10.2. SR 02-02-2015 City of Elk Request for Action River To Item Number Mayor and City Council 10.2 Agenda Section Meeting Date Prepared by Work Session February 2, 2015 RaeAnn Gardner, Communications Coordinator Item Description Reviewed by Wayfinding Program Tina Allard, City Clerk Reviewed by Cal Portner, City Administrator Action Requested • Review revised wayfinding designs • Provide staff direction with the Wayfinding Program Background/Discussion At the November 17, 2014,Work Session, Council and members of the Wayfinding Fact Finding Group provided feedback to Visual Communications on the design options for the Wayfinding Program. Visual Communications has since taken those comments and created two new drawings for consideration for the starting design for the whole Wayfmding Program. Option 1A and 113 show the difference between the two stones and also keeps the city logo off of the sign, but uses subtle touches of the logo within the design. Options 2A and 213 also show the gateway signage using the two different stones,and incorporate parts of the city logo. The Wayfinding Program will help tie a consistent theme to all the signage throughout the city. The program is a long-term guide. It will not be bid on all at once. Visual will put together specifications so that projects will be bid out as they're needed and budgeted. Financial Impact Current wayfinding maintenance is already included in annual budgets of various departments. Other wayfinding projects have been budgeted in the Capital Improvement Plan by various departments based on Council's vision goals, and adopted development plans. Attachments • Signage Design Options • Staff Report City Council Meeting 11-17-14 • City Council Minutes 11-17-14 P a w E A E U s r Template Updated 4/14 INIM UREI p � o 00 � SXU' ®1'U F�TI O h a Q) t r J O } a O C7 c -f , 4 I i 4 t I c 0 .. 0 r : ' �Lh INI, IP�u q .o • ai 4)w++P ail _ I �M �s /i Elk Request for Action Fiver To Item Number Mayor and City Council 9.1 Agenda Section Meeting Date Prepared by Worksession November 17, 2014 Tina Allard, City Clerk RaeAnn Gardner, Communications Coordinator Item Description Reviewed by Wayfinding Program Cal Portner, City Administrator Reviewed by Action Requested 1. Direction on design concept. 2. Review the project schedule. 3. Provide staff direction with the Wayfinding Program. Background/Discussion At the October 6, 2014, meeting, Council stated they would like a worksession to discuss the design of signage for the Wayfinding Plan. Council is asked to reference attached staff report dated January 21, 2014,which explains why staff has requested this program. Many of our long-term development plans call for the need of connections and wayfinding. All city signage should be tied to a theme established through a Wayfinding Program. The Wayfinding Program will help tie all development plans together so they are not being completed as silos. Currently, staff in various departments complete signage projects on their own with no consistency and sometimes done incorrectly because they are not technical experts in this field. Having this plan would create a consistent signage family that fits with the city's branding,beautification and fit proper standards for design readability. The Wayfinding Program is a long-term guiding document.Visual will put together a full spec plan and projects will be bid out as they're needed and budgeted. The current value of our city street/park signage system is approximately$1.2 million. Financial Impact Wayfinding maintenance is already included in annual budgets of various departments. Other wayfinding projects have been budgeted in the Capital Improvement Plan by departments based on Council's vision, goals, and adopted development plans. Attachments • January 21, 2014 Staff Report • Project Schedule PV0WIAI1 6Y Template Updated 4/14 IN"Af UR cii of Request for Action Rive To item Number Mayor and City Council 8.3 Agenda Section fleeting Date Prepared by General Business anua F 21, 2014 RaeAnn Gardner, Communications Coordinator item Description Reviewed by Wayfmding Signage Program Tina Allard, City Clerk Reviewed by Cal Portner, City Administrator Action Requested Approve, by motion, the.hiring of Visual Communications to create a wayfinding signage program for the city. Background/Discussion On January 6, 2014, the Council heard a presentation from Visual Communications regarding wayfinding signage. Staff recommends a global,long-term,Wayfinding Master Plan Program for the following reasons: • The Master Plan would provide an inventory of current signage to determine areas that need to be improved and/or where signage needs to be de-cluttered (such as the downtown parking lot). • A plan is consistent with the Council's Beautification Goal in the adopted 2014 Visioning Plan. A task under the Beautification Goal is to Pimide Consistent and Expanded Signage. • It would meet the Council and FDA's goals in the Powered by Nature Branding Program. A wayfinding program would create a similar, more cohesive look and feel throughout the community and strongly emphasize Elk River's unique identity.This would highlight and make it easier for visitors to locate our parks and our downtown;provide for more connectivity to our amenities. Examples would be signage along the major highways to direct people to such amenities as the Youth Athletic Complex, Hillside Park, the downtown, etc. • From the currently Council adopted Comprehensive Plan regarding Community Image, Public signage is an important element of image. Directional and inforrraational signage can rest community image and beritage. These public improvements should be part of broaderplans for corridor enhancements If conidoas attempt to dram people into Elk Kh er, signage must suppod this objective. Signage srsg ests that there are points of interest not hramediately risibleurn the edge orgateavay. Eectire signage hers visitors navigate around the community. • Assist in meeting the objectives of the Council adopted Mississippi Connections Redevelopment Framework Plan. A strategy outlined for the Core Downtown is to,Develop and implement a ra a finding signage playa, as an added connection between the core donVoini aiva and other neighlaorhoods in the study area. Transition existing regulatory and infonvatim signage to the theme established by the signage plan. Short-term priority Projects (0-2 years) outlined in the Framework Plan are: o Implement a Downtown District signage plan,including parking and directional signage pew [ flEU et arIJAYURE] o Establish historical point of view context signage. Mid-term projects (3-5 years): o Create interpretive signs highlighting historic occurrences along the Mississippi River trail after hail is installed. ■ City staff doesn't have the technical resources to create a wayfinding program. Signs in the past have been created on an as needed basis with no uniform look.This can sometimes result in the need to go back and fix signage,which can cost more in the long run. With a Wayfinding Master Plan Program, signs requested by departments would be required to meet certain standards before being created and placed. Once a program is in place the city would have the means to create some of the smaller signs with the new printer/cutter that the Street Division purchased in 2013. The city could also move forward with the signs for the downtown area and Bailey Point Nature Preserve. Visual Communications would team up with HKGi who will do the research on funding sources that might be available for the fabrication and placement of future signs. Financial Impact The Council has designated $65,000 from the Development Fund,which is outlined in the Capital Improvement Plan. Attachments ■ Capital Improvement Plan Worksheet NAPu61ic Bodies\clgendg Packets\01-21-14\Fina1\x$.3 sr Wsyfinding Hiring.docx Wayfinding Plan Schedule Completed May 13 Wayfinding Committee Meeting • Determine wayfinding concerns and common areas • Collection of city marketing and development plans May 14 Visual Communication City Tour ■ Tour of city to understand wayfinding challenges, parks, history, culture June 3 Visual met with Council Appointed Fact-finding Committee ■ Receive information on areas of concern and design elements. SWAT Analysis June Visual Creates Design Concepts June Visual Presents Preliminary Design Options June-October Visual's own analysis projects • photographic inventory • definable destinations • traffic decision points • sight lines June July Various Concepts Rendered/Combined August Presented Final Options 1 &2 August 25 Presented Sign Options on Facebook for Public Comment August 28 Public Open House for Options 1 &2 ■ Fact-finding&Wayfinding Committees invited to attend October 6 Present Options to Council ■ Staff directed to provide costs of two options October 20 Ballpark cost estimates presented to Council ■ Council asked for design review/discussion at worksession Projected Schedule November 17 Council worksession discussion on design concepts ■ Council to provide input on a design concept they'd like to see December Council to select design concept. December Visual to create new or revised options based on Council intent January Visual to mock up full design schematics ■ Detailed schematics review with Visual&Wayfinding Committee. Schematics will consist o£ ❑ Sign types (sizes, shapes, colors, materials,poles, and hardware) • Size of letters, fonts,heights, spacing, and style • Menu of signs and specifications laid out in a draft plan. • Develop installation locations by sign size and type. Map out via GIS. ❑ Develop terminology and design icons for primary and secondary destinations (landmarks,public facilities, retail, and dining destinations) ❑ Material performance specifications February Proposed plan schematics presented to Council ■ Council to recommend changes for incorporation into plan March Proposed plan schematics presented to Council ■ Council adoption of Wayfinding Plan April Once the city is ready to begin fabricating and installing certain components of the system,Visual will assist with vendor selection and monitoring of the production process May Staff to begin process for proposed 2015 budgeted projects Wayfinding Plan Schedule 1) Economic Development—Downtown Signage (As directed in the Mississippi Connections Plan document) 2) Economic Development—Downtown Parking 3) One Gateway welcome sign a. Pull together partnership opportunities b. Complete any paperwork permitting process c. Costs/location/final design presented to Council 4 Parks and Recreation Capital Improvement Plan Items Ongoing Routine maintenance of signage as budgeted by departments 2016 Projects may be budgeted based on Council Vision Plan City Council Minutes Page. 8 November 17,2014 ---------------------------- Moved by Councihnember Wcstgaard and seconded by Councilmember Motin to approve an increase in engineering fees as outlined in the staff report. Motion carried 5-0. Moved by Councilrnember Wilson and seconded by Councilmember Westgaard to adopt the following resolutions: 1. Resolution 14-71 establishing parking restrictions on particular municipal state aid routes. 2. Resolution 14-72 requesting a variance from standard for state aid operation for Project No. S.A.P. 204-135-001. 3. Resolution 14-73 for implementation of Municipal State Aid Streets Fund advance. Motion carried 5-0. Council recessed at 7:17 pm. Council reconvened at 7:23 p.m. 9.1 Wayfnding Program Mr. Portner stated consultants from Visual Communications and the Fact-finding Committee are present tonight to provide their input regarding wayfinding signage. He reviewed existing signage and some future signage projects that various departments are working toward completing. Jesse Yungner and Constance Carlson discussed how they worked with the fact- finding and wayfinding committee. They reviewed wayfinding signage design options, outlining how and why certain design elements were selected. Mr. Portner stated the consultant listened to both the fact-finding and wayfinding committee to identify expectations and community destinations. They then toured the city and formed some of their thoughts and perspectives of Elk River. They created their initial designs considering the items the committee expressed as important and included some of the community's history and highlights improve wayfinding. They utilized local input and matched it with an outsiders perspective. Mr. Richard Lang explained the sign hierarchy. He stated the sign plan will be a blueprint for the city and outlines in detail how each sign will look,including such things as font style and size, sign type and materials. He stated his staff will need to do some field testing to determine how a sign will work and meet with construction experts to determine the best value at which a particular sign can be built. He stated they value engineer signage and try out different parts and features to see what will provide the best value and still work for its location. Mr. Lang noted the city welcome sign in Orono Park would cost approximately$50,000-60,000 to build today. Mr. Lang revealed a preliminary map with a key messages mock-up to show the Council the type of data that would be provided in a wayfinding plan. pawinia By NATURE City Council Minutes Page 9 November 17,2014 ----------------------------- Mayor Dietz stated several of the signs shown have stonework in them but this type of stone is not native to Elk River. He stated the city has a lot of gravel pits and maybe something more native should be used, such as rock. Councilmember Westgaard noted that the downtown Rivers Edge Park has the limestone look throughout. Mayor Dietz stated it would be valuable for the consultant to look at the city's sign equipment in order to see how much can be done in-house. He stated he likes Option A. He stated he wants to keep a simple approach and not add more design elements to signage than needed. Councilmember Wilson concurred. He expressed concern about the investment the city has in its logo and that it should be carried through in wayfinding signage. He stated he wants the logo more obvious rather than subtle. He understands why the limestone look was chosen but doesn't feel it is representative of the city. He stated Elk River rock or boulders would be more representational. He stated he preferred Option A. He stated the vertical gateway signage had more appeal to him. Councilmember Motin stated he has no issues with the limestone type rock in the designs as they go well with the downtown. He stated he doesn't necessarily feel every sign needs to be consistent and have the same look to them and suggested that park signs have one look and another sign type have another look. He expressed concerns with the original signage not having costs attached with them when presented to Council at a previous meeting. He questioned how issues can be remedied based on uniformity of signage, such as the rules signage in some parks. He stated he likes the use of the city logo and would like to see it done in a way that if the city changes its logo, the city logo portion of the sign can be changed out. Councilmember Westgaard concurred. He stated he likes the limestone look and feels it makes the signs look rich and nice. He stated a goal wasn't set out at the beginning that the committee had to use only materials found in Elk River. He stated the city has already made a conscious effort in the downtown park and questioned why the city would depart from using that same concept, otherwise it may look more disjointed. He stated he likes a vertical sign over horizontal signage. He stated he doesn't think the city*needs to have the logo on gateway signage because its purpose is primarily to say welcome to Elk River visitors. He suggested using the watermark at time or the cutouts (not an all or nothing situation use,but to watermark at times without necessarily the elk logo). He stated he likes the international pictograms and they're easily identifiable as to what is located in the park. He stated the city needs to clean up and organize its signage and make a conscious effort to make them all the same as they need replacing. He stated he likes the traditional and contemporary option. He stated he likes the concept of the option (Option B)with the elk antlers but without the antlers that hang off the signage (the watermark). ATUR City Council Minutes Page 10 November 17,2014 Councilmember Burandt stated they all had some features about them that are nice and would represent Elk River well. She stated the city needs to look at the costs and which sign option would be most conducive to that. She stated she likes the idea of placing signage over time and being consistent with the signage look. She stated she wouldn't be opposed to any of the options. Councilmember Motin expressed concern with readability and commented on the Northstar signage. Mayor Dietz asked for comments from the fact-finding committee.. Jennifer Wagner, stated she would be hesitant to put the city logo on the signage in case the logo were to change in future years and suggested the sign be designed so it can be removed easily. She questioned if anyone can remember what any other city's logo looks like. She stated the logo is not what identifies the city and isn't going to dictate whether outsiders like the sign or not. She stated she loves the watermark and the waves with the die cutting and think they are important design elements. She stated she likes using the copy of the Powered by Nature brand, but not the logo as it will become outdated and people will wonder why it was used. She also noted how important readability is for signage and referred to the Northstar signage. She stated the limestone is in the downtown park,which is a true gem of the entire city. Mr. Lang stated there is use of different types of stone throughout the community and the limestone reflects who the newer suburbs are. Councilmember Wilson disagreed and stated Elk River is not a new suburb. He stated this is describing us like we want to become a Maple Grove and it's not who we are,but, he stated,maybe it's because he has lived here all his life. He stated this city has taken a lot of the essence of what's important in this community and replaced it with what's popular today and has no meaning to it. He referenced the river rock at Handke Pit and how nice it was for a backdrop for the Hockey Day Minnesota event. Ms. Wagner stated she understands the need to maintain history but she also understands the city needs to look into the future and think of the solidarity of color. She noted it is so much easier to look for the same color signs in a community when you are trying to locate different areas. Councilmember Wilson stated he agrees consistency is needed. Debbie Rydberg, Fact-finding Committee—Stated she would like to see the signage remain more natural/neutral, since the community is powered by nature. She stated the reds,blues, and oranges, or a defusing color are not needed because everyone has their own opinion as to what a color stands for and the community is diverse. She stated she saw a lot of plants being used and expressed concerns about upkeep and maintenance in all seasons. She stated she likes the use of natural elements, such as metals. INATUREI City Council Minutes Page 11 November 17,2014 Charlie $lesener, Fact-finding Committee— Stated he likes the idea of having a plan, similar to the St. Paul example shown, and it makes sense for the cite to adopt a long-term plan. He stated he liked the vertical look the best. He stated all capital letters shouldn't be used because it's more difficult to read. He liked Option 1 the best and didn't care for the red lettering in another option. He stated he liked the subtle elements such as the antler watermark in the background. Dave Anderson, Fact-finding Committee—Stated he liked Option 1 the best but he is not sure he likes it better than the current sign near Orono Park. He noted the sign does need to be upgraded to the current city elk logo. He stated he prefers the elk logo on the gateway signage. He stated he prefers natural stone over limestone but noted it's hard to build things out of round rocks. He stated there are some parr signs the need to be upgraded. He questioned if the city is behind the times and should consider creating an Elk River navigation app for mobile technology. He stated he would like to see the signage be low maintenance with the landscaping. Cal questioned how much more public input the Council would like for this project and asked if they wanted it sent to the boards and commissions or want to see updated designs based on comments received this evening. He noted money is in a number of departmental budgets for signage. He stated we are Elk River but there are a lot of people who come from other communities to spend time and money at our businesses and the city wants to maximize their experience in the community. Councilmember Morin stated it would be difficult to send to the commissions because there will be many varied ideas on signage design. He stated there are many different representatives and viewpoints here tonight and it will be difficult creating signs based on the differences in comments expressed. Mayor Dietz suggested the consultant come up with one option that centers on the current city logo and one without it. There was discussion about using Option A and changing it out with the elk logo and the field stone versus the limestone.Various Council and committee members were split on the use of Option A and Option 1. Councilmember Motin further expressed concern about using the Powered by Nature logo because it hasn't taken off in the community. He expressed concern with it being drilled into the stone and trying to replace it later. Mr. Lang stated the drill holes in the stone would be an easy fix with different techniques. Mr. Anderson asked if the existing sign in Orono Park could be utilized as gateway throughout the city. P II M C E A E 1 8 Y INATUREI City Council Minutes Page 12 November 17,2014 Mr. Portner asked the consultant about using the existing elements of the Orono Park sign and creating a wayfinding plan from it. Mr. Lang stated the Orono Park sign as a gateway sign is very strong and he isn't sure how it would transfer through the whole signage system. He stated he isn't sure there are characteristics that are unique enough to create a sign system around it and suggested adapting it to fit for Orono Park. Council consensus was to take Option 1 and incorporate some items discussed tonight, such as changing out the logo and trying different elements of the limestone and fieldstone. 902 Stares waterr Uti� ty Fee Program Mr. Femrite presented the staff report. He reviewed communications efforts to engage the public about how to fund the stormwater program. He discussed survey questions regarding whether the community wanted a fee based program or for funding to be taken from property taxes. He noted that more people chose the fee based program. Mr. Femrite discussed the feasibility report. He stated the report recommends $3 per month on residential parcels and a residential equivalency rate for all the commercial and industrial properties based on their impervious surfaces. The report didn't discuss how the city should distinguish between a rural or urban residential property. Mr. Femrite stated staff is working on a draft ordinance. He reviewed a proposed fee structure. He suggested a tiered rate for residential properties, such as $3 for urban service residents, $2 per month for rural residential and other properties (non-single family residential) would contribute $21 per acre of impervious surface per month. He stated at these rates, the city would generate about$415,000 annually for the stormwater program. Mr. Simon stated a new enterprise fund would be created for the stormwater program. He noted many cities have it classified as an enterprise fund since user charges are typically the funding source.With creation of a storm sewer enterprise fund,like all other similar funds, depreciation of assets is included in the budget. A resolution to close out the current surface water management fund and transfer any remaining assets to the new enterprise fund will be done as part of the program approval. Mr. Femrite stated the impact fees charged to developers are being kept in the fee schedule in order to keep the fee low for residents and businesses. Mr. Femrite compared some other cities and asked the Council to focus not on the amount of the other community's stormwater fee, but rather the trend of their fees increasing. He stated the general trend,in other cities,is the fee has been increasing to meet the needs of the new regulations for their reissued permits. He stated this is P d E R E ! 6 T INATUREI