6.1. SR 05-17-2004TO:
FROM:
DATE:
SUBJECT:
MEMORANDUM
Mayor and City Council
Chris Leeseberg, Planner ~.
May 17, 2004
Request by Suburban Land Development for Final Plat
Approval- Boulder Point
Items # 6. I.
Request
Consider a request by Suburban Land Development for Final Plat Approval of Boulder
Point.
Location
The property is located at the southeast corner of the intersection of Sherburne County No.
12 and Twin Lakes Road.
Zoning/Land Use
Rld (Single Family Residential) / MR (Medium Density Residential)
Attachments
· Location Map
Memos from the City Engineer
· Final Plat
Overview
Suburban Land Development has submitted the Final Plat for Boulder Point. The plat will
subdivide the property into two lots for two townhome structures. Lot-1 will be utilized for
five units and Lot-2 will be utilized for four units.
City Council / Boulder Point Final Plat
May 17, 2004
Page 2
Access to the site will be off the cul-de-sac on Vance Circle in the Trott Brook Farms South
subdivision. There will be no access to CSAH 12 or Twin Lakes Road.
The applicant was granted Preliminary Plat approval on October 20, 2003 and the Final Plat
is consistent with the Preliminary Plat.
Recommendation
Staff recommends that the City Council approve the Final Plat with the following
conditions:
A DEVELOPER'S AGREEMENT IS PREPARED AND EXECUTED OUTLINING
THE TERMS AND CONDITIONS OF THE PLAT APPROVAL PRIOR TO
RELEASING THE PLAT FOR RECORDING.
o
THE DEVELOPER PROVIDES HOMEOWNER ASSOCIATION DOCUMENTS
FOR THE CITY ATTORNEY'S REVIEW AND APPROVAL PRIOR TO
RECORDING THE FINAL PLAT.
SURFACE WATER MANAGEMENT FEE IS PAID IN THE AMOUNT REQUIRED
BY THE CITY AT THE TIME OF FINAL PLAT, PRIOR TO RELEASING THE
PLAT FOR RECORDING.
o
PARK DEDICATION FEE IN THE AMOUNT REQUIRED BY THE CITY AT THE
TIME OF FINAL PLAT IS PAID PRIOR TO RELEASING THE PLAT FOR
RECORDING.
A SEALCOAT FEE IN THE AMOUNT TO BE DETERMINED BY THE CITY
ENGINEER SHALL BE PAID PRIOR TO RELEASING THE PLAT FOR
RECORDING.
6. THE CITY ENGINEER'S COMMENTS SHALL BE INCORPORATED INTO THE
PLANS.
7. STREET LIGHTS SHALL BE INSTALLED AS REQUIRED BY ELK RIVER
MUNICIPAL UTILITIES.
8. A LETTER OF CREDIT IS PROVIDED TO THE CITY IN THE AMOUNT OF 100%
OF THE COST OF THE PUBLIC IMPROVEMENTS.
o
UPON COMPLETING ALL OF THE IMPROVEMENTS AND HAVING THEM
ACCEPTED BY THE CITY, A WARRANTY BOND IN THE AMOUNT OF 25% OF
THE IMPROVEMENTS COSTS SHALL BE SUBMITTED TO THE CITY FOR A
PERIOD OF ONE YEAR.
10. A GRADING AND EROSION CONTROL PLAN SHALL BE APPROVED BY THE
CITY ENGINEER PRIOR TO THE ISSUANCE OF BUILDING PERMITS.
11. A DEVELOPMENT PLAN SHALL BE APPROVED BY THE CITY ENGINEER
PRIOR TO THE ISSUANCE OF BUILDING PERMITS.
S:\PLANNING\Case Files\2003\P 03-11 Boulder Point\P 03-11_CC-Final Plat. doc
City Council / Boulder Point Final Plat
May 17, 2004
Page 3
12. ALL GRADING BE CERTIFIED PRIOR TO THE ISSUANCE OF BUILDING
PERMITS.
13. ALL MAILBOXES SHALL BE CLUSTERED.
14. A TREE PRESERVATION PLAN SHALL BE APPROVED PRIOR TO RELEASING
THE PLAT FOR RECORDING.
15. ANY TREES OFF-SITE OR ON-SITE, NEAR THE LIMIT OF GRADING THAT
ARE TO BE PRESERVED, SHALL BE FENCED WITH A SNOW FENCE AT THE
DRIP LINE TO PREVENT GRADING, COMPACTION, OR STORAGE OF
EQUIPMENT, DEBRIS OR MATEARIALS. STAFF SHALL INSPECT FENCING
PRIOR TO GRADING COMMENCING.
16. WATER ACCESSIBILITY FEES IN THE AMOUNT DETERMINED BY THE
UTILITIES SHALL BE PAID PRIOR TO RELEASING THE PLAT FOR
RECORDING.
17. ANY ITEM OR CONDITION FOUND THAT INDICATES THE SITE IS LIKELY
TO YIELD INFORMATION IMPORTANT TO PRE-HISTORY OR HISTORY
SHALL BE REPORTED TO THE CITY IMMEDIATELY. FURTHER, THE CITY
RESERVES THE RIGHT TO STOP WORK AUTHORIZED IN ITS APPROVAL
UNTIL THE SITE IS APPROPRIATELY INVESTIGATED AND WORK IS
AUTHORIZED.
18. A VARIANCE OF 12.6-FEET SHALL BE GRANTED TO ALLOW LOT-l, BLOCK-1
TO BE CONSTRUCTED AS PROPOSED AND ADDITIONAL SCREENING
SHALL BE PLANTED AS SHOWN ON THE PLANS DATED SEPTEMBER 10,
2003.
19. THE APPLICANT SHALL OBTAIN AND COMPLY WITH THE REQUIREMENTS
OF AN NPDES PERMIT.
20. THE PLAT SHALL RESTRICT ACCESS TO CSAH 12 OR TWIN LAKES ROAD.
S:\PLANNING\Case Files\2003\P 03-11 Boulder Point\P 03-1 l_CC-Final Plat.doc
MUL VANE ¥
OUTLOT B
OUTLOT E
UPA
SITE
BLOCK 2
AVENUENW
BLOCK 3 LOT1
1
CIRCLE
HILL
CITY
¢~e Numbe~
Location Map
ZC 03-06 & P 03-II
BOULDER POINT
N
Howard R, Green Qompany
May 10, 2004
File: 822070J-0240
Mr. Chris Leeseberg
City of Elk River
13065 Orono Parkway
Elk River, MN 55330
RE: BOULDER POINT FINAL PLAT
Dear Mr. Leeseberg:
As requested, we hav'e reviewed the final plat of the Boulder Point subdivision. As you are aware,
this is the parcel of land at the southeast quadrant of Twin Lakes Road and CSAH 12 intersection.
It is proposed to platted for the construction of nine multi-family units consisting of a four-unit
building and a five-unit building. The final plat provides the additional dedication of right-of-way for
Twin Lakes Road in the northwest corner of the plat. The only item we would note is that the final
plat should provide access control along the CSAH 12 frontage and Twin Lakes Road frontage.
The development will have all of its access internally towards Trott Brook Farms South subdivision.
With that condition, we would recommend approval of the final plat of Boulder Point Addition. If
you have any questions regarding this issue, please call.
Sincerely,
Howard R. Green Company
-re~ j~.~~E.¢~
TJM:sw
Ltr-051004-Leeseberg.doc
2550 University Avenue West · Suite 400N ° St. Paul, MN 55114 · 651/644-4389 fax 651/644-9446 toll free 888/368-4389
?
?
?
/
/
/
/
/
/
..
BOULDER POINT
VICINITY MAP
S 1/'2 SEC 35, 2 33 R. 25 & N il2 SEC 2, Z32 R. 25
/
NO SCALE
~B1~T AVE
0 30 60 90
SCALE IN FEET
.~ ~. k..~ ~ / % I tach = I00 feet.
~ ~ /( ~ ./~.'"~_~ ~ The West line of the Southeast Quarter
~ ~ ~ / % '% ~ of the Southwest Quorter of Section 35,
~ ~ ~ / , ~ Township ~3, R~nge 26, Sherburne County,
~ '-~ ~ ~ ~ ( ,'%, ~ Minnesota, is assumed to beer
'~ ~ ~ % ~ / ~ ~ '1 ~ North 00008'35" Wes(
,/ ~ _~ '~ ~ -- ~ ~ ~ ~ Denotes PK nail set
/ %-o-. ~ ~ % ~, ,'~ ~ iron Monument Found
~ ~ %.~ %~ % V / I~ % with o plastic plug stomped RL.S. 21729,
[ //'~. ~ ~ ~ / ~ to be set within I year of recording [his plot.
~ ,/ ~ ~% ~ % % % ~ ~ Denotes Iron Pipe Found
5000 ' _- ~ ~ ~ ,'-~s ~ ~ ~ m ~ -'~ .'-Denotes Lmited Access
'------, ~ ~ ~ ,_:/ ~ ~
//C~'~ - ~ ~'
~ ~
, ,~.,~]_. . ,,_~ ~-/:~:~ ~~ -/: .-, .......... _ ~ .... . ~ _
~ ~ - ~ - ,' Iq ...... N89'51'IS"W 157,77 ...... ~ ~
Drainage end Utility E,Jsements shell
be shown os thus:
A
IVY'/
Beina I0 feet ~n width and adjoining
indicated, also being 5 feet in ~idth
FILE COPY ,nd ,djoin/ng /ot ii ...... , ..... her-
- John Oliver & Associate& Inc.