Loading...
8.1. SR 04-06-2015City of Elk River Request for Action To Item Number Mayor and City Council 8.1 Agenda Section Meeting Date Prepared by General Business Aril 6, 2015 T. ohn Cunnin ham, Fire Chief Item Description Reviewed by Fire Department Ladder 1 Change Order Tim Simon, Finance Director Reviewed by Cal Portner, City Administrator Action Requested Approve, by motion, a total project budget of $246,209.50 for the refurbishment of Ladder 1. Background /Discussion The Fire Department's ladder truck, built in 1990, was sent out for refurbishment earlier this year. Two bids were received and the contract was awarded to Custom Fire Apparatus, Inc. for $229,392, with a contingency of $5,500 held to cover any unforeseen costs that might arise. As part of the truck's refurbishment, the vendor completed a thorough evaluation of the vehicle's plumbing, hydraulic, and electrical systems. This involved tearing apart many of the components to better evaluate wear and tear. The true condition of the interior working parts, such as pumps, hydraulics, drivetram, etc., are unknown until the vehicle is disassembled. While the truck is in excellent condition, there were a number of items that needed additional work, above that of what was anticipated in the original Invitation to Bid. This includes some significant repairs to the hydraulic cylinders, rebuilding of the aerial platform's rotation motor, and the replacement of the pump impeller. The total cost of the additional work is $16,042.50. Staff was able to deduct $4,225 of repairs and parts from the original proposal, bringing the total change order to $11,817.50. Staff is also recommending replacing hose and other miscellaneous firefighting tools at a cost not to exceed $5,000. While the project cost has increased slightly, the overall cost is still significantly lower than a new truck ($1.2 million). The added improvements are necessary to the core functions of the truck and will enhance the vehicle's overall lifespan. Financial Impact The change order and additional equipment is a 4.77% increase over the original budgeted amount of $235,000. Funds are available in the Equipment Replacement Fund to cover the additional improvements. Attachments Change order summary December 15, 2014, Request for Action P a w E A E U s r NaA f RE] Built For Life u M 1=1 JOB CHANGE ORDER CUSTOMER Elk River, MN 1 DATE PROPOSED MARCH OF 2015 Job # 15 -134 TYPE OF CHANGE Pre Pre -Build QW PART i DESCRIPTION CHANGE COST INITIAL TO SELECT 1 Driver side roll out tray —floor mounted $450.00 YES- NO-2 Passenger side roll out tray -floor mounted $450.00 YES- NO_ 3 Repairs to hydraulic cylinder— stripped threads. Needs to be retooled $4,340.00 YES- NO-4 Rebuild Aerial rotation motor $1,990.00 YES _NO_ 5 Replace 4 Outrigger lights with LED. Not in original proposal $1,040.00 YES- NO-6 Replace pump impeller. Existing is not repairable per $2,200.00 YES. NO 7 Replace 5 chassis marker lights with LED version. $750.00 YES- NO-8 Change rear electrical outlets to 20 amp household 3 prong. $400.00 YES_NO_ 9 Mount fire extinguishers in compartment P3. $300.00 YES- NO-10 Add 2 sets of seat belts for jump seats $756.00 YES- NO-11 Replace water tank with UPF brand poly tank. $1,500.00 YES- NO-12 PAC Irons Lok #K5003 to be mounted in aerial platform $276.00 YES NO_ 13 Add 6 adjustable shelves with tracks in 6 compartments. $966.12 YES- NO-14 Add one -4 bottle cylinder rack lined with Line X. $624.38 YES- NO_ SUBTOTAL OF ADD -ONS: $16,042.50 1 Replace only the front shocks. Per conversation with Aaron - $800.00 YES NO 2 Rear dual valve stem extensions - existing ones are good - $40.00 YES- NO-3 Remove hub covers and lug nut covers. Existing OK - $300.00 YES- NO_ 4 Remove 2 rear fans - $175.00 YES_ NO 5 Remove 2 rear heaters. Plenty of heat exists. - $600.00 YES NO 6 Remove replacement interior trim in rear area of back wall. - $500.00 YES- NO-7 Remove crew cab interior spray. Not necessary. - $300.00 YES— NO 8 Remove repelling eyes per conversation with Aaron. - $500.00 YES- NO-9- Remove Parapet hooks per conversation with Aaron. - $500.00 YES NO 10 Remove storage box on driver side of base section ladder. - $450.00 YES NO 11 Remove lighting for inside stokes storage box on ladder. - $60.00 YES- NO-SUBTOTAL OF DEDUCTS: - $4,225.00 CHANGE ORDER TOTAL PER TRUCK $11,817.50 CHANGE ORDER ACCEPTANCE MUST BE RECEIVED AT FACTORY BY 10 days from receipt FAILURE TO RETURN ACCEPTANCE BY ABOVE: DATE WILL BE CONSTRUCTIVE: ACCEPTANCE AND WORK WILL BE COMPLETED AT THE COST SHOWN ABOVE:. * * * * * * * * * ** CONDITIONS OF CUSTOMER ACCEPTANCE * * * * * * * * * ** THIS CHANGE: ORDER BECOMES PART OE' AND IN CONFORMANCE WITH THE EXISTING CONTRACT. THE ABOVE: PRICES AND SPECIFICATIONS OF THIS CHANGE: ORDER ARE SATISFACTORY AND ARE HEREBY ACCEPTED. ALL WORK TO BE PE:RE'ORM N:D UNDER SAME: TERMS AND CONDITIONS AS SPECHIED IN ORIGINAL CONTRACT UNLESS OTHERWISE: STIPULATED. CUSTOMER ACCEPTANCE BY: DATE: City of River Request for Action To Item Number Mayor and City Council 4.11 Agenda Section Meeting Date Prepared by Consent December 15, 2014 T. John Cunningham, Fire Chief Item Description Reviewed by Accept Bid for Ladder Truck Refurbishment Cal Portner, City Administrator Reviewed by Action Requested Approve, by motion, the bid from Custom Fire Apparatus, Inc. in the amount of $229,392 for the refurbishment of Ladder 1, with a contingency of $5,500. Background /Discussion Included in the 2014 Equipment Replacement Fund in the amount of $235,000 is the refurbishment of the Fire Department's ladder truck. The truck was originally built in 1990 and is still in great working condition. A replacement truck would cost in excess of $1 million. A committee consisting of Elk River firefighters and officers has worked over the past year to develop a Est of specifications, which included a comprehensive service of the vehicle, pump and ladder as well as upgrades to the vehicle's lighting, heating system and pump panel. Two (2) sealed bids were received and opened on December 8, 2014: • Custom Fire Apparatus, Inc. - $229,392 • Red Power Diesel Service, Inc. - $253,361 Staff reviewed both proposals to ensure adherence to the published invitation to bid and specifications document and recommends the bid from Custom Fire Apparatus, Inc. in the amount of $229,392. Staff is also requesting a contingency of $5,500 be held to cover any unforeseen costs that might arise that was not provided for in the invitation to bid. The bidder has provided a 10% bid bond. The department anticipates an additional 10 useful years of the ladder truck due to this refurbishment and continued regular maintenance. Financial Impact $235,000 has been budgeted in the 2014 Equipment Replacement Fund. Attachments ■ NA P0WIAI1 0 Template Updated 4/14 IN"Af UR