Loading...
4.4. SR 03-16-2015Request for Action To Item Number Mayor and City Council 4.4 Agenda Section Meeting Date Prepared by Consent March 16, 2015 Justin Femrite, P.E., City Engineer Item Description Reviewed by Resolution: Plans and Specifications for 2015 Street Cal Portner, City Administrator Reviewed by Improvement Project Action Requested Adopt, by motion, a resolution approving the plans and specifications and authorizing the advertisement for bids in the matter of the 2015 Street Improvement project Background /Discussion Final plans, consistent with the recommendation of the Feasibility Report, have been prepared for the 2015 Street Improvement Project. The plans are currently being reviewed by the MnDOT office for compliance with all applicable state aid rules. The full set of plans is available for viewing at City Hall. The schedule for the project is as follows: • Feasibility Report approved by City Council November, 17, 2014 • Approve Plans /Authorize Bids March 16, 2015 • Open Bids April 14, 2015 • Award Contract April 20, 2015 • Construction May — October 2015 Financial Impact The estimated construction cost of $4,746,000 is still consistent with the estimates provided in the preliminary engineering report. A final project cost breakdown will be refined upon opening of bids and before award of the construction contract. No expenditures above previously approved project administration fees are associated with the adoption of the attached resolution. Attachments • Resolution — Approving the Plans and Authorizing the Advertisement for Bids • Plan Set Title Sheet AR RESOLUTION 15- A Resolution for the City of Elk River A Resolution Approving the Plans and Specifications and Ordering the Advertisement for Bids in the Matter of the 2015 Street Improvement Project Whereas, Bolton & Menk, Inc., at the direction of the city engineer, has prepared plans and specifications for the 2015 Street Improvement, which plans and specifications have been reviewed by the city. Now, therefore, be it resolved by the City Council of the City of Elk River, Minnesota: Such plans and specifications, a copy of which is attached hereto and incorporated herein by this reference, are hereby approved. 2. The city clerk shall prepare and obtain the publication of an advertisement for bids for the making of the improvement pursuant to the attached plans and specifications. The advertisement shall be published for 10 days, shall specify the work to be done, and shall state that the bids will be received by the city clerk until 10:00 a.m. on April 14, 2015, at which time the bids will be publicly opened in the Council Chambers of the City Hall by the city clerk and the city engineer and will then be tabulated for consideration by the City Council at a meeting thereof at 6:30 p.m. on April 20, 2015, in the City Council Chambers at City Hall. No bids will be considered unless sealed and filed with the city clerk and accompanied by a cash deposit, cashier's check, bid bond, or certified check payable to the City of Elk River in the amount of 5% of the amount of such bid. Passed and adopted this 161h day of March, 2015. John J. Dietz, Mayor ATTEST: Tina Allard, City Clerk N Q M ° ba G "i8 giL �& � 3 °a �= N w 8b £ s a x ge W Z Z s t-u m 8 a o G o W °z z in i i> 2z tD a r �£ vzizs3B °uu� �B °ddd6$��5���i9Z9i9�$B �gZgaU $ -- d U � Z N1$ Z�i s gd QKd mEo° Q � o H i r Z w €Fa Q wf� O ~ 5 O 0 LLB= cn w `n� � es Q Z wo > 0 s9 cc he > � al� 1� W O >� Q1 g H J zZ a ww �° OO�w -2 w. Q — Z 0 U -)a Q` a V re Ln 0 0 cU f $ W;N CO N N LU W = < 9 Z a g a ffi Z ® o s lw 5z > u t;i ;�Ga� Qc sz �o oKs zGy G WWG mom° ° $r s8 CC' 'g bgbbaLLO 3�tWt s���W �m��t �mty� t LL d! 11 a = i zzz W �8e 2�o° m� g� oQ �o¢ 99 z 6N ig 2mm 3G oaf WJot� JoG o� WJoG 4,E G „ zoz 9b9a'b8A �GZ �rz G a to z W °- a 8e o �o�� 8¢ =� ��CW K�d� o °z sip o �8 yoG F= �kk°'°k' °k' RI.H. HHH Wz ., &mWi z °' u� z G i° a� SLL�i 8988 m so §' i _° oW �F° gggg Pi O wl xO 6w G�u� u°iS O Zpp�Yi�2 ¢QQ 8$$ d o i i °i� 000� 9� z� C vgg18 Nzo dddd oze'adnN O2u mezzo �zx oG c RR rvry amp � E`