4.8. SR 01-20-2015City of
Elk
River
Request for Action
To
Item Number
Mayor and City Council
4.8
Agenda Section
Meeting Date
Prepared by
Consent
January 20, 2015
Justin Femrite, P.E., City Engineer
Item Description
Reviewed by
2015 Maintenance Agreement with Wright County
Cal Portner, City Administrator
for Parrish Avenue Bridge
Reviewed by
Action Requested
Approve, by motion, the 2015 Maintenance Agreement between the City of Elk River and Wright County
for routine maintenance work on the Parrish Avenue Bridge.
Background /Discussion
Annually, the City of Elk River is asked to enter into a maintenance agreement with Wright County for
maintenance of the Parrish Avenue Bridge. Since the bridge was rebuilt, the City of Elk River and Wright
County have shared maintenance duties. The agreement is the same as in the past.
Financial Impact
There is no financial impact beyond the maintenance issues that the city has currently been responsible
for on the Parrish Avenue Bridge. These include maintenance of the street lights, removal of snow from
the sidewalk, maintenance of the slope and berms on the north approach, snow and ice control from
bridge and approaches, and removal of marking /spray paint from visible surfaces of bridge structure.
Attachments
Cover letter from Virgil Hawkins, Wright County Highway Engineer
Maintenance Agreement for 2015
PV0WIBEO BY
INAMUR
JAN 6
oJNrir o4* WRIGHT COUNTY VIRGIL G. HAWKINS, P.E.
. DEPARTMENT OF HIGHWAYS H(763) 682.7388 gineer
z
at CHAD D. HAUSMANN, F.E.
AV d d Wright County Public Works Building Assistant Highway Engineer
.� dy I901 Highway 25 North (763) 682 -7387
Buffalo, MN 55313
7$66 MARK A. JOHNSON
Jct. T.H. 25 and C.R. 138 Right -of -Way Agent
Telephone: (763) 682 -7383 (763) 682 -7386
FAX: (763) 652 -7313
December 30, 2014
City of Elk River
Tina Allard, Clerk
13065 Orono Parkway, Box 490
Elk River, MN 55330 -0490
Dear Ms. Allard:
Enclosed is a maintenance agreement for the maintenance activities on Bridge 86515.
Two copies of this are enclosed for your review and execution by the City. As of 2002,
this agreement has been changed to an annual agreement so that we can include it for
approval with our other maintenance agreements, which are all submitted on an annual
basis. The current agreement will be effective from January 1, 2015, to December 31,
2015. Please return both copies of the executed agreement. After approval by the
County Board, one of the copies will be returned to you for your files.
If you have any questions concerning this agreement, please contact me.
Sincerely,
V16Z .4:vQ
Virgil G. Hawkins
County Highway Engineer
Enclosure
bh
Equal Opportunity /Affirmative Action Employer
RESOLUTION 1S-
MAINTENANCE AGREEMENT - 2015
THIS AGREEMENT made and entered into by and between the City of Elk River hereinafter referred to as the "City"
and the County of Wright hereinafter referred to as the "County ".
WHEREAS, it is deemed to the best interest of all parties that the duties and responsibilities of both the City and
the County as to maintenance on Bridge #86515 and its approaches should be clearly defined.
NOW THEREFORE, IT IS AGREED with regard to said structure maintenance:
MAINTENANCE
CITY RESPONSIBLE FOR:
(1) Maintenance of street lights;
(2) Removal of snow from sidewalk;
(3) Maintenance of slopes /berms and roadway on north approach (includes: turf maintenance,
bituminous maintenance, drainage and riprap maintenance);
(4) Snow and ice control from bridge and approaches;
(5) Removal of markings /spray paint etc. from visible surfaces of bridge structure.
COUNTY RESPONSIBLE FOR:
(1) Periodic sweeping to remove sand and debris and removing sand /dirt from expansion joints;
(2) Signing for bridge and approaches;
(3) Maintenance of slopes /berms and roadway on south approach (includes: turf maintenance,
bituminous maintenance, drainage and riprap maintenance);
(4) Centerline and edge pavement marking (includes stop bar).
The agreement between the City and County shall be for a one -year period and run from January 1, 2015, to
December 31, 2015. All maintenance responsibilities will be deemed "offsetting" therefore no payments will be required
for the individual maintenance work which conforms to the areas stated herein and performed under authorization of
either the City or County.
In the event that the structure needs major maintenance /rehabilitation an agreement detailing the work and
shared costs must be approved and accepted by the City and County.
ADOPTED:
120
ATTEST:
City Clerk
Mayor
CERTIFICATION
I hereby certify that the above is a true and correct copy of a resolution duly passed, adopted and approved by the
City Council of said City on , 20
City Clerk
APPROVED AND ACCEPTED:
COUNTY OF WRIGHT Name of City
Chairman of the Board Date
ATTEST
County Coordinator Date