Loading...
6.1.e. ERMUSR 03-17-2015 Elk River Municipal Utilities UTILITIES COMMISSION MEETING TO: FROM: Elk River Municipal Utilities Commission Eric Volk-Water Superintendent John Dietz—Chair Al Nadeau—Vice Chair Daryl Thompson—Trustee MEETING DATE: AGENDA ITEM NUMBER: March 17, 2015 6.1e SUBJECT: Staff Update DISCUSSION: • Delivered 6 new residential water meters. • Sealed the water meter and took curb stop ties from 7 water services. • Went on 7 Service calls. • Completed 25 BACTI/Total Chlorine Residual Samples; all confirmed negative for Coliform Bacteria. • Completed 20 routine fluoride samples. All samples met MDH standards. • Annual well maintenance is almost over for the winter. We have two filters left to clean and recharge before the busy season. The operators have done an outstanding job getting the wells and filters ready for summer. The annual preventive maintenance involves recharging and cleaning the filters, replacing chemical lines, changing oil in compressors, and painting. The operators use their experience to try to anticipate any problems that may come up in the summer. In order to prevent such problems they will replace items that are known to fail. • I have started working with Badger State Inspections on painting the inside of Gary Street Water Tower. The belly of the tank, dry tube, and condensate ceiling will be sandblasted and painted this summer. • Sprint has started the 2.5 upgrades on all three water towers. The projects will only take a couple weeks. • With help of Russ Stuhr,Mike Langer installed a new water meter in Well#8. This was not an easy task as it involved a 12"pipe. A filler flange had to be ordered and installed as well. • We've been working with Bolton and Menk to complete the annual updates for our mapping system. We will be printing map books shortly and will continually update the maps. • We are preparing to begin locating and exercising the gate valves that are located within the 2015 street project areas. After the project is complete, we'll go and locate each valve • PYOWERED 11 Page 1 of 2 NATURE Reliable Public. Power Provider POWERED To SECVE 78 to ensure it is visible. We'll also be checking the valve boxes to make sure they are not filled in with dirt or asphalt. ATTACHMENTS: • February Pumping By Well PyONEDED 81 Page 2 of 2 NATURE Reliable Public Power Provider P O W E R E D T D S E R V E 79 an C O Q N E M E a et o Co■ 0a) a) tD Y 1-1 co a) U It CO a) — 0 a 3 Q*i n Cl. E oLID= o a o 00 To > S v a — 01 _ 0 Ln 2 r i O to O t0 ,. o N �i ,. > Lip N o CO \ a;' tD It - N— c) a) Q1 � r w .'.i Q N 00 It - _ ,' ,0 . v I n C1 00 00 O .--I Lt It C)