83-000 RES G c,,4.-x5
RESOLUTION 83-0
411 EXTRACT OF MINUTES OF MEETING OF THE CITY COUNCIL
OF THE CITY OF ELK RIVER HELD JANUARY 3, 1983
Pursuant to due call and notice thereof, a regular meeting of the City Council of
the City of Elk River, Minnesota was duly called and held at the Elk River Public
Library in said City on the 3rd day of January 1983, at 7:30 p.m.
The following members were present: Mayor Hinkle, Councilmembers Schuldt,
Gunkel, Engstrom and Duitsman.
The following members were absent: None
Councilmember Duitsman introduced the following resolution and moved its adoption:
RESOLUTION 83-0, A RESOLUTION ACCEPTING THE PROJECT FEASIBILITY STUDY AND CALLING
A PUBLIC HEARING FOR THE GATES AVENUE IMPROVEMENT PROJECT TO BE HELD MONDAY,
FEBRUARY 7, 1983, AT 8:00 P.M.
WHEREAS, the City Council deems it necessary and expedient that the City of Elk River
construct certain improvements to wit:
Street storm sewer improvement in the City of Elk River as described and
in accordance with the preliminary plans and feasibility report prepared
• by Mr. Terry Maurer of Consulting Engineers Diversified, consulting engineer;
and,
WHEREAS, the City Council has been advised by the consulting engineer that said pro-
ject improvements are feasible and should thus be made as proposed; and,
WHEREAS, the Statute provided that no such improvements shall be made until the City
Council shall have held a public hearing on such improvements following
mailed notice and two publications thereof in the official newspaper stating
time and place of hearing, the general nature of the improvements , the
estimated cost thereof, and the area proposed to be assessed in accordance
with law.
NOW, THEREFORE BE IT RESOLVED by the City Council of the City of Elk River as follows :
1. A public hearing will be held at the Elk River Public Library on
Monday, February 7, 1983, at 8:00 p.m. to consider said proposed
improvements.
2. The nature of the improvement, the estimated cost of such major portion
thereof and the areas proposed to be assessed therefore are described
in the form of notice of hearing hereto attached.
3. The notice of public hearing shall be in substantially the form con-
tained in the notice hereto attached.
•
4. The City Administrator/Clerk is hereby authorized and directed to
cause notice of said hearing to be given two publications in the
official newspaper. Said publications shall be one week apart and
at least three days shall elapse between the last publication and the
hearing. Not less than ten days before the hearing, the Administrator/
Clerk shall mail notice of the hearing to the owner of each parcel of
land within the area proposed to be assessed as described in the notice.
For the purpose of getting such mailed notice owners shall be those
shown to be such on the records of the County Auditor or if the tax
statements are mailed by the County Treasurer, on the records of the
County Treasurer. As to properties not listed on the records of the
County Auditor or the County Treasurer, the Administrator/Clerk shall
ascertain such ownership by any practical means and give mailed notice
to such owner.
5. That the feasibility studies by Consulting Engineers Diversified for the
Gates Avenue Improvement Project are hereby accepted.
The motion for the adoption of the foregoing resolution was duly seconded by Council-
member Engstrom, and upon a vote being taken thereon, the following voted in favor
thereof:
Councilmembers Engstrom, Gunkel, Duitsman and Schuldt
The following voted against the same:
None
•
Whereupon said resolution was declared duly passed and adopted this 3rd day of
January, 1983.
n
4,/
Richard Hinkle, Mayor
ATTEST:
Robert C. Midc1 u h� City ministrator
g
0