Loading...
5.6. SR 01-10-2000Aty of · MEMORANDUM lver Item # 5.6. TO: FROM: DATE: SUBJECT: Mayor & Council Sandra Peine, City Clerk January 10, 2000 2000 Fee Schedule The city reviews its fees for services on a yearly basis to ensure that the fees charged reflect services rendered. The council adopts the fee schedule by resolution. Department heads have reviewed fees relating to their perspective departments. In some instances fees have been increased and in a few instances fees have been decreased or eliminated. Listed below are the proposed fee amendments. 1. Building Permit and Related Fees See attached information from the building and zoning department. Park Dedication Fees - (December 14 memo from Michele McPherson attached) On December 20, Michele McPherson indicated that the Park and Recreation Commission requested the Council to consider an increase in residential park dedication fees from $1,300 to $1,400. The Council made no decision on this issue at the December 20 meeting. The proposed fee schedule reflects the increase to $1,400. This can be amended prior to adoption of the fee schedule resolution if the council desires. 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425 3. Administration ITEM EXISTING NEW FEE COMMENTS FEE Dubbing Audio $20 $10/tape Police will remain at $20 due to Tapes the type of tapes they use (micro cassettes). Bowling Alley $5 per lane per 0 Request by Owner to eliminate. License year Research revealed that few cities regulate bowling centers. The City does not regulate or inspect the bowling alley. The Police Chief had no problem eliminating this license. Meeting Packets $7/Packet $5/Packet To make council packet information more easily available to public. Labor Rate $20/hour $15/hour This is included in our data practices policy, but not included in the fee schedule. $15 better reflects the average labor rate. Mechanical $35 per device $15 per This is a recent requirement by Amusement Devices establishment State Law plus $15/device Surface Water Res. Rural- Res. Rural - 3% annual increase per Resolution Management Impact $70.89 $73.02 94-110 Fee Res. Urban Res. Urban - $141.82 $146.07 Multi-Fam, Multi-Fam, Comm., Ind. Comm., Ind. $850.88 $876.41 Action Requested Council motion adopting a resolution setting fees for the year 2000. Any amendments can be made prior to the motion and they will be included in the resolution. City of Elk River 2000 Fee Schedule Building and Zoning Department Recommendations Building permits - No increase allowed, the city is charging the maximum. Plan check- No increase allowed, the city is charging the maximum, 65% of the cost of the building permit. Miscellaneous building permits -No increases recommended; these fees cover the citY's expenses. Heating, ventilation and air conditioning permits - Currently the city charges 1% of the valuation of the work being done for this type of permit (Exhibit "B" of the Fee Schedule). The new energy code imposed by the state will become effective in April of 2000. This new code will cause an additional two inspections for mechanical equipment in a home. To be consistent with other communities and to cover the additional inspections, staff is recommending the city charges 1.5% of the valuation of the work being done for the permit. Gas fitting permits -No increase recommended. Gas fitter's license - Currently the city charges $24 per year for a gas fitter's license. Staffis recommending this fee be increased to $35 per year to cover the cost of administration. Plumbing permits - Currently the city charges $6.00 per fixture for a plumbing permit (Exhibit "D" of the Fee Schedule). To cover staff time associated with plumbing permits, staff is recommending this fee be increased to $8.00 per fixture. This is consistent with other communities. Staff also recommends the minimum charge for a plumbing permit be increased from $18.00 to $24.00. Grading permits/wetland filling and draining permits - Grading permits are currently $25, plus consultant time if needed. This fee is insufficient to cover staff's time so we are recommending it be increased to $50. Wetland permits are $75. The city covers wetland permits under grading permits so we are proposing to eliminate this fee. Mineral excavation licenses -No increase recommended, the current fee covers staff's time. Rental dwelling licenses - This fee should probably be increased to cover staff's time, although after three years of licensing most serious problems have been corrected and less staff time should be needed. Staff is not recommending these fees be increased in 2000, rather let us track how much staff time is spent on this program in 2000 and give proper notice to the apartment owners, if we recommend an increase in 2001. Septic installation - Current fee is $60, no increase recommended. Septic repair - Staff is recommending that this fee be increased from $30 to $60 to cover staff time. A septic repair involves as much staff time as a new septic installation. Solid waste facility license - The current fee covers staff's time and solid waste facilities pay for city consultant time, no increase is recommended. Street disruption/utility hookup permits - Staff is recommending that this fee be increased from $25 to $35 to cover staff's time. ~ity of iver Item # 6.7. MEMORANDUM Mayor & City Council Michele McPherson, Director of Planning TO: FROM: DATE: December 14, '1999 SUBJECT: Consider Increase in Park Fees for 2000 Request The Park and Recreation Commission requests that the City Council consider an increase in the residential park dedication fee from $1300 total per lot to $1400 total per lot. The Commission also requests that the City Council consider an increase in the trail reimbursement to developers to $14.00 per linear foot. Attachments · September 8, 1999 Park and Recreation Commission Meeting Minutes · New Trail Specifications · Bid Estimate for Bituminous Trail · Trail Cross-Section Analysis As an annual task, the Park and Recreation Commission proposes to review the Park Dedication requirements and make a recommendation to the City Council prior to adoption of the fee structure each year. This year, the Commission reviewed the park dedication fees at their September meeting. The Commission voted to make the following recommendations to the City Council: Increase the park dedication fees from $1300 to $1400 per lot for residential developments. Of the $1400, $1,150 would be for park development, the other $250 would be dedicated for trail development. Increase the trail reimbursement to developers to $14.00 per linear foot based on "real life" numbers. It is anticipated that this increase would become effective with the adoption of the 2000 fee structure. Recommendation Staff recommends that the City Council consider the Commission's recommendation as part of the adoption of the 2000 fee structure. 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425 ?ity of MEMORANDUM TO: FROM: The Mayor and City Council Stephen Wensman, Planner ~ DATE: January 10, 2000 SUBJECT: Park Dedication Information Note In February, 1999 staff conducted a survey of park dedication fees in surrounding communities in order to assess how the City of Elk River compared. In December, the Council requested that staff provide an update of what other Cities are doing with park dedication fees. As requested, staff obtained a survey of park dediction fees conducted by Ingraham and Associates that shows the status of park dedication fees in September, 1999. From the survey, staff has highhghted cities with high residential growth, cities that are near Elk River, and cities with the highest park fees. Attachments · Park Dedication Survey 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 * Fax: (612) 441-7425 PARK DEDICATION SURVEY 1998 1999 CITY SINGLE FAMILY SINGLE FAMILY Albe rtville 1300/u nit 1300/u nit Blaine 900/unit 1300/unit Brooklyn Park 900/unit 1300/unit Chanhassen 1100/unit park 1200/unit park 300/unit trail 400/unit trail Dayton 1100/u nit 1100/unit Eagan 1028/unit park 1272/unit park 160/unit trail 160/unit trail Eden Prairie 1850/unit 1950/unit Fridley N/A 1500/unit Lakeville 900/unit park 1325/unit park 225/unit trail O/unit trail Maple Grove 1100/unit 1125/unit Ramsey 925/unit park 1200/unit park 150/unit trail 300/unit trail Plymouth 1500/u nit 1600/unit % Increase 0% 44% 44% 14% 0% 21% 5% N/A 18% 2% 40% 7% RESOLUTION 00- A RESOLUTION FOR THE CITY OF ELK RIVER A RESOLUTION ADOPTING FEES FOR SERVICES FOR 2000 WHEREAS, WHEREAS, the council has reviewed the fees charged for services; and the attached fee schedule reflects the fees charged for services rendered by the city of Elk River NOW, THEREFORE, BE IT RESOLVED, that the attached fee schedule is effective for the year 2,000. Passed and adopted by the City Council of the City of Elk River this 10th day of January, 2000. ATTEST: Stephanie A. Klinzing, Mayor Sandra A. Peine, City Clerk S: \ DOCUMENT \ RESOLUTI \ feeresol.doc CITY OF ELK RIVER 2000 FEE SCHEDULE ASSESSMENT SEARCH CERTIFICATION ........ $15/each ANIMAL LICENSES Cat ....................................................... Duplicate Cat or Dog License ................. Residential Kennel .................................. Commercial Kennel ................................ $5/2 years $10/2 years $2 each $50/year $75/year AUDIO/VISUAL Dubbing Police Audio Tapes ................... Dubbing Audio Tapes ............................. Dubbing Video Tapes ............................ Video Operator ..................................... $20/tape $1 O/tape $30/tape $40/hour- ($80 minimum) BUILDING PERMIT Industrial, commercial, multifamily residential, single family homes, and additions .............................................. State Residential Contractor License Search .................................................. Miscellaneous Building Permits ................. Heating, Ventilation and Air Conditioning. Gas Fitting Permit Fee ............................. Gas Fitter's License ................................. Plumbing Permit ..................................... State permit fee, UBC Table lA, plus 65% plan check fee (valuation based on current State of MN building valuation data) $5/permit City permit fee schedule Exhibit C plus State Surcharge City permit fee schedule Exhibit B - 1.5% City permit fee schedule Exhibit A $35/year City permit fee Schedule D - $8/fixture BURNING PERMITS Residential Special Burning Permit ............. $10 each Residential Special Burning Permit to Clear Land ...................................................... $25 each Residential Special Burning Permit - Daytime Hours ......................................... $25 each COMMUNITY PROFILE ............................... $.20 each COPIES ................................................... $.15 each CUPS - ELK RIVER $2.25 each DOCUMENTS Audit ..................................................... Budget ................................................... City Code .............................................. Housing Maintenance Ordinance ............ Meeting Packets ..................................... Microfilm Document ................................ Sign Ordinance ....................................... Subdivision Ordinance ............................. Zoning Ordinance ................................... $0 $75 each $5 each $5/packet $1/page $5 each $5 each $25 each FALSE ALARMS Fire ......................................................... Other ...................................................... FLAG - (City) ........................................... GARBAGE HAULER LICENSE ........................ GRADING PERMIT ..................................... LABOR RATE - Research, Computer Services, Etc ............................................ LIQUOR LICENSE Club ....................................................... Intoxicating On Sale ................................. Intoxicating Sunday On Sale ..................... Investigation Fee Corporation .......................................... Single ................................................... Non-Intoxicating Off Sale .......................... Non-Intoxicating On Sale ......................... Set Up .................................................... Wine ...................................................... Temporary Non-Intoxicating ..................... Temporary Intoxicating ............................ Premises Extension Permit (on-sale) ............ MAPS Aerial Photos ........................................... Aerial Topography Maps .......................... Large Base, Zoning, or Land Use Map ........ Medium Base or Zoning Map .................... Medium Base Ward Map .......................... Copies of Maps from Xerox Machine MARKETING BROCHURE ............................ $150 for the 4th alarm, $50 for each successive alarm therea~er $50 for 5th alarm $32 each $60 1st truck plus $15 each additional truck $50 plus city consultant fees if required to process application $15/hr (15 minutes minimum) $300/year $4,000/year $200/year $250 $150 $75/year $225/year $75/year $650/year $20/day $20/day $25 $6/sheet $15/per acre $3 each $2 each $2 each $2 each $3 each MASSAGE ESTABLISHMENT ........................ Initial Fee (Includes Investigation Fee) Single .................................................. $200 Corporation ......................................... $300 Partnership ........................................... $300 Renewal Fee ........................................... $150 MASSAGE THERAPIST .............................. Initial Fee (Includes Investigation Fee) ...... $150 Renewal Fee .......................................... $100 MECHANICAL AMUSEMENT Mechanical Rides ................................... Pin Ball Games ....................................... Pool Tables (Coin Operated) ................... Video Games ......................................... $15/per establishment plus: $15/ride $15/machine $15/ta ble $15/game MINERAL EXTRACTION .............................. PARK DEDICATION FEE (Resolution 95-89) Residential .............................................. Commercial ............................................ Industrial ................................................. PARK AND GAZEBO RESERVATION FEE 0-100 People ........................................... 101-250 People ........................................ 251-500 People ........................................ Over 500 People ...................................... Large Community Events .......................... $20/acre to be actively mined in forthcoming year or not reclaimed $5/acre approved but not actively mined (to be amended 3/99) $1,400/dwelling unit $3,000/acre $2,000/acre $50 $75 $100 $200 $5OO (Deposits are refundable if the shelter and surrounding area are cleared of refuse and debris prior to leaving the area.) PARKING FINES (Resolution 97-30) Overtime Parking .................................... $10 Prohibited/Improper Parking .................... $15 No Parking 2 a.m. to 6 a.m ....................... $15 Winter Parking Ordinance ........................ $15 Other ...................................................... $15 Fire Lane/Hydrant .................................... $20 Handicap Parking Only ............................ $200 PARKING STICKERS Railroad Parking Lot ................................. Commuter Parking ................................... Duplicate (for lost stickers) PAWN SHOPS ........................................... Investigation Fee ...................................... PINS Plastic - Elk River ....................................... Metal- Elk River ........................................ RENTAL DWELLING LICENSE ......................... $12/space (3 stickers/space maximum) $12/space (2 stickers/space) $1/sticker $12,000/year $1,500 $.35 each 2.50 each $12/dwelling unit SEPTIC INSTALLATION AND REPAIR .............. $60 SEWER AVAILABILITY CHARGE (SAC) (Plant replacement interceptor) ................ $1,300 SIGN PERMITS Up to 100 square feet ............................... $30 101-300 square feet .................................. $90 Over 300 square feet ................................ $150 Yearly Advertising Structure (Billboard) Inspection ............................................... $10 SOLID WASTE FACILITY LICENSE .................. STREET DISRUPTION/UTILITY HOOKUP PERMIT.. SURFACE WATER MANAGEMENT IMPACT FEE. (3% annual increase) (Resolution 94-110) TOBACCO ............................................... TRANSIENT MERCHANT LICENSE .................. WATER ACCESS CHARGE (WAC) ................. (Contact Municipal Utilities - 441-2020) WATER CONNECTION CHARGE ................... (Contact Municipal Utilities - 441-2020) ZONING/PLANNING APPLICATIONS Administrative Subdivision ......................... Conditional Use Permit Commercial/Industrial ............................ Residential ............................................. Amendments and renewals requiring public hearings ...................................... Easement Vacation .................................. General Zoning Requests .......................... Land Use Plan Amendment ....................... Nonconforming Sign Alteration .................. Ordinance Amendment ........................... Plats ....................................................... Permitted Home Occupations ................... Planned Unit Development (PUD) ............... Site Plan Review ....................................... Variance ................................................. Zone Change .......................................... $2,000 plus cost of reviewing license. Amount of annual cost incurred by the city for monitoring and inspecting the facility plus the license. $35 $73.02/residential lot (rural) $146.07/residential lot (urban) $876.41/acre (multifamily, commercial, and industrial) $100/year $50/year $300 $1,050 $150 plus Park Dedication if applicable $300 $1oo $75 $150 $50 $300 $110 $30O $500 + $5/Iotfor each lot over50 $15 Charge forwhatever planning applications are needed forthe PUD, i.e. CUP, Rezoning, etc. $250 $150 $25O \ \ elkriver\sys\shrdoc \document\ resoluti\99fees.doc EXItIBIT A CITY OF ELK RIVER FUEL-GAS PIPING PERMIT FEES The Chief Building Inspector, before issuing any permit for the installation of any fuel-gas piping, shall require the payment by the applicant for such permit of fees in the amount herein provided. Minimum Fee In no case shall the fee charged for any permit issued by the Chief Building Inspector be less than Eighteen Dollars ($18.00). Basic Fees (A) The fees for all fuel-gas piping permits shall be computed on the basis of the number of fuel-gas appliances. The fee for each appliance so provided for shall, except as hereinafter otherwise specifically provided, be Six Dollars ($6.00) for each fuel-gas appliance. (B) Where any such permit is issued for roughing-in of fuel-gas lines for future appliances, a fee of Six Dollars ($6.00) shall be charged for each line or lines. (C) In addition to the Six Dollar ($6.00) charge for each fuel-gas appliance and future fuel-gas lines run for appliance, a Six Dollar ($6.00) charge for the main fuel-gas supply in the building shall be charged. (D) For the purpose of this article, a gas appliance shall be taken to mean a furnace, range, water heater, dryer, fireplace, barbecue, etc. s: \ b&z \ ord-fuel.doc EXHIBIT B CITY OF ELK RIVER HEATING, VENTILATION AND AIR CONDITIONING PERMIT FEES FEES REQUIRED The Chief Building Inspector, before issuing any permit for the installation, alteration, or repair of any heating, ventilation, and air conditioning appliance items, connections or appendages, shall require the payment by the applicant for such permit of fees in the amount herein. MINIMUM FEE In no case shall the fee charged for any permit issued by the Chief Building Inspector be less that $18.00. MAXIMUM FEE In no case shall the fee charged for any permit issued by the Chief Building Inspector be more than $100.00 for a single family home. PERMIT FEE FOR HEATING, VENTILATION AND AIR CONDITIONING APPLIANCE ITEMS, CONNECTIONS OR APPENDAGES For any permit for the installation, alteration or repair of the above- referenced items, the fee shall be one and one-half percent (1.5%) of the valuation of the work or as calculated under the Uniform Mechanical Code, whichever is greater. \ \ elkriver \ sys \ shrdoc \ b&z \ heatvent.doc EXHIBIT C CITY OF ELK RIVER MISCELLANEOUS PERMIT FEES Decks $8.00 per square foot for valuation for permit fee; plus state surcharge. Plan check is included with this price. Fences Under 6 feet no charge Over 6 feet - $15.00 plus state surcharge Fireplaces and Wood Stoves $20.00 plus state surcharge $15.00 plus state surcharge for a burning appliance installed into an existing chimney. Garages and Basement Finish $10.00 per square foot for valuation, use building permit fee plus state surcharge. Plan check is included with this price. Re-roof Residential - $35.00 plus state surcharge. Commercial/Industrial - $.50 per square foot for valuation for permit fee plus state surcharge. Swimming Pools $35.00 plus state surcharge 3 Season Porches $40.00 x square footage -- valuation for permit fee plus state surcharge. Plan check is included with this price. Moving Structures Moving structures in - $150.00 plus state surcharge Moving structures out - $35.00 permit fee s: \ b&z \ fees.doc EXHIBIT D CITY OF ELK RIVER PLUMBING PERMIT FEES The Chief Building Inspector, before issuing any permit for the installation of any plumbing work, fixture, or device, shall require the payment by the applicant for such permit of fees in the amount herein provided. MINIMUM FEE In no case shall the fee charged for any permit issued by the Chief Building Inspector be less than Twenty-Four Dollars ($24.00) BASIC FEES (A) The fees for all plumbing permits shall be computed on the basis of the number of fixture openings, plumbing fixtures, or devices provided for in such permits, whether subsequently so installed or not, and the fee for each fixture so provided for shall, except as hereinafter otherwise specifically provided, be Eight Dollars ($8.00) for each fixture installed or replaced or set only (no waste or vent piping), the fee for each such fixture shall be Eight Dollars ($8.00). (B) Where any such permit is issued for roughing in plumbing openings only, providing for certain proposed fixtures, which are to be installed or set later, a fee of Eight Dollars ($8.00) shall be charged for each such opening, which fee shall be in addition to the fee charged for other plumbing work included in the same permit. (c) For the purpose of this article, a plumbing fixture shall be taken to mean and include any sink, laundry tub, bathtub, wash basin, drinking fountain, floor drain, or any other plumbing device arranged to be connected with the sewer or plumbing system, either directly or indirectly, and required to be trapped. CITY UTILITY HOOK-UP PERMIT Building Sewer Plant ............................................................................. $18.00 Curb Stop Water Connection Permit ..................................................... $21.00 Abandoning or Repairing Water Service Permit .................................. $21.00 Storm Sewer Connection Permit and Inspection Fee ............................ $18.00 City of Elk River Plumbing Permit Fees-Exhibit D ALTERATIONS, REPAIRS Page 2 For each permit for the alteration or repairing of existing plumbing work not included above, the fee shall be Six Dollars and Twenty-five Cents ($6.25) for the first Five Hundred Dollars ($500.00) or fraction thereof in the estimated cost of such proposed work. For each additional Five Hundred Dollars ($500.00) or fraction thereof in such estimated cost, Six Dollars and Twenty- five Cents ($6.25) shall be added to the above described fee for such permit. \ \ elkriver \ sys \ shrdoc \ b&z \ ord-plum.doc Meeting Packet Request Form Meeting packet information is available at City Hall for public inspection at no charge. Copies of the complete packet or individual items from the packet are available at the rates listed below. Please fill out the following form and return with payment. Full packet requests must be made by 3 p.m. on the Wednesday preceding the meeting. Entire Packet Meeting packets are available on the Friday preceding the meeting. Upon receipt of payment, packets may be picked up on Friday after 4 p.m. If requested, packets will be mailed (we do not guarantee mailed pack~ts will be delivered in time for meeting). Type of Meeting (ie, City Council, Planning Commission, etc. Date of Meeting #Packets Total x $5 = x $5 = ×$5 = ×$5: TOTAL x $5 = Individual Items Cost for individual agenda items (ie, memo/back-up on a certain iten per page. A labor charge of $15.00 per hour will be included after 5£ (15 minutes minimum). x) is $. 15 copies. Type of Meeting (ie, City Council, Meeting Agenda I Planning Commission, etc. Date Item # # Copies x $.15= ! Total x$.15 =1 x$.15 =] x$.15 =! x$.15 =] Labor Charge (over 50 copies) # Hours X $15 = ] TOTAL ] Name: Address: Phone: X\forms\pktrqst.doc VI. COST FOR SERVICES ao Co g° Photocopy rate (Flat Rate) ................................. $ .15 per page Labor rate (research, assembly, computer services etc.) .............. $15.00 per hour (15 minutes minimum) Postage .....................................Prevailing rate Microfilm services From film to hard copy ................. $ 1.00 per page (includes labor cost) Dubbing audio tapes Police Department ........................ $20.00/tape Other .......................................... $10.00/tape Dubbing video tapes .................. $ 30.00 per tape Meeting Packets ........................ $ 5.00 per packet These rates are subject to change. The rates will be included in the fee schedule, which is adopted by council resolution. \ \ elkriver \ sys \ shrdoc \ forms \ infdiscr.doc