departments current and project space needs. TO BE PROVIDED BY THE OWNER: The Owner shall provide: All background information the Owner may have available related to this project and necessary instructions and input regarding the program requirements. Existing site plans and building lines, as-built drawings of existing buildings, soils reports, other topographical and utility maps and information the Owner has and, if necessary, measured drawings of existing structures. The Architect shall be entitled to rely upon the completeness and accuracy of this information, surveys and reports furnished by the Owner. A designated representative from whom the Architect will receive instructions and authorization. Proposal for Professional Services City Hall Complex Space Needs Assessment Study City of Elk River May 22, 2001 Revised June 12, 2001 Page 5 of 6 Prompt written notice to the Architect if the Owner becomes aware of any fault or defect in the project of non-conformance with the Contract Documents. Provide information pertaining to key issues, including typical facility use and problem areas regarding traffic flow between staff and the public. 6. Provide information pertaining to current and future facility requirements. TIME: Tushie-Montgomery & Associates, Inc., shall begin the Work within one (1) week of being authorized and shall complete all tasks in this proposal within the schedule to be established with the Owner. ENGINEERING SERVICES: Tushie-Montgomery & Associates, Inc. does not employ professional Engineers'on their in-house staff. All Engineering services recommended in this proposal shall be provided by the Architect through a consultant relationship with one or more Engineering firms experienced in the type of work contemplated in this proposal. FEES AND METHODS OF PAYMENTS: Tushie-Montgomery & Associates, Inc., bases all fees for professional services on the amount of time anticipated to complete the described scope of services. Fees for professional services shall be billed monthly in proportion to work completed on the project and shall be paid thirty (30) days from the date of invoice. A 1.5% monthly interest rate shall be applied to all past due accounts. TOTAL FEES ANTICIPATED: The total cost of all basic services recommended in this proposal shall be as shown below plus normal reimbursable costs of printing, faxes, reproductions, CAD plots, copies, telephone, postage, delivery, building renderings, and mileage, etc. I.& II. Programming & Implementation Plan $22,380.00 III. Design $24,710.00-$47,300.00 HOURLY RATES: Principals Senior Associate Associate Architect or Landscape Architect Architect Draftsperson Interior Designer Interior Designer Intern $150/Hour $120/Hour $104/Hour $ 94/Hour $ 82/Hour $ 94/Hour $ 82/Hour Hourly rates may change at the beginning of each calendar year. Proposal for Professional Services City Hall Complex Space Needs Assessment Study City of Elk River May 22, 2001 Revised June 12, 2001 Page 6 of 6 This proposal is good for thirty (30) days. If acceptable, a signed copy will be our authorization to proceed for Parts I and II of this Proposal. Part III shall be a possible future phase. If the Scope of Services in this proposal is not exactly as you would like it, we would be happy to adjust it and revise the fee accordingly. Respectfully submitted, TUSHIE-MONTGOMERY & ASSOCIATES, INC. President AUTHORIZATION TO PROCEED: CITY OF ELK RIVER By: Its: