Loading...
PRSR MEMO 04-12-1995 ( � I MEMORANDUM City of fElkt Riever TO: Park and Recreation Commission FROM: Phil Hals, Street/Park Superintendent DATE: April 12, 1995 SUBJECT: Agenda Memo for the April 12, 1995,Meeting 6. Windsor Development-Lafayette Woods Plat This is the plat of the Brady property that has been presented to the Park and Recreation Commission twice before by Ron Bastier. A copy of the preliminary plat map and drainage and grading plan are included in the agenda packet. A full- sized preliminary plat will be available at the regular meeting for the Commission's consideration. Park dedication will be met with property as per a previous agreement with Mr. Bastier. The preliminary plat will go to the Planning Commission on April 25, 1995, for their review. • 7. Lindquist/Mastley Developers- Weatherwood Plat This plat is approximately 60 acres that will be subdivided into 21 single family lots. Since this area is zoned for 21/2 acre lots and not shown to contain a neighborhood park on the park plan, staff recommends that cash park dedication fees be accepted. This preliminary plat will also go before the Planning Commission on April 25, 1995. A copy of the plat is included in the packet. 8. Grant Application for Property Purchase Under Minnesota DNR Natural and Scenic Grant Program As Commissioners will recall, the Grant application by Mike Niziolek was discussed at the meeting on 3/21/95. Mr. Niziolek is requesting City support for a state grant to purchase 25 acres of wooded property north of Ridgewood Estates and east of Woodland Trails Park. It is my understanding that this grant is a 50/50 match so that if this grant were to be successful, one consideration will be the funding source for the City's portion of the matching funds. Please come prepared td discuss this and other issues that might affect this possible purchase. • 13065 Orono Parkway • P.O. Box 490 • Elk River, MN 55330 • (612) 441-7420 • Fax: (612) 441-7425 • 9. Consider Park Capital Improvements For 1995 Attached is a list of Park improvements for 1995. The first list identifies nine projects that were recommended for funding last year, but were not completed. Those nine will be scheduled for 1995 plus approximately $27,00.00 worth of items from the second list. The items are listed by park, but there is no priority intended in the way the projects or parks are recorded. 1994 List Orono Park • Finish Walkways and handicap access to playground equipment 1,000.00 • Extend Orono Trail form Orono Park to Orono Parkway on the east side of the softball complex. 2,700.00 • Purchase two barbecue grills 500.00 Ridgewood East Park • Install four street lights 3,200.00 Deerfield IV Park • Landscape pond area 1,000.00 • Lion's Park • Dozer rental to improve drainage 2,000.00 Moldenhauer Park • Full basketball court 4,000.00 • street light 800.00 EDA Site Downtown • Install irrigation 2,500.00 1995 List Orono Park • Install handicap accessible impact absorbing material 9,000.00 • Construct picnic shelters between beach and fishing pier 17,500.00 • Grade shore line by boat dock-equipment rental 1,200.00 • Install four street lights 3,200.00 • ADA recommended pathways 5,000.00 • ADA improvements (boat dock, picnic tables, and beach access) 3,000.00 • Ridgewood East Park • • Install handicap accessible impact absorbing material 4,000.00 Deerfield IV Park • Install handicap accessible impact absorbing material 5,000.00 Barrington Park • Do ADA upgrade to park equipment 3,800.00 • Install handicap accessible impact absorbing material 3,000.00 Baldwin Park • Do ADA upgrade to park equipment 2,200.00 • Install handicap accessible impact absorbing material 3,600.00 Oak Knoll Park • Granite Class 2 for walking trail 3,000.00 • Additional fencing for baseball fields 5,500.00 Trail Installations • Heritage Landing 3,000.00 • Schoolview Addition 1,000.00 • 10. Park Reservation Update Enclosed in this agenda packet is a letter to me from Kristy Mansfield, City Hall Receptionist,that deals with park reservations. She brings up some valid concerns. One other issue that should be considered is possibly having a City employee on duty on Saturdays and Sundays for park related items. Please come prepared with your thoughts and concerns for discussion of this item. 11. MnDOT Planting Partnership Update The MnDOT Planting Partnership is moving forward and the target date of May 6, 1995, has been set for the actual planting. There is much preparation, and that is also moving forward. We plan to use six planting teams of ten members each and, at this time, we have two teams signed and two tentative. I will have a verbal update on this item at the meeting. 12. Soccer Field/Baseball Field Update The need for additional play fields is a growing issue. One temporary solution is to offer two to five fields near City Hall. Staff continues the search for property and will have a verbal update for the Commission at the April 12 meeting. No s other area community seems willing to offer to build and maintain fields in their jurisdiction. Your input would be most welcome. • 13. Consider Uses for EDA Site/Jackson Square The issue of uses for the EDA site has come up and I would like to set forth some type of guidelines before the Riverfront Corridor Committee completes their project: 1. What type of activities should be permitted? 2. Who should schedule activities? 3. Are deposits required? 4. What other concerns do you have? Enclosed in this agenda packet is a memo from Bill Rubin regarding Jackson Square and, in particular,the issue of the"Community Theater" sign. This sign has become an eyesore and since Jackson Square is technically a park, it would be appropriate for the Park and Recreation Commission to comment on Mr. Rubin's suggestions and to add you own suggestions as well. 14. Woodland Trails Park Update I will have maps to hand out at the meeting with the latest proposed trail • improvements and a verbal update of the 1995 construction schedule. •