8.0. PRSR 03-03-1993 ITEM 8.
ftof TO: PARK AND RECREATION COMMISSION
lkRiver FROM: PHILIP HALS, STREET/PARK SUPT.
DATE: FEBRUARY 25, 1993
SUBJECT: PARK IMPROVEMENTS
The following is a list of park improvements suggest by the
Park Department staff. The items are listed by park with no
particular priority attached. As in the past, the funds
available will be between $20,000 and $25,000 .
It would be well to have a recommendation on these items for
the City Council/Park and Recreation Commission joint meeting
scheduled for March 8, 1993 .
ORONO PARK
Finish handicap access to playground equipment $ 1,200
Hiking Trail from Orono Parkway to Orono Beach
Parking Lot-2,700 feet of Bituminous Surface 12,000
Playground and shelter trails-Bituminous Surface 880
25 Picnic tables 1,600
• Concrete Pads for Picnic Tables- 12 ea. @ $75/ea. 900
Move Fishing pier and build handicap ramp 2,000
Add 2 barbecue grills 500
Shelter 1 improvements 1,000
DEERFIELD IV PARK
Finish handicap access to playground equipment 600
Asphalt trails for handicap accessibility 500
Connecting trail from Carson Street to Dodge Street 1,500
Landscaping and fencing on giant slide 800
RIDGEWOOD EAST PARK
Handicap access changes for playground equipment 1,600
Stand-alone swing set 1,000
Barbecue grill 200
LION' S PARK
Asphalt surface hiking trail 500 ' X 10 ' (Test Plot) 2,000
Dozer Rental-Build Athletic Field 1,500
BALDWIN PARK
• Handicap access changes for playground equipment 2,000
720 Dodge Avenue N.W., Elk River, Minnesota 55330 (612) 441-7420
Park Improvements Page 2
February 25, 1993
!
BARRINGTON PARK
Handicap access changes for playground equipment 2,000
Bituminous Parking Lot 20 ' X 70 ' 800
DOWNTOWN PARK
Landscape after construction 500
Install irrigation system 800
OLD CITY HALL SITE
Landscape with retaining blocks, trees and shrubs 7,500
Plant spruce and wild flowers on Hillside 3,000
!
S