INFORMATION #1 04-10-2000iNFORMATiON
SPECIAL MEETING OF THE ELK RIVER CITY COUNCIL
JOINT MEETING WITH SHERBURNE COUNTY BOARD
HELD AT THE ELK RIVER CITY HALL
TUESDAY, FEBRUARY 23, 1999
Council Members Present:
Mayor Klinzing, Councilmembers Dietz, Thompson, and
Motin
Members Absent:
Councilmember Farber
City Staff Present:
Pat Klaers, City Administrator; Sandra Peine, City Clerk; Terry
Maurer, City Engineer; Tom Zerwas, Police Chief; Steve
Rohlf, Building and Zoning Administrator
County Board Present:
Chair Mike Johnson; Commissioners Terry Nagrorski, Arne
Engstrom, and Betsy Wergin
County Board Absent:
Commissioner Ray Freidl
County Staff Present:
Administrator Dave Loch; Sheriff Bruce Anderson
Call Meetin,q To Order
Pursuant to due call and notice thereof, the meeting of the Elk River City Council
was called to order at 6:00 p.m. by Mayor Klinzing.
2. Introductions
4.1.
Introductions of those present were made.
Consider A.qenda
The agenda was accepted as presented.
Northstar Corridor Project
The City's major concern regarding this issue relates to the siting of a depot
location, understanding the parking needs and the impact this would have on
the downtown area. Commissioner Wergin indicated that Phase II of this project
has just begun. She also noted that it is too early in the study to know where
stations will be located. Commissioner Wergin indicated that Phase II will include
BRW (the planning consultants) contacting cities to begin discussions about the
specifics of train stations. City Administrator Pat Klaers indicated that the city has
a concern with the timing of choosing a site. He noted that the downtown area
is in the process of a major study and would like to include the train station as part
of the study. Administrator Loch indicated that he would contact BRW and
inquire if it would be possible for them to talk to city staff at an early stage so as to
at least give the city preliminary information. General discussion was held
regarding what a train station could encompass such as the types of businesses
needed in the area, parking, etc. It was noted that up to 3 acres could be
necessary for parking. Commissioner Wergin noted that it is not too soon for the
City of Elk River to begin identifying sites for the train station.
City Council Minutes
Joint Council/County Meeting
February 23, 1999
Page 2
4.2. Enerav City
4.3.
4,4,
Building and Zoning Administrator Steve Rohlf gave an update on Energy City. He
noted that top national awards have been received for Energy House I and the
Elk River Landfill Gas-to-Electricity Project. Steve stated that the Energy City
designation in the City of Elk River has the potential to benefit the city and county
economically. He stated that it is anticipated that this designation will attract
start-up energy companies. He noted that Energy City will be working with the
Historical Society on energy related displays for the Heritage Center.
Government Center and Jail Construction Project
County Sheriff Bruce Anderson provided an update on the progress of the jail
expansion construction project. He noted that the project is going well. The jail
will increase to a 178 bed capacity facility when complete. He explained that
the federal portion of the project will start in the Spring and when that is
completed in 12-14 months, the jail will be a 358 bed facility. Mayor Klinzing
indicated her concern regarding the adjacent residents. She noted they have
concerns regarding a buffer plan. Bruce Anderson indicated that the city has
approved a landscape buffer plan. He also noted that fencing will not be
necessary as the facility will be secure.
County Roads
County Roads 12/13
It was expected that the County Engineer, Dave Schwarting, would lead the
discussion on this issue, however, he was unable to attend the meeting. Dave
Loch noted that the plans have been submitted to MnDOT and that right-of-way
issues are still pending. Discussion was held regarding a funding agreement
between the County and City for this project. Both staffs were requested to
finalize a proposal to be considered by the Board and Council.
Mayor Klinzing questioned which agency affected residents would contact with
issues relating to the road reconstruction. Terry Maurer indicated that they could
contact him at City Hall.
County Roads 33 and 77
Steve Rohlf gave an update on the timetable of lowering and realigning of
County Roads #33 and #77. He noted that this project is tied in with the gravel
mining that is taking place in the area. He stated that complete reclamation of
gravel mines in the area cannot be accomplished without this road work. Steve
stated that it is anticipated that the road work will be accomplished in about two
years.
Councilmember Dietz indicated his concern with the current condition of County
Road 33. He noted that some type of improvement should be considered if the
road is not going to be realigned for another two years. Chief Zerwas suggested
realigning County Road 33 east of 169 due to the dangerous "S" curve.
City Council Minutes
Joint Council/County Meeting
February 23, 1999
Page 3
4.5.
Councilmember Thompson indicated that the intersection of 77 and 33 is
dangerous. He suggested removing the east/west stop sign as the people are
not stopping. Discussion pursued regarding the possibility of a four-way stop. It
was noted that the County Administrator would talk to the County Engineer
about conducting a traffic study to determine what is necessary in the way of
stop signs.
County Roads I and 77 Intersection
City Engineer Terry Maurer indicated that residential development continues to
increase at the area of County Road 77 and Proctor Avenue. He stated that It is
likely that a signal is warranted. He questioned the County's plans for
signalization of this intersection. The County Administrator indicated that the
County Engineer would review traffic counts in this area to determine if the timing
is right for a signalized intersection.
School Liaison Pro,qram
Police Chief Tom Zerwas updated the group on the school liaison program
currently being provided by the City of Elk River Police Department to the School
District. He noted the program has been in existence since 1974. Chief Zerwas
stated that Police Department does not want to lose the program. Sheriff
Anderson indicated that it is unfortunate that the County is being placed in the
middle of this issue. He further stated that if the County is requested to provide
these services to the School District, that the answer would be a County Board
decision. He noted that these services are currently being provided to other
communities by the County free of charge. Commissioner Engstrom indicated
that if requested, he would be in favor of providing these services for his
constituents in his district. Discussion was held regarding the differences in the
County providing these services in Elk River versus a smaller city or township. The
differences noted are as follows:
· Elk River currently has a Police Department which provides the juvenile liaison
program.
· The Elk River Police Department currently have special arrangements with the
School regarding the program including officers attending off-hour events
which entails overtime.
· Elk River requires 3 officers compared to 1 for other cities and townships.
· The cost to the County to provide this service to Elk River would be far greater
than what is being paid to provide these services to other cities and
townships.
Councilmember Motin indicated that he is on a committee that is in the process
of trying to find a solution to this issue. He questioned whether the County would
be willing to pay some of the money that the school district is now responsible for
paying to have the City continue this service. 'Commissioner Wergin did not feel
this was a viable solution due to equity concerns. Councilmember Thompson
requested the County Board to have an open mind regarding all options when
the committee submits its proposal.
City Council Minutes
Joint Council/County Meeting
February 23, 1999
Page 4
4.6. County Ditches and City Surface Water Mana.qement JSWM)
Steve Rohlf updated the County on the portion of County Ditch # 10 that will be
taken over by the City of Elk River in 1999.
4.7. Solid Waste Issues
4.7b. Elk River Landfill
Steve Rohlf updated the County on the continued process to regulate the landfill.
He noted that staff has coordinated the County, City and MPCA permitting
process which eliminates conflicting requirements of the landfill owners. The
owners of the landfill were present.
4.7a. SCORE Proiect/Funds
Steve Rohlf thanked the County Board for the grant that was received allowing
the purchase of a wood chipper between the cities of Big Lake, Becker,
Zimmerman and Elk River.
4.7c. RDF Tippinq Fee and City/County Contract
Steve Rohlf indicated that the current tipping the city pays is proposed to
increase to .$51.00/ton in 2000 and $56/ton in 2001. He indicated his concern that
Elk River residents will have higher garbage bills than their non-Elk River neighbors
due to the cost of tipping fees charged by the RDF Plant. He suggested that an
option would be to let the hauler's dispose of the city's waste wherever they can
find the most cost effecti~'e deal. Mayor Klinzing indicated that this issue would
be discussed in greater detail by the City Council at a later date.
4.8. 1999 Leqislative Session
The issue of deregulation of power plants and the elimination of the personal
property tax was discussed by the group. Commissioner Wergin indicated that
she predicts that this will take place at some time in the future and noted it is
something the county must anticipate.
5. Other Business
There was no other business
6. Adjournment
There being no further business, Mayor Klinzing adjourned the meeting at 8:29
p.m.
City Clerk