Loading...
6.1.c. ERMUSR 03-17-2015 Elk River Municipal Utilities UTILITIES COMMISSION MEETING TO: FROM: Elk River Municipal Utilities Commission Mark Fuchs—Electric Superintendent John Dietz—Chair Al Nadeau—Vice Chair Daryl Thompson—Trustee MEETING DATE: AGENDA ITEM NUMBER: March 17, 2015 6.l c SUBJECT: Staff Update DISCUSSION: • Had four new services. • Continue working on collecting data with the GPS for our ArcView maps as time permits. • Continue tree trimming. • Continue going thru the map book and inspecting equipment on the overhead and underground system. • Continue working with the City of Elk River Streets Department trimming trees that are in the road right-of-way. • The City shop does D.O.T.'s for our trucks and trailers. They will be doing these during February, March and April. • Diversified completed annual inspections on the bucket and digger trucks. The inspections include: Visual/Operational, Magnetic Particle, Dielectric, Load and Acoustic Emission Testing. • Changed out the fluorescent lights to LED's in the offices and break room at the Field Services Building. We are also working on changing out the fixtures in the older shop to LED's. • The wind blew some garbage into our feeder located by the landfill. This caused the recloser to operate and knock the generator off line. • A gopher or some other type of rodent chewed through an underground primary splice. This caused one of the two feeders that feed a data center to open up resulting in us having to feed them from a different feeder. We had Connexus come out to locate the fault so we could thaw the ground and repair it. • PyewEDED 01 Page 1 of 1 NATURE Reliable Public Power Provider P O W E R E D T o S E 72