Loading...
4.11. SR 05-04-2015 Request for Action To Item Number Mayor and City Council 4.11 Agenda Section Meeting Date Prepared by ConsentMay 4, 2015Justin Femrite, P.E., City Engineer Item Description Reviewed by Change Order No. 1 for 2015 Street Improvement Cal Portner, City Administrator Project Reviewed by Action Requested Approve, by motion, Change Order No. 1 on the 2015 Street Improvement project. Background/Discussion As directed at the April 20, 2015, meeting, staff has prepared the formal change order document to add th the milling and overlaying of 196 Avenue between County Road 1 and Lander Street to the 2015 Street Improvement contract. This segment was identified through our pavement ratings to be overlaid in 2019 but because its condition rapidly deteriorated over the past winter it cannot wait that long. The flexibility afforded by the franchise fee financing of the Pavement Management Program enabled the th city to expedite this project without a large property tax assessment to 196 Avenue property owners and to make important improvements to this street that will extend its useful life and avoid more costly annual patching or reconstruction. The formal change order document is attached. Financial Impact Change Order No. 1 will increase the 2015 Street Improvement contract by $73,528.92 to a total of $3,805,722.06. Due to competitive pricing and a good market for pavements, the successful 2015 Street Improvement Project bid was well under original cost estimates. Attachments  Change Order No. 1 Date of Issuance: 5/5/2015 Effective Date: Change Order No, 1 Project: 2015 Street Improvements Owner: Owner's Contract No.: City of Elk River SAP 204 -135 -001 Contract: 2015 Street Improvements Date of Contract: Contractor: North Valley, Inc. Engineer's Project No.: N15.108340 The Contract Documents are modified as follows upon execution of this Change Order: Description: Mill (1.5" over entire surface) and overlay 196`h Avenue (including returns to side streets) from CSAE 1 to Lander Street. Approximately 2,750 LF. Attachments (list documents supporting change): CHAINGE IN CONTRACT PRICE: CHAINGE IN CONTRACT TIMES: Original Contract Price: Original Contract Times: ❑ Working days ® Calendar days Substantial completion ( date): October 9, 2015 $3,732,193.14 Ready for final payment (date): October 26, 2015 [Increase] [Decrease] from previously approved Change Orders No. NIA to No. N/A : Contract Price prior to this Change Order: $3,732,193.14 Increase of this Change Order: $73,528.92 Contract Price incorporating this Change Order: $3,805,722.06 RECD% MENDED: Bolyn & Menk. Inc, Y: Engineer i,Authorized Signature) Date: ' Approved by Funding Agency (if applicable): [Increase] [Decrease] from previously approved Change Orders No. N/A to No. N /A: Substantial completion (days): 0 Ready for final payment (days): 0 Contract Times prior to this Change Order: Substantial completion (date): October 9. 2015 Ready for final payment (date): October 26, 2015 [Increase] [Decrease] of this Change Order: Substantial completion (days or date): 0 Ready for final payment (days or date): 0 Contract Times with all approved Change Orders: ACCEPTED: Substantial completion (date): October 9, 2015 Ready for final payment (date): October 26, 2015 By: Owner (Authorized Signature) Date: Date: A By: I Contractor (A thorized Signature) Date: Z71' 1 CHANGE ORDER 1 - MILL AND OVERLAY 196th AVENUE CITY OF ELK RIVER, MINNESOTA SAP 204 -135 -001, 204 - 107 -007, 204- 114 -003, 204- 116 -002 BMI PROJECT NO. N15.108340 ITEM NO. MNDOT NO_ ITEM UNIT QTY UNIT COST TOTAL 1 2021.501 MOBILIZATION LUMP SUM 0.05 $149,206.38 $7,460.32 3 2104.5 REMOVE CONCRETE CURB & GUTTER LIN FT 35 $4.80 $168.00 20 2231.501 BffUMINOUS PATCHING MD:TURE TON 25.00 $0.01 $0.25 23 2232.501 MILL BfFUMINQUS SURFACE 1.5 "' SQ YD 9900.00 $1.38 $13 662.00 26 2360.501 TYPE SP 9.5 WEARING COURSE MDCTURE 2,C TON 850.00 $61.02 $51,867.00 45 2531.501 CONCRETE CURB & GUTTER DESfGN 8618 LfN FT 35.00 $10.69 $371.35 Total: $73,528,92