8.0. SR 12-10-2001Item 8.
December 6, 2001
File: 230000M-0325
Honorable Mayor and City Council
City of Elk River
13065 Orono Parkway
P.O. Box 490
Elk River, MN 55330-0490
RE: TRANSPORTATION ISSUES
Dear Council Members:
As you are aware, a number of transportation issues that were scheduled to be discussed at last
week's City Council meeting were postponed until Monday, December 10, 2001. This letter is
intended to provide you with a list of items and some brief background on them for Monday's City
Council meeting. Items that staff would like to discuss with the City Council are as follows:
A. PAVEMENT REHABILITATION REPORT
Please bring with you the draft Pavement Rehabilitation Report that was included in last
week's City Council packet. This draft report lays out the framework for the pavement
rehabilitation program that staff has been discussing with the City Council for some time.
Monday, I will briefly go through the report and some of the issues that staff needs direction
from City Council on in order to complete and finalize the document. It would be staff's intent
that the document be finalized in early 2002 and that the first pavement rehabilitation project
be started by spring 2002 with construction planned for the summer of 2003.
B. COMPREHENSIVE TRANSPORTATION PLAN
This is an item that the City Council has indicated they would like to discuss relative to whether
or not the City needs to update their Transportation Plan. The previous plan prepared several
years ago had a specific focus on corridor preservation for transportation routes around the
core city. A portion of that plan was actually implemented with the construction of Tyler Street.
Staff would like to hear from City Council as to what they feel needs to be addressed with an
update of the Comprehensive Transportation Plan. I will be available to discuss with the City
Council typical items that are included in such a study.
With the ongoing TH 169 and TH 10 Interregional Corridor Studies, there is some available
information in traffic forecasting and modeling which could be used as a basis for a City
Comprehensive Transportation Plan.
C. 175TH AVENUE IMPROVEMENT PROJECT
As I reported to the City Council previously, we have the environmental documents which are
necessary for the federal funding completed and approved by MnDOT. Plans for the road
Ltr 12-05-01 Council.doc
Honorable Mayor and City Council
December 6, 2001
Page Two
improvements are 95% complete and have been initially reviewed by MnDOT. The two issues
that remain to be resolved on this project are land acquisition and utility issues.
First, on land acquisition, I have met with the majority of property owners along the project and
discussed the need for land acquisition. In each individual meeting, I am providing the
property owner a written offer based on tax value of their property along with easement
documentation. This is required by Federal law associated with the TEA-21 grant. Thus far,
the only easement that has been fully executed is for the Klein property. One property owner
talked to me just this week and indicated they would like to take the City's offer of money and,
in fact, have asked for slightly more than the amount offered. The property owner was offered
approximately $1,350 for the easement. They have come back and asked for $2,000. Based
on this, I am looking for direction from the City Council as to how to proceed with land
acquisition. Would the City Council like me to continue to push to have the easements signed
at no cost in anticipation of a road improvement with no assessments to abutting property
owners, or would the City Council want to pursue a strategy of paying for and/or condemning
property along 175th Avenue, assuming that the street improvement would be assessed to the
abutting property owners?
The second issue is whether or not to include sanitary sewer and watermain with the project.
The proposed Park Pointe project will be coming forward to the City Council on December
17th. At that time, we believe there will be a petition from the Developers of that project
requesting sanitary sewer and watermain be included in 175th Avenue. A decision on whether
or not to include sanitary sewer and water in the project can certainly wait until the petition is
received or later.
D. ZANE AVENUEIMPROVEMENTS
This is the Cooperative Agreement project that would realign Zane Avenue near the NAPA
Auto Parts Store and Saxon Motors. along with connecting the road to the new road in the
Mississippi Ridge development, allowing the access onto TH 10 to be permanently closed.
We have recently heard back from MnDOT that they do have funding available to participate in
this project. They have earmarked approximately $160,000 for their contribution to the road
improvement. As we discussed previously, at this point the City Council should consider
whether or not to order a feasibility study for the extension of sanitary sewer and water laterals
to serve NAPA Auto Parts, Saxon Motors, and the Americlnn. Attached for your consideration
is a resolution which would authorize such a feasibility study.
E. WACO STREET/TH 10 SIGNALIZATION
MnDOT has approved the Signal Justification Report for the signalization of this intersection.
We have prepared preliminary plans and have had them reviewed by MnDOT. At this point,
we are waiting for direction from the City Council on how and when to proceed with this
project. One issue is should any of the adjacent property be assessed for the signal and if so,
how much. The second issue is one of timing, when to proceed with the construction of the
signal. The City could initiate the construction of the signal or wait until a request comes
forward for the signal from the adjacent properties.
Ltr 12-05-01 Council.doc
Honorable Mayor and City Council
December 6, 2001
Page Three
F. TEA-21 PROJECT SOLICITATION
MnDOT is initiating the annual project solicitation for TEA-21 projects in fiscal year 2004. Staff
thought it may be appropriate to submit a project for intersection improvements at TH 10 and
Main Street. The City of Elk River previously had received an ISTEA grant for an improvement
project here back in the early 90s. However, the City Council at that time chose not to
proceed with the project due to the issue of land acquisition and business relocation. Since
the City is trying to acquire Boelters' property, it may be an appropriate time to pursue another
grant to make intersection improvements at this location.
G. MnDOTANNUALTOUR
The annual tour with MnDOT staff had been planned for the fall of 2001; however, due to the
state workers' strike, the tour was unable to be scheduled. I have recently heard from MnDOT
that they are interested in doing a winter tour and have suggested the dates of Monday,
January 28, or Wednesday, February 6, 2002. These tours normally involve a brief meeting
with MnDOT staff at City Hall followed by a tour of the City, showing them projects recently
completed or anticipated in future years, followed by a lunch at a local establishment. Tours
normally start around 9:30 a.m. and are complete by approximately 1:30 p.m. If the City
Council is interested in having such a tour, I would be happy to coordinate the event with the
MnDOT staff.
H. MAIN STREET/OLD CSAH 13 LEFT TURN LANE
As requested by the City Council sometime ago, we have prepared a drawing of how the left
turn lane at the intersection of Main Street and old CSAH 13 could be enlarged. We have also
prepared a cost estimate for this work. In addition, we have done some traffic counts on old
CSAH 13 to determine how many vehicles are simply using the route as a shortcut (between
Tyler Street and Main Street). I will be prepared to share all of this information with the City
Council on Monday evening.
If there is any other information you would like to have me prepare for Monday evening, please call.
Sincerely,
Howard R. Green Company
Terry J. Maurer, P.E.
TJM:tw
Ltr 12-05-01 Council.doc
RESOLUTION 01-
A RESOLUTION FOR THE CITY OF ELK RIVER
A RESOLUTION OF THE CITY OF ELK RIVER
ORDERING A PRELIMINARY FEASIBILITY REPORT IN THE
MATTER OF THE ZANE AVENUE STREET AND UTILITY
IMPROVEMENT OF 2001
WHEREAS
WHEREAS
the City has determined that it should consider improving certain property
by extending sanitary sewer and water, reconstructing and realigning
Zane Avenue, connecting the street to Mississippi Ridge, and closing the
northerly access of TH 10 (the improvement); and
Council must first secure a preliminary feasibility study in order to
consider making the improvement;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Bk River,
Minnesota:
This matter shall be referred to Howard R. Green Company who is requested to
provide to the City Council a report advising, in a preliminary way, whether the
proposed improvement is feasible and whether the improvement should thus be
made as proposed or in connection with some other improvement and the
estimated cost of the improvement as recommended.
Passed and adopted this lOth day of December, 2001.
ATTEST:
Stephanie A. Klinzing, Mayor
Sandra A. Peine, City Clerk
C:\windows\TEMP\RESOLUTION 12-05-01.doc
MEMORANDUM
TO:
FROM:
DATE:
Mayor and Council
Pat Klaers, City Adm r
December I 0, 2001 T
SUBJECT: Transportation Comprehensive Plan
Item 8.
In addition to the material from the city engineer regarding transportation issues, attached to
this memo is part of the city comprehensive transportation plan.
It should be noted that a number of our most significant city transportation issues are inter-
related with MnDOT (Highway 10 and 169) and Sherburne County (county road system).
Accordingly, the city cannot independently address many of our most pressing
transportation issues.
Additionally, it should be noted that a number of the transportation improvements identified
in this comprehensive transportation plan have been accomplished. On the other hand,
some of the improvements identified in the plan are no longer realistic and need to be
amended.
Finally, it should be noted that staff review of all development plats and proposals are made
with the city long-range transportation plan in mind.
II
!
Il
!l
Il
Il
II
II
CITY OF ELK RIVER
COMPREHENSIVE TRANSPORTATION PLAN
NOVEMBER 1995
ADOPTED BY CITY COUNCIL APRIL 27, 1998
!l
CTP-230.156 230-I 56-80
TABLE OF CONTENTS
I. INTRODUCTION .............................................................................................. 1
II. TRANSPORTATION PLANNING PROCESS ...................................................... 1
III.
III.
CTP-230.156
General Data Collection ............................................................................... 1
Socioeconomic Forecasts ............................................................................. 3
Travel Demand Modeling ............................................................................ 4
Trip Generation ................................................................................ 7
Trip Distribution .............................................................................. 9
Netwvork Assignments .................................................................... 10
ao
Replication ......................................................................... 17
Ultimate Forecast ............................................................... 17
D. Development of Transportation Plan ......................................................... 18
Functional Classification ............................................................... 18
System Deficiencies ....................................................................... 20
Remedial Actions ........................................................................... 24
ao
Improvements to Existing Roadways ................................ 24
Roadway Additions ............................................................ 27
PROPOSED TRANSPORTATION PLAN ........................................................... 30
IMPLEMENTATION ........................................................................................... .~4
230-156-80
ge
roadway network, with existing roadway capacities. As the figure shows, the
area where demand exceeds capacity is in the commercial and industrial core
of the City. T.H. 10 is deficient through the entire length of the downtown
district. Another significant problem area is Proctor Avenue north from T.H.
10, through the intersection with School Street and northwest along County
Road 1 to the Elk River Industrial Park, and School Street east from the
Proctor Avenue intersection to Jackson Avenue. T.H. 169 is deficient from
the T.H. 10 interchange north to Main Street, as in County, Road 13 from
Tyler Street to the T.H. 169/Main Street intersection. Upland Avenue is
deficient from T.H. 10 north to Meadowvale Road, and although it doesn't
appear on the map, Meadowvaie Road has the potential for congestion from
Upland Avenue west to 192nd Avenue. Other isolated problem areas are on
Jackson Avenue and School Street, both to the west from T.H. 169, and Main
Street west from T.H. 10 to downtown Elk River.
These areas identified as deficient are roadway segments where forecasted
travel demand exceeds existing roadway capacity in an all-or-nothing
ultimate assignment. They are not guaranteed to be the only problem areas
as the City grows, but they are the most likely areas for congestion to
develop.
Remedial Actions
In this section, each roadway segment that is deficient in the ultimate
development travel demand forecast is examined individually to identify
improvements within the right-of-way that will likely be necessary. This is
followed by descriptions of proposed additions to the roadway network and
their impact on the remainder of the network. As a general introductory note,
when the issue of congestion on a roadway comes up, the first place to look
is its intersections. Traffic will generally flow smoothly on any roadway
segment if there are not interruptions. The addition of access points, on-street
parking, lane drops, etc. can have serious adverse effects on traffic flow. But
intersections are the most critical features affecting traffic movement on a
roadway. Improving traffic control and channelization at intersections will
often do more to increase roadway capacity than any other measure. This is
particularly true when two congested roadways intersect.
a. Improvements to Existing Roadways
Trunk Highway 10
Ultimate travel demand forecasts suggest that T.H. 10 will become an
extremely high volume arterial, with ADT's well over 50,000 through
the central business district. Aside from increases in thru traffic,
there are two primary internal causes for the heavy volumes: the
filling in of areas zoned commercial in the CBD, and a large increase
in commercial/industrial trip generation in the southeast comer of the
City. T.H. 10 is currently accessed nearly every block between
Upland Avenue and Main Street. Many of these intersections will
-24-
CTP-230.156 230-156-80
need to be removed. A frontage road along the south side of the
highway is recommended, with highway access limited to Upland
Avenue, Proctor Avenue, Jackson Avenue and Main Street. Traffic
signals should be coordinated to provide the best possible arterial
level of service without doing too much harm to cross street
movements. T.H. 10 is likely to need a third thru lane in each
direction between Upland Avenue and the T.H. 169 interchange. The
T.H. 10/T.H. 169 interchange will most likely need to be
reconstructed as a free-flow interchange with diverging and merging
ramps for every movement. T.H. 10 will be one of the greatest
beneficiaries from some of the roadway additions proposed later in
this section.
Proctor Avenue
Proctor Avenue between T.H. 10 and School Street will ultimately
carry the highest traffic volumes of any minor arterial on the system.
School Street, Proctor Avenue itself and Coun~ Road 1 all dump
traffic into this stretch of road. The latter two will carry a
considerable amount of traffic generated by the fully developed
residential areas to the north. Proctor Avenue will need
channelization improvements, with left and right turn lanes at its
intersections with T.H. 10 and School Street. The traffic signal at
T.H. 10 will need to be revised to provide eight-phase operation. A
new traffic signal is proposed at the School Street h~tersection. It will
be coordinated with the T.H. 10 signal. Access points along Proctor
Avenue between T.H. 10 and County Road 1 should be consolidated
or eliminated wherever possible. Proctor Avenue stands to benefit
more than any other street by some of the roadway additions
proposed later in this section.
School Street
School Street will need turn lanes on its approach to the Proctor
Avenue intersection. Recently, it was improved to provide two thru
lanes in each direction from T.H. 169 to just west of Jackson Avenue.
In the future, it will most likely need two thru lanes in each direction
between Proctor Avenue and Jackson Avenue. The recent
improvements also signalized the intersection of Jackson Avenue and
School Street, eliminating a four-way stop condition. This street will
also benefit considerably from proposed roadway additions.
T.H. 169
T.H. 169 will not be quite as congested as T.H. 10, but it will still
carry heavy traffic volumes. Additional access points directly to the
highway should not be permitted. Some existing access points may
need to be closed. This should be examined on a case-by-case basis,
and will depend on where the displaced traffic will access the
CTP-230.156 -25- 230-156-80
CTP-230.156
highway and to what degree it will promote congestion at those
locations. The T.H. 169/Main Street intersection has potential for
considerable congestion levels, and further improvements will likely
be necessary. Recent 'improvements at School Street and Jackson
Avenue will alleviate problems at these intersections for the
foreseeable future. As suggested in the T.H. 10 discussion, the T.H.
10/T.H. 169 interchange will probably need upgrading.
CounW Road ! 3
County Road 13 is listed as deficient from Main Street to Tyler
Street. Since there are no commercial or industrial zones along this
road, and therefore its internally generated traffic is residentially
produced, traffic volumes are expected to dissipate consistently as the
road travels away from the CBD. A capacity deficiency is most
likely to occur near the intersection with Main Street. Channelization
improvements and a traffic signal, coordinated with the T.H.
169/Main Street signal, will. probably be needed here.
Upland Avenue and Meadowvale Road
Upland Avenue and Meadowvale Road will provide a legitimate
alternative access to T.H. 10 for traffic that would otherwise desire to
use a very crowded Proctor Avenue. The ultimate travel demand
forecast shows these roads also having plenty of their own traffic.
Capacity improvements that might be necessary include roadway
widening and channelization, particularly on the approach to T.H. 10,
and reduction of access points. Currently, the east-west portion of
Meadowvale Road has an intersection with a residential street every
block. This proliferation could be reduced with the introduction of
cul-de-sacs. Like Proctor Avenue, Upland Avenue and Meadowvale
Road would receive significant benefit from some of the proposed
roadway additions.
Main Street
Main Street is a very important road, connecting the core of the
downtown area with T.H. 10 and T.H. 169. The portion of Main
Street that lies west of T.H. 10 and traverses the central commercial
district definitely has a potential for congestion, even though the
ultimate travel demand forecast only identifies the small segment
between T.H. 10 and the fiver bridge as being deficient. This type of
area is very difficult to model accurately because streets in the
network come close together and the assignment cannot possibly take
into account all the factors that influence a driver's route selection
when several of equal attractiveness are available. It is reasonable to
assume that the segment between T.H. 10 and the river bridge could
become a significant problem area, with the forecasted traffic
volumes on T.H. 10 and the rapid growth of Otsego. The river bridge
-26- 230-t56-80
intersection is too close to the T.H. 10 intersection to install a
separate traffic signal. The best solution might be to introduce turn
prohibitions, particularly for the westbound to southbound left turn.
At some point, it might be necessary to replace existing on-street
diagonal parking with parallel parking and additional off-street
parking.
Roadway Additions
Additions to the roadway network had to satisfy several criteria:
1.
They could not damage the urban fabric. Elk River has many
well established neighborhoods and parklands, and a
commitment was made to find solutions to transportation
system inadequacies without showing roads cutting new
swaths through existing neighborhoods. However, existing
local street rights-of-way were considered eligible for
incorporation into the system of arterials or collectors, as
necessary.
o
They had to take traffic off those roadway segments that had
been identified as deficient in the ultimate travel demand
forecast. In areas where no deficiency was identified,
roadway additions were not shown unless they provided a
significant positive impact on deficient areas elsewhere in the
system. As development occurs in these areas, it will be
necessary to add collectors to the system. This is especially
tree of the northern part of the City, where arterials are spaced
further apart. However, it is beyond the scope of this study to
recommend locations for new residential collectors in areas
not yet developing. As development plans are submitted to
the City, the review process should include referring to a
functional classification characteristics chart such as Table 4
to ensure that collectors are added to the system at property
spacing, in such a way as to promote their intended use.
Roadway additions had to fit the overall functional
classification scheme. Arterial additions had to fill in holes
in the system, their addition being means to the end of an
integrated network of arterials.
Figure 6 is a map of the City of Elk River with proposed minor
arterial additions described herein highlighted. The letter attached to
roadway additions in the text correspond to the letters on Figure 6.
Roadway A
Roadway A is a north-south link along the west edge of Elk River
that provides the connection from T.H. 10 across the Elk River to
County Road 72 and subsequently County Road 32. This roadway
-27-
CTP-230.156 230-156-80
provides a second access across the Elk River for the west central
portion of the City. In conjunction with Roadway B, this roadway
provides an alternative route for traffic around the central core of the
City and will help to divert some traffic from T.H. 10, Proctor
Avenue, and T.H. 169.
Roadway B
Roadway B is an east-west connection from County Road 1 and 32
in the west to T.H. 169 at 205th Avenue in the east along with a
realignment of County Road 33 and 77. This road is a reflection of
the existing lack of east-west corridors in Elk River. In conjunction
with Roadway A provides for a bypass of the central cove of the City.
Roadway B provides an alternative access to T.H. I69 for traffic into
and out of the northwest area of Elk River and helps to divert some
traffic from the very high traffic areas on County Road 1, Proctor
Avenue, and School Street.
Roadway C
Roadway C consists of two segments that provide an additional link
in an east-west corridor north of the core city. This roadway connects
County Road 33 east of T.H. 169 with County Road 13 and County
Road 31 to provide a more direct connection to T.H. 169. This also
provides for a connection from County Road 22 in Anoka County,
which is the primary east-west route in northern Anoka County.
Roadway D
Roadway D is another east-west link that serves basically the same
function as Roadway C, to divert traffic away from the Main
Street/T.H. 169 intersection. It begins at the 193rd Avenue
intersection with T.H. 169 and proceeds east to County Road 13.
This road provides direct access from the east to areas along T.H. 169
that are zoned for commercial development.
Roadway E
Roadway E is a north-south connection from T.H. 10 east of T.H. 169
in the commercial/industrial area in the SE area of the City. It is an
extension of 171st Avenue across the railroad then parallels the
railroad to the NW before turning north to intersect County Road 12
and 13.
This roadway provides an alternative to traffic using the T.H. 10/169
interchange when traveling to or from the SE area of Elk River from
the north east and north central areas of the City. It will also help to
direct traffic away from the Main Streev'T.H. 169 intersection.
-29-
CTP-230.156 230-I 56-80
III.
Roadway F
Roadway F provides a continuous north-south corridor along the
eastern border of Elk River in order to pull some traffic away from
T.H. 10, T.H. 169 and the T.H. 169/Main Street intersection. It uses
the Jarvis Street right-of-way to the north from T.H. 10, then a new
roadway segment connecting Jarvis Street to Fillmore Street.
Fillmore Street right-of-way is used from that point north to County
Road 12. County Road 40 is shown relocated further west, aligned
with Fillmore Street, but intersecting County Road 13 in
approximately the same location that is presently does. This
realignment removes three 90 degree curves, making County Road 40
a more desirable route.
Figure 7 is a map of forecasted ultimate ADT volumes with all the
above mentioned roadway network additions in place.
PROPOSED TRANSPORTATION PLAN
The transportation plan proposed herein is based on travel demand forecasts with a horizon
of ultimate or saturation, development in the City of Elk River. This horizon is many years
in the future; how many depends upon a wide range of factors.
Assumptions were used through the process that led to development of the plan. Because
of the distant horizon and the assumptions made in virtually every step of the process, it is
imperative that the assumptions be reviewed periodically for their continued validity as the
City grows. When necessary, adjustments should be made to the plan recommendations.
It is important to recognize that the form and condition of a transportation system can drive
land development, but also that land development can cause changes in a transportation
system. Therefore, development proposals should be checked for consistency with the
transportation plan, and likewise the plan should be adjusted as necessary to remain
representative of land use conditions in the City.
The proposed ultimate functional classification system for the City of Elk River, minus
future residential collectors in areas still to develop, is shown in Figure 8. Included are the
proposed roadway additions described in the previous section. The main focus of this system
is to develop a City-wide minor arterial network that provides adequate area coverage and
enough traffic moving capacity to handle vehicular traffic in an ultimate development
scenario. As mentioned earlier in the report, roadway additions alone will not solve the
anticipated capacity problems. In the previous section, many roadway and intersection
improvements were identified. The recommended improvements all progress toward the
creation of a functional classification system whose roadway designs and traffic control are
consistent with the characteristics in Table 4 of this report.
Following is a summary of the most critical existing roadway segments and intersections,
and recommended improvements:
-30- 230-~sr-g0
CTP-230.156
Roadway Recommended Improvement
T.H. 10 from Upland Avenue
to T.H. 169
Remove intersections
- Frontage road on south side
- Coordinate traffic signals
- Additional thru lane each direction
- Upgrade T.H. 10/T.H. 169 interchange
- Roadway additions, especially bypass to
T.H. 169
Proctor Avenue from County Road 1 -
to T.H. 10
Channelization improvements
- New and revised traffic signals,
coordinated
- Consolidate or eliminate access points
- Roadway additions, especially westerly
extension of Highland Avenue and T.H.
10/T.H. 169 bypass
School Street from Proctor Avenue
to Jackson Avenue
T.H. 169 from T.H. 10 to Main Street
- Add thru lanes, turn lanes
- New traffic signals at Proctor
- Roadway additions which remove traffic
from this route
- Limit access points; reduce access points
along the length of T.H. 169 through the
City
- Channelization improvements at
intersections
- Upgrade T.H. 169/T.H. 10 interchange
- Roadway additions, especially T.H. 169/
T.H. 10 bypass and segments D, E, and F
in Figure 6
County Road 13 from Main Street
to Tyler Street
- Channelization improvements
Possibly new coordinated traffic signal
- Roadway additions, especially segments D
and E in Figure 6
Upland Avenue, Meadowvale Road
Roadway widening
Channelization improvements
Reduce access points
Roadway additions, especially bridge
across the Elk River at Waco Street
Main Street
Turn prohibitions
Replace on-street diagonal parking
Recommended roadway additions are as shown in Figure 6 and are described in the previous
section of this report.
-33-
CTP-230.156 230-t56-80
IV.
Design Standards
Street improvement design standards were adopted by the Elk River City Council on
March 6, 1989. These standards should remain valid, with correlations to the functional
classification system proposed in this report as follows:
Major arterials and a majority of minor arterials fall under the category of Federal, State, and
County Highways in the Street Improvements section of City of Elk River Design Standards.
It is unlikely that many of the county, roads that currently have a rural section will eventually
be redesigned with an urban section. In its review process, the City should make certain that
redesign is consistent with its transportation plan. Collectors in the transportation plan fall
under one of three categories: Municipal State Aid (MSA) Streets, Collector Streets, or
Commercial/Industrial Streets. Which category a particular street belongs in depends on its
designation for funding purposes (i.e. Municipal State Aid) and the zoning of the land
adjacent to its right-of-way. Local streets in the transportation plan are categorized as
Residential Sh-eets in the City of Elk River Design Standards.
In its designs the City should be conscious of transit and other modes of transportation. As
the City grows, transit in some form will become more appealing. Potential transit, track and
school bus routes should be considered when designing curb radii at intersections and other
channelization features. When acquiring right-of-way, the City should examine its policy
regarding sidewalks and bike paths, and provide adequate room for these facilities.
IMPLEMENTATION
The City of Elk River, by commissioning this transportation plan, has made a commitment
to the establishment and maintenance of a working transportation system well into the future.
In doing so, it promotes an environment for organized growth. In many ways, putting this
plan into effect is not a unilateral process, but rather a cooperative effort with other
jurisdictions, particularly Sherbume County and MnDOT. This section outlines a
recommended series of steps to implement the transportation plan.
Review and adopt the transportation plan. Adoption will establish guidelines for
improving existing transportation facilities and adding new ones. It will provide City
staff with an official reference to be used in review of development plans, to ensure
that they are consistent with long-range City planning. Contingency should be made
for changes to the plan resulting from a periodic review of assumptions, including
estimates of future development locations and densities, modal split, external growth
factors, trip generation rates, etc.
Protect right-of-way. From the transportation plan, the City should identify those
areas where right-of-way will need to be acquired. These corridors should be
protected until acquisition takes place.
Initiate jurisdictional realignment process. The City should review jurisdictional
responsibility of roads on the existing street network and identify those roads where
responsibility should change hands. Very generally, we recommend that the State
assume responsibility for major arterials, the County for minor arterials, and the City
-34- 230-156-80
CTP-230.156
for collectors and local roms. Not all roads currently operate with the characteristics
attributed to their functional classifications shown in Figure 8. For this reason,
jurisdictional realignment should happen over time, as the functional balance of
certain roads shifts between access and mobility.
Create a transportation improvement program. Begin by evaluating the existing
system and determining structural and/or capacity deficiencies. Set up a five-year
improvements program, to be updated each year, with an annual budget of City
money and prioritization of improvements within budget constraints. Review
funding sources for roadways with different jurisdictional responsibilities.
Coordinate with the County and the State well in advance of anticipated
improvements on their roads. When improvements are made, they should generally
be consistent with the transportation plan. However, one must remember that the
forecasting horizon that led to the recommendations in the transportation plan is a
distant one, that of ultimate development within City borders. The lives of some
improvement projects that are undertaken in future years will be shorter than the
forecasting horizon. Therefore, an effort must be made to estimate conditions within
the anticipated lifetime of each project, and to let those conditions drive the design.
Traffic conditions on existing roadways should be monitored to help schedule
roadway additions proposed in the transportation plan.
In summary, a transportation plan is the important beginning step in the dynamic planning
process. This plan is intended to serve as a guideline for furore decisions on transportation
related issues, but must be reviewed periodically to ensure that it continues to give proper
direction based on developments within and outside the City of Elk River.
-35- 230-~s6-a0
CTP-230.156