Loading...
8.1. SR 04-20-2015 �i EOty lk Request for Action River To Item Number Mayor and City Council 8.1 Agenda Section Meeting Date Prepared by General Business Aril 20, 2015 Michael Hecker, Parks and Recreation Director Item Description Reviewed by Rivers Edge Commons Park Concept Plan Cal Portner, City Administrator Reviewed by Action Requested Recommend, by motion the Rivers Edge Commons Park Concept Plan. Background/Discussion At the November 3, 2014, Council meeting, staff presented options to replace the pavers at Rivers Edge Commons Park and the downtown crosswalks. After the discussion, Council directed staff to replace the pavers in the crosswalk and upper alley,which was recently completed. Council also directed staff to work with the Parks and Recreation Commission to review stabilizing the retaining walls and expanding the seating for the park. Rivers Edge Commons Park design services included expanding the park into the alley, additional seating space, stormwater enhancements, retaining walls stabilization, and a Mississippi River dock option. The dock option was requested by Council in July of 2014 after a resident spoke during Open Forum. HKGi was chosen for design services and work began in late January of 2015. The Parks and Recreation Commission reviewed concept plans on March 11. The commission discussed the need to make the park a destination for downtown by attracting larger capacity crowds for concerts, weddings, and providing river access,which is also recommended in the draft Parks and Recreation Master Plan. Staff recommends a phased approach as outlined in the attached phasing diagram. Phase I includes removing the alley, adding seating, and restoring the retaining walls. The concept phased in cost options will be presented by HKGi at the Council meeting. If Phase I improvements are to be made to the park this fall, staff recommends removing some of the trees between the alley and park before the concert series begin on June 11. Financial Impact If the Council elects to begin Phase I of the concept plan, the proposed cost for final design and construction documents is $80,000. Final costs will be presented to Council before beginning any work. Attachments • Rivers Edge Commons Park Concept • Rivers Edge Commons Park Phasing Diagram P0WInII a Template Updated 4/14 [NATUREJ Park Expansion Concept EXPANDED SEATING WITH LIMESTONE REMOVE/REGRADE ALLEYWAY STEPS TO RIVER LANDING STORMWATER WATERFALL PERMEABLE PAVERS BRIDGE NO CHANGE Elk River Commons version 4.15.15 STEPS CURVED RETAINING WALLS - decorative railing STORMWATER WATERFALL ACCESS RIVER • formal stairs to landing • informal stone steppers into water • ADA ramp - future option • fl oating seasonal dock (DNR review required) UPPER PLAZA • add plaza • shelter • open for bleachers UTILITIES • relocate light control box/cable box • consolidate electrical STAGE AREA • Enlarge stage CREATE STRONGER EDGE • restore slope with prairie plantings shelter ADA ramp as future option landing set above ordinary high water level long term park expansion area NO CHANGE TO GAZEBO Pa r k E x p a n s i o n - P h a s i n g D i a g r a m Fu t u r e pr o m e n a d e / t r a i l El k R i v e r C o m m o n s Ve r s i o n 4 . 1 5 . 1 5 Fu t u r e P e r m e a b l e Mu l t i - U s e P a r k i n g P l a z a Fu t u r e S u p p o r t Bu i l d i n g ( r e s t r o o m s , st o r a g e , e t c ) PH A S E 1 : R e p l a c e fa i l i n g r e t a i n i n g w a l l Fu t u r e Ga z e b o Fu t u r e t r a i l / e l e v a t e d b o a r d w a l k PH A S E 1 : Re m o v e a l l e y , gr a d e h i l l & a d d s e a t i n g En l a r g e St a g e A r e a St o r m w a t e r Fa l l s Up p e r St a i r w a y Lo w e r St a i r w a y & r i v e r l a n d i n g & s t o n e l e d g e s in t o w a t e r R e s t o r a t i o n P l a n t i n g s Br i d g e Lo w e r O v e r l o o k St o r m w a t e r Fa l l s Ac c e s s i b l y R a m p t o L a n d i n g Up p e r p l a z a a n d as s o c i a t e d r e t a i n i n g w a l l Re p l a c e t a l l s h o e b o x li g h t i n g w i t h d e c o r a t i v e ar e a l i g h t i n g Economic Deve�oprnent Department Process DiscusMon 1. EDD a. Key contact for the department. Act as a gatekeeper and decision-maker,if required, and ensure siting/expansion decisions are driven by customer requirements. b. Team Atmosphere— EDA members direct questions/concerns to EDD for follow UP. c. Maintain collaboration and alignment among internal/external departments. d. Be progressive &proactive e. Reinforce Success f. Emphasize our strengths 2. Lead Generation a. Generate leads from a customer-driven marketing and sales plan. b. New prospect,lead or existing customer. 3. Site Selection/Site Visit a. EDD to guide this process with clients. 4. Project Review/Proposal Development a. Negotiate and develop a comprehensive proposal including project and approval components for client review and acceptance. 5. Finance Concept Approval a. Delivering a packaged deal to EDA and Finance Committee subject to final approval. 6. Final Project Approval a. Assist the client in obtaining the needed regulatory approvals for the project. b. Collaborate with internal departments to obtain necessary approvals. Po nts to consider 1. Rely more on State/Federal programs for projects. 2. Utilize TIF/TAF for GAP Financing. a. Reduces overall tax burden for residents. 3. Utilize Internal Microloans/Revolving Loan Fund money for GAP Financing. 4. Create a sound business environment a. Take care of our existing business base b. Maintain a strong downtown c. Conduct BR&E Visits with members of the EDA i. Collaborate with the Elk River Chamber & Grow Minnesota to conduct Visits d. Listen to Client's needs and address concerns 5. Ensure confidentiality with clients 6. Develop a Long-term Client Relationship a. Builds Trust b. Provides opportunities for referrals. City Council EDA Public Utilities & Engineering V.7 Administration Planning and Zoning Finance and Building and Legal Inspections oordha e Externan Communkadans on City Administration Site Selector Real Estate Utilities Broker Developer B u s '� n ea s 1(1!,5;State/Federal Infrastructure Agencies Project Workforce Rail Center Tech Colleges and State Colleges