7.4 HRSR 04-06-2015Action Requested
Receive update on city beautification initiatives in the downtown area.
Background/ Discussion
One of the goals identified in the 2013-2014 visioning process was city beautification. "Flave attractive,
welcoming streetscapes at city entrances and primary corridors." Under this goal, three capital
improvement tasks were identified:
Cl: "Prepare plans to improve primary intersections with landscaping, lighting, and hardscapm'g."
C4: "Complete improvements to primary intersections."
C5: "Implement median and streetscape design and maintenance standards."
'free Replacements along Main Street in Downtown
Three dead boulevard trees along Main Street were replaced last fall. The trees struggled, and ultimately
died due to a number of factors. The trees have very little space to grow and the pavement runs up to the
trunk, limiting the amount of water the toot system receives.
The replacement included removing some of the pavers installing tree grates, improving the planting soil,
and replacing the trees with a Japanese Tree Lilac. These changes permit water to reach the soil, protect
the roots and trunk, and 'increase the odds of long-term growth. Main Street through downtown is well
traveled and receives a large amount of pedestrian traffic, a prime location for improved beautification.
.A number of other trees along Main Street are struggling and will be replaced with a similar process on
an as needed basis.
Ding Avenue Parking Lot
The area between the parking lot and the sidewalk along Highway 10 includes a number of Ash trees and
landscape rock. The space will benefit from improved landscaping and staff has been working on plans
for the area. Improvements include replacing struggling trees with a different species to avoid impacts
from the Flmerald.Ash Borer beetle. The planting will include a variety of shrubs and perennials to
provide year-round color, interest, and screening. The project will be installed during the 2015 growing
season.
P 1-1—F-Me— V
Template U 1
pdatcd 4/ 4 WNA�TUJRE
Financial) pact
The CIII includes $130,000 for use towards beautification goals throughout the city.
Attachments
® None
N:\I)cp,,irtinents\(:ommuiiity, DeN clopmelit\Fcononix I velopmCoO 11 ,\\,,\dmiiiistrati�,c\,Ngetida\2015\4 6 2015\7.4 Sr Downtown
Beautification () pd,,ite.docxN�\I)cpartmcnts\(;oryirnuriir%I 1)cvclol)rnctit\l)lanniiig\llrojects \C7tv Beautification Ilrojects\(,.orridorlicautiFicatiori
Updates 7-21-2014.docx