6.1.A. ERMUSR 04-15-2015 Elk River
Municipal Utilities UTILITIES COMMISSION MEETING
TO: FROM:
Elk River Municipal Utilities Commission Troy Adams, P.E. —General Manager
John Dietz—Chair
Al Nadeau—Vice Chair
Daryl Thompson—Trustee
MEETING DATE: AGENDA ITEM NUMBER:
April 14, 2015 6.1a
SUBJECT:
Staff Updates—General Manager
DISCUSSION:
• This month in the history of Elk River Municipal Utilities: On April 11, 1944, Elk River
holds special election to buy electric utility. #acenturyofservice
Voters of Elk River Favor Public Owned Electric System, Authorized Council to go
Into Power and Light Business at Special Election Tuesday
The voters of Elk River decided in favor of a municipally owned electric light
business, and have authorized the village council to take necessary steps for
acquiring the local distribution line and possibly the power plant.
Less that have the qualified voters of Elk River exercised their right to express their
opinion in the matter at the special election Tuesday, a total of 269 ballots being cast,
195 in favor of the proposition and 74 against. This was more than the necessary two
thirds required to carry the proposition.
Just what the next step of acquiring the local system will be is not known, and is left
with the village council. It is believed most of the voters favor the acquisition of the
distribution system alone, if possible and the purchase of electricity on the line from
Northern States of the REA.
The bond issue is set for a total of$70,000, which is believed large enough to acquire
the complete power plant and distribution system if necessary and to make the
necessary improvements in the system and the hydro power dam to maintain the plant
and the level of Lake Orono.
It is understood the REA would still like to negotiate for the purchase of the hydro-
plant for use as an auxiliary for its lines and would then be in a position to furnish
Elk River with current on the line when the village takes over the distribution system.
The REA would also be able to negotiate to take over the Zimmerman and Dayton
franchises.
UN Page P O w E 0 E 0 0 1
age l of 4 NATURE
Reliable Public
Power Provider POWERED To SEavE
138
Mass Meeting Held Monday
The mass meeting called for Monday night to discuss the issues involved in the
special election was well attended, about 100 citizens being present. The meeting
was conducted by Glenn Davidson, Mayor.
The proposition before the people was explained in an able and thorough manner by
R. K. Wilson, chairman of the civic affairs committee of the Commercial Club. He
pointed out the need for the village to take some action at once and urged the voters
to give the village council a vote of confidence so that it may go ahead and make the
best kind of a deal possible.
Mayor Davidson read and answered the circular sent out Monday by the local power
company, and Leo Scherf, who was formerly on the power commission at Ada, Minn.,
pointed out the advantages of a municipally owned distribution system in that town.
Mr. Richardson,power engineer employed by the village council, gave his figures on
the actual value of the local power plant and distribution system and the necessity for
improvements to the dam, the power plant and the distribution system.
The meeting was afterwards turned into a round table discussion of the present
situation and questions were asked and answered, bringing out the advantages of the
municipally owned system. —Sherburne County Star News, April 11, 1944
• The Board of Directors of the Minnesota Municipal Power Agency(MMPA)met on
March 24, 2015. At the meeting,the Agency approved a 78 MW wind energy purchase
agreement with Black Oak Wind, LLC. Upon the successful completion of this project,
MMPA would either own or have under contract renewable resources sufficient to meet
nearly all of its requirement to have 25% of its total 2025 energy supply come from
renewable sources.
The Board also received an update on the Agency's 2015 Energy Education program,
which is expected to reach over 2,500 fourth grade students from more than 30 schools in
all twelve MMPA member communities. The Board also approved the installation of a
solar energy facility at its Faribault Energy Park plant. The Board also continued its
planning discussions focused on renewable energy.
• On April 6, I chaired the MMUA Solar/DG Task Force meeting in Plymouth, MN. Tom
Sagstetter is also participating in the task force with me. The task force is working to
develop the municipal approach to solar. The areas of focus include: Education;
Development of model ordinance, interconnection agreement, and standard technical
requirements; Demonstration projects,project costs, and project production data; and
Rate design.
• I am attending the Connexus Energy Annual Meeting the morning of April 14.
Y C
Page 2 of 4 Ii .tii1
Reliable Public
Power Provider P O V W E K E D T O S V E
139
• We have had significant time invested into personnel over the past month which leads to
a lot of human resources time in the upcoming month:
• Interviews for the vacant Water Operator position were held on April 8.
• The Plant Operator/Mechanic position is currently vacant. That position's essential
job duties include responsibility for the operation and maintenance of the diesel
engines/generators as well as operation and maintenance of the Lake Orono Dam as
ERMU's designated dam tender. Another essential function of this position includes
working as a bore rig operator and assisting the Lead Bore Rig operator with
installation of underground cable.
Over the past years, we have implemented cross training for the operation of the
diesel engines/generators and the operation of the dam. It is unlikely in the current
EPA climate that our diesel power plant will operate as anything but emergency
reserve. Because of this, the cross training that we had done has provided the depth
we need to operate those engines in an emergency. Also, assistance in operation of
the bore rig and frost trenching have become substantially more that 50%of this
positions normal duties.
This has led us to post for a Bore Rig Operator to fill the vacant Plant
Operator/Mechanic position. By focusing on the primary essential function of
operating a bore rig, we hope to hire a highly experienced operator to help with the
upcoming electric service territory acquisition. For major maintenance or repairs of
the diesel engines/generators, we would contract with specialists. This posting was
expedited due to critical schedule of labor relating to the underground feeder project
that has started ramping up. This project is bringing a feeder from the Waco
Substation located at Zebulon Street and Co Rd 35 to the Sherburne County
Government Center.
The Bore Rig Operator position rates at a paygrade step 6, which is a lower hourly
wage than a Plant Operator/Mechanic position which rates at a paygrade step 8. This
is an approximate $12,000 annual difference.
• Interviews for the vacant Customer Service Representative and Purchasing Specialist
positions will be conducted in April.
• Posting for the vacated Lineworker position will be open through April 24. This
position has been open since Lead Lineworker Ed Zurn left in fall of 2014. This
vacancy was held open until the next class of lineworker schools graduated. This
vacant position will be filled with an entry level apprentice lineworker and not a
journeyman lineworker in a Lead Lineworker position.
• We have posted the Technical Services Superintendent position which will be vacated
at the end of June with Wade Lovelette's upcoming retirement. This was budgeted for
a 6 month overlap with Wade, which is not going to happen. We are looking to hire
as soon as possible to maximize the overlap. Prior to Wade being in this position, this
• Y 111 Page 3 of IPOIVER.ED NA °U E
Reliable Public
Power Provider P O W E R E D T O S E R V E
140
position's minimum job requirements included an engineering degree or equivalent
experience. We have added this requirement back into the job description.
Depending on the experience of the candidate selected, we will re-evaluate what
expertise is needed for the budgeted addition of a Field Engineer. It is likely that the
Field Engineer position will then evolve with essential functions shifting towards web
based mapping. This position's hire would be delayed until the new Technical
Services Superintendent is assimilated into ERMU and can help assess the
department needs.
• Page 4 of 4 r0-111EFIED D 1 ATURE
Reliable Public
Power Provider P O W E R E D T o S E R V E
141