6.3. SR 12-03-2001MEMORANDUM TO: FROM: DATE: Mayor and City Council Pat Klaers, City Admini ~,/ November 26, 2001 SUBJECT: Consider Designation of Holt and Jackson Funds Item 6.3. On March 12, 2001, the City Council allocated into various funds the majority of the proceeds from the Holt/Jackson land transaction. Following the spring 2001 decisions, the Council also authorized the installation of a sidewalk along the Holt/Jackson commercial project and funded this improvement from the land transaction proceeds. At this time, approximately $60,000 of the land transaction proceeds remain undesignated. At the March 12, 2001, City Council meeting, staff was requested to provide options as to where the balance of the funds should be allocated. Some Councilmembers at that meeting expressed interest in having the balance remain undesignated and/or not spending the money in the near future. It is suggested that the Council place the $60,000 balance into a reserve for special unbudgeted projects, which develop from time to time. In a sense, this ~vould be like a "contingency" reserve fund for the Council. For example, it would be appropriate to use this fund if the city hired a planning consulting firm to assist in updating the comprehensive plan and we had no funds in the 2002 budget for this activity. In the past, the Council has authorized a YMCA study and participation in a communications/customer service study without these activities being in the annual budget. Usually the annual budget contingency fund can be used for these expenses, but this may not always be the case. In many respects the more flexibility that the Council can have in addressing unforeseen expenditures the better off we are as a municipality. Sometimes we are doing budget work 18-20 months before an expenditure takes place and forecasting activities this far in the future can be difficult. If the Council would prefer to have these Holt/Jackson funds put toward a specific use, it is suggested that the Council look at the fact that ultimately the ice arena floor in the old barn will need replacing. When this will happen is unknown, but the expenditure is going to be high and may even approach $500,000. Starting a reserve for this inevitable expenditure would also be appropriate. Other possible uses of these funds include helping with: 1. The development of the two baseball fields at YAC ($110,000'). 2. The paving of the YAC parking lot ($150,000') 3. The FF&E fund for the city hall expansion project. * Amoun~ are approximate. Recommendation It is recommended that the City Council allocate the approximately $60,000 balance from the Holt/Jackson land transaction into a council contingency reserve fund. City Council Minutes Page 2 March 12, 2001 3°6. REQUEST THAT THE SEASONAL BUILDING INSPECTOR POSITION BE MADE A FULL TIME POSITION - APPROVED RESOLUTION 01-12 ENTERING INTO AGREEMENT NO. 81236 WITH MNDOT FOR ACQUISITION OF LANDSCAPE MATERIALS - APPROVED COUNCILMEMBER TVEITE SECONDED THE MOTION. THE MOTION CARRIED 5-0. Review Use of Funds From Holt/Jackson Land Transaction City Administrator Pat Klaers stated that the city-owned Holt and Jackson property has been sold for $348,085. Mr. Klaers suggested that $48,085 be put into the capital reserve fund, $150,000 into a TIF matching fund for business park activities, and that $82,546 be used for the ice resurfacer purchase. Mr. Klaers requested Council direction on the remaining balance of $67,454. Mayor Klinzing inquired how the $150,000 in the TIF matching fund would be used. Mr. Klaers stated that the money could be used for past or future TIF projects where the city has an LGA penalty or a match requirement and that Council action would be necessary before any funds are spent or transferred. CouncJlmember Kuester suggested that the remaining $67,454 balance should remain undesignated at this time. COUNCILMEMBER DIETZ MOVED THAT $48,085 BE PUT INTO THE CAPITAL PROJECTS RESERVE FUND, $150,000 BE PUT INTO A TIF MATCHING FUND, $82,546 FOR THE ICE RESURFACER PURCHASE, AND THAT STAFF BRING OPTIONS TO COUNCIL AS TO WHERE THE $67,454 REMAINING BALANCE COULD BE ALLOCATED. COUNCILMEMBER TVEITE SECONDED THE MOTION. THE MOTION CARRIED 5-0. Councilmember Matin commented that he may not want to see the remaining $67,454 balance spent right away. 5. Open Mike Doug Franz, 19406 Dodge Street - Questioned if Item 6.3. was a public hearing. Mayor Klinzing stated that the public hearing was closed but Council would listen to comments. Michael Mass, 19374 Baldwin Street - Stated he had an issue with the names of the streets all being similar in the proposed Hillside Development. He also stated that the proposed width of Dodge Street was too narrow to be safe. Request for Preliminary Plat Approval (Twin Lakes Townhomes 2nd Addition, Public Hearinq - Case No. P 01-04 Request for Conditional Use Permit for Site Plan - Twin Lake Townhomes 2nd Addition, Public Hearin.q - Case No. CU 01-04 Staff report submitted by Director of Planning Michele McPherson. Senior Planner Scott Harlicker stated that the developer, Phoenix Enterprises, is requesting preliminary plat approval of Twin Lakes Townhomes 2nd Addition and that they would like to amend the site plan for this addition. Mr. Harlicker stated that the developer has acquired additional land and is requesting to put in an easterly access on Twin Lakes Road, which would be in compliance with County TO: FROM: DATE: SUBJECT: Item # 4. I. MEMORANDUM Mayor and City Council Pat Klaers, City Administrator March 12, 200 I Review Use of Funds from Holt/Jackson Land Transaction The city owned Holt and Jackson property has been sold for a commercial development project. After closing costs the city received $348,085. It was a very long and difficult process to assemble this property with clear fide. Part of the side was Right-of-Way and part of the property was owned by the Elk River Associated Investors, Inc. In exchange for this Association deeding the property to the city, I indicated in a November 30, 1995, letter to them that (if the site sells) I would recommend to the Council that 50% of the revenues be dedicated toward Business Park or Industrial Park development. Assembling, platting, and getting clear tide to this property took years and the efforts of the city was contested by various groups throughout the process. Ultimately, the city did get clear tide (Order and Decree of Registration) in order to sell the property. Prior to selling the site, the city also had to provide sewer and water and this involved additional expenses as the utilities from the residential development around the cemetery did not get to the site and the water line from the northern part of Elk Park Center had not been looped through this area. In total, the city has somewhere in the neighborhood of $45-50,000 invested in assembling this property and providing it with full utilities. Furthermore, on June 14, 1999, the City Council purchased an Ice Resurfacer for the arena. The cost was $82,546 and the motion stated that money from the Holt and Jackson Avenue site be used to reimburse the reserve fund which originally financed this purchase. A summary of the figures looks something like the following: Revenues 348,085 - 48,085 300,000 -150,000 150,000 - 82,546 Balance $67,454 (goes back into the capital projects reserve fund) (for business park activity) (for ice resurfacer purchase) It is recommended that the money that goes toward business park activities actually go into a TIF matching fund. As the City Council knows, there is a penalty placed upon municipalities with each new TIF district and this results in either an LGA loss or a local match requirement. It is suggested that this $150,000 be dedicated toward this use. Staff needs Council input on what to do with the $67,454 balance that is unallocated. These funds could be used for any purpose including paying for part of the Library site expansion, funding new bleachers at the Ice Arena, financing some of the improvements at YAC, adding some beautification improvements to the downtown project such as tree grates, trash receptacles, planters, etc. or it could go into equipment reserve or any other reserve, such as one for a community center or YMCA project. There is no hurry for the Council to make this decision - and I need to know if you want more information on various options. Action Requested The City Council is requested to use the proceeds from the Holt and Jackson transaction as follows: · $48,085 into the Capital Projects reserve · $150,000 into a Business Park TIF match reserve · $82,546 into the NSP reserve It is recommended that the City Council consider where to allocate the $67,454 remaining balance. Howard R, Green Company Item 8.1 - 8.6. November 20, 2001 File: 230000M-0325 Honorable Mayor and City Council City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330-0490 RE: TRANSPORTATION ISSUES Dear Council Members: As you are aware, the focus of Monday evening's City Council meeting will be various transportation issues within the City. This letter is intended to give you a brief background on some of the topics we will be prepared to discuss with the City Council: 1. INTERREGIONAL CORRIDOR STUDIES MnDOT is currently performing planning studies on seven interregional corridors throughout the State of Minnesota. Two of these studies happen to cross in the City of Elk River. These are the corridor studies on TH 10 from 35W in Mounds View to Clear Lake, and the TH 101FFH 169 Study from Rogers to Garrison. We have asked the engineer working on the TH 10 Study to be available at the meeting to discuss specifically the recommendations that will be coming forth relative to TH 10 in the City of Elk River. We will have available the drawings and information for the TH 169 Study relative, again, to proposals for inside the City of Elk River. It is important to point out that these are only planning studies at this point in time. Each of these studies, when they are concluded, will develop a list of deficiencies in the corridor and potential projects to remedy these deficiencies. It is likely that the seven interregional corridor studies will generate several billion dollars worth of identified improvements that are necessary. In order to implement any of these improvements, first of all, money needs to be appropriated. Once money is appropriated to a specific project, there is a fairly long process, including environmental studies, an ElS if necessary, preliminary and final plan preparation, and land acquisition, followed by construction. The typical project would take at least five years to implement once money has been appropriated. MnDOT has appropriated a few hundred million dollars for interregional corridor improvements. As you might guess, there will likely be stiff competition for these dollars and no one knows at this time which interregional corridors or which projects on those corridors will be allocated monies from this pool. Also, it is unclear how quickly and how much additional dollars MnDOT will be able to earmark for interregional corridor improvements. Ltr 11-20-01 Council 1326 Energy Park Drive · St. Paul, MN 55108 ° 651/644-4389 fax 651/644-9446 toll free 888/368-4389 Honorable Mayor and City Council November 20, 2001 Page Two In conclusion, it is unlikely that any improvements on TH 10 or TH 169 in the City of Elk River would actually begin construction any sooner than five years, and more likely it would be in the 15 to 20 year time frame. TRANSPORTATION PLAN We will be available to discuss components in a typical transportation plan and to listen to input from the City Council relative to their view of the type of transportation planning needed for the City of Elk River. As you are aware, several years ago a plan was put together that was called a transportation plan. In reality, that plan only contained one component of an overall transportation plan. That component was corridor preservation. That transportation plan dealt with identifying and preserving corridors for Tyler Street and an east-west corridor across the northern part of the urban area of the City of Elk River, essentially connecting Anoka County with TH 10 at the west end of the City. Many other issues that are typically contained within a transportation plan were not dealt with by this original study. PAVEMENT REHABILITATION STUDY A draft copy of the Pavement Rehabilitation Study is enclosed with this letter. Staff would like to go through our vision for this process. As you review this document, keep in mind that at this point in time it only deals with the old core City streets within the City of Elk River. It is anticipated that once the City embarks on a pavement rehabilitation program, it will go on indefinitely. By the time the streets in the old core City are updated over a course of many years, there will be other streets within the City that are reaching the same age and should be considered for the same type of improvement. 'I75TH AVENUE IMPROVEMENTS We will be prepared to update the City Council on the progress on this project relative to land acquisition, preparation and approval of plans and specifications, and the issue of whether or not sanitary sewer and water improvements should be included in the project. OTHER TRANSPORTATION-RELATED ISSUES There are several other transportation-related issues that can or should be discussed as time permits. These would include: · Waco Street/TH 10 signalization · TH 169/County Road 33 interchange update · Main Street east of TH 169 left turn lane issue · Jackson Avenue/School Street signal modifications update · TH 10/171st Avenue signal update Ltr 11-20-01 Council Howard R, Green Company CONSULTING ENGINEERS Honorable Mayor and City Council November 20, 2001 Page Three If you have any other issues you would like me to be prepared to discuss, or any specific information you would like me to have available concerning items raised in this letter, please call. Sincerely, Howard R. Green Company Terry J. Maurer, P.E. TJM:tw Ltr 11-20-01 Council Howard R, Green Company QQNSULTING ENGINEERS of DRAFT R. Green November 2001 City Pavement Rehabilitation Report For The City of Elk River I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision, and that I am a duly licensed professional engineer under the laws of the State of Minnesota. Terry J. Maurer, P.E. Lic. No. 15316 Prepared by: Date Kdstina Thompson, E.I.T. Howard R. Green Company 1326 Energy Park Ddve St. Paul, MN 55108 Phone: 651-644-4389 Fax: 651-644-9446 Howard R. Green Company Table of Contents IV. V. VI. VII. VIII. INTRODUCTION ..................................................................................... 1 STREET EVALUATION ........................................................................... 2 PROPOSED IMPROVEMENTS .............................................................. 3 Street ............................................................................................ 3 Sanitary Sewer ............................................................................. 4 Watermain .................................................................................... 5 Storm Sewer ................................................................................. 5 Right-of-Way and Easements ....................................................... 5 Permits .......................................................................................... 6 ESTIMATED PROJECT COST AND PHASING ...................................... 7 FINANCING ............................................................................................. 8 ASSESSMENTS .................................................................................... 10 PROJECT SCHEDULE ......................................................................... 13 CONCLUSION ....................................................................................... 14 APPENDIX Howard R. Green Company Project No. 802400J Pavement Rehabilitation Report City of Elk River, Minnesota I.INTRODUCTION In 1997, Howard R. Green Company began working on the Pavement Rehabilitation Program. The streets within the old core City were beginning to deteriorate with age and had advanced past the useful life span of the bituminous surface and concrete curb and gutter. It was determined that the most feasible method of pavement rehabilitation for several of the roads was a full reconstruction. As the first step towards identifying the streets that were in need of reconstruction, the streets within the old core City were inspected. After the inspection was completed, the project was put on hold for several years, but in May 2001 City Council authorized the preparation of a Pavement Rehabilitation Report for the City of Elk River to serve as a guideline for street reconstruction projects within the City. There are several issues that this report will address including: · Street Evaluation · Proposed Improvements · Estimated Project Cost and Phasing · Financing · Assessments · Project Schedule The area evaluated as part of this report is outlined on Exhibit 1. The area is identified as the old core City for the purpose of this report. The pavement rehabilitation report addresses how to rehabilitate one of the City of Elk River's largest investments, its paved street network. The report identifies the need for the project and provides a framework for the reconstruction process. -1- Howard R. Green Company Project No. 802400J Pavement Rehabilitation Report City of Elk River, Minnesota Ii. STREET EVALUATION Due to the relatively young age of the streets within the City and proactive street maintenance efforts, the City of Elk River has not had a need for large-scale street reconstruction projects in the past. However, the streets are continuing to deteriorate with age. Seal coating and overlay projects are no longer adequate measures to increase the pavement life of a number of streets within the City. Total street reconstruction is the only cost-effective means of continuing the City's proactive street efforts and ensuring an adequate means of transportation for the residents. In addition to rehabilitating street pavement, a total street reconstruction will allow for correction of existing drainage problems through the construction of concrete curb and gutter, modifying street grades, and the installation of a storm sewer collection system where needed. In 1997, a survey of the streets within the old core City was completed. shows the streets that were determined to be in need of reconstruction. showed severe signs of advanced pavement deterioration. Exhibit 1 The streets There are several signs that indicate pavement deterioration. They include: Alligator Cracking - 2"'= Street between York Avenue and Xenia Avenue -2- Howard R. Green Company Project No. 802400J Pavement Rehabilitation Report City of Elk River, Minnesota III. PROPOSED IMPROVEMENTS At the time of construction of many of the streets within the old core City, there were no guidelines in place to ensure uniform construction. Design standards are now in place and all streets would be reconstructed in accordance with the current and proposed standards. In conjunction with street reconstruction, improvements to existing utilities including watermain, sanitary sewer, and storm sewer will be completed. A detailed description of each proposed improvement is provided below. Also included are digitally prepared photographs showing "before" and "after" proposed improvements. The proposed street improvements include: · Uniform road width of 32 feet face-of-curb to face-of-curb All residential streets would be constructed to a uniform width of 32 feet face-of- curb to face-of-curb with B618 concrete curb and gutter. Residential streets that do not currently meet this requirement would be examined to determine if widening or narrowing the street is feasible during the preliminary design stage. There are some streets within the City where a wider street width is necessary based on average daily traffic counts, such as collector and county roads, and where parking occurs on both sides of the street as a regular occurrence, such as Main Street. In order to maintain a high level of service on these heavily used streets, a width that meets the traffic needs would be used. Concrete driveway aprons will be constructed at all driveway locations regardless of driveway type. -3- Howard R. Green Company Project No. 802400J Pavement Rehabilitation Report City of Elk River, Minnesota · Streets constructed to a 7-ton design Urban residential streets should be constructed to a minimum 7-ton design. Based on typical soils in Elk River, the proposed pavement section for residential streets consists of 6 inches of Class 5 aggregate base, 2 inches of bituminous base course, and 1% inches of bituminous wear course. The proposed street section will need to be verified by a geotechnical investigation during the design phase. · Installation of concrete sidewalk Proposed improvements also include constructing 6-foot wide sidewalk where feasible on both sides of the road, and replacing existing concrete sidewalk where necessary. · Installation of street lights Street lighting has been included as part of the proposed improvements to allow for upgrading of intersection lighting and installation of street lights where necessary for improved traffic safety. According to Elk River Municipal Utilities Standard on Street Lighting, street lights shall be installed at all major intersections and at mid-block provided that no lights are spaced closer than 300 feet. Street lighting layout shall be approved by the Elk River Municipal Utilities and shall be consistent with the standard type of lighting currently being utilized by the City to provide for a uniform City Street Lighting System. · Standard boulevard restoration will consist of sodding all disturbed areas. The typical street section is shown in Exhibit 2. The majority of the City of Elk River is currently served with sanitary sewer as shown on Exhibit 3. At this time, no specific sanitary sewer improvements are proposed; however, before street reconstruction, all of the sanitary sewer within the project area should be televised. Through reviewing televising reports, it will be possible to identify any areas where deterioration of the sewer main from age and/or tree roots has occurred and is compromising the system. Deterioration of the sanitary sewer mains allows clean ground water to enter the mains. Treating this clean water is an unnecessary expense and can be addressed if necessary during street reconstructions. A general proactive street and utility reconstruction and maintenance program is the best way to address infiltration and inflow due to sewer line deterioration. Minimal improvements have been included in the cost estimate. -4- 'W 60' 52.00' FACE TO FACE 16.00' 16.00' B618 CONCRETE CURB AN[ GUTTER - 13.50' 13.50' 6' 6' WIDE CONC.---~ SIDEWALK 5' SIDEWALK -- 1.5" 2550 TYPE MV5 WEARING COURSE MIXTURE -- TACK COAT 2" 2550 TYPE LV5 NONWEARING COURSE MIXTURE 6" CLASS 5 AGGREGATE BASE APPROVED SUBGRADE  EXHIBIT mlver 0 C Z (~ c) -- "~ Z -< c C) z ~0 or- z ~,.0 -'~ '-< ~ 1C; = lQ 10 LECEND STREET RECONSTRUCTION SANITARY SEWER LINE W/ PIPE SIZES & MANHOLES WASTEWATER -- TREATMENT PLANT CORE CITY STREETS PAVEMENT REHABILATION PROGR SANITARY SEWER EXHIBIT EXHIBI Howard R. Green Company Project No. 802400J Pavement Rehabilitation Report City of Elk River, Minnesota The City Engineer and General Manager of Elk River Municipal Utilities have identified several areas where watermain improvements are necessary due to inadequate water flow from east to west due to small sized mains. The small sized mains also result in inadequate fire protection. The existing water system, with proposed improvements noted, is shown on Exhibit 4. The improvements include: · Installation ofwatermain Currently, there is no watermain on York Avenue from Main Street to 2nd Street, 2nd Street from York Avenue to Xenia Avenue, and Xenia Avenue from 2nd Street to Main Street. Six-inch watermain would be installed at the time of street reconstruction. · Upsizing of4-inch watermain Currently all areas between Main Street and Trunk Highway 10 are served with 4-inch watermain. This small watermain size has resulted in Iow fire flows and high head losses across the 4-inch main. All 4-inch watermain will be upsized to a minimum of 8 inches as necessary. The most crucial improvement to the overall water system is the upsizing of the 4-inch watermain along 5th Street from Jackson Street to Main Street to provide adequate fire flow protection to residential homes and businesses. The existing storm sewer collection system is shown on Exhibit 5. Several streets within the study area are not currently served with storm sewer. When streets are reconstructed to an urban section, storm sewer will be constructed. During the preliminary design phase, the collection system will be reviewed to determine if the current pipe and storm sewer outlets are adequate. An example of existing storm sewer that needs to be reconstructed is in the Upland/Tipton area. The existing storm sewer currently runs through properties. The storm sewer location needs to be corrected so that it is within the public right-of-way. Approximately thirty feet of right-of-way (ROW) is necessary on either side of centerline of the street to construct the proposed improvements. Currently, the majority of the streets within the project area have adequate ROW. The streets that have less than 60- feet are: ~0~ (NOT IN USE) (NOT IN USE) 100,0OO GALLON WA ]'ER TOWER WELL ~1 (ABANDONED ,1,000,000 GALLO~ WATER TOWER STATION LEGEND STREET RECONSTRUCTION INSTALL WATERMAIN INCREASE WATERMAIN SIZE WATERMAIN W/ PIPE SIZES &: VALVES 41t- HYDRANT CORE CITY STREETS PAVEMENT REHABILATION PROGR WATER MAIN EXHIBIT EXHIBI ~M 1! STREET RECONSTRUCTION STORM SEWER W/ PIPE SIZES & STRUCTURES CORE CITY STREETS PAVEMENT REHABILATION PROGRAM STORM SEWER EXHIBIT ~,~ EXHIBIT 5 Howard R. Green Company Project No. 802400J Pavement Rehabilitation Report City of Elk River, Minnesota · Upland Avenue from Main Street to Trunk Highway 10 · 5th Street from 5% Street to Gates Avenue · Gates Avenue from 5th Street to 5% Street · 5% Street from Gates Avenue to 5th Street During preliminary design phase, it will be determined if additional right-of-way will be necessary to construct the proposed improvements. Temporary construction easements may be needed if grading is necessary outside of the permanent ROW due to possible changes in the vertical street alignment. During the preliminary design phase, necessary easement locations will be determined and temporary construction easements acquired from individual property owners. As with all construction projects, there are several permits that will need to be obtained prior to construction of the proposed improvements. The required permits will depend on the specific improvements of the project. They include, but are not limited to: Agency · Minnesota Pollution Control Agency · Minnesota Department of Health · Minnesota Pollution Control Agency · Sherburne County · Mn/DOT Improvement Sanitary Sewer Watermain Grading Work within their ROW Work within their ROW -6- Howard R. Green Company Project No. 802400j Pavement Rehabilitation Report City of Elk River, Minnesota IV. ESTIMATED PROJECT COST AND PHASING Exhibit 1 illustrates the streets that need to be reconstructed at this time. The financial burden on the City that would result from the reconstruction of all these streets in a single construction season makes one large project unfeasible. However, the project size must be large enough in scale to insure that COmpetitive bids will be received. Therefore, the streets have been grouped together into projects that have a total project cost of apProximately $1,000,000.00 using today's construction costs. In addition to financial concerns, the location of the streets was taken into account to minimize the frequency of the construction impacts to residents when determining which streets the should be grouped together. In addition, the streets that contain watermain that needs to be upsized for fire flow protection are proposed to be reconstructed in the first few phases. The base improvements used in determining the $1,000,000.00 project size includes: · Reconstruction of the roadway · Installation/Improvement of the storm sewer if necessary · Installation of sidewalk · Street lighting · Boulevard Restoration · 28% overhead The 28% overhead is in accordance with the City's assessment manual. It includes city administration, engineering design, construction staking and inspection, and fiscal and legal costs. The cost of the installation of watermain and/or sanitary sewer, or the repair of either system would be in addition to the $1,000,000.00 costs. These costs were not included due to the separate means of finance used to fund these types of improvements, SUch as Elk River Municipal Utilities and the general sanitary sewer budget. A Preliminary construction cost estimate for each street is provided in the Appendix. The estimates are based on construction costs from recent years. An increase in construction costs from inflation has not been added, but it should be noted that future project costs would be higher due to inflation of construction costs and/or construction materials. As each individual project is authorized, a more detailed cost estimate will be COmpleted with revised construction costs in the feasibility phase. No costs have been included for the acquisition of utility easements and rights-of-way. The proposed project phasing is shown on Exhibit 6. h JLL imiii PROPOSED YEAR OF STREET RECONSTRUCTION 2005 2005 2007 2009 2011 2015 2015 CORE CITY STREETS PAVEMENT REHABILATION PROGRAM STREET RECONSTRUCTION EXHIBIT EXHIBIT 6 Howard R. Green Company Project No. 802400J Pavement Rehabilitation Report City of Elk River, Minnesota V. FINANCING The improvements discussed in this report are proposed to be financed through a number of different methods. These include: · Assessment to benefiting properties Assessments play an essential role in funding street reconstruction projects. The reconstruction of a street improves the City transportation system for residents in the community, however the major benefactor of the improvements is the adjacent property owners. They are the primary users of the improved street and typically, property values increase due to the reconstruction. Therefore, a portion of the street reconstruction cost should be assessed to all adjacent, benefiting property owners. The method and determination of the assessments is noted in the following section. · Elk River Municipal Funds In areas currently served with watermain, it is anticipated that improvements to the system will need to be completed in conjunction with the street reconstruction projects. Improvements may be as minor as additional hydrant installation for increased fire protection, replacement of existing hydrants and valves, and isolated watermain replacement; or as significant as total watermain replacement due to deterioration of the in-place watermain and upsizing of some of the existing 4-inch watermains. The funding for repairs or replacement of an existing watermain system would be paid for through Elk River Municipal Utility funds. Sources of these funds include Water Availability Charges (WAC) and normal water usage fees. In some areas that are not currently served, a minimum of a 6-inch watermain would be installed for fire protection and domestic water service at the time of street reconstruction. The cost for the watermain and all appurtenances would be funded through assessments to the benefiting properties. In the event, an individual property does not have existing watermain service; one would be installed and financed through assessments to the benefiting property. · Other Utility funds As described previously within the report, all existing sanitary sewer lines will be televised for cracks, breaks, and infiltration to determine areas in which repair is needed. The repairs will be financed through the general sanitary sewer funds. -8- Howard R. Green Company Project No. 802400J Pavement Rehabilitation Report City of Elk River, Minnesota In the event, an individual property does not have existing sanitary sewer service; one would be installed and financed through assessments to the benefiting property. · Surface Water Management funds Several of the streets within the project area do not have concrete curb and gutter or a storm drainage system. When the road is reconstructed to an urban section, it will be necessary to address the drainage and install the necessary additions to the storm sewer system. In addition, if repairs are necessary to the existing storm sewer it would be completed as part of the street project. Surface water management funds would be contributed for storm drainage improvements. City contribution In recent budget cycles, the City Council has dedicated a portion of the City levy to a fund for future pavement rehabilitation projects. The purpose of this fund is to provide an additional means of financing for street reconstruction projects when the improvement costs exceed funds that can be obtained through assessments and other sources. · StateAid Municipal funds An additional funding source available for only some of the streets within the city is the City's Municipal State Aid Account. Some streets, which provide key connections between State Highways, County Roads, and other major City streets, have been designated as part of Elk River's Municipal State Aid (MSA) street system. These streets typically carry higher volumes of traffic than residential city streets and may have increased width and weight capacity to handle the traffic volumes and loads. Due to the extra width and design standards, the reconstruction costs are higher than that of a normal residential city street. The portion of the construction cost of the reconstruction of MSA streets is eligible for funding through the City's MSA account. However, to insure equitable treatment of all property owners within the City the MSA funds should not be used to lower the property assessment to adjacent property owners. -9- Howard R. Green Company Project No. 802400J Pavement Rehabilitation Report City of Elk River, Minnesota VI. ASSESSMENTS The current Elk River Assessment Manual does provide some details on how to proceed with assessments for street reconstruction projects. However, the current manual proposes to assess street reconstruction projects based on a lot's front footage. It is proposed that the assessment policy be revised to assess improvements against the abutting or benefiting properties within the project area on a per unit basis. A "per unit" assessment would consist of assessing a residential lot that could not be subdivided as one unit. Lots that can be subdivided would be assessed multiple units as appropriate. In addition commercial, industrial, and multi-use properties such as apartments, schools and churches would be assessed more than one unit as determined on a case-by-case basis. The proposed assessment per unit is $5,000 for residential properties, which includes street, curb and gutter, sidewalks, storm sewer, and street lighting. The maximum assessment rate per unit should be adjusted annually by the construction cost index. It is recommended that the following guidelines be adopted and added to the assessment policy to ensure equitable assessments for all affected property owners. It should be noted that the assessment guidelines that follow have been prepared based on circumstances and factors know today. It is recognized that modifications may be necessary from time to time to ensure equitable treatment of affected properties. The proposed additions or revisions to the assessment policy are as follows: The cost for improving intersections of streets and similar parts of public improvements not immediately fronting on either private or publicly owned property should be distributed over the benefited properties within the assessment area. A single-family residential lot should be assessed on a per unit basis in accordance with the following guidelines: · Interior lots - Interior lots fronting on streets should be assessed at 100% of the per unit basis. ~UNIT UNIT UNIT UNIT UNIT UNIT STANDARD 1-UNIT LOT -10- Howard R. Green Company Project No. 802400J Pavement Rehabilitation Report City of Elk River, Minnesota Any lot where subdivision is possible based on zoning requirements and placement of existing structures on the lot should be assessed on a per unit basis for each sub-dividable lot. UNIT UNIT UNIT UNITS UNIT SUBDIVIDABLE LOT Corner lots - Corner lots that are bordered by two City streets should be assessed at 100% of the per unit assessment regardless of where the improvement is.  LOT B~ L01 C LOT O CORNER LOT ON TWO CITY STREETS Double frontage units - If a lot faces on one street and backs onto another, it should be assessed 100% of the per unit assessment regardless of where the improvement is. An exception is if the lot can be subdivided, in which case the lot would be assessed on a per unit basis for each sub-dividable lot. -11 - Howard R. Green Company Project No. 802400J Pavement Rehabilitation Report City of Elk River, Minnesota STREET IMPROVEMENTS FRONT & BACK All properties other than residential including commercial, industrial, and multi-use such as apartments, churches and schools should be assessed based on the following: · All of the above shall be assessed an appropriate number of units as determined on a case-by-case basis. Exhibit 7 shows the zoning for the properties within the old core City. -12- R2b Mecrlum In~ 8oki Waste Faclty R4 Antenna Tower IVl~eral Excavation LECEND Sbl;lle Fam~ Reaidential Single Fam~ Residential Sbgle F. am~ Reeidential S~31e Farna'y Residential Two Fan'a~ Reaidenfial Two Fe~ Reaidenlial Townhouse/Mulliple Fama~ ReaidentiaJ MullJple Fame/Reaidefflial CORE CITY STREETS PAVEMENT REHABILATION PR~M ZONING MAP EXHIBIT I-k:l~ed R (~n Cx3ml3a~ ~,~ EXHIBIT 7 Howard R. Green Company Project No. 802400J Pavement Rehabilitation Report City of Elk River, Minnesota VII. PROJECT SCHEDULE In order for each project to be successful, adequate time needs to be allowed for public involvement in the process. To allow sufficient time for public informational meetings and individual feedback on design concerns, it is proposed that a construction project be authorized every other year. A tentative schedule for a typical construction project, as provided in Table 1, is based upon guidelines established in Minnesota State Statues, Chapter 429, Local Improvements, Special Assessments. These dates will be revised as a project develops. Table 1. Proiect Schedule Identify pavement rehabilitation project and prepare initial feasibility study July Year 1 including topographic survey Hold a public information hearing with September affected property owners Prepare a formal feasibility study, which would include public informational October hearing input. Hold public hearing before City Council November November thru Prepare plans and specifications February Coordinate walk-through of affeCted March Year 2 properties with 95% comPleted plans Bid project April Hold assessment hearing April Award Contract May Begin Construction May Construction substantially complete September Final lift of bituminous placed and any June Year 3 punch list work completed Final project with Contractor July Begin new Pavement Rehabilitation Program improvement project August It is recommended that the first project be authorized in early spring of the first year the project is to proceed in. This is earlier than the typical project schedule provided in Table I and would allow for adequate time for City staff and Council to become familiar with the process. -13- Howard R. Green Company Project No. 802400J Pavement Rehabilitation Report City of Elk River, Minnesota VIII. CONCLUSION In order to maintain the integrity of street network system, it is the recommendation of the report to proceed with the reconstruction projects as they have been outlined. As the projects progress the streets scheduled for reconstruction can be evaluated and revised based on comments from residents. The City Council should take the following actions in order to proceed with the reconstruction process: · The report should be adopted · The maximum "per unit" assessment rate for residential properties should be finalized and adopted. · Authorize televising of the sanitary sewer. · Order feasibility study and preliminary survey for the first project. This report focuses on the streets within the old core City. The streets within this area are among the oldest in the City and have reached the end of their useful lifespan and in order to maintain an adequate means of public transportation within the City of Elk River the streets should be reconstructed. As time progresses and the streets are rehabilitated, there will be areas outside of the old core City where the streets will be approaching the end of their useful life. At that time it will be necessary to expand the pavement rehabilitation process to include other areas of the City. Pavement rehabilitation does not eliminate the need for preventative maintenance such as seal coating and overlay programs. Seal coating and overlay projects enhance and prolong the lifespan of the bituminous pavement. Through reconstruction and preventative maintenance programs the City will be able to provide residents with a safe and effective transportation system. -14- Howard R. Green Company Project No. 802400J Pavement Rehabilitation Report City of Elk River, Minnesota APPENDIX Pavement Rehuuilitation Program 11/12/01 Street Improvements Schedule STREET 2ND ST. 2ND ST. 2ND ST. 2ND ST. 3RD ST. 3RD ST. 3RD ST. FROM RAILROAD DR. FREEPORT YORK EVANS IRVING HOLT GATES TO FREEPORT EVANS XENIA CUL-DE-SAC HOLT GATES EVANS COMMON EXCAVATION CY $ 10.00 579.4 770.0 727,2 913.9 797.2 855.6 1567.2 REMOVE BITUMINOUS PAVEMENT SY $ 3.00 662.2 880.0 831.1 1618.9 1594.4 1857.8 2686.7 REMOVE SIDEWALK SF $ 2.50 0.0 0.0 0.0 0,0 0.0 0.0 0.0 {EMOVE CONCRETE CURB & GUTTER LF $ 3.50 0.0 0.0 0m0 MAILBOX RELOCATION LS $ 500.00 0.0 0.0 0,0 0.0 0.0 0.0 0.0 MILL BITUMINOUS PAVEMENT SY $ 9,50 0.0 0.0 0,6 0.0 0.0 0.0 0.0 AGGREGATE BASE, CLASS V TON $ 10.50 378.8 504.6 476.7 602.2 520.9 559.7 1027.( TYPE 41A, WEAR COUSE MIXTURE TON $ 35.00 118,8 157.9 149.1 187.4 163.5 175.5 321.4 TYPE 31B, BASE COURSE MIXTURE TON $ 34.00 92.4 122.8 116.0 145.8 127.2 136.5 250.0 BITUMINOUS MATERIAL FOR TACK COAT GAL $ 1.50 48.0 63.8 60,3 75,7 66.1 70.9 129.9 CONCRETE CURB & GUTTER, DESIGN B618 LF $ 8.00 596.0 792.0 748.0 940.0 820.0 880.0 1612.0 6" CONCRETE DRIVEWAY AND APRON SY $ 34.00 15.8 47.3 47.3 126.2 15.8 64.3 94.7 2" BITUMINOUS DRIVEWAY RESTORATION SY $ 15.00 0.0 99.6 99.6 373.3 49.8 49.1 273.8 CONCRETE SIDEWALK SF $ 2.50 1788.0 4752.0 2244.0 5640.0 2460.0 2640.0 9672.0 PEDESTRIAN RAMP EA $ 300.00 2.0 4.0 2.C 4.0 2.0 2.(3 4.0 SODDING, LAWN AND BOULEVARD SY $ 3.00 662.2 880.0 831.1 1044.4 911.1 977.8 1791 .1 FURNISH & INSTALL SIGN PANELS, TYPE C SF $ 28.00 6.3 6.3 0.C 6,3 6.3 6.3 12.5 FURNISH & INSTALL STREET SIGNS EA $ 200.00 1.0 1.0 0.0 1,0 1.0 0.C 2.0 ADJUST GATE VALVE EA $ 150.00 0.0 1.0 0.C 1.0 2.0 0.C 0.0 ADJUST MANHOLE EA $ 200.00 1.0 1.0 2.0 2.0 1.0 0.C 3.0 STORM SEWER LF $ 50.00 298.0 396.0 374,C 470.0 410.0 440.0 806.0 STREET LIGHTING LS $ 200.00 1.0 1.0 I ,O 1.0 I ,0 1 .C 1.0 TOTAL ESTIMATED CONSTRUCTION COST: $ 47,168.02 $ 71,320.17 $ 61,114.65 $ 92,417.26 $ 67,270.97 $ 73,374.83 $ 147,282.79 28% OVERHEAD: $ 13,207.05 $ 19,969.65 $ 17,112.10 $ 25,876.83 $ 18,835.87 $ 20,544.95 $ 41,239.18 TOTAL ESTIMATED PROJECT COST: $ 60,375.06 $ 91,289.82 $ 78,226.75 $ 118,294.10 $ 86,106.84 $ 93,919.78 $ 188,521.97 TOTAL COST: $ 6,936,053.65 O:\Proj\802400j\costest-report 1 FROM TO CY REMOVE BITUMINOUS PAVEMENT SY REMOVE SIDEWALK SF REMOVE CONCRETE CURB & GU'I-rER LF MAILBOX RELOCATION LS MILL BITUMINOUS PAVEMENT SY AGGREGATE BASE, CLASS V TON TYPE 41A, WEAR COUSE MIXTURE TON TYPE 31B, BASE COURSE MIXTURE TON BITUMINOUS MATERIAL FOR TACK COAT GAL CONCRETE CURB & GU'I-TER, DESIGN B618 LF 6" CONCRETE DRIVEWAY AND APRON SY 2" BITUMINOUS DRIVEWAY RESTORATION SY CONCRETE SIDEWALK SF PEDESTRIAN RAMP EA SODDING, LAWN AND BOULEVARD SY FURNISH & INSTALL SIGN PANELS, TYPE C SF FURNISH & INSTALL STREET SIGNS EA ADJUST GATE VALVE EA ADJUST MANHOLE EA STORM SEWER LF STREET LIGHTING LS TOTAL ESTIMATED CONSTRUCTION COST: 28% OVERHEAD: TOTAL ESTIMATED PROJECT COST: tOTAL COST: Pavement Reh,~litation Program Street Improvements Schedule JACKSON OXFORD MORTON LOWELL KING PROCTOR TH 10 NORFOLK $ 10.00 606. 600., 830.: 437 830. $ 3.00 1040., 1030.~ 1992 1050. 1992.' $ 2.50 0., 0.1 4270.0 1125 2135] $ 3.50 0.0 0.0 854.0 0.0 854. $ 500.00 O.C 0.0 0.0 O. $ 9.50 0.0 0.0 0.0 0.0 0.( $ 10.50 397.7 394.2 542.~ 285.5 543.9 $ 35.00 124.4 123.: 170.3 89.7 170.3 $ 34.00 96.; 95J 132., 69., 132., $ 1.50 49. 68,~ 36.; 68J $ 8.00 I..( 618. 854.[ $ 34.00 450.~ 854.( 112.(, 23.7 32J 47.; $ 15,00 24. 74.7 24.~ 0.( 149.: $ 2,50 0,0 5124 1350. 2562.0 $ 300.00 0.0 4.0 $ 3.00 693.: 686.7 948. 2.0 500.0 948J $ 28.00 6.3 6.3 $ 200.00 1.0 1.0 1.0 1.0 1.0 $ 150.00 0.0 1.0 1.0 0.0 0.0 $ 200.00 1.0 1.0 1 .C 1.0 1.0 $ 50.00 312.£ 309] 427.0 225.0 $ 200.00 1 .¢ 427.0 1.0 1.0 $ 46,068.38 $ 49,220.49 91,351.36 $ 41,116.35 ~; 81,366.76 $ 12,899.15 $ 13,781.74 $ 25,578.38 $ 11,512.58 $ 22,782.69 $ $ 58,967.52 $ 63,002.22 $ 116,929.74 $ 52,628.93 $ 104,149.46 $ 6,936,053.65 NORFOLK OXFORD 2240. 4800.~ 960.~ 0.0 611.2 191,4 148,9 77.; 960.1 80.' 124.4 1066.7 0.0 1.0 0.0 1.0 480.0 1.0 105,377.66 29,505.74 134,883.40 11/12/01 PROCTOR QUINN 834. 2002.1 4290] 858 0.0 0.0 545., 171. 133] 69.' 858.( 114.: 24. 5148.~ 953.; 1,0 0.0 1.0 429.~ $ 94,684.96 $ 26,511.79 $ 121,196.75 O:~Proj\8024OOj\costest-report Pavement Reh~,,~litation Program 11/12/01 Street Improvements Schedule STREET 4TH ST. 5TH ST. 5 1/2TH ST. 5TH ST. 5TH ST. 5TH ST. 5TH ST. FROM QUINN SEYMOUR GATES NORFOLK OXFORD PROCTOR QUINN TO RUSH END HOLT OXFORD PROCTOR QUINN RUSH COMMON EXCAVATION CY $ 10.00 830,3 565.8 1102.5 1098.6 824.4 840.0 834.2 REMOVE BITUMINOUS PAVEMENT SY $ 3.00 1992.7 1164.0 1701.0 1946.1 1884.4 1920.0 1906.7 REMOVE SIDEWALK SF $ 2.50 2135.0 0.0 0.0 0.0 4240.0 2160.0 2145.(~ REMOVE CONCRETE CURB & GUTTER LF $ 3.50 854.0 0.0 0.0 0.0 848.0 0.0 858.0 MAILBOX RELOCATION LS $ 500.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 MILL BITUMINOUS PAVEMENT SY $ 9.50 0.0 0.0 0.0 20.7 0.0 0.0 0.O AGGREGATE BASE, CLASS V TON $ 10.50 541.7 371.0 721.2 718.7 554.9 565.3 561.8 TYPE 41A, WEAR COUSE MIXTURE TON $ 35.00 170.3 116.0 226.1 225.3 174.9 178.2 177.~ TYPE 31B, BASE COURSE MIXTURE TON $ 34.00 132.4 90.3 175.8 175.2 136.0 138.6 137.6 BITUMINOUS MATERIAL FOR TACK COAT GAL $ 1.50 68.8 46.9 91.4 91.0 70.7 72.0 71.5 CONCRETE CURB & GUTTER, DESIGN B618 LF $ 8.00 854.0 582.0 1134.0 1130.0 848.0 864.0 858.0 6" CONCRETE DRIVEWAY AND APRON SY $ 34.00 65.6 72.2 268.9 105.0 187.6 122.0 97.1 2" BITUMINOUS DRIVEWAY RESTORATION SY $ 15.00 0.0 74.7 124.4 74.7 74.7 49.8 49.8 CONCRETE SIDEWALK SF $ 2.50 2562.0 1746.0 3402.0 3390.0 5088.0 5184.0 5148.0 PEDESTRIAN RAMP EA $ 300.00 2.0 2.0 2.0 2.0 4.0 4.0 4.0 SODDING, LAWN AND BOULEVARD SY $ 3.00 948.9 646.7 1260.0 1255.6 942.2 960.0 953.3 FURNISH & INSTALL SIGN PANELS, TYPE C SF $ 28.00 6.3 0.C 0.0 0.0 6.3 6.3 0.0 FURNISH & INSTALL STREET SIGNS EA $ 200.00 1.0 0.0 0.0 1.0 0.0 1,0 0.0 ADJUST GATE VALVE EA $ 150.00 1.0 0.0 0.0 0.0 0.0 2.0 0.0 ADJUST MANHOLE EA $ 200.00 2.0 0.¢ 2.0 3.0 1.0 1.0 1.0 STORM SEWER LF $ 50.00 427.0 291.0; 567.0 565.0 424.0 432.0 429.0 STREET LIGHTING LS $ 200.00 1.0 1.0 1.0 1.0 1.0 1.0 1.0 TOTAL ESTIMATED CONSTRUCTION COST: $ 80,248.17 $ 50,132.81 $ 99,645.48 $ 94,367.91 $ 96,946.93 $ 88,074.74 $ 88,998.62 28% OVERHEAD: $ 22,469.49 $ 14,037.19; $ 27,900.73 $ 26,423.01 $ 27,145.14 $ 24,660.93 $ 24,919.61 TOTAL ESTIMATED PROJECT COST: $ 102,717.66 $ 64,170.00 $ 127,546.22 $ 120,790.92 $ 124,092.08 $ 112,735.67 $ 113,918.23 TOTAL COST: $ 6,936,053.65 O:\Proj\802400j\costest-report 3 Pavement Reh,,,~dtation Program 11/12/01 Street Improvements Schedule STREET 5TH ST. 5TH ST. 5TH ST. 5TH ST. 5TH ST. 6TH ST. 6TH ST. FROM RUSH IRVING HOLT IRVING END GATES JACKSON TO SEYMOUR HOLT GATES JACKSON UPLAND IRVING IRVING COMMON EXCAVATION CY $ 10.00 591.1 591.1 1092.8 707.8 552.2 445.3 713.6 REMOVE BITUMINOUS PAVEMENT SY $ 3.00 1216.0 1080.9 1748.4 1496.4 631.1 966.9 1304.9 REMOVE SIDEWALK SF $ 2.50 0.0 0.0 0.0 0.0 0.0 0.0 0.0 REMOVE CONCRETE CURB & GUTTER LF $ 3.50 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ,,1AILBOX RELOCATION LS $ 500.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 MILL BITUMINOUS PAVEMENT SY $ 9.50 0.0 0.0 0.0 0.0 0.0 0.0 0.0 AGGREGATE BASE, CLASS V TON $ 10.50 387.5 386.1 714.5 463.6 362.5 293.1 467.1 TYPE 41A, WEAR COUSE MIXTURE TON $ 35.00 121.2 121.2 224.1 145.1 113.2 91.3 146.3 TYPE 31B, BASE COURSE MIXTURE TON $ 34.00 94.3 94.3 174.3 112.9 88.1 71.0 113.8 BITUMINOUS MATERIAL FOR TACK COAT GAL $ 1.50 49.0 49.0 90.5 58.6 45.8 36.9 59.1 CONCRETE CURB & GUTTER, DESIGN B618 LF $ 8.00 608.0 608.0 1124.0 728.0 568.0 458.0 734.0 6" CONCRETE DRIVEWAY AND APRON SY $ 34.00 105.( 40.7 195.4 72.2 112.9 415.8 64.3 2" BITUMINOUS DRIVEWAY RESTORATION SY $ 15.00 74.7 24.9 99.6 74.7 149.3 149.3 0.0 CONCRETE SIDEWALK SF $ 2.50 1824.0 3648.0 3372.0 4368.0 0.0 1374.(; 4404.0 ~EDESTRIAN RAMP EA $ 300.00 2.0 4.0 2.0 4.C 0.0 2.0 4.0 SODDING, LAWN AND BOULEVARD SY $ 3.00 675.6 675.6 1248.9 808.§ 631.1 508.9 815.6 FURNISH & INSTALL SIGN PANELS, TYPE C SF $ 28.00 0.0 12.5 0.0 12.5 6.3 6.3 12.5 FURNISH & INSTALL STREET SIGNS EA $ 200.00 0.0 2.0 1.0 1.0 1 .(; 0.0 1.0 ADJUST GATE VALVE EA $ 150.00 0.0 2.0 1.0 1.0 0.0 1.0 0.(~ ADJUST MANHOLE EA $ 200.00 2.0 2.0 2.0 1.0 1.0 1.0 2.(} STORM SEWER LF $ 50.00 304.0 304.0 562.0 364.0 284.0 229.0 367.(~ STREET LIGHTING LS $ 200.00 1.0 1.0 1.0 1.0 1.0 1.0 1 .O TOTAL ESTIMATED CONSTRUCTION COST: $ 53,690.53 $ 56,545.77 $ 96,537.64 $ 68,687.93 $ 45,739.44 $ 53,874.22 $ 67,251.71 28%OVERHEAD: $ 15,033.35 $ 15,832.81 $ 27,030.54 $ 19,232.62 $ 12,807.04 $ 15,084.78 $ 18,830.48 TOTAL ESTIMATED PROJECT COST: $ 68,723.88 $ 72,378.58 $ 123,568.18 $ 87,920.55 $ 58,546.49 $ 68,959.00 $ 86,082.19 TOTAL COST: $ 6,936,053.65 O:\Proj\802400j\costest-report 4 Pavement Reh~.,~tation Program 11/12/01 Street Improvements Schedule STREET 7TH ST. 7TH ST. 8TH ST. 8TH ST. 8TH ST. EVANS EVANS FROM IRVING IRVING HOLT GATES IRVING RAILROAD DR. 1ST TO GATES JACKSON GATES END JACKSON 1 ST ZND OOMMON EXCAVATION CY $ 10.00 925.6 711.7 822.5 301.4 717.5 915.8 653.3 REMOVE BITUMINOUS PAVEMENT SY $ 3.00 1745.3 1138.7 1880.0 688.9 984.0 889.7 709,3 REMOVE SIDEWALK SF $ 2.50 0,0 0.0 0.0 0.0 0.0 0.0 0.(] REMOVE CONCRETE CURB & GUTTER LF $ 3.50 0.0 0.0 846.0 310.0 0.0 0,0 0.0 MAILBOX RELOCATION LS $ 500.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 MILL BITUMINOUS PAVEMENT SY $ 9.50 0.0 0.0 0,0 0.0 0.(] 0.0 0.~ AGGREGATE BASE, CLASS V TON $ 10.50 604.6 466.2 537.4 197.0 470.4' 597.9 428.1 TYPE 41A, WEAR COUSE MIXTURE TON $ 35.00 , 189.8 145.9 168.7 61.8 147.1 187.8 134.0 TYPE 31B, BASE COURSE MIXTURE TON $ 34.00 147.6 113.5 131.2 48.1 114.4 146.1 104.2 BITUMINOUS MATERIAL FOR TACK COAT GAL $ 1.50 76.7 59.0 68.2 25.0 59.5 75.9 54.1 CONCRETE CURB & GUTTER, DESIGN B618 LF $ 8.00 952.0 732.0 846.0 310.0 738.0 942.0 672.0 6" CONCRETE DRIVEWAY AND APRON SY $ 34.00 409.1 72.2 212.4 73.4 80,1 40.7 39.4 2" BITUMINOUS DRIVEWAY RESTORATION SY $ 15.00 24.9 49.8 49.8 24.9 124.4 24.9 99.6 CONCRETE SIDEWALK SF $ 2.50 2856.(~ 4392.0 5076.0 1860.0 4428.0 0.0 4032.0 PEDESTRIAN RAMP EA $ 300.00 2.0 4.0 4.0 4.0 4.0 0.0 4.0 SODDING, LAWN AND BOULEVARD SY $ 3.00 1057.8 813.3 940.0 344.4 820.0 1046.7 746.7 FURNISH & INSTALL SIGN PANELS, TYPE C SF $ 28.00 6.3 12.5 0.C 0,0 12.5 6.3 0.0 FURNISH & INSTALL STREET SIGNS EA $ 200.00 0.0 1.0 1.(] 0.0 1.0 0.0 1.0 ADJUST GATE VALVE EA $ 150.00 1.0 0.0 1.(~ 0.0 0.0 1.(] 0.0 ADJUST MANHOLE EA $ 200.00 2.0 1.0 1.0 1.0 1.0 2.0 1.0 STORM SEWER LF $ 50.00 476.0 366,0 423.0 155.0 369.0 471.0 336.0 STREET LIGHTING LS $ 200.00 1,0 1.0 1.0 1.0 1.0 1.0 1.0 TOTAL ESTIMATED CONSTRUCTION COST: $ 90,155.19 $ 67,411.61 $ 86,282.58 $ 32,453.12 $ 68,820.22 $ 66,666.35 $ 60,600.58 28% OVERHEAD: $ 25,243.45 $ 18,875.25 $ 24,159.12 $ 9,086.87 $ 19,269.66 $ 18,666.58 $ 16,968.16 TOTAL ESTIMATED PROJECT COST: $ 115,398.65 $ 86,286.86 $ 110,441.70 $ 41,539.99 $ 88,089.88 $ 85,332.93 $ 77,568.74 TOTAL COST: $ 6,936,053.65 O:\Proj\802400j\costest-report 5 Pavement Reho,~itation Program 11/12/01 Street Improvements Schedule STREET EVANS FREEPORT GATES GATES GATES GATES HOLT FROM 2ND 2ND 8TH 5TH 7TH ST. RAILROAD DR. 5TH ST, TO MAIN ST. MAIN ST. SCHOOL 5 1/2 ST 6TH ST. MAIN ST. 5TH ST. COMMON EXCAVATION CY $ 10.00 771.9 775.8 884.7 575.6 604.7 595.C 245.0 REMOVE BITUMINOUS PAVEMENT SY $ 3.00 838.1 931.0 1921.1 723.6 1313.1 1020.O 392,0 REMOVE SIDEWALK SF $ 2.50 0.0 0.0 0.C 0.0 0,(} 0.0 0.0 REMOVE CONCRETE CURB & GUq-FER LF $ 3.50 0.0 0.0 910,0 0.0 O.C 0.0 0.0 MAILBOX RELOCATION LS $ 500.00 0.0 0.0 0.0 0.0 0.C 0.0 MILL BITUMINOUS PAVEMENT SY $ 9.50 0.0 0.0 0.0 0.0 0.0 0.0 0.C AGGREGATE BASE. CLASS V TON $ 10.50 504.8 508.4 578.7 375.9 395.3 389.3 160.2 TYPE 41A, WEAR COUSE MIXTURE TON $ 35.00 158.3 159.1 181.4 118.0 124.0 122.0 50.2; TYPE 31B, BASE COURSE MIXTURE TON $ 34.00 123.1 123.7 141.1 91.6, 96,5 94.9 39.1 BITUMINOUS MATERIAL FOR TACK COAT GAL $ 1.50 64.0 64.3 73.3 47.7 50.1 49.3 20.3 CONCRETE CURB & GUTTER, DESIGN B618 LF $ 8.00 794.0 798.0 910.0 592.0 622.0 612.0 252.0 Y' CONCRETE DRIVEWAY AND APRON SY $ 34.00 56.4 47.3 97.1 7.9 146.9 23.7 7.9 2" BITUMINOUS DRIVEWAY RESTORATION SY $ 15.00 49.8 149.3 99.6 24.9 49.8 49.8 24.9 CONCRETE SIDEWALK SF $ 2.50 2382.0 4788.0 5460.0 1776.0 1866.0 1836.0 756.0 PEDESTRIAN RAMP EA $ 300.00 2.0 4.0 4.0 2.0 2.0 2.0 2.0 SODDING, LAWN AND BOULEVARD SY $ 3.00 882.2 886.7 1011.1 657.8 691.1 680.0 280.0 FURNISH & INSTALL SIGN PANELS, TYPE C SF $ 28.00 0.C 12.,' 6.3 0.0 0.0 6.3 0.0 FURNISH & INSTALL STREET SIGNS EA $ 200.00 0.C 1.0 1.0 1.0 2.0 1.0 0.0 ADJUST GATE VALVE EA $ 150.00 2.(; 0.0 1.0 0.0 0.0 0.0 0.0 ADJUST MANHOLE EA $ 200.00 0.0 1,0 1.0 1.0 1.0 1.0 2.0 STORM SEWER LF $ 50.00 397.0 399.0 455.0 296.0 311.0 306.0 126.0 STREET LIGHTING LS $ 200.00 1.0 1.0: 1.0 1.0 1.0 1.0 1.0 TOTAL ESTIMATED CONSTRUCTION COST: $ 63,926.21 $ 72,725.36 $ 88,763.56 $ 46,987.92 $ 56,237.41 $ 50,421.50 $ 21,313.48 28% OVERHEAD: $ 17,899.34 $ 20,363.10 $ 24,853.80 $ 13,156.62 $ 15,746.47 $ 14,118.02 $ 5,967.77 TOTAL ESTIMATED PROJECT COST: $ 81,825.55 $ 93,088.46 $ 113,617.36 $ 60,144.54 $ 71,983.88 $ 64,539.52 $ 27,281.26 TOTAL COST: $ 6,936,053.65 O:\Proj\802400j\costest-report 6 Pavement Rehaullitation Program 11/12/01 Street Improvements Schedule STREET HOLT HOLT IRVING IRVING IRVING IRVING IRVING FROM 5 1/2 ST SCHOOL 6TH ST. 4TH ST. 5TH ST. 6TH ST. 7TH ST. TO 5TH ST. BTH ST. 6TH ST. 3RD ST. 5TH ST. 7TH ST. 8TH ST. COMMON EXCAVATION CY $ 10.00 318.9 824.4 420.C 773.9 455.0 348.1 540.6 REMOVE BITUMINOUS PAVEMENT SY $ 3.00 510.2 1884.4 768.0 1724.7 962.0 596.7' 926.7 REMOVE SIDEWALK SF $ 2.50 0.0 0.0 1080.0 3980.0 1170.0 895.(~ 1390.0 REMOVE CONCRETE CURB & GUTTER LF $ 3.50 0.0 848.0 0.0 796.0 0.0 0.C 0.0 MAILBOX RELOCATION LS $ 500.00 0.0 0.0i 0.0 0.0 0.0 0.O 0.0 MILL BITUMINOUS PAVEMENT SY $ 9.50 0.0 0.C 0.0 0.0 0.0 0.0 0~0 AGGREGATE BASE, CLASS V TON $ 10.50 208.4 539.8 274.8 507.1 298.0 227.8 353.1 TYPE 41A, WEAR COUSE MIXTURE TON $ 35.00 65.4 169.1 86.1 158.7 93.3 71.4 110.9 TYPE 31B, BASE COURSE MIXTURE TON $ 34.00 50.9 131.5 67.0 123.4 72.6 55.5 86.2 BITUMINOUS MATERIAL FOR TACK COAT GAL $ 1.50 26.4 68.3 34.8 64.1 37.7 28.8 44.8 CONCRETE CURB & GUTTER, DESIGN B618 LF $ 8.00 328.0 848.0 432.0 796.0 468.0 358.0 556.0 6" CONCRETE DRIVEWAY AND APRON SY $ 34.00 73.4 236.1 48.6 80.1 23.7 48.6 106.2 2" BITUMINOUS DRIVEWAY RESTORATION SY $ 15.00 24.9 99.6 49.8 49.8 24.9 49.8 0.0 CONCRETE SIDEWALK SF $ 2.50 984.0 5088.0 2592.0 4776.0 2808.0 2148.0 3336.0 PEDESTRIAN RAMP EA $ 300.00 2.0 4.0 4.0 4.0 4.0 4.0 4.0 SODDING, LAWN AND BOULEVARD SY $ 3.00 364.4 942.2 480.0 884.4 520.0 397.8 617.8 FURNISH & INSTALL SIGN PANELS, TYPE C SF $ 28.00 0.0 6.3 0.0 12.5 0.0 0.0 0.0 FURNISH & INSTALL STREET SIGNS EA $ 200.00 1.0 1.0 1.0 1.0 1.0 1.0 1.0 ADJUST GATE VALVE EA $ 150.00 1.0 1.0 0.0 1 .C 1.0 0.0 0.0 ~,DJUST MANHOLE EA $ 200.00 0.0 1.0 1.0 2.0 0.0 0.0 1.0 STORM SEWER LF $ 50.00 164.0 424.0 216.0 398.0 234.0: 179.0 278.0 STREET LIGHTING LS $ 200.00 1.0 1.0 1.0 1.0 1.0 1.0 1.0 TOTAL ESTIMATED CONSTRUCTION COST: $ 29,363.69 $ 88,200.99 $ 43,807.10 $ 87,653.30 $ 46,231.56 $ 36,704.12 $ 56,199.10 28% OVERHEAD: $ 8,221.83 $ 24,696.28 $ 12,265.99 $ 24,542.92 $ 12,944.84 $ 10,277.15 $ 15,735.75 TOTAL ESTIMATED PROJECT COST: $ 37,585.53 $ 112,897.27 $ 56,073.09 $ 112,196.22 $ 59,176.39 $ 46,981.27 $ 71,934.85 TOTAL COST: $ 6,936,053.65 O:\Proj\802400j\costest-report 7 STREET FROM ¥O COMMON EXCAVATION CY REMOVE BITUMINOUS PAVEMENT SY REMOVE SIDEWALK SF REMOVE CONCRETE CURB & GUTTER LF MAILBOX RELOCATION LS MILL BITUMINOUS PAVEMENT SY ~GGREGATE BASE, CLASS V TON I'YPE 41A, WEAR COUSE MIXTURE TON TYPE 31B, BASE COURSE MIXTURE TON BITUMINOUS MATERIAL FOR TACK COAT GAL CONCRETE CURB & GUTTER, DESIGN B618 LF 6" CONCRETE DRIVEWAY AND APRON SY 2" BITUMINOUS DRIVEWAY RESTORATION SY CONCRETE SIDEWALK SF PEDESTRIAN RAMP EA SODDING, LAWN AND BOULEVARD SY FURNISH & INSTALL SIGN PANELS, TYPE C SF FURNISH & INSTALL STREET SIGNS EA ADJUST GATE VALVE EA ADJUST MANHOLE EA STORM SEWER LF STREET LIGHTING LS TOTAL ESTIMATED CONSTRUCTION COST: 28% OVERHEAD: TOTAL ESTIMATED PROJECT COST: TOTALCOST: $ 10.00 $ 3.00 $ 2.50 $ 3.50 $ 500.00 $ 9.50 $ 10.50 $ 35.00 $ 34.00 $ 1.50 $ 8.00 $ 34.OO $ 15.00 $ 2.5O $ 300.00 $ 3.OO $ 28.OO $ 200.00 $ 150.00 $ 200.00 $ 50.00 $ 200.00 $ $ 6,936,053.65 Pavement Reh~,~nitation Program Street Improvements Schedule 8TH ST. SCHOOL ST. 925.6 1586.7 2380.0 0.0 0.0 0.0 607.6 189.8 147.6 76.7 952.0 78.9 149.3 5712.0 4.0 1057.8 6.3 1.0 0.0 1.0 476.0 1.0 93,889.17 $ 26,288.97 $ 120,178.13 $ 5TH ST. 4TH ST. 1108.3 2660.0 2850.0 1140.0 0.0 0.0 723.~c 227.3 176.8 91. 1140. 48., 24.' 6840.~ 4.0 1266.7 6.3 1.0 2.0 3.0 570.0 1.0 115,101.77 32,228.49 147,330.26 5TH ST. 6TH ST. 460.8 895.3 1185.0 0.0 0.0 0.0 301.4 94.6 73.5 38.2 474.0 114.1 49.8 2844.0 4.0 526.7 0.0 1.0 0.0 1.0 237.0 1.0 50,044.17 14,012.37 64,056.53 7TH ST. 7TH ST. 440.~ 660.~ 0J 0.0 167.5 52.6 40. 21 .: 264.~ 32J 0.~ 1584.0 4.0 293.3 0.0 1.0 0.0 1.0 132.(; 1.0 $ 27,027.56 $ 7,567.72 $ 34,595.28 ~ 1/12/01 TH 10 _ RIVER 4TH'~T. . _865.3~ 755.3 234.7 ~1_96.?.7l 1373.3J 3__577., 1~45.oJ 708J 0.0J 256.C 0.( 0.0 0.O 0.0 555.2 180.1 140. 72.; 708.1 139J 24. 4248. 4. 786.7 12.5 2.0 2.0 2.0 354.0 1.0 87,179.03 $ 24,410.13 $ 111,589.16 $ 0.0 484.~ 157.: 122.~ 63J 0.0 106. 24.~ 1854.~ 2.1 686.7 6.3 0.0 0.0 2.0 309.0 1.0 57,884.00 $ 16,207.52 $ 74,091.53 $ 0.0 162.4 51.0 39.7 20.6 256,0 O.C 0.0 1536.0 4.0 284.4 12.5 1.0 0.0 O.O 128.0 1.0 24,784.86 6,939.76 31,724.62 O:\Proj~802400j\costest-report Pavement Rehau~itation Program 11/12/01 Street Improvements Schedule STREET MORTON NORFOLK NORFOLK NORFOLK OXFORD OXFORD QUINN FROM 4TH ST. TH 10 5TH ST. 4TH ST. TH 10 5TH ST. TH 10 TO MAIN ST. 5TH ST. 4TH ST. MAIN ST. 5TH ST. 4TH ST. 5TH ST COMMON EXCAVATION CY $ 10.00 1079.2 127.0 583.3 1147.2 365.6 810.6 546.4 REMOVE BITUMINOUS PAVEMENT SY $ 3.00 2035.0 152.4 933.3 1835.6 647.6 1343.7 874.2 REMOVE SIDEWALK SF $ 2.50 0.0 245.0 1500.0 2950.0 0.0 O.O 0.0 REMOVE CONCRETE CURB & GUTTER LF $ 3.50 1110.0 98.0 600.0 1180.0 376.0 0.(] 0.0 MAILBOX RELOCATION LS $ 500.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 MILL BITUMINOUS PAVEMENT SY $ 9.50 0.0 18.7 0.0 0.0 0.0 O.(] 0.O AGGREGATE BASE, CLASS V TON $ 10.50 705.2 62.2 381.3 750.7 238.5 529.8 356.9 TYPE 41A, WEAR COUSE MIXTURE TON $ 35.00 221.3 19.5 119.6 235.3 75.0 166.3 112.0 TYPE 31B, BASE COURSE MIXTURE TON $ 34.00 172.1 19.5 93.0 183.0 58.3 129.3 87.1 BITUMINOUS MATERIAL FOR TACK COAT GAL $ 1.50 89.4 7.9 48.3 95.1 30.3 67.2 45.3 CONCRETE CURB & GUTTER, DESIG~I B618 LF $ 8.00 1110.0 98.0 600.0 1180.( 376.0 834.(] 562.0 §" CONCRETE DRIVEWAY AND APRON SY $ 34.00 187.6 0.0 15.8 178.4 32.8 212.4 73.4 2" BITUMINOUS DRIVEWAY RESTORATION SY $ 15.00 0.0 0.0 24.9 74.7 0.0 49.8 24.9 CONCRETE SIDEWALK SF $ 2.50 6660.0 0.0 1800.0 3540.0 1128.0 5004.01 3372.0 PEDESTRIAN RAMP EA $ 300.00 4.0 0.0 2.0 2.0 2.0 4.(; 4.0 SODDING, LAWN AND BOULEVARD SY $ 3.00 1233.3 108.9 666.7 1311.1 417.8 926.7 624.4 FURNISH & INSTALL SIGN PANELS, TYPE C SF $ 28.00 12.5 6.3 0.C 6.3 12.5 12.5 6.3 FURNISH & INSTALL STREET SIGNS EA $ 200.00 1.0 1.0 1 .C 1.0 1.0 0.0 1.0 ADJUST GATE VALVE EA $ 150.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ADJUST MANHOLE EA $ 200.00 0.0 0.0 0.0 1.0 0.0 0.0 0.0 STORM SEWER LF $ 50.00 555.0 49.0 300.0 590.0 188.0 417.0 281.0 STREET LIGHTING LS $ 200.00 1.0 1.0 1.0 1.0 1.0 1.0 1.0 TOTAL ESTIMATED CONSTRUCTION COST: $ 107,225.66 $ 9,008.97 $ 54,120.04 $ 111,250.26 $ 33,016.04 $ 80,551.53 $ 52,281.18 28% OVERHEAD: $ 30,023.19 $ 2,522.51 $ 15,153.61 $ 31,150.07 $ 9,244.49 $ 22,554.43 $ 14,638.73 TOTAL ESTIMATED PROJECT COST: $ 137,248.85 $ 11,531.48 $ 69,273.64 $ 142,400.33 $ 42,260.53 $ 103,105.95 $ 66,919.91 TOTAL COST: $ 6,936,053.65 O:\Proj\802400j\costest-report 9 Pavement Reha,~,Htation Program 11/12/01 Street Improvements Schedule STREET QUINN RAILROAD DR. RAILROAD DR RAILROAD DR RAILROAD DR RUSH RUSH FROM 5TH ST. JACKSON IRVING GATES 2ND ST. TH 10 5TH ST. TO 4TH ST. IRVING MAIN I;~ND ST. EVANS 5TH ST. CTH ST. COMMON EXCAVATION CY $ 10.00 801.1 838.1 1411.7 262.5 2000.8 593.1 929.41 REMOVE BITUMINOUS PAVEMENT SY $ 3.00 1281.8 1676.1 2016.7 360.0 2744.0 948.9 2018.2! REMOVE SIDEWALK SF $ 2.50 2060.(] 2155.0 0.0 0.0 0.0 0.0 2390.0 REMOVE CONCRETE CURB & GUq-FER LF $ 3.50 0.(~ 0.0 1452.0 0.0 0.0 0.0 956.0 MAILBOX RELOCATION LS $ 500.00 0.C 0.0 0.0 0.0 0.0 0.0 0.0 MILL BITUMINOUS PAVEMENT SY $ 9.50 0.0i 0.0 0.0 0.0 0.0 0.0 0.0 AGGREGATE BASE, CLASS V TON $ 10.50 524.5 547.2 922.9 171.3 1306.6 387.7 607.5 TYPE 41A, WEAR COUSE MIXTURE TON $ 35.00 164.3 171.9 289.5 53.8 410.3 121.6 190.6 TYPE 31B, BASE COURSE MIXTURE TON $ 34.00 127.8 133.7 225.2 41.9 319.1 94.6 148.2 BITUMINOUS MATERIAL FOR TACK COAT GAL $ 1.50 66.4 69.4 117.0 21.8 165.8 49.1 77.0 CONCRETE CURB & GUTTER, DESIGN B618 LF $ 8.00 824.0 862.0 1452.0 270.0 2058.0 610.0 956.0 6" CONCRETE DRIVEWAY AND APRON SY $ 34.00 72.2 7.9 39.4 0.0 23.7 15.8 122.0 2" BITUMINOUS DRIVEWAY RESTORATION SY $ 15.00 49.8 24.9, 124.4 0.0 49.8 24.(` 49.8 ' OONCRETE SIDEWALK SF $ 2.50 4944.0 2586.0 0.0 0.0 0.0 3660.0 5736.0 PEDESTRIAN RAMP EA $ 300.00 4.0 2.0 0.C 0.0 0.0 4.(] 4.0 SODDING, LAWN AND BOULEVARD SY $ 3,00 915.6 957.8 1613.3 300.0 2286.7 677.8 1062.2 FURNISH & INSTALL SIGN PANELS, TYPE C SF $ 28.00 6.3 6.3 12.5 0.0 0.0 12.5 12.5 FURNISH & INSTALL STREET SIGNS EA $ 200.00 1.0 1.0 2.0~ 1.0 1.0 1.(] 2.0 ADJUST GATE VALVE EA $ 150.00 0.0 1.0 0.0 0.0 0.0 1.0 1.0 ADJUST MANHOLE EA $ 200.00 1.0 3.0 2.0 0.0 0.0 0.0 0.0 STORM SEWER LF $ 50.00 412.0 431.0 726.0 135.0 1029.0 305.0 478.0 STREET LIGHTING LS $ 200.00 1.0 1.0 1.0 1 .(] 1.0 1.0 1.0 TOTAL ESTIMATED CONSTRUCTION COST: $ 80,184.00 $ 75,556.73 $ 110,216.22 $ 19,053.64 $ t44,145.12 $ 54,717.58 $ 99,145.62 28% OVERHEAD: $ 22,451.52 $ 21,155.88 $ 30,860.54 $ 5,335.02 $ 40,360.63 $ 15,320.92 $ 27,760.77 TOTAL ESTIMATED PROJECT COST: $ 102,635.52 $ 96,712.62 $ 141,076.76 $ 24,388.66 $ 184,505.76 $ 70,038.50 $ 126,906.40 TOTAL COST: $ 6,936,053.65 O:\Proj\8024OOj\costest-report 10 Pavement Reh~,,,itation Program 11/12/01 Street Improvements Schedule STREET RUSH TIPTON UPLAND UPLAND UPLAND WATSON XENIA FROM 4TH ST. MAIN TH 10 TIPTON 5TH ST. MAIN 2ND ST. TO MAIN UPLAND TIPTON 5TH ST. MAIN END MAIN COMMON EXCAVATION CY $ 10.00 0.0 1678.1 618.3 750.6 1403.9 425.8 762.2 REMOVE BITUMINOUS PAVEMENT SY $ 3.00 0.0 2493.1 848.0 857.8 1604.4 584.0 958.2 REMOVE SIDEWALK SF $ 2.50 0.0 0.0 0.0 0.0 0.0 0.0 0.0 iREMOVE CONCRETE CURB & GUTTER LF $ 3.50 0.0 0.0 0.0 0.0 0.0 0.0 0.0 MAILBOX RELOCATION LS $ 500.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 MILL BITUMINOUS PAVEMENT SY $ 9.50 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ~GGREGATE BASE, CLASS V TON $ 10.50 0.0 1098.2 403.8 490.1 917.8 278.9 498.4 I~'PE 41A, WEAR COUSE MIXTURE TON $ 35.00 0.0 344.1 126.8 153.9 287.9 87.3 156.3 TYPE 31 B, BASE COURSE MIXTURE TON $ 34.00 0.0 267.6 98.6 119.7 223.9 67.9 121.6 'BITUMINOUS MATERIAL FOR TACK COAT GAL $ 1.50 0.0 139.0 51.2 62.2 116.3 35.3 63.2 CONCRETE CURB & GUTTER, DESIGN B618 LF $ 8.00 0.0 1726.0 636.0 772.( 1444.0 438.0 784.0 ~" CONCRETE DRIVEWAY AND APRON SY $ 34.00 0.0 136.6 7.9 139.0 137.8 56.4 89.2 2" BITUMINOUS DRIVEWAY RESTORATION SY $ 15.00 0.0 149.3 24.9 24.9 74.7 0.0 49.8 CONCRETE SIDEWALK SF $ 2.50 0.0 10356.0 3816.0 4632.0 4332.0 0.0 2352.0 PEDESTRIAN RAMP EA $ 300.00 0.0 4.0 4.(~ 4.0 2.0 0.0 2.0 SODDING, LAWN AND BOULEVARD SY $ 3.00 0.0 1917.8 706.7 857.8 1604.4 486.7 871.1 FURNISH & INSTALL SIGN PANELS, TYPE C SF $ 28.00 0.0 12.5 0.C 0.0 6.3 6.3 6.3 FURNISH & INSTALL STREET SIGNS EA $ 200.00 0.0 2.0 1.C 0.0 1.0 1.0 1.0 ADJUST GATE VALVE EA $ 150.00 0.0 2.0 0.C 2.0 0.0 1.0 1.0 ADJUST MANHOLE EA $ 200.00 0.0 4,0 0.(~ 2.0 1.0 0.0 1.0 STORM SEWER LF $ 50.00 0.0 863.0 318.(~ 386.0 722.0 219.0 392.0 STREET LIGHTING LS $ 200.00 0.0 1.0 1.(~ 1.0 1.0 1.0 1.0 TOTAL ESTIMATED CONSTRUCTION COST: $ $ 155,878.09 $ 55,725.11 $ 71,604.13 $ 116,828.52 $ 32,916.04 $ 65,100.12 28% OVERHEAD: $ $ 43,645.86 $ 15,603.03 $ 20,049.16 $ 32,711.98 $ 9,216.49 $ 18,228.03 TOTAL ESTIMATED PROJECT COST: $ $ 199,523.95 $ 71,328.14 $ 91,653.28 $ 149,540.50 $ 42,132.53 $ 83,328.15 TOTAL COST: $ 6,936,053.65 O:\Proj\802400j\costest-report 11 Pavement Ret, .... ,ration Program ,1/12/01 Street Improvements Schedule STREET YORK YORk FROM MAIN 183RD CT. TO 183RD CT. 2ND ST. COMMON EXCAVATION CY $ 10,00 530.8 208.1 REMOVE BITUMINOUS PAVEMENT SY $ 3.00 667.3 261.6 REMOVE SIDEWALK SF $ 2.50 0.0 0.0 REMOVE CONCRETE CURB & GUTTER LF $ 3.50 0.0 0.0 MAILBOX RELOCATION LS $ 500.00 0.0 0.0 MILL BITUMINOUS PAVEMENT SY $ 9.50 0.0 0.0 AGGREGATE BASE, CLASS V TON $ 10.50 347.5 136.5 TYPE 41A, WEAR COUSE MIXTURE TON $ 35.00 108.9 42.7 ~YPE 31B, BASE COURSE MIXTURE TON $ 34.00 84.7 33.2 BITUMINOUS MATERIAL FOR TACK COAT GAL $ 1.50 44.0 17.2 CONCRETE CURB & GUTTER, DESIGN B618 LF $ 8.00 546.0 214.0 S" CONCRETE DRIVEWAY AND APRON SY $ 34.00 23.7 15.8 2" BITUMINOUS DRIVEWAY RESTORATION SY $ 15.00 74.7 49.8 CONCRETE SIDEWALK SF $ 2.50 1638.0 642.0 PEDESTRIAN RAMP EA $ 300.00 2.0 2.0 SODDING, LAWN AND BOULEVARD SY $ 3.00 606.7 237.8 FURNISH & INSTALL SIGN PANELS. TYPE C SF $ 28.00 6.3 0.0~ FURNISH & INSTALL STREET SIGNS EA $ 200.00 1.0 0.0 ADJUST GATE VALVE EA $ 150.00 0.0 0.0 ADJUST MANHOLE EA $ 200.00 1.0 1.0 STORM SEWER LF $ 50.00 273.0 107.0 STREET LIGHTING LS $ 200.00 1.0 1.0 TOTAL ESTIMATED CONSTRUCTION COST: $ 44,946.05 $ 18,609.23 28% OVERHEAD: $ 12,584.89 i $ 5,210.59 TOTAL ESTIMATED PROJECT COST: $ 57,530.95 $ 23,819.82 TOTAL COST: $ 6,936,053.65 O:\Proj\802400j\costest-report 12