4.2. SR 01-18-2000'ity of River MEMORANDUM Item # 6.2. TO: FROM: DATE: SUBJECT: Mayor and City Council Scott Harlicker, Senior Planne January 18, 2000 Northstar Corridor Update At the January 6, 2000 meeting of the Northstar Corridor Development the Authority heard an update from MnDOT regarding their draft plan for commuter rail and discussed possible legislative action in 2000 state legislative session. The main issue in the draft MnDOT plan that will affect Elk River is their proposal for local ownership, operation and maintenance of the station. Each city will be expected to acquire the property, own and operate the station and be responsible for day-to-day maintenance. It was mentioned that some funding could be available from the state, however, the MnDOT representative did not elaborate. The NCDA staff is discussing the draft plan with MnDOT and changes in the plan regarding station policy are expected. Because Elk River has been identified as a multi-model station, money for property acquisition is likely to be available from the multi-model transit fund, which is available through the NCDA. The NCDA's legislative consultant presented their proposed strategy for the 2000 legislative session. It included using a portion of the state sales tax to fund a portion of the operating costs for the corridor. It was not a proposal to increase the sale tax, but to allocate a percentage of the current 6.5 % tax to fund operating costs. Their proposal to fund capital costs included $19 million cash funding for the year 2000 and a $35 million bonding proposal for the year 2001. The NCDA's public relations consultant will be mailing out, to 300,000 homes within 5 mile of the corridor, a color informational newsletter. The newsletter will include maps, photos and articles regarding the activities and plans for the Northstar Corridor. S:\PLANNING\SCOTT\NCDAJAN.DOC 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425 Northstar Corridor Development Authority Thursday, January 6, 2000 4:30 p.m. Sherburne County Government Center Elk River, MN Minutes of December 9, 1999 Meeting* Election of Vice Chair Action Requested Approval Election 3. Resolution of Appreciation*-Gerry Donlin Approval 4. Ex~utive Committee Report Approval .,al. M,,ulti-Modal Transit Facility Development- //,Site Selection* //b. StOlon Planning Issues- Correspondence from /t-h~ Metropolitan Council* .Legislative Update 5. Ridership Update Information a. Overview of Projections* b. ProCess for Review of St. Cloud Area Ridership Northstar Newsletter ,~,)~ ~[~ ~'~~rmation Mn/DOT's Commuter Rail System Plan Information Metropolitan Regional Transit Master Plan Information 9. Other Next Meeting' *Attached February 3, 2000 Enclosure: Copy of Star Tribune Article DRAFT DRAFT DRAFT DRAFT NORTHSTAR CORRIDOR DEVELOPMENT AUTHORITY Re~lular Meetin~l Minutes December 9. 1999 The Northstar Corddor Development Authority met on December 9, 1999, at 4:30 p.m. at the Sherburne County Government Center, Elk River, Minnesota. .-- The followin~j members, alternates and citizens were present: Walt Fehst, Gerry Donlin, Tim Yantos, Stephanie Eiler, Yvonne Chaillet, Rick Nau, Ken Stevens, Gary Hammer, Jean Keely, Ray Friedl, John Norgren, Terry Nagorski, Paul Goenner, Lewis Stark, Duane Cekalla, Duane Grandy, Gerald Goebel, Carl Yilek, Patrick Cairns, Art Daniels, Jerry Leese, Tom Cruikshank, Tom Gamec, Peter Beberg, Gary Erickson, Dave Saunders, Steve Billings, Jerry Newton, Dan Erhart, Mary Richardson, Linda Jungwirth, David Loch, Brian Bensen, Lynn George 1. The meeting was called to order at 4:35 p.m. A motion was made by John Norgren, seconded by Patrick Cairns and carded unanimously to approve the agenda of December 9, 1999, and the minutes of November 4, 1999, as presented. A motion was made by Dan Erhart, seconded by Dave Saunders and carried unanimously to approve two invoices from MainLine Management in the amounts of $20,689.25 and $20,934.24. 4. Executive Committee Report: a) A motion was made by Duane Grandy, seconded by Gary Erickson and carried unanimously to approve the recommendation of the Executive Committee to approve the 1999 amended budget, the proposed contract amendments for 1999 and 2000, and the proposed 2000 budget and authorize the Chair to finalize negotiations and execute the contract amendments. b) A motion was made by Tom Gamec, seconded by Jerry Leese and carried unanimously to approve the recommendation of the Executive Committee to authorize working with Mn/DOT to develop up to four initial multi-modal transit facilities in the Northstar Corridor. o Tim Yantos and Stephanie Eiler reviewed the goals of the NCDA Major Investment Study (MIS) during the past two years. Rick Nau, BRW, Inc. reviewed the suggested process for selecting the locally preferred transportation investment strategy (LPTIS) and the results of the analysis of the five alternatives being studied: 1) No Build, 2) Transportation System Management (TSM), Northstar Corddor Development Authority Regular Meeting Minutes December 9. 1999 Page 2 3) Commuter Rail, 4) Commuter Rail plus TH 10 Improvements, and 5) Commuter Rail plus TH 10 Improvements plus two River Crossings. The Project Management Team recommended that the NCDA consider and adopt Strategy 5 as noted above. This does not mean that the NCDA~. would be fully responsible for all the projects encompassed in this strategy. Any future decisions to construct would likely involve multiple agencies. Furthermore, choosing strategy 5 would preclude having to do a Major Investment Study (MIS) in the future on any individual project noted here because the MIS currently underway covers these particular projects. A motion was made by Steve Billings, seconded by Dan Erhart to approve Resolution #99-6 whereby the NCDA 1) affirms its commitment to improve the safe and efficient movement of people and goods along the Corddor by selecting a comprehensive multi- modal transportation investment strategy including commuter rail, feeder bus, TH 10 improvements and new river crossings, pedestrian and bike improvements and ITS initiatives; 2) urges the Twin Cities, the Metropolitan Council and the Minnesota Department of Transportation ("Mn/DOT') to move forward to implement the proposed Regional Transit Master Plan, to define the connections to St. Paul, and to implement the connection to the Hiawatha Corridor, so that the Northstar Corridor riders can travel efficiently throughout the Twin Cities metropolitan area; and 3) urges the greater St. Cloud metropolitan area, cities and counties, the St. Cloud APO, and Mn/DOT, in concert with local elected officials and legislators, to similarly define the connections to and extensions to the Corridor to ensure the safe and efficient travel within and beyond the St. Cloud area. A motion was made by Jerry Newton, seconded by Duane Grandy and carried unanimously to amend Resolution #99-6 removing the terminology "and legislators" in Resolve #3. Mr. Billings moved approval of Resolution 99-6 as amended. The motion was seconded by Commissioner Erhart and carried with one no-vote by Gary Hammer, Becker Township. Mary Richardson, Richardson, Richter and Associates, discussed the upcoming activities and actions to be taken in January and February, 2000. Ms. Richardson urged all members to consider the Amendment to the Joint Powers Agreement, if they have not already done so, and to notify her as soon as possible of their decision on the Amendment. A motion was made by Steve Billings, seconded by John Norgren and carried unanimously requesting the Executive Committee to draft a letter in response to Senator Opatz' letter to Governor Ventura. In his letter, which was copied to NCDA members, Senator Opatz expressed his opposition to further development and funding of the Northstar Corridor commuter rail line unless the counties who will benefit from it 2 Northstar Corddor Development Authority Regular Meeting Minutes December 9. 1999 Page 3 o commit to planning for and restricting growth to designated urban areas. The next meeting of the Northstar Corridor Development Authority is scheduled for Thursday, January 6, 2000, at 4:30 p.m. at the Sherbume .County Government Center. - The meeting was adjourned at 6:00 p.m. Betsy Wergin Chairperson Date F:\DEPT~COORD~ADM NDATA\COMMITTE\CORRIDOR\1999\120999.doc\lmg ,4genda Item #3 NOR THST,4R CORRIDOR DE VEL OPMENT.4 UTHORITY RESOLUTION 99- 7 WHEREAS, Gerry Donlin, as Vice Chai~; has served on the Northstar Corridor Development Authority since 1997; and WHEREAS, Mr. Donlin has made significant contributions to the advancement of the NCDA's mission to improve the safe and efficient movement of p~ople and goods along the Northstar Corridor; and tlZHEREAS, Mr. Donlin has advocated for consensus in finding solutions to critical issues; and WHEREAS, Mr. Donlin has consistently dedicated his time and efforts to bridge the gapsbetween the needs and interests of the Greater St. Cloud Metropolitan Area and the Northstar Corridor Development Authority; and WHEREAS, Mr. Donlin's leadership has helped the Northstar Corridor Development Authority position itself to develop a multimodal solution to the Northstar Corridor's transportation needs. NOW, THEREFORE, BE IT RESOLVED THAT the Northstar Corridor Development Authority extends its sincere appreciation for Gerry Donlin's leadership, his commitment to working within the structure of the Authority to find a viable solution to the transportation needs of the Corridor, and his steadfast service to the Northstar Corridor Development Authority; and further; the Northstar Corridor Development Authority expresses its desire for Mr. Donlin's on-going support and involvement in the development of commuter rail and the Northstar Corridor. Adopted: danuary 6, 2000 By: Betsy IVergin, Chair I hereby certify that the above resolution is a true copy of the Resolution dulypassed, adopted, and approved by the Northstar Corridor Development Authority on January 6, 2000. MEMORANDUM Agenda Item #4a DATE: TO: FROM: SUBJECT: December 29, 1999 NCDA Executive Committee Multi-Modal Transit Facility Development - Site Selection At its December 9 meeting, the NCDA authorized working with Mn/DOT to develop up to four initial multi-modal [ransit facilities in the Northstar Corridor. At its December 16, 1999 meeting, the Executive Committee considered the attached evaluation of potential multi-modal station sites. Based on the technical evaluation, the Committee recommends that the locations for immediate implementation include Big Lake, Elk River and Riverdale. The Committee also recommends that a fourth site, East St. Cloud, be evaluated as a potential fourth multi-modal facility. Action Requested: Approval. Northstar Corridor Development Authority 2100 3`4 Avenue, Anoka, Minnesota 55303-2265 (612) 323-5700 Fax: (612) 323-5682 Initial Multimodal Station Site Evaluation Transit MultiModal Transit Operating Property Land Site Loss Ease of Rank Demand Efficiency Cost Cost Vacant Potential Construction Coon Rapids- 2247 Foley (1) Fridley (2) 1672 Riverdale 1419 High (3) Med High Yes High High 3 Elk River 967 High (4) Med Med Yes Med High 1 Anoka 731 Med Med Med (5) No Low (7) Low (8) Big Lake 425 High (4) Med Low Yes High High 2 E. St. Cloud 200 Low High Low (6) Yes Low High Ramsey 121 Med Med Low Yes High High Notes: Stations are liSted in descending order of ddership. (1) Coon Rapids - Foley not considered due to proximity of existing transit facility (2) Fridley not considered due to level of current service and TSM routing over TH610 (3) High Potential for new transit connections (4) No current transit service (5) Includes building demolition (6) MnDOT owns property (7) City of ^noka purchase proceeding (8) Split station proposed for commuter rail, includes building demolition C:\TEMP\sitevall .wpd Metropolitan Council Worla'ng for the Region, Planning for the Future DATE: TO: FROM: December 28, 1999 Betsy Wergin, Chair, Northstar Corridor Development Authority (NCDA) Jim Barton, Sandra Pinel, Transportation, Communi~ Development Metropolitan Council SUB. CT: Coordination of the Northstar Corridor Development Process with the Completion of Community Comprehensive Plans in the Twin Cities Metropolitan Area Enclosed is a draft letter proposed to be sent to the communities within the Metropolitan area that are members of the Northstar Corridor Development Authority .. We would appreciate any comments or discussion on the letter from the NCDA at its January meeting prior to its mailing to the communities.. DRAFT December 29, 1999 Mail Merge to Local Officials and Community Development Staff The Metropolitan Council is working closely with the Northstar Corridor Development Authority (NCDA) and Anoka County to realize the potential of the proposed Northstar Commuter Rail Line in achieving the Governor's Smart Growth Initiative. Within the metropolitan region, we have an opportunity to connect transportation investments with housing, jobs and transit-oriented land use plans. To be competitive for Federal Transit Administration funding, the commuter rail proposal and station area plans must also demonstrate a benefit to regional growth management, job development, and pei:lestrian-oriented urban design. This is best documented within the Metropolitan area if the proposal includes commitments made by participating local governments in land use and/or redevelopment plans, policies and ordinances. The purpose of this letter is to suggest how the Metropolitan Council will work with local governments during within the metropolkan portion of the corridor in order to help strengthen the NCDA funding application to the Federal Transit Administration (FTA). We understand that most local governments participating in the commuter rail plans will have submitted 1998 comprehensive plan updates before the commuter rail "Major Investment Study" is completed, and therefore, may not include planning details relative to the rail corridor. However, documentation of local transit-oriented land use and investment commitment is needed by August submittal date for the funding request to be competitive. The 2020 Comprehensive Plans from cities along the metropolitan portion of Northstar Commuter Rail corridor that are submitted to the Metropolitan Council are expected to include a brief description of the project status and proposed station locations, but given the short time frame, may not include more detailed station area land use plans that demonstrate the desired benefits ora federal investment by the FTA. The Metropolitan Council is offering to work with the NCDA and participating cities to undertake station area planning consistent with realizing a competitive regional economy. We are proposing to document this commitment in the review of local comprehensive plans. For those cities in the metropolitan area where a NCDA station is planned, the city will be asked, as part of the comprehensive plan review, to submit a resolution of commitment to developing a full station-area plan for submittal as a plan amendment. In this way, we can work together to document the regional benefits of a federal investment in the proposed commuter rail corridor. The proposed commuter rail passes through urban and rural areas, therefore, not all stations will be the same. Some may be oriented to parking and transit connections, while others would provide an opportunity for generating additional development through a station area plan for compact and mixed uses with a design character that are pedestrian friendly. Compact land use patterns consisting of transit supportive density are important parameters, along with other development strategies in measuring the potential success of transit system investments. We look forward to working with you on land use and station area plans. If you have any questions or concerns, please contact Jim Barton at 651 602-1735 or your sector representative Sandra Pinel at 651 602- 1513. Sincerely, Eli Cooper, Director Planning and Growth Management TSM Boarding Summary TriPs in Production/Attraction Format 2005 Anoka Home 8asecl Work 3 Total Dal¥ ~ Station InOound Outl3ouna Inbounct Outtmuncl Total Wal~Acc JDrive Acc Walk Acc Drive Acc Walk Acc Dnve Acc Total Walk Acc Dnve Acc Total Daily 2 2 2 8oarrlings Rice 4. 39 0 0 8 41 49 0 0 0 49 E. St:. Cloud 14 102 0 1 28 114 142 0 1 1 143 Clear Lake 35 35 16 2 65 40 105 31 2 33 138 Becket 22 52 6 2 49 60 ,, 109 i'- 9 2 11 "- 120 Big Lake 107 186 5 5 196 210 406 14 5 19 425 Elk River 285 387 4 3 525 444 969 11 3 14 983 Ramsey 37 37 1 1 71 46 117 3 1 4 121 Anoka CBD 287 242 7 1 444 271 715 15 1 16 731 Coon Ral3icls/Foley 820 1,005 5 3 1,095 1,091 2,186 13 4 17 2,203 Fridley 376 1,059 0 0 520 1,148 1.668 0 0 0 1.668 Minneapolis CBD #NtA #N/A 59 12 #N/A #N/A #N/A 105 14 119 tfN/A Total 1,987 3.144 103 30 3,001 3.465 6.466 113 35 115 6,581 Grano Total 5,264 2005 Riverdale Home Basecl Work Total Daily Station InDouncl Outl3ound Inbouncl Out~ouncl Total Walk Acc IDnve Acc Walk Acc Dnve Acc Walk Acc Dnve Acc ~Total Walk Acc Dnve Acc Total Dmly Boar~incjs Rice .; 39 0 0 8 41 49 0 0 0 49 E. St:. Cloud 15 102 0 1 30 114. 144 0 1 i 145 Clear Lake 33 35 16 2 57 40 97 32 2 34 131 Becker 23 52 4. 2 46 59 105 5 2 7 112 Rig Lake 104 186 9 4 186 212 398 23 .t 27 425 Elk River ] 282 383 5 6 513 433 946 13 8 21 967 R amsey 38 36 0 3 75 43 118 0 3 3 121 Riverclale 693 435 5 3 921 484 1.405 11 3 14 1.419 Coon RamOs/Fotey 851 1.005 3 2 1.143 1,089 2.,232 7 3 10 2,242 Fridtey 375 1.064 0 0 520 1,152 1.672 0 0 0 1,672 Minneal3olis CBD #N/A #N/A 71 12 #N/A #N/A #NtA 14.7 13 160 #N/A Total 2,418 3,337 113 35 3,499 3,667 7,166 116 37 117 7,283 1 Grancl Total 5,903 e:~nstar~-ounas'~oaatsm 3 10-Nov-99 Point of beginning of A.M. trips and end point of P.M. trip Includes people taking bus to station to ride train Trips from home to work and back only All trips, not just work TSM Boarding Summary Trips in Production/Attraction Format 2020 Anoka Home Based Wort( Total Daily Station tnbouncl Outl3ouna Inbound Outt3ouna Total Wall( Acc Dnve Acc Wall( Acc Drive Acc Walk Acc Dnve Acc Total Wall( Acc Dnve Acc Total ;Daily BoarclinoA Rice 5 45 0 0 10 ~,7 57 0 0 0 57 'E. St. Cloud 15 104 0 2 32 122 154 0 4 4 158 Clear LaKe 41 33 18 5 78 38 116 33 6 39 155 Becl(er 31 70 6 4 67 79 146 9 5 14 160 Big Lal(e 124 222 7 7 225 253 : 478 ·. - 18 8 26 504 Elk River 349 476 5 6 639 541 t, 180 14 7 21 1,201 Ramsey 46 41 0 1 92 52 144 0 1 1 145 Anoka CBD 358 321 10 5 520 356 876 21 5 26 902 Coon RaDi(~s/Foley 979 1.222 6 0 1,289 1,329 2,618 15 0 15 2,633 Fdclley 376 1.110 0 0 519 1,202 1.721 0 0 0 1,721 Minneapolis CBD =N/A ~N/A 69 14 #N/A #N/A #N/A 117 16 133 #N/A 2020 Riverdale Home Basecl Worl( Total Daily Station Inoouncl Outbouncl InPouncl Outt3ounct Total Wall( Acc Dnve Acc ~Walk Acc Drive Acc Wall( Acc Drive Acc Total Wall( Acc Dnve Acc Total Dally Boardincjs Rice 5 45 0 0 10 47 57 0 0 0 57 'E. SC. Cloud 16 104 0 2 36 120 156 0 4 4 160 Clear LaKe 36 33 21 5 65 37 102 41 6 47 149 Becl(er 30 70 4 1 63 79 142 5 ! 6 146 Big Lal(e 1 125 220 7 6 228 245 473 17 9 26 499 Elk River I 346 ~73 6 3 634 537 1.171 17 ,~ 21 t.192 RamseyI 45 40 2 2 87 52 139 4 3 7 146 Riverclale ! ~J72 580 8 3 1.130 54.6 1,776 16 3 19 1.795 Coon RaplOs/Foley I ~.008 ~.220 4 0 1,329 ~..326 2.655 8 0 8 2.663 Fficlley I 379 ~,. 112 0 0 527 1,21 0 1.737 0 0 0 1,737 Minneapolis CBDt #N/A #NIA 64 15 ~NIA #N/A #NIA 109 16 125 #N/A Total 2.862 3.897 116 37 4,109 4,2.99 8,408 217 46 138 8,546 Gran~l Total 6,912 e:~lst arVoum3s~ioacllsm3 10-Nov-99 2. 3. 4. Point of beginning of A.M. trips and end point of P.M. trip Includes people taking bus to station to fide train Trips from home to work and back only All trips, not just work Commuter Rail Boarding Summary Trips in Production/Attraction Format 2005 St. Cloud/Anoka Home BaseO Work Total Daily Station Inbouncl Oult)ound Inbound Outbound Total Walk Acc I Drive Acc Walk Acc Dnve Acc Walk Acc Dnve Acc Total Walk Acc Dnve Acc Total Dally Boardino~s St Cloud CI~O 58 77 0 0 90 95 185 0 0 0 185 E St Cloud 34 68 0 0 55 91 146 0 0 0 146 Clear Lal(e 39 88 3 3 88 98 186 6 3 9 195 Bectcer 28 lg 0 0 46 27 73 -' 0 0 0 " 73 Big Lake 164 426 4 20 266 506 772 10 21 31 803 Elk River 227 969 2 9 326 1,194 1,520 5 12 17 1.537 Ramsay 26 133 0 0 47 171 218 0 0 0 218 Anoka CBD 281 719 0 2 349 803 1,152 0 2 2 1,154 Coon Rapids/Foley 651 1.200 0 2 776 1,277 2,053 0 3 3 2,056 Fridley 364 1,273 0 8 435 1.370 1.805 0 10 10 1,815 NE Minneapolis 314 0 0 0 490 0 490 0 0 0 490 Minneapolis CBD 0 0 1 0 0 0 0 3 0 3 3 Total 2,186 4.972 10 44 2,968 5,632 8.600 24 51 75 8,675 Grand Total 7.212 2005 St. Cloud/Riverdale Home Based Work Total Daily Station Inbouno Outt3ound Inbound Oult~ound Total Walk Acc Dnve Acc Walk Acc Drive Acc Walk Acc Ddve Acc Total Walk Acc Ddve Acc Total Dally Boardings St Cloud CBD 57 79 0 0 88 94 182 0 0 0 182 E St ClouQ 34 68 0 0 55 85 140 0 0 0 140 C[ear Lake 32 90 3 1 65 104 169 7 1 8 177 Becker 28 18 0 1 44 27 71 0 2 2 73 Big Lat(e I 148 463 5 17 236 546 782 7 19 26 808 E[lk RiverI 227 996 1 8 325 1,216 1.541 .t 11 15 1,556 ~ 29 173 0 0 51 216 267 0 0 0 267 ~ Ramsey ~ Riverclale 436 ~. 166 1 1 530 1.279 1.809 2 2 4 1,813 Coon RapidS/Foley 641 1,100 0 3 765 1.176 1,941 0 5 5 1,946 Fridley 364 1.276 0 7 435 1,377 1,812 0 8 8 1,820 NE Minneapolis 314 0 0 0 490 0 490 0 0 0 490 CBD I 0 0 1 0 0 0 0 3 0 3 3 Minneapolis Total ! 2.310 5,429 11 38 3.084 6.120 9.204 23 48 71 9,275 Grand TotalI 7,788 e:~sta~ounOs3~loa~3.wk4 I 0-Nov-99 2. 3. 4. Point of beginning of A.M. trips and end point of P.M. trip Includes people taking bus to station to ride train Trips from home to work and back only All trips, not just work Commuter Rail Boarding Summary Trips in Production/Attraction Format 2005 Rice/Anoka Home Base(3 Wont Total Daily Station Inpouncl Outbound Int3ound Outbound Total Walk Acc Dnve Acc Walk Acc Drive Acc Walk Acc Dnve Acc Total Walk Acc Drive Acc!Total Daily iBoarclino~s Rice 2 78 0 0 2 88 90 0 0 0 90 E St Cloud 46 183 0 0 70 225 295 0 0 0 295 Clear Lake 40 88 1 3 90 97 187 2 3 5 192 Beck, er 28 19 0 0 46 27 73 -' 0 0. 0 ~ 73 Big Lake 163 428 6 14 263 509 ~72 ' ' 15 15 30 802 Elk River 227 969 I 9 326 1,194 1,520 3 12 15 1,535 Ramsey 26 133 0 0 47 171 218 0 0 0 218 Anoka CBD 281 719 0 2 349 803 1.152 0 2 2 1,154 'Coon Rapids/Foley 651 1.200 0 2 776 1.277 2,053 0 3 3 2,056 Fddley 364 1.273 0 8 435 1.370 1.805 0 10 10 1 ,B15 NE Minneapolis 314 0 0 0 490 0 490 0 0 0 490 Minneapolis CRD 0 0 1 0 0 0 0 3 0 3 3 Totat 2.142 5.090 9 38 2.894 5.761 8.655 23 45 68 8.723 Grand Total 7.279 17.378 2005 Rice/Riverdale ; Home Based Work` I Total Daily Station Inl~ouncl Outbound ~nDound OutbounQ Total Walk Acc Dnve Acc Walk Acc Drive Acc Walk Acc Dnve Acc Total Walk Acc Ddve Acc Total Daily Boardings Rice 2 88 0 0 2 97 99 0 0'1 0 99 E St Cloud 46 185 0 0 70 223 293 0 0 0 293 Clear Lak,e 32 91 3 0 65 105 170 8 0 8 178 Beck`er 28 17 0 2 44 26 70 0 3 3 73 Big Lake 147 463 4 18 233 546 779 7 20 27 806 Elk River 227 996 0 6 325 1.216 1.541 0 9 9 1,550 Ramsey 29 173 0 0 51 216 267 0 0 0 267 Riverclale 436 ;.166 1 2 530 1.279 1.809 2 -t 6 1.815 Coon Rapids/Foley 641 1.100 0 3 765 1.176 1.941 0 5 5 1,946 Fridley 364 1.276 0 7 435 1.377 1.812 0 8 8 1,820 NE Minneapolis 314 0 0 0 490 0 490 0 0 0 490 Minneapolis CBD 0 0 1 0 0 0 - 0 3 0 3 3 Total 2.266 5.555 9 38 3.010 6.261 9.271 20 49 69 9,340 Grand Total 7.868 18.611 e:~n star~ouncls3~loa(~3.w~4 10-Nov-99 Point of beginning of A.M. trips and end point of P.M. trip Includes people taking bus to station to ride train Trips from home to work and back only All trips, not just work Commuter Rail Boarding Summary Trips in Production/Attraction Format 2020 St. Cloud/Anoka Home Basecl Work Total Dmly Station InDound Outbound Inbound Outbouncl Total Walk Acc Drive Acc Walk Acc I Dnve Acc Walk Acc Ddve Acc Total Walk Acc Dnve Acc Total Daily _Roe__rdings St Cloucl CBD 58 74 0 0 91 91 182 0 0 0 182 E St Cloud 40 75 0 0 66 98 164 0 0 0 1 64 Clear Lake 43 89 3 4 95 105 200 6 4 10 . 210 Becker 37 22 0 1 60 32 , 92 ~ 0 '1 1 93 Big Lake 202 503 7 25 326 596 922 18 28 46 968 Elk River 284 1,196 1 14 407 1,476 1,883 3 18 21 1,904 Ramsay 27 146 0 0 48 196 244 0 0 0 244 Anoka CBD 336 84.8 0 1 419 931 1,350 0 1 I 1,351 Coon Rapids/Foley 722 1,283 1 2 862 1,367 2,229 3 3 6 2,235 FridleyI 371 1,303 0 7 447 1.404 1,851 0 8 8 1,859 NE Minneapolis I 334 0 0 0 521 0 521 0 0 0 521 Minneapolis CBDJ 0 0 I 0 0 0 0 3 0 3 3 I I Total J 2.454 5.539 13 54 3.342 6.296 9,638 33 63 96 9.734 Grand Total 8,060 19.372 2020 St. Cloud/Riverdale i Home Based Work Total Daily Station InDound OutOound Inbound Outbound Total Walk Acc Drive Acc Walk Acc Dnve Acc Walk Acc Drive Acc Total Walk Acc Drive Acc Total Daily Boarclinc~s St Cloud CBD 57 75 0 0 89 90 179 0 0 0 179 E St Cloud 40 76 0 0 66 94 160 0 0 0 160 Clear Lake 34 90 4 2 71 102 173 9 2 11 184 Backer 37 21 0 2 61 32 93 0 3 3 96 Big Lake 178 544 ; 1 25 282 647 929 26 29 55 984 Elk River 264 1.226 I l 5 405 1,494 1.899 2 18 20 1.919 Ramsey i 32 ~ 93 0 0 55 249 304 0 0 0 304 Riveraale I 500 7.327 0 2 606 1.447 2,053 0 3 3 2,056 Coon RaDials/Foley 713 1.186 I 2 852 1.266 2.118 3 ,.t 7 2.125 Fridley 370 1.303 0 7 445 1,401 1,846 0 9 9 1.855 NE Minneapous l 334 0 0 0 521 0 521 0 0 0 521 Minneapolis CBDI 0 0 1 0 0 0 0 3 0 3 3 Total 2.579 6,041 18 55 3,453 6,822 10,275 43 68 111 10,386 Grand Total 8,693 20,661 e:~nstaCroun(ts3~Joac~3.w~4 1 O-Nov-99 Point of beginning of A.M. trips and end point of P.M. trip Includes people taking bus to station to fide train Trips from home to work and back only All trips, not just work Commuter Rail Boarding Summary Trips in Production/Attraction Format 2020 RiceJAnoka Nome Based Wor~ Total Dally Station InOound Ou~ound tnDound Ou~ouna Total Walk Acc Dnve Acc Walk Acc Dnve Acc Walk Acc IDnve Acc Total Walk Acc Drive Acc Total Dally I Boarclino, s Rice 2 82 0 0 2 91 93 0 0 0 93 E St Cloud 52 188 0 I I 81 231 312 0 1 1 313 Clear Lake 43 88 3 [ ,~ 95 104 199 6 4 10 209 Becker 37 22 0I 1 60 32 =, 92 ..'2 0 -1 I ' 93 Big Lake 203 501 8 24 329 594 923 19 27 46 969 Elk River 284 1.196 1 13 407 1.476 1.883 2 16 18 1,901 Ramsey 27 146 0 0 48 196 244 0 0 0 244 Anoka CBD 336 848 0 t 419 931 1,350 0 1 1 1,351 Coon Rapids~Foley 722 1.283 1 2 862 1.367 2.229 3 3 6 2,235 Fridlev 371 'I .303[I 0 6 447 t 1.404 1.851 0 7 I 7 1.858 NE Minneapolis [ 334 0 0! 0 521 0 521 0 } 0 I 0 521 iMinneaooiis CBD 0 I 0 "I 0 0 0 0 3 I 0 I 3 3 Total :1! 2.41'.il 5.657} 'J' I ,_ =~ 3.27! I 6.426t 9.697I 33I 60i} 93!, 9.790 iGrand Total 3.134 i ~9.487 I I 2020 Rice/Riverdale i -tome Based Work Total Dally Station L inOounO Outl3ouno inbound Outbound :Total !21Walk Acc,DnveAcc Walk Acc DnveAcc Walk Acc DnveAcc Total iWalk Acc IDnve Acc,Total Daily , Boa~ings I Rice 88 0I 0 2 97 99 0 0 0 99 iEStCIouO ' 52 ,88 C, "I 8t , 226 307 i 308 1 Clear Lake I 34 91 -[ !I 71[ 103 i 174 10 i i t 11 185 Becket I ~ 21 '3 I ~ 61 32 93 0 i 3 [ 3 96 3ig La~e ! 179 545 a 1 23:3 i 285 648 933 26 I ~.5 978 Elk River 284 :226 ' 405 1.494 I 1.899 2 17 I 19 1.918 .~amsey Ii 32I !93I 3! ':i 55 249I 304 o i :. I 0 304 i Riveroale i 500, ;327' ,3I 3 606 1.447 2.053 0 t ': i 4 2.057 i Coon RamdsiFoleV j 713 : 186 ~ 2 852 1.266 2.118 ~'j "i 7 2.125 ; FriOley J 370 : .303 i 6 445j 1.401 1.846 ~ 8 j 11 1.857 i NE Minneapolis , 334 , 0 O; i 0 521J ,. 0I 521 0t OJ 0 521 Minneapolis CBD 0 O : 0 r~ O O 3 0 3 3 Total 2.537 6.168 16 51 3,384 6.963 10.347 40 I 64 104 10.451 ~ Grand Total , 8.772 20.798 e:,z~star~ounds3~Joao3.wl(4 : 0-Nov-99 2. 3. 4. Point of beginning of A.M. trips and end point of P.M. trip Includes people taking bus to station to ride train Trips from home to work and back only All trips, not just work Commuter Rail Boarding Summary Trips in Production/Attraction Format 2020 East St, Cioud/Riverdale Home Oasecl Work Total Oail.v Stat,on Inl3ounO OutDouncl Ini~ounO Outt~3unO Total Walk Acc Dnve Acc Walk Acc Dnve Acc Walk Acc Dnve Acc Total Walk Acc Drive Acc Total Daily - c St Clouci 84 177 0 0 96 214 310 0 0 0 310 Clear LaKe 36 90 2 2 76 102 178 4 2 6 184 Becl(er 37 21 0 2 61 32 93 0 3 3 96 Big Lake 178 544 11 24 282 647 929 25 28 54 983 EJk River 284 1.226 l 14 405 1.494 1.899 2 17 19 1.918 Ramsey 32 193 0 0 55 249 304 0 0 0 304 Riverclale 500 1.327 0 2 606 1.447 2.053 0 2 3 2.056 Coon Rap~OstFoley 713 1.186 1 2 852 1.266 2.118 . 3 -t 7 .2.125 Fnclley 370 1.303 0 7 445 1,401 1.846 ~ 0 2 9 1,855 NE Minneal~olis 334 0 0 0 521 0 521 0 0 0 521 Minneapolis CBD 0 0 1 0 0 0 0 3 0 3 3 0 0 0 Total 2.548 5.067 16 53 3.399 6.852 38 66 I 0.251 104 1 GranO Total 8.684 2020 East St. CIoud/Anoka Walk Home Basecl Work Total Da,v Stat, on Acc Walk 1' I nnounO OutbounQ Inbound OutDoun(3 Total , Acc Dnve Acc Drive Acc Walk Acc Dnve Acc Total Walk ACc Dnve Acc Total Dally : St CIou(3 i ' Boarclincjs - 64 I 177 0 0 96 219 315 0 ; 0 315 CZear LaKe ! 43 89 3 4 95 105 200 9ecker 37 ?--2 0 1 60 32 92 0 1 93 Big LaKe I 202 503 7 25 326 596 922 18 28 46 968 _.Elk River 284 1.196 1 14 407 1.476 1.883 3 18 2~ 1.904 Ramsev 27 146 0 0 48 196 244 0 ~ 0 244 Anoka CBD 336 848 0 1 419 931 1.350 0 ~ 1 1.351 :Coon Rapids/Foley 722 1.283 1 2 862 1.367 2.229 3 ~ I 6 2.235 Fri(tlev I 371 1.303 0 7 447 1.404 1.851 0 ~ 8 1.859 NE MinneaoolmI 334 i 0 C 0 521 0 521 0 ; 0 521 ! Minneapolis CBD I 0 ! 0 1 0 0 0 0 3 ~ 3 3 ~ I t 0 0 0 ;Tota~ :, ~.420 5.567 ~3 54 3.281 6.326 33 53 , i ! I ! ,9.703 i,Grano Total , 5.054 ] Point of beginning of A.M. trips and end point of P.M. trip Includes people taking bus to station to ride train Trips from home to work and back only Ail trips, not just work Commuter Rail Boarding Summary Trips in Production/Attraction Format 2020 RicelRiverdale ~1 I Home Base~ Work I Total Daily i Station ! ,nOouna J Oufoouna I lnt~ouno Ou~ouna Total ; Walk Acc Drive Acc Walk Acc Drive Acc Walk Acc IOnve Acc Total Walk Acc i Ddve Acc Total IDaity II ! Boarclings 'Rice 2 88 0 0 i 2 97 99 0 0 0 99 E St Cloud 52 188 0 1t 81 226 307 0 I 1 308 Clear Lake 34 91 4 1 71 103 174 10 I 11 185 Becket 37 21 0 2 61 32 93 -- 0 .3 3, 96 Big Lake 179 545 8 23 285 648 ;933 - 19 26 45 978 Elk River 284 1,226 1 13 405 1,494 1,899 2 17 19 1,918 Ramsey 32 193 0 0 55 249 304 0 0 0 304 Riverdale 500 1.327 0 3 606 1,447 2.053 0 4 4 2,057 i Coon Rap~ds~Foley 713 1.186 t 2 852 1.266 2.118 3 .t 7 2,125 . Fridley 370 1.303 i 6 445 1.401 1.846 3 8 11 1,857 NE Minneaooiis 334 0 0 i 0 i 521 0 521 0 0 0 521 i Minneapolis CBD , 0 0 1 0 ! 0 0 0 3 0 3 3 'Total i 2..537 I 8.168 16 51 3.384 I 6.963 10.347 40 64 104 10.451 iGrand Total I 8,772 2020 US 10 Improvements Home Based Work I Total Daily ] Station I redound OutOouna [ inl3oune [ 'OutDouna Total Walk Acc Onve Acc Walk Acc IDnve Acc IWalk Acc Drive Acc Total .Walk Acc Dnve Acc Total Daily , Boardings Rice I 2 87 ,3 I '3 2 94 96 0 0 0 96 ! 50 183 0 0 220 294 0 0 0 294 Clear Lake [ 34 901 3 I ~ 70 102 172 6 : 7 179 , I o! .56 29 O l o 0 87 Elk River [ 282 I ,.1'T7 ~ !3 400 1.422 1.822 3 [ 17 20 1.842 Ramsey i 32 201 O :3] 54 261 315 0] Oi 0 315 Riverdale [ .t97 ~ .328 0 3 [ 603 1,450 2.053 0 ] 3 3 2,056 Coon Rao~as/Foley 713 1.186 : I 2 852 1,268 2,120 3 3 6 2,126 ,-'r~dley . 370 1.303 i [ 8 I 4.45 1.403 1.848 3 7 t0 1,858 NE MinneaDoUs i 334 .3 t .3 0 521 0 521 0 i O 0 521 Minneaoous CBD * 0 0 0 0 0 0 3 I 0 3 3 Grand Total 8.691 ~. :-n star~ounos3~oaos3h.wK4 16-Nov-99 2. 3. 4. Point of beginning of A.M. trips and end point of P.M. trip Includes people taking bus to station to ride train Trips from home to work and back only All trips, not just work Commuter Rail Boarding Summary Trips in Production/Attraction Format 2020 Crossing la Home Based Work Total Daily Station inbound Outbound Inbound Outbound Total Walk Acc Drive Acc Walk Acc Drive Acc Walk Acc Drive Acc Total Walk Acc Dnve Acc Total Daily Boarclings Rice 2 87 0 0 2 94 96 0 0 0 96 E St Cloud 50 182 0 I 74. 216 290 0 2 2 292 Clear Lake 33 88 3 1 67 t00 167 6 1 7 174 Becker 36 21 0 0 58 29 87 " 0 0 0 ' 87 Big Lake 176 523 5 26 272 610 882 12 31 43 925 Elk River 281 1,166 2 15 398 1,406 1.804 6 18 24. 1.828 Ramsey 32 202 0 0 54 262 316 0 0 0 316 Riverdale 497 1.328 0 3 603 1,450 2,053 0 3 3 2.056 Coon Rapids/Foley 713 1,186 1 2 852 1.268 2.120 3 3 6 2.126 Fridley 370 1.303 1 6 445 1,403 1.848 3 7 10 1,858 NE Minneapolis 334 0 0 0 521 0 521 0 0 0 521 Minneapolis CBD 0 0 I 0 0 0 0 3 0 3 3 Total 2.524 i 5.086 13 54 3.346 6.838 I 0.184. 33 55 98 10.282 Grand i Tota, 8.677I 2020 Crossing lb Home Based Work I Total Daily Station inDouno Outbound InDound Outbound Total ,'Watk Acc Dnve Acc Walk Acc Drive ACC Walk Acc ;Dnve Acc Total Walk Acc fDnve Acc Total BoardincjsDaily ~_ St Clouo~ 50 182 O ~ 74 2t 6I 290 0 2 2 292 Clear Lake 34 89 3 i 70 101 171 6 ~ · 7 178 Backer 36 2I 0 0 58 29 87 0 0 0 87 Big Lake 176 523 5 26 272 610 882 12 31 43 925 Elk River 281 1,166 2 15 398 1.406 1,804 6 18 24 1.828 Ramsay 32 202 0 0 54 262 316 0 0 0 316 Rivercla~e 497 1.328 0 3 603 1.450 2.053 0 3 3 2.056 Coon Rapids/Foley 713 1.186 1 2 852 1.268 2.120 3 3 6 2.126 Fridley I 370 ! .303 1 5 445 1.403 1,848 3 7 I 0 1.858 NE Minneapolis 334 0 0 0 521 0 521 0 0 I 0 521 Minneapolis CBD 0 0 1 0 0 0 0 3 0t 3 3 Total 2.525 I 6.087 13 54 3.349 6.839 I 10,188 33 55 98 10.286 Grand Total 8.679 e:,nstarvoun(ts3~oa~s3h.w~4 16-Nov-99 Point of beginning of A.M. trips and end point of P.M. trip Includes people taking bus to station to ride train Trips from home to work and back only All trips, not just work rT' lie NEWSPAPER OF THE TWIN CITIES Saturday DECEMBER 18, 1999 Commuter rail, the other line, is taking shape Propnsed commuter- ra~ stations ?i'.: :.' Proposed commuter- rail route A St. Cloud-to-Minneapolis line could be in operation by 2005. By Laurie Blake "' Star Tribune Staff Writer While the public spotlight has been focused on the Twin Cities area's first light-rail line, work on the region's first commuter-rail line has been chug- ging ahead quietly. Now, after three years of study and design, thb proposed 80-mile Northstar line is about to pull into view for serious scrutiny. The plan is to run 18 passenger trains a day on existing freight tracks between St. Cloud and Min- neapolis. Four counties, 15 cities and four town- ships along the route are pushing the project with hopes of starting service by 2003, the same year light-rail service is expected to begin'along Hiawa- tha Avenue in Minneapolis. RAIL continues on kl.7: -- Prospects for state funding are unclear. ALSO INSIDE: Four big-name construction compcmies are chosen to con- tinue bids for light-rail con- tract. B3 mnea The Nonhstu would requl~e .... 'l~{OFe [qfonnation: " $22.3 million in public flmding and ........... :.' ..................................... approval by the Burlington North..: ::),.' Phone: Northstar Contdor De- '~ em Santa Fe railroad, which ownj ~..::. ve[opmentAuthodty, 612-323-" the tracks, And because commuter :' 5692. rail proponents are counting on $89 n'dllJon fi.om the state, the pro- ject's fate is expected to be sealed in the upconfing legislative se..sion. 'A lot now hangs on whai the public decides to do with respect to suppo~ng the project." said DI Mitchell, assistant vice president of passenger operations for. Burlinglon. f tUthough Burllnglon officials are open to sharing Minnesota tracks w~th passenger n'ains -- the company already qhares tracks in mher cities -- the railroad will not cmnplete negotiations until pro- ject linanchlg is secured, Mitchell said. The prospects fi)r ilate funding Jre unclear. Gay. lesse Venmra mentioned the prniect in'his imm. .aural ~peech, but the ,idmin- istration hasn't decided what irans- ponation ~nding t0 recommend. Northstar o~cials have hired a lob- byist but have not identified legisla- tors who will push for funding, 'transportation Commissioner Elwyn rinklenberg, who tikes the Northstar proposal, said his own ioal is to establish a fund for transit proiecu -- ~nuch tike the gasoline :iLX dedicated [o road improve- meats -- SO transit improvements can be freed fi.om project-by- project political approval. Northstar proponents say they are optimistic that legislators will recognize the need to plan coming growth and traffic con- gesdon. "Some people are against ev- erything and some people are ahald of change,' said Anoka County Commissioner Paul McCarron, a leading commuter- rail proponent. "But I think that under close examination they will see that this wonld serve the ,q'eater good. "lt w~ll muve a maximum hum~ bet o1' people with a minimum amount of cost -- less cost than expanding the roads or putting in light rail,' he said. 'rhe Minnesota rransponation L]flna r~ m~Fi [ hlpl rnnked the ~.. Web: hn'p:Hwww.brwinc.com/ northstar. }. Whot'a n.t: Planning meetings will begin in late Jannary or early February to gather public input on station amenities. Northstar as Ihe store's most protnising commuter-rail line. Sludies have hagen on two olhers: the Dan Patch line front I.akeville to Minneapolis and the Red flock tine from Ilasdngs to St. Paul.. Relief for Hwy. 10 Work .n ~l~c' xlmshqar began when ~1 bec:line ,:lear dial the area northwest of Minneapolis wouhl not he ~ choice tar ',i~hl .~.h:tL. mo said. Fha line was con- ceiveti as an ahemadve which is jammed with commnle~s al rush hour md is expected m becmne more congealed as the area northwest of th~ Twin Chi. grmvs, Now, lh~. 10 carries an amage of fig,000 cars a day In the cily of Anoka. acco.ting m the l'ranspomtion DepamnenL tn additi.n Io ils use I)y lhe work fo[ce, supl)~lrle[S ~ay, the train would allow sludems to live at home and commule lo the Uni- versity nE Mtnnesola Cloud State Universi~. And some are b~okJng [on~ard m taking a commuler train to Minneapolis lo connect with the }ll~a Avenue light-rail line an mute to the Ml~eapolis-St, Paul Inlemadon~ g~on. Bide.hip esOm~les ~orecast ~,340 dd~ a day in 2003, or about 2.8 mi~ion rides a ye~. Iohn Weaver, an Anoka City Council member, ~nks mlership wouhl ~ow as the frustration in- creases ~th delays on }1~. 10. "This MIl be a ma~elous ~ellef v~ve that we n~,' Weaver aid. ~e popnlafi~ of the project has astounded Sherimrne Cnmmissim~r Betsy Wergin, chainvoman of lhe Northstar Cop ddnr Development .~dthnri~y, Commuters board a Bufllnglon Northern Santa Fa train this week at Chicago's Union Station. The rail- road's b'acks sro also used for com- muter rail In Los Angel.. joint powers board ,werseeing the proiect. Wergin said she ms ini- tially a skepdc, "What I hear when I go eve~vhere i~, 'You've got to do this,' ' she said, Hailroad Is eooperating Rtulin~on bas bom suppnrlive ;Ind involved in disc.salons ;IbOlll the project, said ~lcCarron, ~oka Coun~ commissioner, The railroad has commuler ~rab~s running on ils tracks in Chicago ~d Los Angeles and ~11 ~oon add ~em in Sealtle, the comp~y's Mitchell said, Besides bu~ng the trains, th~ capHal case co~ected ~th com- muter r~l come in ~e con- s{~ction o[ stadons ~nd iQ' Irack ~p~ovemen~ necessa~ for safe andefficient sharing of · ac~ by passengers and fieighl, · Some of the negmiations be- tween Northstar officials and ~e railroad focus on what uack im- provements are necessa~ and ow much each side ~1 pay. Bu~on would be paid for the passenger train use of its track hut d.es not e~ecl to make a prnfit ham Ihe ~er.'ice, HilchNI ';aid. ,. The primary concern for the : company Is that It must be sure . that the passenger service does [not get In the way o.!' or delay lis · ~tel$ht Opi~tlons, he said. Among the opponents of the project a~e two Republican legislators from the area that would be served by 'ther~illine. ,,, .: ', ,' 't Rep. Mark Olson, R-Big Lake, 'said people support the rail line not because they plan to use It but because they th~nk it will get other drivers off the toad. "l think it's a fun and exciting thing for os to confider .... "he said. But when roeople look at the facts, support r the.project will fade, he said. Sen. Mark Ourada, R-Buffalo, a member of the Senate Transpof radon Commitlee, said he is skep- Ileal of the benefit commuler rail would provide far the money. 'l'o my way of Utinking we may be much better off to say. 'Let's spend that on technology and lecnmmutin~ capability :go that people don'! have to commute at all.'" ~ervice In 2003 Unlike Ii~ht rail..vbich -uns ,m its mvn tracks and provides ire- quent, all-day service, cnmmtner rail wonld mn only ,'st rush hours. The tracks would have t,) lye kept open for freight !ransportadon most'o( the slav. B~t like tht: proposed Hiawatha !lght-rall line. which has received $120 million Itt state Eroding, the Northstar must receive a ftmdtng commitment rtom die state to Will approval from tire Federal Transit ,\dministrati,m .sod $1 i I million fi'om the federal government. Though ofllclais wince at the suggestion that the tw~ projects are competing far funding, both need money front the same fed- ual transpormion fund. Commuter rail officiaJs hope to receive a favorable rating for the project from the Transit Ad. rr~nisn'adon in Februa.,~ or March. The long*range plan is to con- nect the light-rail and commuter- rail Lines with a station in down- town Ivfinneapolls behind the T~- get Center. In August. the Northslar devel- opment authority hired Shandwick Reeearch International to conduct a lelephone poll of 500 residents Ii,ag within .5 miles ~fthe North. stqr line. Seventy-three percent nf respondents ~aid they considered commuter rail ia go,t,l idea..md 17 percent said they would use dte , Rail_pj_oJects at a glance 'North~ta~ commut, r 'raft ~ b ~ Commute~ rail is passe~ge~ ~'a~ service Ii, at oPeatea on existing height railroad ~'ac~& In cars ~led ~ c~esel serves ionge~ ~z~s from suburban madders and opeates pimadb' from & a.m. to 9 a~. and 3 pm. to t.~g~ 80 miles~ dde~ip: 9.340 per ddes a day u about 2.8 million ruff a year by 2001 '/ Wright Bl~ Lage- LSat~ Co. Rd. ,I 3 light rail ~ is ltl: [ i~t tal eun~ on ilz own ~acks, off~k~g fre~ent se~e ~ough Ihe day. R uses e~tr~ ~wer c~r~ ~y ove~e~d wle$. · ~Oda~ed ~: 19,5~ dal~ g ps at ~n~g and 24,4~ a day Oy 2020. ~g c~ $9~ milan a ye~, ~ ~ ~ ~ ~t a~i~b~ ~ ~ ~ ~ ~t ava~b~ ~ oo~t: S223 milan -- ~0 percent federal, 40 percem state' atx110 pece~t mien a year inchiding ~ cost of f~ bu~s Pas~8~ f~ wash off~t ~e of U~is COSL $.u5. ~ $3.47 ~ 2~3. 30 ~rcenl of xl Ramsay B~ H~.Co. 6/st Ay. and Cenfal Ay. NF. ~_. Mlnneaool~ - N, 511~ SL and St . Mpls.-SL Paul hr1Ah'<xt Sources: Minnesola DeoaMment at Nonttstar CorrUot D~velo~ne~l Star Ttbune mao by ~.'-a~ F~e~rnann line to commute to work. All four counties touched by the rail line -- Sherbume, Benton, Annka attd tlennepin -- have agreed m pay part of the t0 per- cent cnunry share of the project, The connty poninn would come to $23 milliun in ."003 dollars, Besides its cost, the biggest concerll ;ihmll the project Is wh. wmzld pay Iho operating ,:n~ts -- $13,8 n.lli,m ,i year in 2110:1 daf hrs. CoomV 'md ci~ nfficiah do or. want their residents In pay. The issue is unresdved. The Transportation Depot!meat '.viii jlresenl a commuter.rail master clan early next year that would alp the Legislature get a com- muter-rail system going, but it would leave funding an open po- litical question. lalurle Blazl:e rem he reached h), e.omit nt Gettin~th~.re,'*~tar NORTHSTAR CORRIDOR DEVELOPMENT AUTHORITY RESOLUTION NO. 2000-2 The Minnesota Department of Transportation (Mn/DOT) assisted by Anoka and Sherburne Counties is proposing to develop up to four multi-modal park and pool/ride lots within the TH 1 O/Northstar Corridor in 2000 to 2001. These multi-modal facilities are intended to aggregate passengers to maximize the use of express bus and other transit services between the cities within the Corridor and to alleviate existing congestion on roads and highways including TH10, TH610, TH252, TH47 and Interstates 94, 694, and 494. Mn/DOT is performing planning and analysis relating to the location, size, design, impact, etc. of each of these multi-modal facilities and will also be performing an environmental review regarding these facilities and their locations prior to development. Each of the multi-modal facilities will be sited and designed to address existing and future transportation/transit needs within the Corridor, alleviate transportation/traffic impacts associated with high and growing volumes within the Corridor and will be able to serve/support a wide variety of alternative transit modes. The multi-modal facilities are needed improvements within the TH1 O/Northstar Corridor regardless of the kind or type of transit mode(s) used to serve the Corridor. The NCDA is currently preparing an environmental impact statement on the Northstar Corridor Transportation Project. The Project EIS is examining three general alternatives for addressing transportation/transit system needs and improvements within the Corridor. Law and regulation governing the preparation of environmental impact statements require that no action be taken in connection with a project under review which would "prejudice the ultimate decision on the project", "have an adverse environmental impact", or "limit the choice of reasonable alternatives." Adopted: January 6, 2000 By: Betsy Wq~n, Chai~ I hereby certify that the above resolution is a true copy of the Resolution duly passed, adopted, and approved by the Northstar Corridor Development Authority on January 6, 2000. Doc# 118723151 MEMORANDUM DATE: TO: FROM: January 6, 2000 Betsy Wergin, Chair Northstar Corridor Development Authority (NCDA) Peter Beberg, Mayor, City of Anoka John Weaver, Councilmember, City of Anoka Status of Anoka 4~ Avenue Commuter Rail Station The City of Anoka requests that the NCDA address the status of the Anoka 4~ Avenue commuter rail station based upon the following facts: On September 2, 1999 the NCDA approved station locations but left the Anoka 4m Avenue and Coon Rapids - Riverdale stations as apparently mutually exclusive options which "are unresolved and require further analysis". Today, the NCDA is being asked to approve and authorize immediate implementation to develop multi-modal stations at Big Lake, Elk River and Coon Rapids-Riverdale. The Big Lake, Elk River and Coon Rapids-Riverdale multi-modal stations are coincident with the designated locations for potential commuter rail stations. The recommended action to select the Coon Rapids-Riverdale station as a multi-modal site is, in reality, selection of this same location as a commuter rail station. Authority planners are strongly urging Anoka to prepare a commuter rail transit area plan for the 4~ Avenue station although it has not yet been formally added to the system by the NCDA. As the next agenda item indicates, "for those cities in the metropolitan area where a NCDA station is planned, the City will be asked, as part of the comprehensive plan review, to submit a resolution of commitment to developing a full station-area plan for submittal as a plan amendment". The letter also notes that "documentation of local transit-oriented land use and investment commitment is needed by August submittal date for the funding request to be competitive". Therefore, the City of Anoka is being requested to make commitments and expend funds for station area planning without having been designated officially by the NCDA as a station location. Therefore, the City of Anoka requests formal designation of the Anoka 4th Avenue station so such planning LEGISLATIVE STRATEGY FOR NORTHSTAR 2000- 2001 CAPITAL COSTS NEEDS $54 MILLION 2000 -$19 MILLION (CASH) 2001 - $35 MILLION (BONDS) OPERATIONS AND MAINTENANCE COSTS TOTAL ANNUAL ESTIMATE YEAR 2003 TO ST.CLOUD $12 MILLION LESS FARE BOX REVENUE $3.5 MILLION OPERATIONS & MAINTENANCE NEEDS $8.5 MILLION** OPERATIONS AND MAINTENANCE COSTS TOTAL ANNUAL ESTIMATE YEAR 2003 TO ST.CLOUD $12 MILLION TO RICE & FEEDER BUS $ 2 MILLION LESS FARE BOX REVENUE $4.6 MILLION OPERATIONS & MAINTENANCE NEEDS $9.4 MILLION** **STATE GENERAL FUND APPROPRIATIONS FOR TRANSIT OPERATIONS $4.5 MILLION **REGIONAL TRANSIT FUNDING FROM A PORTION OF THE 1991 COUNTY ADOPTED ONE HALF CENT SALES TAX $4.0 MILLION DEDICATION OF A PERCENTAGE OF CURRENT 6.5% SALES TAX. TWO SEPARATE FUNDS - METRO AND NON METRO - CREATED. METRO FUND WOULD REMOVE TRANSIT OPERATIONS FROM PROPERTY TAX AND PROVIDE REVENUE TO GROW THE TRANSIT SYSTEM, INCLUDING BUSWAYS AND COMMUTER RAIL. (SEE ATTACHED SHEET FOR YIELDS) Sales Tax MVET Total State-Wide 3,686 52O 4,2O6 2O0O Metro 2,395.9 338 2,733.9 Non-Metro 1,290.1 182 1,472.1 Rate .25¢ .2¢ .1¢ Yield 323.54 258.83 194.09 161.77 129.42 64.71 Metro (65%) 210.30 168.24 126.16 105.15 84.12 42.06 Non-Metro (35%) 113.24 90.59 67.93 56.62 45.30 22.65 Sales Tax MVET Total State-Wide 3,875 526 4,401 2001 Metro 2,518.75 341.9 2,860.65 Non-Metro 1,356.25 184.1 1,540.35 Rate .5¢ .4¢ .3¢ .25¢ .2¢ .1¢ Yield 338.54 270.83 203.09 169.27 135.42 67.71 Metro (65%) 220.05 176.04 132.01 110.03 88.02 44.01 Non-Metro (35%) 118.49 94.79 71.08 59.24 47.40 23.70 (:.o,m m ule'.r px E! i, TABLE OF CONTENTS Section I -Introduction 1.1 Background 1.2 Implementation Strategy Section 2 - Plan Administration Guidelines 2.1 2.2 2.3 2.4 Governance System Plan Approval Process System Plan Maintenance Planning and Programming Section 3 - Funding and Financing Guidelines 3.1 Cost Sharing 3.2 Sources of Funding 3.3 Financing Techniques Section 4 - Advanced Corridor Planning Guidelines 4.1 4.2 4.3 4.4 Planning Guidelines Design and Procurement Guidelines Construction Guidelines Operating Guidelines Appendix Section A- Central Corridor Service Schedule Section B - Background Material Section C - 1999 Commuter Rail Legislation Section D - Growing Smart in Minnesota, Office of Governor Jesse Ventura Commuter Rail System Plan TOC-1 Introduction SECTION Vision Statement Commuter rail will be planned, designed, and implemented to provide a unified, integrated, and efficient multimodal transportatiOn system. ,'"'.fn/Do~as built on the results '~e Twin Cities Metropofitan ¢¢,'nmuter Rail Feasibility Study" INTRODUCTION 1.1 Background In January 1999 the Minnesota Department of Transportation (Mn/DOT) presented the results of the Twin Cities Metropolitan Commuter Rail Feasibility Study to the Minnesota Legislature. After hearing those results the legislature passed M.S. 174.80 to 174.90 which gave the commissioner of Mn/DOT the authority to plan, design, construct, and operate commuter rail in the State of Minnesota. Further, the commissioner was charged with the responsibility of developing a commuter rail system plan that would ensure that, if built, commuter rail would be part of an integrated transportation system that would interface with all other forms of transportation including light rail transit (LRT), buses, Dark and ride, bicycles, and pedestrians. In devetoDing the commuter rail Commuter Rail Feasibility Study and in particular the implementation strategy presented in the final report. The commuter rail system plan addresses the following: · How Mn/DOT will manage the authority provided for in legislation. · Describes in detail the process that commuter rail corridors must follow to obtain Mn/DOT approval to move forward with'implementation of commuter rail. · Provides a single point of authority to advance commuter rail implementation. · Establishes ground rules for the funding and financing of all aspects of commuter rail activity. · Develops engineering standards for system components. · Declares a framework for conducting negotiations with the host railroad(s). · Declares the necessity of coordination of commuter rail with all other transportation plans and transit services. The commuter rail system plan has been developed as a prescriptive tool that ensures commuter rail will be accomplished in a cooperative and consistent manner that provides to the maximum extent possible, coordination among stakeholders. The system plan reinforces the legislative direction that has placed Mn/DOT in charge of the planning, design, construction, and operation of commuter rail and the system plan that commuter rail will only be advanced where it is consistent with the transportation plans Commuter Rail System Plan 1-1 "The Commuter Rail System Plan builds on the results of the Twin Cities Commuter Rail FeaSibilitY Study" of affected metropolitan planning organizations and with the implementation strategy contained in the system plan itself. 1.2 Implementation Strategy The Commuter Rail System Plan, as stated earlier, builds on the results of the Twin Cities Commuter Rail Feasibility Study and in particular focuses on the implementation strategy presented in the Final Summary Report. This implementation strategy provided for a two tiered and staged implementation of six (6) commuter rail corridors and the central corridor connecting the cities of Minneapolis and St. Paul as shown in the map below. Commuter Rail System Plan 1-2 'Within the Commuter Rail Sys[em Plan [he implementation strategy has been modified only slightly." "Revised legislation provides Mn/DOT the authority to plan for commuter rail beyond the seven county metropolitan area" Tier I staging was presented as follows: · Stage 1 - Northstar corridor from Elk River to Minneapolis; · Stage 2 - Red Rock corridor from Hastings to St. Paul; · The Minneapolis to St. Paul connection may be implemented in Stage 1 or Stage 2 and must be implemented no later than Stage 2; · Stage 3- Dan Patch corridor from Lakeville to Minneapolis. Tier II included the following corridors with no staging or priority for implementation suggested: · Bethelto Minneapolis; · Forest Lake to St. Paul; · Norwood-Young America to Minneapolis; and · Extension of existing corridors. Within the Commuter Rail System Plan the implementation strategy has been modified only slightly. It has been modified by extending the Northstar Corridor termini from Elk River to the St. Cloud area reflecting the authority given to Mn/DOT to plan commuter rail beyond the seven county metropolitan area. In addition, it has been modified to reflect that the Minneapolis to St. Paul connector will be implemented with the Red Rock Corridor. Justification for these modifications include the following: · Revised legislation provides Mn/DOT the authority to plan for commuter rail beyond the seven county metropolitan area; · The Northstar Corridor Development Authority has actively pursued implementation of commuter rail service to the St. Cloud area consistent with its federal funding authority; and · The Twin Cities Metropolitan Commuter Rail Feasibility Study identified significant value in implementing the central corridor with the Red Rock (Hastings) corridor rather than implementing it with the Northstar Corridor. Specifically, ridership on the Red Rock Corridor is extremely dependent on through trips to downtown Commuter Rail System Plan 1-3 Minneapolis. The same is not true for the Northstar Corridor ridership dependence on trips through to downtown St. Paul. Commuter Rail System Plan 1-4 Plan Administration Guidelines SECTION PLAN ADMINISTRATION GUIDELINES The purpose of this section is twofold: (1) to outline the various alternatives related to public sector sponsorship of commuter rail services provided throughout the State of Minnesota (2) to recommend a viable organizational approach for ~e safe, reliable and cost-effective provision of such services. "/t is recommended that Mn/DOT serve as the initial sponsor of commuter rail service." 2.2 Governance in light of the passage of recent Minnesota State legislation~ that establishes Mn/DOT as the state's commuter rail planning and implementation agent, it is recommended that Mn/DOT serve as the initial sponsor of commuter rail service. Mn/DOT may delegate commuter rail sponsorship to a federated Joint Exercise of Powers Agency (JPA) comprised initially of representatives of affected parties. An alternative to Mn/DOT would be the creation of "MnTransit," a state-level agency with statewide responsibility for transit planning and operations similar to the New Jersey/NJTransit model. However, this approach seems to conflict with the legislature's intent to specifically empower Mn/DOT with these same duties and responsibilities as they relate to commuter rail. Furthermore, adding to the already lengthy list of Minnesota public agencies with some measure of transit and/or specifically rail-related responsibilities may not be viewed by the current administration as being in the best interest of the public. Candidates for membership in a JPA include relevant Regional Railroad Authorities a~ Metro Transit as well as other affected counties, cities, communities, metropolitan planning organizations, and/or transit service providers throughout the region. To the extent that commuter rail Advanced Corridor Plans are initiated outside the seven-county region, the membership of the federated Joint Powers organization could be modified accordingly. This approach is similar to that adopted in the Central Puget Sound Region. Another potential alternative would be the delegation of sponsorship status by Mn/DOT to Metro Transit. This alternative would be consistent with Metro Transit's current duties and responsibilities as primary transit service provider throughout the seven-county Twin Cities Metropolitan Area. However, current state law limiting the provision of Metro Transit's services to the seven-county area would have to be amended to allow for the potential provision of commuter rail service outside the region or elsewhere throughout the State of Minnesota. The approach which has been taken in the Central Puget Sound with regard to the role of bus service providers has been to formulate intergovernmental agreements with such agencies (Community, Everett and Pierce Transit) for the provision Minnesota Session Laws 1999, Chapter 230 - S.F. No. 1762, Section 20 Commuter Rail System Plan 2-1 "'~ and when the Commissioner 2roposes modifications to the C~ystem Plan, the modifications will De presented to affected MPO's for ~pprovaL " of feeder bus service to and from LRT and commuter rail stations. Giver~ their long history of providing high-quality bus service throughout the Twin Cities Metropolitan Area, this may also De Metro Transit's "best and highest use" in the context of the provision of commuter rail service as opposed to serving as sponsor of such service. 2.3 System Plan Approval Process Approval by affected Metropolitan Planning Organizations (MPO's) is required prior to the preparation of final design plans. Approval of the System Plan by the Metropolitan Council for the Twin Cities Metropolitan area and the St. Cloud Area Planning Organization for the St. Cloud area is required. tf and when the Commissioner proposes modifications to the System Plan, the modifications will be presented to affected MPO's for approval. Approval Process Steering Committee Adoption I· Mn/DOTCommbsioner '-=~1 Consultation with Affected ] Regionnl Rnilrend Authorities (1) Commuter R~il Corridor Committees Review AdoPtion by Mn/DOT Commiasiener (I) Consultation is achieved through liaison by Smermg Committee mem~rs with their respective Regional Railroad Authorities Commuter Rail System Plan 2-2 "Mn/DOT is the logical organization to maintain the System Plan" "it is imperative that communities, along with affected Metropolitan Planning Organizations and Mn/DOT, panner and address issues that ensure the success of the community and of commuter rail service." 2.3 System Plan Maintenance The Twin Cities Commuter Rail System Plan is a living document that wi II need to be modified, especially as real-life experience with commuter rail is gained. As the organization responsible for all aspects of planning, developing, constructing, operating and maintaining commute rail, Mn/DOT is the logical organization to maintain the System Plan. Mn/DOT will be responsible for ensuring the commuter rail plan is in compliance with local, state and federal planning and programming requirements. However, the Steering Committee structure that was used during the Twin Cities Commuter Rail Feasibility Study and again to develop the System Plan, presents an opportunity to maintain communication and coordination among the regional rail authorities and Commuter Rail Corridor Coordinating Committees. It is recommended that the Steering Committee structure be maintained and utilized as a review board for maintaining the System Plan. 2.4 Planning and Programming Commuter rail service is dependent upon the compatibility between efficient land b. policy and transit investments. Commuter rail is most successful when land use policy around stations, neighborhoods, communities, the region and ultimately the state allows for innovative, flexible, and inclusive solutions. Community Plans Local communities play a large role in the success or failure of commuter rail service, especially in the initial stages of implementation. It is imperative that communities, along with affected Metropolitan Planning Organizations and Mn/DOT, partner and address issues that ensure the success of the community and of commuter rail service. In order to maximize commuter rail service and community opportunities, local land use planning must recognize the potential impacts of commuter rail investments. Mn/DOT will work with local units of government to ensure their voice is heard while commuter rail is being explored as an investment option for the people of Minnesota. To meet this commitment, Mn/DOT will: Commuter Rail System Plan 2-; "The Minnesota Department of ~,'ansL)ortation (Mn/DO]} will :oordinate with the Metropolitan Council (Council) to address critical policy ~lirections' "The Mn/DOT Strategic Plan envisions a coordinated transportation network" · Coordinate with local planning process(es); · Work with Commuter Rail Coordinating Committees in commu'ter rail corridors; and · Provide consistent and timely information and feedback. Mn/DOT will work with communitiesr__ to use~..~commuter rail as a tool to create more vital, economically sound and livable'c°mmunities~or all to enjoy. Metropolitan Council The Commuter Rail System Plan reflects the planning and policy decisions outlined in the Metropolitan Council's Regional Blueprint, Transportation Plan and Metropolitan Master Transit Plan and initiatives such as Smart Growth. These plans and initiatives underscore the importance for commuter rail service in the region to be integrated with other transit options, correspond to regional growth strategies, accessible, and maximize public investments in livable communities. The Minnesota Department of Transportation (Mn/DOT) will coordinate with the Metropolitan Council (Council) to address critical policy directions in terms of commuter rail investments for the region that encourage economic growth, foster reinvestment in distressed areas and preserve the natural environment. Mn/DOT will work cooperatively with the Council to ensure that commuter rail service will support travel-time advantages for transit, improve transit service reliability and increase transit accessibility to jobs. In addition to the above planning principles, Mn/DOT will work with the Council to achieve the region's smart growth strategies. Minnesota Department of Transportation Mn/DOT Strategic Plan - The Mn/DOT Strategic Plan envisions a coordinated transportation network that provides safe, user-friendly access and movement, and responds to the values of Minnesota's citizens. In its mission to develop Commuter Rail System Plan 2-4 "Mn/DOT has four strategic objectives - information, multimodal, inter-regional corridors, and program delivery.." "Mn/DOT will update the Statewide Transportation Plan to place more emphasis on the development and /ntegration of all modes, including commuter rail" "Mn/DOT will ensure that commuter rail activities are incorporated into strategic plans, business plans as well as Transportation improvement Plans of affected districts and offices." Minnesota's coordinated transportation network, Mn/DOT is committed to promote and support connections among transportation systems, such as light rail, commuter rail and bus transit. In its efforts to promote and support such connections, the department has developed a Commuter Rail System Plan that articulates how this piece of the transportation network will be developed. Mn/DOT has four strategic objectives - information, multimodal, inter-regional corridors, and program delivery. The multimodai objective aims to increase travel options for people and for moving goods that enhance the economic vitality of the state' provide safe, timely and efficient movement of people and goods; and improve the quality of life. Statewide Transportation Plan - One of several action items related to achieving the multimodal objective specifically states that Mn/DOT will update the Statewide Transportation Plan to place more emphasis on the development and integration of all modes, including commuter rail. A second action item states that Mn/DOT will partner with the Metropolitan Council to develop a regional master plan for transit that integrates LRT, commuter rail, bus ways and transit services. District and Office Plans - Business and Strategic - In addition to a Statewide Transportation Plan, each district and office within Mn/DOT has developed a working unit level strategic plan and business plan. These plans focus more locally on how to carry out specific action items, and deliver products and services that best achieve the department's strategic objectives. Mn/DOT will ensure that commuter rail activities are incorporated into strategic plans, business plans as well as Transportation Improvement Plans of affected districts and offices. Proqramminq of Commuter Rail Proiects Feasibility Studies - Feasibility studies are generally conducted when further information or detail about a given topic is necessary, in 1997, the Minnesota Legislature required that such a study be conducted to determine the plausibility of a commuter rail system in the Twin Cities Metropolitan Area Several factors were evaluated as part of Twin Cities Commuter Rail Feas,..,~y Commuter Rail System Plan "To become eligible for federal capital investment funds, the proposed project must emerge from the metropolitan and[or Stalewide planning process. In addition, a corridor-level analysis of mode and alignment oDlions must be performe~. ' Study, including ridership, capital and operations anci maintenance costs, measures of cost-effectiveness, perceived opportunities, and implementation barriers. Upon conclusion of the Twin Cities Commuter Rail Feasibility Study, six corridors were identified as leasible commuter rail routes in the Twin Cities Metropolitan Area. Advanced Corridor Plans -In 1998, the Minnesota Legislature asked Mn/DOT to develop a Commuter Rail System Plan that would articulate necessary engineering standards, as well as provide guidance for advanced corridor planning. Advanced corridor planning is defined by legislation to address the following: - Contain a physical design component that identifies the physical design of facilities; - Specify track and signal improvements; - Address handicapped access; - Specify intermodal coordination and connections with bus and light rail transit operation and routes; - Project ridership, capital costs, operating costs and revenues; - Identify sources of funds for operating subsidies and funding for final design, construction and operation; - Describe an implementation method; - Describe a plan for public involvement and public information; - Define anticipated agreements with the railroads; and, - Address land use impacts. - From advanced corridor plans, preliminary engineering plans are developed and from there, final design documents are prepared. Federal Planninq Requirements Mn/DOT will align the commuter rail planning and programming process to follow the Federal Transit Administration's (FTA's) New Starts Criteria (Title 49, United States Code, Section 5309) for construction of new fixed guideway systems and extensions. The New Starts Program, a capital investment program, will guide planning and programming of commuter rail service in the areas of mobility improvements, environmental benefits, Commuter Rail System Plan 2-6 "The final design stage cannot be initiated until environmental requirements have been satisfied and documented.," operating efficiencies, and cost effectiveness. To become eligible for federal capital investment funds, the proposed project must emerge from the metropolitan and/or Statewide planning process. In addition, a corridor-level analysis of mode and alignment options must be performed. This alternatives analysis (advanced corridor planning) will provide information on the benefits, costs and impacts of alternative strategies, leading to the selection of a locally-preferred solution to the community's mobility needs. When this work is completed, Mn/DOT will submit the application to the FTA for preliminary engineering that contains documentation of the following items: · Project justification; · Mobility improvements; · Environmental benefits; · Operating efficiencies; · Cost-effectivenss; · Local financial commitment; and · Land use policies and smart growth initiatives. FTA will then evaluate the proposed project and determine whether or not to advance the project into preliminary engineering. FTA approval to initiate preliminary engineering is not a commitment to fund final design or construction activities. Upon approval, project costs, benefits and impacts are further refined. In addition, environmental impact statements are prepared, project management concepts are finalized and required funding sources are put into place. FTA will then evaluate the proposed project and determine whether or not to advance the project into final design. Final design is the last phase of project development, and includes right-of-way acquisition, utility relocation, and the preparation of final construction plans and detailed cost estimates, and bid documents. The final design stage cannot be initiated until environmental requirements have been satisfied and documented. Once FTA has · Commuter Rail System Plan 2-7 approved the final design element of a project, FTA may propose to grant a Full Funding Grant Agreement with the project sponsor. A Full Funding Grant Agreement (FFGA) with the federal government is the mechanism for the state to receive funding assistance under the New Starts Program. The FFGA · defines the project cost, time lines and outlines the maximum level of federal investment of the project. This agreement with FTA will be managed by Mn/DOT, as the project sponsor. Commuter Rail System Plan 2-8 Funding and Financing Guidelines SECTION This section discusses recommendations for cost sharing of commuter rail system costs between the railroads and the public sector and among :. state and local governments and summarizes the most promising funding sources and financing techniques to pay for the capital and operating costs of commuter rail FUNDING AND FINANCING GUIDELINES 3.1 Cost Sharing Recommendations related to the sharing of commuter rail capital and operations costs include the following: Distribute commuter rail development and operating costs equitably among State and local governments in the Twin Cities metropolitan area, Assign the maior share for debt service to the State of Minnesota with any railroad cost sharing or federal funding reducing the portion of the capital costs funded by the State, and Assign responsibility for public funding of commuter rail operating costs not covered by operating revenues to the local and/or regional level of government. Local and regional governments have more than sufficient fiscal capacity to fund the portion of commuter rail operating costs not covered by operating revenues (i.e., fares, parking fees, advertising, etc.). The metropolitan counties have the authority to levy real property taxes directly or through their regional railroad authorities. Affected cities have a diverse mix of taxing and fee-setting authority. However, it is also important to point out that, historically, the State of Minnesota has appropriated monies from its General Fund to support transit operating costs. 3.2 Sources of Funding Prospective sources of funding include the following: Operatin,q Revenues Projected operating revenues derived from passengers fares, based on the zone fare structure recommended in Section 4.4, will serve to partially offset operating costs. Commuter Rail System Plan 3-1 Local, Reqional, and State Fundin.q Existing property taxing authority granted by the State to the metropolitan counties should be utilized. This taxing authority authorizes the counties to impose levies on real estate of up to 0.04835% of market valuation. State enactment of a prospective regiona! sales tax should be considered that could generate $332 in annual revenues for each 1% sales tax imposed. A rate of 0.05% would yield the $16 million needed to cover the initial year operating requirements for the First ~er system. Use of State motor vehicle excise tax revenue that currently generates $400 million annually for the State's general fund should also be considered. Another potential funding source would be the existing State sales tax that yielded $3.1 billion in 1998 and that has produced revenue growth of 6.5% over the past three years. Each 0.1% increase in the State sales tax would yield $48 million annually. Federal Grants Federal grant assistance may be able to be obtained from the following sources: Section 5309 New Starts Program - part of FTA's Capital Program that funds new fixed guideway systems (heavy rail, light rail, commuter rail, busways, etc.) and extensions in metropolitan areas. In FY 1999, $896 million was appropriated nationwide. Surface Transportation Program (STP) - a formula program through which funds are allocated to states and metropolitan areas for highways, transit capital, and bus terminals and facilities. Minnesota received $115 million in FY 1999. National Highway System (NHS) - a FHWA formula program that provides funding for improvements to rural and urban roads that are part of the National Highway System (NHS). Under certain circumstances, funds can be used fr, r transit. Minnesota's apportionment in FY 1999 was $89 million. Commuter Rail System Plan 3-2 interstate Maintenance - a FHWA formula program for resudaci ng, restoring, rehabilitating, and reconstructing most routes on the interstate System. Up to 50% of a State's apportionment may be transferred to NHS and STP programs. Minnesota's 1999 apportionment was $75 million. 3.3 Financing Techniques All or some combination of tl~e following financing techniques should be applied to support the provision of commuter rail service: · Transportation Revolving Loan Fund financing - a revolving loan program to finance Title 23 (highway) or l~tle 49 (transit) eligible projects. GARVEE bond financing: any financing instrument for which principal and/or interest is repayable with future federal-aid highway and transit funds. The debt is issued in anticipation of the receipt of federal-aid grant reimbursements in subsequent years. Other conventional financing techniques or sources which may be available include revenue bonds that are backed by specific revenues and/or general obligation bonds secured by the "full faith and credit" of the State. Commuter Rail System Plan 3-3 Advanced Corridor Planning Guidelines SECTION ADVANCED CORRIDOR PLANNING GUIDELINES The purpose ofthis section is to pro, de guidelines to ensure consistency during l~e planning, design, procurement, construction and operation of commuter rail improvements. 4.1 Planning Guidelines System E. xpansion and Modal Inteqration In the development of linear transportation corridors, there often exists an opportunity to construct the corridor in segments based on criteria such as funding availability, right-of- way availability, completion of environmental mitigation measures and facility need. A review of the corridors contained in the System Plan may identify opportunities to stage construction of these corridors. While this issue was examined in the Twin Cities Commuter Rail Feasibility Study, further developments and concepts for the System Plan corridors have lengthened the corridors and possibly presented new opportunities for staging. The decision regarding when and where to make system expansions will be based on four criteria: 1. Service to major travel generators. System expansions, either line extensions or station additions, will be staged to provide service to significant trip generators. Cost effectiveness. It is expected that the end of each commuter rail line will be served by a system of feeder busses that expand the travetshed of that line. When the cost of providing that feeder bus service and the potential for even greater ridership on an extended line exceed the cost of the tine extension, the extension will be considered cost-effective. Community support. The potential of a particular commuter rail project may be enhanced by the level of financial support offered by interested and affected parties to the project. When this criteria is applied, the total cost of a project must be considered, including capital cost and lifetime operating and maintenance cost. Policy considerations. The extension of an existing commuter rail line may also be justified by policy considerations. For example, it may be determined that the economic well being of the region or state would be enhanced by providing commuter rail service to a major metropolitan area. Commuter Rail System Plan 4-1 "The guidelines for staBon design! ? are drawn from numerous other: commuter rail systems." "Station area/and use and site olanning is recognized to be an opportuniO/ to use transportation investment to shape the set~ng in which commuter rail se/vices are offered." To increase the level of service provided to transit users and to enhance the efficiency with which transit services are operated, commuter rail service planning will include: · Selective elimination of parallel bus routes serving similar origins and destinations at the same time as the commuter rail service. · The routes and schedules of other transit routes serving the central business districts should coordinated to the extent possible with commuter rail service. · The facilitation of convenient access between commuter rail service in downtown Minneapolis and the Hiawatha light rail transit line. Provision of feeder bus routes where service can be provided to areas outside of reasonable walking distance of commuter rail stations and reasonable travel time to principle destinations can be provided. In communities that have established circulator transit services, include the loc commuter rail stations in the service and arrange schedules to allow two-way transfers between the trains and the circulator busses. Station Development and Site Planning The guidelines for station design are drawn from numerous other commuter rail systems, although there is consistency on basic design issues. There is a lower level of consistency for design details that are not directly associated with the operation of the railroad. On some of those issues, where consistency is highly desirable, firm standards are provided. On non-critical issues, information is provided, but no standard is provided. Station area land use and site planning is a critical issue in the success of a commuter rail service, and are generally recognized by transportation planners to represent an opportunity to use transportation investment to shape the setting in which commuter rail services are offered. By offering a certain type of transportation service in a certain location, communities are able to shape their growth in attractive and economical ~ The goals that communities generally include are attractive, friendly, more compact, and Commuter Rail System Plan 4-2 less auto-oriented growth. The opportunities to shape growth with commuter rail projects are generally limited to the area at and within the travelshed of the commuter rail stations. The Twin Cities metropolitan area and most of the state is committed to the concept of "smart growth." Under this concept, communities attempt to maximize the return on their investment in infrastructure and enhance the quality of life for their residents. Two of the key elements in "smart growth" are the encouragement of developments with densities higher than typically associated with communities of a particular type and location, and support of the types of development which support higher levels of transit use than currently occur. Achievement of these goals requires a carefully crafted set of planning guidelines and development standards for the commuter rail stations and supporting facilities and for the area within the travelshed. The guidelines and standards presented here are drawn from a number of sources. Where the standards and guidelines are consistently suggested by a number of sources, they are recommended for adoption here. If there is inconsistency, a rationale is presented for adoption of a specific guideline. In all cases, local conditions and situations are considered in development of a recommendation. With respect to the design of the station and supporting features on the station site, recommendations can be summarized as follows: · All facilities will be designed to accommodate forecast year peak period volumes at a reasonable level of service. All facilities will be designed, at a minimum, to meet the requirements of the Americans with Disabilities Act (ADA); an effort will be made to provide a higher level of service than required by ADA. The platform will include a cover and windscreen, lighting, benches, fare vending equipment or services, trash receptacles and current information regarding transit services offered at the station. Commuter Rail System Plan 4-3 "The success of the commuter rail /ine, as well as the success of the development around the stations /s dependent, to a large extent, on achieving the mixes and densities oroposed in the following tables." Other amenities may be provided at the station, depending on the needs and opportunities peculiar to the site including telephones, drinking fountains, rest rooms and retail and service business outlets. Parking facilities will be designed with 15% excess capacity to reduce the time needed to find an open space and to allow for spaces lost to improper parking and incomplete snow removal. · All parking and access features will be designed to facilitate use of the station by pedestrians and cyclists and to minimize conflict with nearby residents. · Opportunities to share parking with adjacent property owners should be explored. With respect to the planning and design of the areas surrounding commuter rail stations, recommendations are in two categories: land use mix and development density. The tables with proposed guidelines are repeated here. It is important to note that the guidelines are not rigid requirements. Different mixes and lower densities are possi. But the success of the commuter rail line, as well as the success of the development around the stations is dependent, to a large extent, on achieving the mixes and densities proposed in the following tables. Commuter Rail System Plan 4-4 Allowable size of TOD (acres) Land devoted to mixed-use Core Land devoted to employment uses (outside the Core) Land devoted to residential uses (outside the Core) Land devoted to civic uses (outside the Core) General Land Use Guidelines for Transit Oriented Development (TOD) Transit Oriented Development Locati OhS Bus Corridors Transitway, Rail & Major Bus CBD/Core inner Outer Suburban Transfer Zones Urban/Suburban Zone Stations Zone and Pockets 60-125 30-125 30-125 30-125 10% - 40% of TOD area At all stations, at least 40 percent of the Core should be retail, such as restaurants or personal services, and public amenities (such as plazas or town greens), or day care, offices, other high-intensity employment, public facilities (such as hospitals, clinics, libraries, government services, post offices, gymnasiums and meeting halls), cinemas, hotels, offices, health clubs and hi! 20% - 30% of TOD area 20% 30% of TOD area h-density/ housing. O% - 7O% of TOD area 5% - 30% of TOD area 0% - 20% of TOD area 0% - 70% of TOD area 50% - 80% of TOD area 10% minimum of TOD area for small parks or plazas, recreation, government/civil, day care. Commuter Rail System Plan 4-5 Mix ol uses Minimum Net mum gross residential density units/acre) [2] Maximum block size Frontage of street along each block with street-facing Setback for street- Minimum transparent area (windows or doors) in primary fa(jade for street- General Guidelines for the Mixed-Use Core of th Transit Oriented Development (TOD) Transit Oriented Development Locations Transitway, Rail / Bus Corridors & Major Bus / CBD/Core Inner Outer Transfer. Zones Urban/Suburban Suburban Stations Zone and Pockets Zone Retail, Restaurants, Personal Services, Office, Cinema, Grocery, Hotel, Apartments/Condominiums, Live-Work, Day Care and other Civic Uses, Park/Plaza *At teast 40% of Mixed-use core most have ground-floor retainl, restaurant/cafes, service commercial, or personal services except in Iow-intensity bus corridors where as little as 5,000 square feet ol these uses meets the requirement. 0.5 O.4 30 25 4 acres 75% o! each street 0.35 15 65% of each street 65% of each street 0 - 10 feet 40% 0.25 10 Station Deferrals and Service Truncations Only one of the recommended service truncations from the Twin Cities Commuter Rail Feasibility Study was on one of the First Tier routes. None of the recommended station deferrals would effect the First Tier system. The recommended service truncation is to terminate the Dan Patch Corridor in the vicinity of the Lakeville station, thereby deferring development of the Northfield station. Commuter Rail System Plan 4-6 A reasonable threshold for determining t_he cost effectiveness of a proposed station is a minimum °f 100 riders servI~(~'~ Railroad Neqotiations ',,,,. The provision of commuter rail service within multiple corridors owned and operated by multiple freight carriers virtually demands that the authority to negotiate terms and conditions with the respective railroads be vested in a single, multi-jurisdictional public entity. The most logical choice at the present time is Mn/DOT. Eight general guidelines are provided for negotiations between the project sponsor and the affected railroads: 2. 3. 4. 5. 6. 7. o Centralize negotiations; Select and empower a multi-disciplinary negotiating team; Define the nature of the service to be provided; Determine procurement strategy; Determine the railroad's risk, liability and insurance requirements; Utilize capacity modeling to verify capital program requirements; Determine public and private benefits and costs; and Negotiate a reasonable cost-sharing formula. 4.2 Design and Procurement Guidelines R qht-of-Way. Recommendations related to public and private right-of-way and land ownership issues as they pertain primarily to joint commuter and freight railroad operation are: It is desirable for the affected municipalities (as opposed to the commuter rail sponsor) to acquire the land or property on which stations and parking lots are constructed, Commuter Rail System Plan 4- All radio equipment purchased for the Twin Cities commuter rail service will comply with Federal Communications Commission regulations, and may be affected by the availability of radio frequencies in the Metro area, Central Control Facilities (COFs) provided for commuter and freight rail service should be equipped to actively and simultaneously monitor dedicated and common frequencies at all times. This facility may initially handle only message generation and announcement broadcast duties, but should be designed for eventual expansion into a facility engaged in train dispatching, and Commuter rail passenger stations should be designed to accommodate the provision of interactive/real-time information displays tied-in to the Orion program. A significant development since the conclusion of the Twin Cities Commuter Rail Feasibility Study has been the development and adoption of regional control centers by BNSF, UP and other major carriers. These centers have been implemented in Texas and California, and more are planned. They enhance intercarrier coordination, as well as facilitating a more immediate reaction to local conditions and are an outgrowth of the problems some rail carriers have experienced in the process of consolidating operatir'-- in key areas. No such center is yet envisioned for the Twin Cities. Locomotives and Rolling Stock Recommendations related to the acquisition of locomotives required for the safe, reliable and cost-effective provision of joint commuter and freight rail service(s) are: 1. Purchase and utilize new locomotives as opposed to used and/or remanufactured motive power, 2. Specify commuter rail service proven locomotives as part of the development of a detailed technical specification for newly manufactured motive power, and 3. Acquire used and/or remanufactured locomotives in the event that future production schedules do not allow for the timely availability of new equipment. Specifications for the acquisition of these locomotives must be definitive as to rebuild/upgrade requirements and performance expectations. Commuter Rail System Plan 4-9 "A final determination as to the most suitable pr~tuct should await the outcome of a competitive orocurement process. ' "A fundamental char',ge since the time of the 'i:win Ci~s Commuter .~all Feasibility Stu~ has been the ~?nposition of FRA rules and the ~.dootion of the Passenger Rail Equipment Safety Standards '?RESS) by the passenger rail agencies." Several choices of new commuter rail proven motive power are available on the domestic market. A final determination as to the most suitable product should await the outcome of a competitive procurement process. Should the use of remanufactured locomotives become the only reasonable alternative, the extent of rebuilding/upgrade should be clearly specified. Baseline pedormance specifications are available from a variety of industry sources if and when_the need arises. A fundamental change since the time of the Twin Cities Commuter Rail Feasibility Study has been the imposition of FRA rules and the adoption of the Passenger Rail Equipment Safety Standards (PRESS) by the passenger rail agencies. These standards require further strengthening of the carbody to withstand collision impacts. They were adopted as a result of a series of accidents in the early 1990s, and focused on the particular concerns of what happens when two vehicles of dissimilar construction collide. It has been estimated that the adoption of these standards adds about 10% to the price of commuter railcars, compared to those used for the Twin Cities Commuter Rail Feasibility Study. Following are summary recommendations related to commuter rail car types, capacities and train lengths. These recommendations apply specifically to opening day service levels appropriate for the First Tier system recommended in the earlier Twin Cities Commuter Rail Feasibility Study. Consequently, these recommendations should be revisited prior to their application to routes or lines outside the First Tier system. 1. Cars purchased for use on the Twin Cities commuter rail system will conform to all FRA requirements and to the PRESS standards. 2. Adoption of the service or operating plan recommended by the Twin Cities Commuter Rail Feasibility Study. 3. Use of three car trains with additional capacity per line initially being achieved by running extra trains as opposed to lengthening the consists. 4. As ridership increases use longer trains to accommodate peak period loads. Note that this will have an impact on train performance, on station platform lengths and on Commuter Rail System Plan 4-10 trips per corridor that will necessitate revisions to the capital ~rogram. This varies from corridor-to-corridor. G maintenance and storage facility requirements, Initial station platform lengths should be capable of accommodating five to six cars. The adjustment of train lengths, number of trains per line, etc., should be done following the conduct of further market analysis or in response to specific concerns expressed by the host railroads during the course of negotiations. Factors which will influence these decisions include (1) refined ridership projections to reflect changing demographics, (2) order backlog at the relevant car builder (determining the schedule by which car deliveries can be made) and (3) the possibility of "piggybacking" on an order being placed by one of the other commuter rail properties to realize cost efficiencies o! scale. An example of this latter strategy may be found in the Seattle "Sounder" project, where the cars for Seattle were ordered as an option on an existing car order for the Los Angeles Metrolink system. Note that the addition of trains or changes in the pedormance capabilities of trains (due to lengthening consists) will require additional negotiations with the host railroads. Recall also that the Twin Cities Commuter Rail Feasibility Study capital program incl,. J improvements required to support the initial level of service on the outlying corridors. There is a threshold in the number of additional commuter rail train trips per corridor that will necessitate revisions to the capital program. This varies from corridor-to-corridor. Following is a discussion of available car types, suggestions for minimum and maximum train lengths and capacities, which justifies the recommendations provided above. Maintenance and Storaqe Facilities Summary recommendations related to the provision of commuter rail maintenance and storage facilities are: o o Retain the Capital Program allocations for both the remote storage facilities and the central maintenance site. The commuter rail sponsor should acquire the Canadian Pacific Shoreham Shops site. Each commuter rail corridor will include a remote storage facility at its outer terminal for train storage and light maintenance. Commuter Rail System Plan 4-11 'The timetable for implementation ol ~he routes and the quantily of locomotives, coaches and cab cars required for those routes may affect the decision regarding a maintenance lacili~" Maintenance of commuter rail locomotive and roiling stock maintenance may be handled by a third-party contract until the third commuter rail corridor is being implemented The commuter rail sponsor will equip its CMF site and assume maintenance responsibilities for locomotive and rolling stock maintenance on implementation of this third corridor (based on the initial-year equipment complements by corridor from the Twin Cities Commuter Rail Study) Examine areas in which bus, LRT and commuter rail projects can share maintenance functions and/or procure common equipment to benefit from economies ol scale The timetable for implementation of the routes and the quantity of locomotives, coaches and cab cars required for those routes (if different from what was recommended in the Twin Cities Commuter Rail Feasibility Study) may affect the decision regarding a maintenance facility. Examples of both approaches (a facility built by the commuter rail owning entity versus contracting with one of the area railroads/suppliers for this service) may be found in the peer commuter rail properties. Safety and Security The commuter rail sponsor and its contractors must commit to providing a safe operation as well as a safe and secure environment for the passengers. This sense of safety and security must be provided in the park-and-ride lots, in and around the stations, as well as on the trains. Recommendations aimed at ensuring the provision of service in the safest manner possible as well as providing a secure environment for passengers and employees while on or around the commuter rail system are: Commit to providing service in a safe and secure manner, Participate in the APTA Rail Safety Audit Program, Designate a state agency to implement the State Safety Oversight of Rail Fixed Guideway Systems in Minnesota. This agency must not be the same one that serves as the commuter rail sponsor, Commuter Rail System Plan 4-12 10. 11. Develop and implement a System Safety Program Plan for the commuter rail network, Develop and implement a Security System Plan for the commuter rail network, Comply with FRA requirements for inspection and maintenance of rolling stock, track, structures and signals, Develop training requirements for all job classifications, as well administering exams to determine a person's adequacy for the position, Require periodic retraining and re-cedification of employees, Establish a security liaison position to work with security forces of the host railroads, on-line communities and counties and the state police, Work with area transit providers and law enforcement agencies to determine where CCTV monitoring of stations and parking lots is warranted, and Establish a program to educate children and adults about the commuter rail service and the hazards present around active railroad tracks. 4.3 Construction Guidelines As the sponsoring agency, Mn/DOT will control all letting and administration activitie~ associated with commuter rail construction or implementation. Construction or implementation of a commuter rail line would follow the Advanced Corridor Planning Stage, at which time, a Major Investment Study (MIS), all necessary environmental clearances (Environmental Impact Statements or Environmental Assessments), preliminary engineering, and final design would also be accomplished. Ali approvals and funding and financing activities associated with the Advanced Corridor Planning are explained elsewhere in the Plan. There are several options a commuter rail implementation process could follow, namely, a design-build approach, a turnkey approach, or traditional design-bid-build approach. The latter approach would necessitate the development of preliminary engineering and final design plans. The following definitions, per state statute, apply to the design plans: Preliminary enqineerin.q plan means a commuter rail transit plan that includes the items in the preliminary design plan for the facilities proposed for construction, h ' Commuter Rail System Plan 4-13 with greater detail and specificity to satisfy final environmental impact statement requirements. The Preliminary Design Plan is a plan that identifies: Preliminary design plans for the physical design of facilities, including location, length, and termini of routes; general dimension, elevation, alignment, and. character of routes and crossings; approximate station locations; and related park and ride, parking, and other transportation facilities; and a plan for handicapped access; and Preliminary plans for intermodal coordination with bus operations and routes; ridership; capital costs; operating costs and revenues, and sources of funds for operating subsidies; funding for final design, construction, and operation; and an implementation method. The preliminary design plan includes the preliminary or draft environmental impact statement for the commuter rail facilities proposed. Final desiqn plan consists of a commuter rail transit plan that includes the items in the preliminary design plan and the preliminary engineering plan for the facilities proposed but with greater detail and specificity needed for construction. The final design plan must include, at a minimum: Final plans for the physical design of facilities, including the right-of-way definition; environmental impacts and mitigation measures; intermodal coordination with bus operations and routes; and civil engineering plans for vehicles, track, stations, parking, and access, including handicapped access; and Final plans for civil engineering for communication, and other similar facilities; operational rules, procedures, and strategies; capital costs; ridership; operating costs and revenues, and sources of funds for operating subsidies; financing for construction and operati(~n; an implementation method; and other similar matters. The final design plan must be stated with sufficient particularity and detail to allow the department to begin the acquisition and construction of operable facilities. The commissioner of transportation may use a design-build method of project development and construction for commuter rail facilities. Notwithstanding any law to Commuter Rail System Plan 4-14 the contrary, the commissioner may award a design-build contract on the basis of requests for proposals or requests for qualifications without bids. "Design-build method of project development and construction" means a project delivery system in which a single contractor is responsible for both the design and construction of the project and bids the design and construction together. If a design-build implementation method is proposed, instead of civil engineering plans the final design plan must state detailed design criteria and pedormance standards for the facilities. Regardless of what administrative approach is selected for construction/implementation of a commuter rail system, agencies conducting commuter rail studies under the direction of the Commissioner, should not loose sight of the fact that the host railroads will play a significant role in any construction activities taking place within their right of way. Talks with the host railroad should be conducted as early as possible and the construction agreement may be pursued as part of the railroad negotiations. 4.4 Operating Guidelines Performance Standards Recommendations aimed at ensuring the provision of on-time pedormance in a safe, reliable, cost-effective and responsive manner are: It is a desirable goal to provide a seat for every commuter rail rider under normal operating conditions. Special events service and other atypical circumstances may occasionally require deviation from this policy. Passenger loadings by train should be counted by on-board employees on each trip. While these counts may not be 100% accurate, they are a good indicator of the need to add cars to a train or to increase the number of trips on a corridor. Agency administrative personnel should take the individual train counts and assemble these on a corridor-by-corridor basis to track the ridership from month to month. To the extent necessary, on-train employee counts should be supplemented with contracted personnel estimating the riders boarding each train at a station in order to obtain reliable boarding counts by station. Commuter Rail System Plan 4-15 "The final delermination of appropriate commuter rail service /evets will be subject to the Terms and Conditions inherent in any' related agreements for the Drovision of such service with the host railroad(s)." Adopt and enforce stringent on-time pedormance criterion and en sure that these criterion are clearly stated in subsidiary operating agreements. in general, on-time performance should be considered to be within five (5) minutes of scheduled arrival or departure. If a train is thirty (30) minutes or more behind schedule,.riders should be granted a free-ride certificate. A "guaranteed ride home" or similar policy should also be adopted as a contingency for late arrivals. Service Levels Following are desirable opening-day service levels for the First Tier routes. These may be revised at such time as capacity modeling and further demand estimation work suggest otherwise: I CORRIDOR: Dan Patch Northstar Red Rock SERVICE_LEVELS:, Six (6) trains inbound AM peak; reverse PM peak. All service provided weekdays only. Five (5) trains inbound AM peak; reverse PM peak. All service )rovided weekdays only. Four (4) trains inbound AM peak; four (4) trains outbound PM peak. All service provided weekdays only. Adjustments to opening day service levels will be pedormed in a coordinated fashion so as to minimize any potentially adverse impacts on freight service as well as the development of service on other candidate lines. Mn/DOT will serve as sole approving authority for such adjustments until such time as the Department delegates such authority and responsibility to another party. The final determination of appropriate commuter rail service levels will be subject to the Terms and Conditions inherent in any related agreements for the provision of such . service with the host railroad(s). commuter Rail System Plan 4-16 "All engineering improvements to railroad physical plant will be done in conformance with Federal regulations, AREMA standards and ~ractices and those ol the host railroad." Station Spacinq and Operatinq Speeds Revision of maximum speeds, and from these the average speeds, may be made as a result of capacity modeling, subsequent revision of the capital program and on the basis of negotiations with the rail carriers. Station dwell times included in the average speed calculations should not be revised until specific rolling stock selections have been made. Recommendations related to reasonable station spacings and operating speeds for commuter rail operations are: o The desirable spacing for commuter rail stations in outlying areas is 5 miles, though station spacings within the corporate limits of Minneapolis and St. Paul may be somewhat closer depending on need, In outlying areas, stations need not be located every 5 miles, they can be further apart depending on development locations, major employment centers and significant highway intersections, A maximum operating speed of 79 mph will be adopted and the system designed in a manner which encourages the attainment of this speed wherever and whet,,..,r it is reasonable and safe to do so, Rolling stock will be specified to be capable of operating at this maximum speed. As a means of maximizing operating efficiency, the system will be designed to permit the following average operating speeds on the First Tier routes: Central 26 mph Dan Patch 39mph I 36 mph Northstar 36mph I 33mph Red Rock 38mph I 33mph o All engineering improvements to the railroad physical plant will be done in conformance with Federal regulations, AREMA standards and practices and those of the host railroad. Commuter Rail System Plan 4-17 "The commuter rail sponsor will offer multiple-ride far m_e~ia" The Central Corridor mileage and running time is figured into the average speed calculations for each of the other First Tier corridors when extending the service to the "2nd CBD" in the table above. This corridor's average speed is also listed separately to illustrate the effect of the frequent station stops on this corridor. Average station spacing along the Central Corridor is 2 miles which, when coupled with civil and traffic restrictions, reduces the Central Corridor's average operating speed. Fare Structure The commuter rail fare structure to be adopted within each corridor as part of the advanced corridor planning process is as follows: 1 0-15 miles $2.00 15-20 miles $2.75 20-25 miles $3.50 25-30 miles $4.25 30-35 miles $5.00 35-40 miles $5.75 The use of concentric circle fare zones (measured on a straight-line basis out from the central business district), as well as the five-mile radius between succeeding fare zones, is common within the commuter rail industry. Note that distance is measured as a straight-line distance, as opposed to the actual rail mileage from the CBD to that station. Suburb-to-suburb travel would be possible by purchasing a ticket good from the originating zone to the first CBD. If both the origin and destination were in the same fare zone, no additional charge would be collected, if the destination were in a fare zone further out than the origin, a zone charge would be collected on the train to the destination. This practice is consistent with that in use at other carriers having multiple lines radiating out of a CBD. commuter Rail System Plan 4-18 The commuter rail sponsor will offer multiple-ride far media, including at least a monthly commutation ticket, and will work with the other transit providers in the Metro area to develop a single, multiple-ride fare media that would be valid on all forms of transit to ease passage from one mode to the next. It would be good for transportation on all modes in the Metro area (bus, commuter rail, LRT, etc.). The prototype for this type of "one size fits all" ticket is found in the San Francisco Bay Area "TransLink" smart card. Commuter Rail System Plan 4-1,(