8.0. PRSR 04-07-1993 _■/ _\( ITEM 8.
City°f TO: PARK AND RECREATION COMMISSION
ilkRiver FROM: PHILIP HALS, STREET/PARK SUPT.
DATE: FEBRUARY 25, 1993
SUBJECT: PARK IMPROVEMENTS
The following is a list of park improvements suggest by the
Park Department staff. The items are listed by park with no
particular priority attached. As in the past, the funds
available will be between $20,000 and $25, 000 .
It would be well to have a recommendation on these items for
the City Council/Park and Recreation Commission joint meeting
scheduled for March 8, 1993.
ORONO PARK
Finish handicap access to playground equipment $ 1,200
Hiking Trail from Orono Parkway to Orono Beach
Parking Lot-2,700 feet of Bituminous Surface 12,000
Playground and shelter trails-Bituminous Surface 880
25 Picnic tables 1,600
Concrete Pads for Picnic Tables- 12 ea. @ $75/ea. 900 ***
• Move Fishing pier and build handicap ramp 2,000
Add 2 barbecue grills 500
Shelter 1 improvements 1,000 ***
DEERFIELD IV PARK
Finish handicap access to playground equipment 600
Asphalt trails for handicap accessibility 500
Connecting trail from Carson Street to Dodge Street 1,500 '**
Landscaping and fencing on giant slide 800
RIDGEWOOD EAST PARK
Handicap access changes for playground equipment 1,600
Stand-alone swing set 1,000
Barbecue grill 200
LION' S PARK
Asphalt surface hiking trail 500 ' X 10 ' (Test Plot) 2,000(REDUCD TO
Dozer Rental-Build Athletic Field 1,500 *** , 000)
BALDWIN PARK
Handicap access changes for playground equipment 2,000
•
720 Dodge Avenue N.W., Elk River, Minnesota 55330 (512) 441-7420
Park Improvements Page 2
February 25, 1993
BARRINGTON PARK
Handicap access changes for playground equipment 2,000
Bituminous Parking Lot 20 ' X 70 ' 800 ***
DOWNTOWN PARK
Landscape after construction 500 `' **
Install irrigation system 800 ***
OLD CITY HALL SITE
Landscape with retaining blocks, trees and shrubs 7,500 ***
Plant spruce and wild flowers on Hillside 3,000***
•
•