5.5. SR 01-10-2000ity of iver MEMORANDUM Item #5.5. TO: FROM: DATE: SUBJECT: Mayor & City Council ~j Klaers, City Administratd~ Pat January 10, 2000 WWTS Lift Station Alarm System City Engineer Terry Maurer, WWTS Chief Operator Gary Leirmoe, and I have met to discuss the alarm system needs for the city lift station system. Initially this issue was discussed with Finance Director Lori Johnson during the budget process and we had a sense early on that the best bid, product, and service would ultimately be coming from the Municipal Utilities. Utilities General Manager Bryan Adams has provided us with a quote for installing the lift station alarm system and identified the maintenance/operating expenses. Without a doubt, an improved alarm/early warning system is needed to protect the city's investment in the lift stations and to protect our citizens so that back-ups can be prevented as much as possible. City Engineer Terry Maurer will be in attendance at the City Council meeting to answer questions the council may have regarding this proposal. The estimate in the budget was $20,000 for this capital improvement. Since the cost is more than this amount, the balance will have to be funded from the WWTS reserve, which has sufficient funds for this expenditure. Recommendation Please see the recommendation in the attached memo from Chief Operator Gary Leirmoe. 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425 2ity of iver MEMORANDUM Item # 5.5. TO: FROM: DATE: Mayor & City Council Gary Leirmoe, WWTS Chief Operator January 10, 2000 SUBJECT: Lift Stations Alarm System The current lift station alarm system consists of an audible horn and flashing light. This system relies on residents to hear the horn or see the light and call Sherburne County, and then the on-call WWTS operator is paged. Also, in the event of a power outage, the alarm system is disabled. There have been sewer back-ups in the past because of this problem. I have obtained quotes from several suppliers for a new system with estimates ranging from $80,000 to $207,000. These systems are much more elaborate than what is needed, and service may be a problem. Elk River Municipal Utilities has proposed a viable system that would fit our needs for $32,000, plus an additional $240/month for monitoring. This system is DC powered so outages would not be a problem. Additionally, with a local company, service would not be a problem. As we gain more lift stations (we currently have 16), this system can be upgraded. I feel our current alarm system is outdated, therefore I am requesting authorization to have Elk River Utilities install and maintain the cellular phone alarm system. Action Requested Council authorization to allow Elk River Utilities to install and maintain a cellular phone alarm system at an initial cost of $32,000, plus an additional $240/month monitoring charge. 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425 ELK RIVER MUNICIPAL UTILITIES Pat Klaers - City of Elk River 322 King Avenue Elk River, Minnesota 55330 Phone (612) 441-2020 Fax (612) 441-8099 Elk River Utilities will provide all labor & material necessary to install and make operational an alarm communicator at each lift station for the Elk River Sanitary Sewer Department at a cost of $2,000.00 each. A common alarm will be initiated upon failure ofA. C. power, low level, or high level. Each lift station will consist of the following equipment: 1. 1-Control Set 2. 1-High level alarm 3. 1-Low level alarm 4. 1-A.C. Failure Alarm 5. 1-Communicator 6. 1-Power Supply The alarms will communicate over the existing cellular network using the digital bandwave. The system will test itself weekly for communication and if there is no signal received it will be reported to you. The signals will be reported to the corporation that has developed this network (Uplink) and from there it will be transmitted to our central station (IDC). IDC will then call your people to let them know which lift station has a problem. The monitoring costs will be $60.00 per four lift stations per month. 14 lift stations would then be calculated for the amount of $240.00 per month. As you add two more lift stations the monitoring will not increase. If adding more than two, it would increase at $60.00 per month for the next 1-4 lift stations. Each lift station will have an $8.00 initial hook - up fee. This fee is not included in the installation price quoted above. We desire to test each site to ensure adequate communication between sites before this proposal is accepted. We will perform these tests at our own expense within the next 2 weeks. Initial investigation indicates that adequate communication does exist. The installation of these controls will be done over the course of a few months, with the last to be installed by the end of March 2000. If there are any questions or concerns please call us. Th~nk you, Elk RiYer Municipal Utilities Security System Division