Loading...
6.6. SR 01-18-2000,ity of River FROM: MEMORANDUM Item # 6.6. The Mayor and City Council Stephen Wensman, Plannerff~/ DATE: January 18, 2000 SUBJECT: Valvoline Instant Oil Change for a Conditional Use Permit, Public Hearing Case No. CU 99-37 Request Please consider a request by Valvoline Instant Oil Change for a Conditional Use Permit to construct an Oil Change shop in the Hillside Crossing Planned Unit Development. Location Lot 3, Block 2, Hillside Crossing, Elk River, MN Zoning/Land Use PUD (Planned Unit Development) / HB (Highway Business) Attachments · Location Map Applicant's Data and Information Sheet (3 pages) · Howard R. Green memorandum · Hillside Crossing Development Standards · Site Plan · Landscape Plan · Building Plan · Building Elevations Overview The applicant wishes to construct a Valvoline Instant 0il Change shop on a .93-acre site located on Evans Avenue across from Northbound Liquors and 13065 Orono Parkway · P.O. Box 490 · Elk River, MN 55330 · TDD & Phone: (612) 441-7420 · Fax: (612) 441-7425 Memo to the City Council/CU99-37 January 18, 2000 Page 2 adjacent to the Coborn's parking lot. The site is one of two remaining undeveloped sites in the Planned Unit Development. The Hillside Crossing PUD Agreement identifies both motor vehicle service stations and motor vehicle specialty shops as conditional uses. Valvoline Instant Oil Change is a motor vehicle specialty shop and if in the future the use changes to a service station, then a new conditional use permit will be needed. The services performed at the Valvoline shop include auto tire rotation and fluid replacement. Valvoline Instant Oil Change shops average 48 cars per day at their 6 stores. The proposed hours of operation are 8 AM to 8 PM, Monday through Friday, 8 AM to 5 PM on Saturdays and 11 AM to 5 PM on Sundays. Site Plan The proposed plans submitted by the applicant conform to the Hillside Crossing Development Plan in regards to parking, signage, grading, drainage and landscaping. Landscaping The landscaping proposed by the developer conforms to the Hillside Crossing PUD. To minimize glare from cars exiting from the shop, staff has requested that the Mugho Pines be maintained at a height of 4-6 feet. Signs The PUD Sign Agreement allows freestanding sites to have one monument sign with a maximum height of 10 feet and a maximum of 100 square feet of area. Freestanding buildings are allowed one wall sign with individual letters that cannot exceed 10 % of the building wall. The applicant is proposing a 100 square foot monument sign and a 37.6 square foot wall sign that conform to the Sign Agreement. The applicant will be required to apply for a Sign Permit prior to installing signs on the property. Grading and Drainage The City Engineer has reviewed the proposed development and has found that what is proposed conforms to the overall Hillside Crossing Grading Plans. \\elkriver\sys\shrdoc\planning\stevewen\ccmmo\cu9937.doc Memo to the City Council/CU99-37 January 18, 2000 Page 3 Trash and Oil Storage As proposed a rock faced concrete dumpster enclosure with a wood gate will be constructed to match the materials and color of the building. The dumpster gate will face the Coburn's parking building and will not face the public right-of-way. New and used oil will be stored in the building in a separate room as required by the building code. Lighting The applicant is proposing to light the site with (4) 19 foot pole hghts with white metal halide fLxtures that conform to the lighting standard set by the Coborn's development. Parking The applicant has proposed 8 parking stalls, one handicap accessible and conforms to the parking requirements. The will be no on-site storage of vehicles as the business is a drive through service. Pedestrian Access A sidewalk is being provided connecting the building to the public sidewalk on Evans. Building Elevation The Planning Commission requested that the building be constructed with an earth tone rather than gray as had been proposed. The applicant has provided staff a buff/tan block sample called, "Sahara." Planning Commission At the public hearing held on December 28,1999, the several residents insisted that a fence was promised them at the rear of Lot 2, Block 2 when additional development occurs. Staff research found that The Hillside Crossing Development Standards stipulate that a berm will be constructed behind the building on the portion of the site that abuts residential properties with an 8 foot privacy fence to provide noise attenuation and to provide screening. The Hillside Crossing Landscape Plans show a fence behind the Coborn's building, but the fence ends at the edge of the Coburn's property and does not extend further to the south. \\elkriver\sys\shrdoc\planning\stevewen\ccmmo\cu9937.doc Memo to the City Council/CU99-37 January 18, 2000 Page 4 City staff recommends that any additional fencing should be considered at the time the last remaining undeveloped Hillside Crossing parcel, Lot 2, Block 2, is developed. Additional concerns included, having the building colors be earth tone rather than gray, and concerns about noise and brightness of lights. Recommendation Staff and the Planning Commission recommend that the City Council approve of the Conditional Use Permit to construct a Valvoline Instant Oil Change with the following conditions: THAT THE MUGHO PINES BE MAINTAINED AT A HEIGHT OF 4-6 FEET TO SCREEN HEADLIGHT GLARE FROM EVANS STREET. THAT THE PARKING STALLS, HANDICAP STALLS AND STACKING LANES BE STRIPED AS REQUIRED BY CITY ORDINANCE. 3. THAT THE SITE BE ILLUMINATED AS REQUIRED BY CITY ORDINANCE. THAT ANY SIGNS CONFORM TO THE HILLSIDE CROSSING PUD AGREEMENT AND ATHAT A SIGN PERMIT BE OBTAINED PRIOR TO INSTALLATION OF ANY SIGNS. THAT ALL COMMENTS OF THE CITY ENGINEER BE ADRESSED. THAT A CONDITIONAL USE PERMIT BE APPLIED FOR IF THE USE OF THE PROPERTY CHANGES FROM THE INSTANT OIL CHANGE TO A FULL SERVICE AUTOMOTIVE REPAIR OPERATION. THAT THE BUILDING BE CONSTRUCTED WITH BROWN TONE BLOCK COMPATABLE WITH THE NORTHBOUND LIQUOR. \\elkriver\sys\shrdoc\planning\stevewen\ccmmo\cu9937.doc LO'CATION G I City of LOCATION MAP 13065 Orono Parkway. P.O. Box 490 CASE: CU 99-37. Elk River, MN 55330 /V DATA AND INFORMATION SHEETS FOR VALVOLINE INSTANT OIL CHANGE November 29, 1999 Page 1 Re: Valvoline Instant Oil Change, and Conditional Use Permit Application. Evans Street N.W. adjacent to Highway 169 and 193rd Avenue Proposed Use: Valvoline Instant Oil Change, three (3) Quick-Lube service bays at main level and service area for technicians and storage at lower level. Auto repair, minor exchange of parts, Occupancy Group - S3 under UBC, 1997 Location: No address assigned to date Legal description: Proposed description Lot 3, Block 2, Hillside Crossing, according to the record plat thereof, Sherburne County, Minnesota. Zoning: PUD, Conditional Use Permit. Auto repair is a permitted use within the PUD. Setback(s) Parking and Building: The proposed building, parking and dumpster enclosure meet or exceed the required setbacks. Setback for: City Guidelines (Feet) Proposed (Feet) Front building / parking20 20 Rear building 20 100 Interior Side 20 129 Parking 10 33 Parking requirements: The typical Valvoline facility provides six (6) customer and employee stalls plus two (2) stacking stalls per service bay. City Parking guidelines': Number required One (1) per Three (300) square feet of building 5 One handicapped stall 1 Total recommended 6 Parking provided: 7 stalls plus 1 H/C stall Customer stacking stalls Total provided 8 9 17 KK 6112 EXOELSI BLVDoMINNE, AFO_IS, MN, 5,..5416 (612T:722-3226 November 29, 1999 Page 2 Re: Valvoline Instant Oil Change, and Conditional Use Permit Application Building area: Landscape: Main level floor area - 1,710 square feet. Lower level floor area - 1,484 square feet. Building area lot coverage is four (4) percent of the total lot area of, 40,476 sf. (.93 acres). Site hard surface (concrete and bituminous) area is forty-seven (47) percent or 18,984 sf. Landscape area is forty-nine (49) percent or 19,788 sf. The proposed landscape plan incorporates the general guidelines recommended by the City of Elk River and the original development agreement. The dumpster enclosure has been screened with Black Hills Spruce. Additional screening and buffering of the cars exiting the building has been included with Mugho Pines. Trees have been included to provide an accent at the open sod area both north and south of the entry drive and parking area. The landscape and sod areas will include underground irrigation. The tree count of overstory (8), understory (2) and evergreens (10) is equal to the original development agreement. Signage: Site and building signage has been noted on the elevations along with sign examples. The building signage will be on one side of the building (West). The site sign or monument sign will be located at the Northwest corner of the site. The proposed signage is within the City sign requirements, City guidelines for signage: Building or Wall sign - Area allowed per sign is ten (10) percent of the wall surface. 33 feet x 15 feet = 495 or 50 sr. Site or Monument sign - One (1) monument sign, max 1000 sf. Max. height ten (10) feet. Proposed signage: Wall sign - One (1) proposed Monument sign - 1 @ 33 sf 33 sf (West) One (1) proposed (8'-0" x 12'-0") each face Height 10 feet 1 @ 96 sf 96 sf Total of signs proposed 129 sf Site Lighting: The proposed site lighting will be directed away from the adjacent roadway and adjacent properties. Shoebox design with metal halide lamps. KK 6112 EXOELSIOR BLVDo MINNF__AI:O_IS, MN, ,.55416 (612'¢22-3226 November 29, 1999 Page 3 Re: Valvoline Instant Oil Change, and Conditional Use Permit Application. Utilities: Existing and proposed services adjacent to the property will meet the needs for the proposed facility. Building Height: Proposed building is a one (1)-story structure, with the building height at about 15 feet. I(!( DE,qlC-N 6112 EXC'EI._SI~ BLVE~oB,,"IlNN~I$, b,'lN. 5,..~16 ~612~22-3226 cH oward R, Green Company SULTING ENGINEERS December 15, 1999 File: 809010J-0240 Mr. Steve Wensman City of Elk River 13065 Orono Parkway Elk River, MN 55330 RE: VALVOLINE INSTANT OIL CHANGE SITE PLAN REVIEW Dear Mr. Wensman: As requested we have reviewed the Valvoline Instant Oil Change submittal package. The package consisted of a site plan, landscaping plan, grading and utility plan, Alta survey and building details. The submittal was prepared by K.K. Design and was dated November 29, 1999. Based on our review we would offer.the following comments. 1. The site plan should include a sidewalk extending from the building to the existing sidewalk along Evans Street. 2. There are some landscaping elements in the northeast corner of the site, which fall in a drainage and utility easement. These landscaping elements should be removed from the utility easement area. 3. The driveway entrance into the building site is located approximately 125-feet from Evans Street. This is a reasonable distance for this driveway to be located away from Evans Street. This driveway location will dictate where the driveway is located on the undeveloped lot located to the east. 4. From the proposed building site drainage would flow to the east to the service drive. There are no additional catchbasins shown to pick up to drainage generated from the Valvoline Oil site. There is an existing 30-inch storm sewer pipe which crosses their driveway near the connection to the service road. We would suggest that additional catchbasins be added to this 30-inch storm sewer line in an effort to pick up all drainage prior to flowing onto the service road and potentially onto Evans Street. 5. The grading plan does show the perimeter of the site being provided with silt fence with the exception of the driveway access points. The driveway access points will be provided with a rock construction entrance approximately 6-inches deep, 50-feet long with a width that varies. This approach should provide adequate erosion protection during the construction. if you have any questions regarding any of these items please call. Sincerely, Howard R. Green Company Terry J. M'a~rer, P.E. \\SPNWFS\VOLI\DATA\PROJ\809010J\0240\ltr 12-13-99 harlicker.doc 1326 Energy Park Drive · St. Paul, MN 55108 ° 651/644-4389 fax 651/644-9446 toll free 888/368-4389 Riverside Development Company EXHIBIT H DEVELOPMENT STANDARDS Architectural The proposed design and color scheme of the buildings within this plat will be consistent with the aesthetics of the area. The grocery store will be constructed in Phase I, and will consist of decorative painted concrete block, brick, stucco and glazing on the west and south sides of the structure. The north and east sides will maintain the decorative painted concrete block, brick and stucco theme. The exterior colors will be of the "earth" tones with a border stripe around the top of the building. The glazing area will highlight the entrance to the Q-Cumbers restaurant on the southwest corner of the grocery store, and will include an attractive canopied atrium entrance of a design and color that will instill a distinctive look to the facility and will be consistent with the theme for the grocery store and the entire plat. Liqhtinq Ail lighting will be in conformance to city standards; general site lighting from high pressure sodium lamps on a painted steel pole fixture at heights of 35 feet. The parking lot will provide an average of 2.5 foot candle coverage on the surface. Special attention will be placed on the back of the building where all lights will be designed and installed so as to shield any light away from the residential area. Other areas, including major entrances, roadways and pedestrian walkways, will be illuminated with a "white" metal halide light on a decorative light fixture to maintain and enhance the quality of this retail development and its compatibility with the equally high standards of the surrounding neighborhood. The fixtures in this phase of development will establish the standard for subsequent development phases of this plat. Landscaping The landscaping, an integral part of this development, is designed and will be installed in a first class and aesthetically pleasing theme. We will establish a visually and environmentally satisfying landscape which will be fully compatible with the characteristics of the site and its tenants. An appropriate mix of seasonal and ornamental shrubs, overstory trees and evergreens will provide a visual display of taste and balance. Special detail and attention will be placed on the portion of the site which abuts the residential sections. A berm will be constructed behind the building along the plat property line. On top of this will be an 8 foot high privacy fence of material which will be visually pleasing as well as to provide noise attenuation. Adequate and appropriate shrubs, trees and plantings will accompany this area to provide additional protection and a visually attractive environment. Another area which will receive high priority in the initial development phase is the retention pond located in the southeast corner of the plat. This existing pond will be completed to accept the storm water from the developed site and will be constructed to accommodate the 100-year rain level. It will be retained with a level of rock rip-rap and two additional levels of Keystone blocks; topped off with sod, clustered shrubs and ornamental trees. Additionally, a 4 foot fence will be installed at the top of the pond for security. 241 Main Street, Suite 4 * Elk River, Minnesota 55330 (612) 241-0714 * Fax (612) 4414575 3-BAY FACILITY - REAR ELEVATION GROUND DIRECTIONALS 3 SECTION BARREL - 2'-0" INTERNALLY ILLUMINATED lOC BARREL MONUMENT SIGN PLANTING SCHEDULE NOTES: Z J -~ ~ CARTS . ._ ~ Plant ~aterial I * -'.-~__'_~,":' ,,,_e,-~ -" '/ [ I '""" ' I [:~id~.Kirsc~tAssoci,~lnc. Landscape Architects-Site Planners ~ ~ .~,;.E~,, ~;:~-.<.~_, / Edina. IMiltlll~l 55436 6121938-4030 ' ~'"~'~"~-~-- ~ t o.^w~ ~:--Iw*s PPEPAR[D ~V ME O~ UNDER ~ ~ a A.~t~ ~ HI~IDE CR~I~ U. S. HIGHWAY 169 OUTLOT A POND .... EXHIBIT EVANS AVENUE OR~GINAL DATF . - ~ll HEREBY CERTIFY THAT DESiC~N 8~ ----- IPLAN, SPECIF~CATION. OR DRAWN BY:~ JWA$ PREPARED BY ME OR CHECKED BY:. IMY D~RECT SUPER~SION ~1 Aa A DULY REQS[RED Lae~scape Architects-Site Pla~nem HILLSIDE CF108811~ ELK FI~R. &eee~aOTA RNERSIDE DEVELOPMENT B-6 ~ ~,, ~c ~N. S~E~ ~; i / / I SITE PLAN 0 20 4O 60 SITE DATA: LOT AR~ 40,470 S,F. ( ,93 ACRES ) BUILD(NB AR~ 1,?04 S.F. ( 4 Z ) LANDS~E AREA~ 19,788 S,F. ( 49 ~ ) TO 8E DETERMINED PER CONDITIONS AT EACH SITE 1MONUMENT SIGN D~ 1/8" = ~' - o" ) HANDICAP StON PRIOR TO EXCAVATION CALb LOCATIONS OF UTILITY STUBS UNLESS NOTED ~ C~D)NG PLAN, EROSION CONFROL P~N LD31~ NOTES / / , io / I I ! LANDSCAPE o 2O 4O 60 PLANTING SC~H EDULE KEY i Q~' COMMON BOTANICAL MATURE PLANTING SIZE NAME NAME SiZE & ROOT q~'PE PINE, MUGHO P~NUS MUCHO 4'-0" 24- -- POT c NOTES: 49 ~ GREEN SPACE AbTOMATIC SPRINKLER STE~EU LOWER LEVEL RE~NFORCED POURED CONCRETE WALLS CONC BLOCK WALLS J FD BIBB FO Dr. ~ NOTES: 1. FLOOR ~E TO BE BOtTEO TO FLOOR MAIN LEVEL 1/4" = 1'- 0" ,4% LUBE CONSOLE LAYOUT SLOPE OOWN~, Ex~us~ SLOPE OOWN~ Pr. ROOF PLAN l/~' = ?'- O' ELECT. SIDE CHANNEL 55.8! s.r. Instant 0// Chan~e ;~"; '- "' SIDE SIDE I I I I t I I I l I I - - _ .... .~_%--, - T~ ~ -- Il EXIT ENTRY BUILDING ELEVATIONS 1/8" = ?'- O' NOTES: 1. SIGNAGE SHOWN FOR GRAJ=HIC REPRESENTATION ONLY REAR SIDE FRONT DUMPSTER ENCLOSURE ELEVATIONS 1/8"=