Loading...
3.1. BASR 03-24-1998 *` Item# 3.1. ty of ' MEMORANDUM lk • River TO: Board of Adjustments FROM: Steve Ach, City Planner DATE: March 24, 1998 SUBJECT: Request by Cargill, Inc. to Appeal a Zoning Determination, Public Hearing Case No. GP 98-1 Issue Cargill, Inc. is requesting to appeal a decision by staff not to issue a building permit for new construction of a research facility within the urban service district prior to the availability of sewer and water. This issue is specifically referenced in Section 900.20(16) of the Elk River Code of Ordinances. • Location The proposed research facility is located just north of 165th Avenue and east of the solid waste facility along Highway 10. Attachments • Location map • Urban service boundary map • Correspondence regarding the application Overview Sometime in September of 1997, Cargill submitted plans and requested a building permit to construct a research laboratory and office space on property they currently owned north of 165th Avenue. The specific site proposed for the research facility is across 165th from the current research facility and animal nutrition center. The property on which the research facility would be located is zoned I-1 (Light Industrial). If city sewer and water were available, the facility would be a permitted use requiring administrative site plan review prior to issuance • of a building permit. 13065 Orono Parkway • P.O. Box 490 • Elk River, MN 55330 • TDD &Phone: (612)441-7420 • Fax: (612)441-7425 • Memo to Board of Adjustments/GP 98-1 March 24, 1998 Page 2 • In a letter to Rita Schmahl at Cargill dated October 1, 1997, I informed Ms. Schmahl that the City could not issue a building permit for their proposed research facility at the subject site because the city ordinance prohibited development within the urban service district prior to the availability of city sewer and water. Ms. Schmahl was informed that if this same building was proposed south of 165th contiguous to their existing facility, the building could be constructed pursuant to the issuance of a conditional use permit. Since that October 1st letter, there has been a series of correspondence between myself, the City Attorney and Mr. Greg Fontaine at Dorsey Whitney, who is representing Cargill in this matter. I have also attached the excerpt from the zoning ordinance pertaining to development within the urban service prior to the availability of city water and sewer. It is staff's opinion the ordinance reads clearly and Cargill's request to construct a new facility within the urban service area prior to the availability of sewer and water is not permitted. As I pointed out in my letter dated November 17, 1997, to Greg Fontaine, in order to construct the research facility in the proposed location, another option would be to request an ordinance amendment modifying the section of the ordinance regarding development prior to city water and sewer. • Recommendation It is recommended the Board of Adjustments deny the request by Cargill, Inc. appealing a zoning decision to deny a building permit for construction of a new facility within the urban service district prior to the availability of city sewer and water as set forth in Section 900.20(16) of the Elk River Code of Ordinances. • \\elkriver\sys\shrdoc\planning\pc\gp98-1.doc f O', 1110114 Rld N. . I. aTr P ' ,74Th � - 1 ATOP v ■amt , , \ ..." _,,, ,,, r 1 —• 1 III l Ile I"TN ♦ \1 176Th ,.r� �1 �,p''.� 175Th IIII a - 1111M6VI 174N Ilk All . ! .0...qiriidi, 1 1111��-- Pao 0 172ND I , 0,M•11•• ,J,0111. _b. ►�I� • 171 T___ 1 iTi riTi L'!A; , 170TH Olt' ow ma RAIL LI all, t in Mil i G. ts + `�;h: sl169114,60TH Iy OD' \1 \\10,WF 167tH 166Th t �: "► lasth1 1 aj 1 tsaT►t \I 1 163tD 12 ,6,51 . . . ', 1601H / _ 4:>--k 1 // , ,60111 11 159TH I lf! _ w= 159Th tsath 0.\ . 130114 i 11 11 157TH ;:,:. .• Lit I i 137Th • g II 1 X11 .�t /..: , NN IP 166Th MTH ? I' �� t41#.S�O �!� d 138Th - Q il tstth i N � 1% 154TH ■ ..-, -1**/-t---- --- , * ,. , / ■ .D.-' '.1--- •-• ;31 r. 1____1\ ;,..,\‘, . I . \ = i• , \ fl! , F.. I ,, ,-_,,\V ■ 1 4.-- ■ ' \-- \ s ""W ' 17240 t, \ „......... i ,_....\\\,`, : i\tl_we,, ,,,,t, \ I n 1\n 1 i Or Inntoon o\nic\ 1 #,, i . , \ \ -1— \ 041".'_ ■ N' -PIP :1---,---,--1 , , 1 i ---1.\ i —.4--. t— , • ,..... 171ST \ , i '■\It' 1 , , ! ■ I 1 ‘1 \ ..... i . \, ,44...j i I \\'`,. /AL ■ 1 t III , A tL'"- 17024 \ 1 1:101Arri,,.\,0 , 1 . • I '. \ , N.,":„ 44 AREA , ; , ; , , , r f 1‘1,\\.1:1&'1! ',\,\ ' ..., , . f ' ---.....---- 1W* 1 ____________ ,\ 1""4 ' f /// 1 .:, ic' ! 1 •1 .,/ ---1 \ '-------f ---- S\ 18821 r ' 11.1.,.,_.4.. ''' ,---- lc- 4 , '//4AL \ " i arLNP"I'' ' •,),:- I . ■ . t . --.1, ' 18724 \ \ . . i .-'"'• , 1 ■ i I\\ 1 4 1 1 11 16872 \ ', I . \, \ I, 0 i s\ r • -.;•‘-\.,- ,• ! A-51!T E\k,\ /, I , I • \,,, I • ' ___ 18524 1 '\ , s., ,,,,..„ __,..______ . .... , § I • :-,M ,, • , -• 1842i ■ . , Z. 1 , lir ‘‘`.*!›,:'• i II I r , I '2',.:-. 1 , •;',,' r __\\__,. ,.. -r- , ..... 1 al , 163110 1 t .4""--- — __I .44. -r- ______ •• 1 i 'Ns I ..o• .',..'1.401,,c.,,, /•"/ -:, _______`,21 , 1 181ST '• ..I4 '.-, .11111-114-14-111411-11-41111444-111141+11-11-1114fla *, ...., -•*,.-'' ', I \'' • a 180114 S., ,I*4.-I.,- -•-• 4. . .. r Ili . 4 A :1' ..!.' IN .1‘ ' i,/ ' -';" ■ -, ,, „ 1 • -.....-,•--, URBAN .,.. ,,,,„ NN',.■ ' \N N N, -•:, -. r \\., •,, 11 1. nErBOC1H NRIA14 ' ' N t ' -mW 7I ‘, .7l t• 1 ' 10 E. ll i .,-... - 1 , .., N., ! I 15724 , ' s. I et I I 1.4., I -...„,:z•II-I ..:-. H; . i 1 ic -----___,, -'---,,. g 1 0 1561H V... .N,. - ',.---.. .,_•,, N"--.--. , \11\ I 5 15514 sure - WTI! ,6 \ • \ . i Ili' --,, •, ‘ I mop reen Corrozny —9 ..- ¶5.4.04 ,\ . ■.,11,l \ 1 ( D I MOS - 1S3R0 --------I-. (------------ \ 4-4309 1 il ii `-•:,-, -\\ ‘• \i) 4\741 ; o . ,... .9 g 11 1 >i K 11,1 • . f,____ 1 1 0 72 S -- .7.-.. .I „ 5 . . __ :.-- I _ . .• A. The shared parking concept does not circumvent the perimeter setback requirement or the required number of parking stalls. B. Proper cross access and cross parking agreements are prepared and executed. C. Common architectural and design standards for all units within the zero lot line development may be required. D. Each zoning lot shall meet the Performance Standards of the zoning district. E. The landscaping and screening provisions of this ordinance shall apply to the zoning lot. F. For the purpose of determining the placement and number of signs for a zoning lot and the uses thereon, the zoning lot shall be considered a "lot" as referenced in the City' s sign ordinance. As such, one free-standing or monument sign is permitted on the zoning lot to identify the uses established thereon. 16. DEVELOPMENT WITHIN THE URBAN SERVICE AREA PRIOR TO THE AVAILABILITY OF CITY WATER AND SEWER The Urban Service Area is defined in the Elk River Comprehensive Plan as the area planned for development with city water and sewer services. As a prerequisite to applying for or receiving any building permit or planning application in all commercial, industrial and business park zoning districts within the urban service area, city municipal utilities (i.e. , sewer and water) must be available for immediate hookup and/or available at the time of occupancy. The following are exceptions to the above stated requirements: A. Existing businesses (structures) located within the urban service area and not currently served or have the opportunity to hook up to city sewer and water, may apply to expand a principal structure; or add a second principal structure on the same parcel. In addition to all other city ordinances or regulations of the city, the following conditions shall apply to an expansion of an existing structure or construction of an additional principal structure on the same parcel: i. An application for a conditional use permit must be submitted in accordance with the requirements set forth in the Zoning Ordinance. 9.73 ii. Applicant enter into a developer' s agreement 410 stipulating the likelihood of the payment of future assessments for city sewer and water. iii. Applicant sign a waiver of rights to appeal future assessments for city sewer and water on the basis of: a. The permitted expansion or additional structure; or, b. The sufficiency of the existing well and septic system. iv. The proposed addition and/or building expansion shall be consistent with the city' s Comprehensive Plan. v. All building improvements shall include provisions for a timely hook up to city water and sewer in accordance with applicable city code requirement. 9.74 411 2 . Board Procedure. The Board may adopt rules of procedure for the transaction of its business consistent with the provisions of this Ordinance and Minnesota Statutes 462.351 through 462.364 . Four members of the Board shall constitute a quorum. Regular meetings of the Board shall be held on the fourth Tuesday of each month or at such other times as are specified in its rules. Special meetings shall be held at the call of the Chair, who shall be the Chair of the Planning Commission. Notice of special meetings shall be posted at the City Hall and transmitted to members at least three (3) days prior to the date of the meeting. There shall be a fixed place of meeting and all meetings shall be open to the public. A record shall be kept of the Board's transactions, findings and determinations. 3. Powers and Duties of Board. Pursuant to Minnesota Statutes 462.357, Subd. 6, the Board shall have the following powers: A. To hear and decide appeals where it is alleged that there is an error in any order, requirements, decision or determination made by the Building and Zoning Administrator in the administration of a land use ordinance. B. To hear requests for variances from literal provisions of the ordinance in instances where their strict enforcement would cause undue hardship because of circumstances unique to the individual property under consideration. 4Appeal. An appeal as specified in 3 (a) may be made by any son (appellant) , including a city officer or employee, • ected by action of the Building and Zoning Administrator. An • eal may be made only following the transmission of a written • ice of appeal which specifies the subject and grounds • refor. Such notice must be received by the Building and • ing Administrator within sixty (60) days following the • uance of the order, requirement, decision or determination • ch is the subject of the appeal. 5. Variance. A. A variance may be requested only by the owner of the property (petitioner) to which the variance would apply. A variance may not be granted which would allow the use of property in a manner not permitted within the applicable zoning district, provided that the Board may grant a variance for the temporary use of a single-family dwelling as a two family dwelling. In granting any variance, the Board may prescribe conditions, to ensure substantial compliance with the ordinance and to protect adjacent property, including without limitation, an expiration date. The violation of any written condition (s) shall constitute a violation of this Ordinance. No request for a variance may be resubmitted sooner than six (6) months following a denial. A variance shall become void within two (2) years 9.143 g`c c DOHERTY 351)10 Fifth Street'lowers 21110 Minnesota World Trade Center 1401 New ler!.;Venue,\At,. 2370 One Tabor Center 131)South Fifth Street all Cast S..nth Street Suit• 15)1! 121➢)Suventeenth Street RUMBLEMinneapolis,\I ne sot•; 55402-421; Saint ['dui,\linnesr,ta 55101-40`0 S.a•hingtun.D.C.21 o; U:river,Colorado 80202-3821 BUTLER Telephone bl_);;0;=i; Telephone 0,l 2i Telephone;1121 3'44-23:-4 ;10 i ).h'h0 l'AX(6122 340-3 384 FAX 01121_01`)313 FAX!=i12)14;-1131 1+)13)572-62i 1 ROPIISSIO\.AI.1ti"OU-ATIOA • Attorneys at Law Writer's direct dial nwnber: 340-5588 Reply to\tinnea polh.otfeo Beckp @drblaw.com December 3, 1997 Gregory A. Fontaine Dorsey& Whitney 220 South 6th Street Minneapolis, MN 55402-1498 Re: Cargill, Inc. Notice of Appeal Dear Mr. Fontaine: Steve Ach is out of town this week and has asked that I get back to you with regard to the Notice of Appeal you filed on November 26, 1997 on behalf of Cargill, Inc. As you know, I serve as City Attorney for the City of Elk River. The Notice of Appeal indicates that Cargill, Inc. is appealing an October 1, 1997, decision denying PP g a building permit for a proposed research facility north of 165t Street at Cargill's animal nutrition center. Mr. Ach's October 1, 1997 letter states that: • "Although the proposed use of the building as a research laboratory and office space is a permitted use in the I-1 zoning district,the City's zoning ordinance does not allow development within the urban service boundary until utilities are made available. Therefore,I cannot review the plans you have submitted nor can we issue a building permit for a building at this location." The issue before the Board of Adjustments will be whether a building permit can be issued in light of Section 900.20(16) of the Elk River Code of Ordinances. I am enclosing a copy of this section of the Zoning Ordinance for your information. Cargill's appeal will be processed pursuant to Section 900.40 of the City's Code of Ordinances. The appeal will be heard by the Board of Adjustments at its regular meeting on January 27, 1998. If the Board approves the appeal, that decision will be final unless an appeal is taken to the City Council. If the Board of Adjustments denies the appeal, that decision will automatically be reviewed by the City Council. In addition to the Notice of Appeal, it will be necessary for Cargill to submit the $150 application fee iand a list of the owners of each property situated wholly or partly within 350 feet of the property to DOHERTY RUMBLE tB V 1 LER Gregory A. Fontaine PROFESSIONAL ASSOCIATION December 3, 1997 Page 2 which the appeal relates. The 60-day period for review of the appeal will begin when the application fee and owners list is received at City Hall. Because of the possibility of City Council review of the appeal, the period for review of this request will be extended an additional 60 days pursuant to Minnesota Statutes Section 15.99, subd. 3(0. Please call either the undersigned or Steve Ach if you have any questions. Since ly, Peter K. Beck PKB/eka • Enclosure cc: Steve Ach 40 BeckP 538900.1 DORSEY & WHITNEY LLP • MINNEAPOLIS PILLSBURY CENTER SOUTH NEW YORK WASHINGTON,D.C. 220 SOUTH SIXTH STREET DENVER LONDON MINNEAPOLIS,MINNESOTA 55402-1498 SEATTLE BRUSSELS TELEPHONE: (612) 340-2600 FARGO HONG KONG FAx: (612) 340-2868 DES MOINES BILLINGS ROCHESTER MISSOULA COSTA MESA GREAT FALLS GREGORY A.FONTAINE (612)340-8729 November 26, 1997 Mr. Steve Ach City Planner City of Elk River 13065 Orono Parkway P.O. Box 490 Elk River, MN 55330 • Re: Notice of Appeal Dear Mr. Ach: Pursuant to Section 900.40 of the Zoning Code of the City of Elk River and Minn. Stat. § 462.357, Cargill, Inc. hereby provides notice of its appeal and/or variance request ("appeal") of the City's administrative decision, dated October 1, 1997, denying Cargill's application for a building permit for its proposed research facility located north of 165th Street at the company's Animal Nutrition Center. Cargill requests a hearing before the Elk River Board of Adjustments as authorized by Section 900.40(6) of the Zoning Code and Minn. Stat. § 462.357, subd. 6. Cargill further requests that the appeal be held at a mutually agreed upon time to be established at least 30 days in advance of the hearing date so that both parties will have an adequate opportunity to prepare and to accommodate the schedules of all involved in the process. Your letter of November 17, 1997 to the undersigned appears to misperceive the intent of Cargill's research facility proposal. Cargill does not wish to construct the facility south of 165th Street, and does not intend to seek a conditional use permit in connection with the research project since it is a permitted use at its proposed location. • DORSEY & WHITNEY LLP • Mr. Steve Ach November 26, 1997 Page 2 Because Elk River's denial of the building permit application is an administrative decision with respect to the City's land use ordinance, Cargill is entitled as a matter of law to pursue relief before the Board of Adjustments under Section 900.40 of the Zoning Code and Minn. Stat. § 462.357, subd. 6. Cargill is not required to seek an ordinance amendment as your November 17, 1997 letter suggests. Please call me at your earliest convenience so that we may discuss procedures and schedules for the proceedings before the Board of Adjustments. Thank you in advance for your cooperation. Very t4f yours, • • r Grego, A. F.ntaine GAF:gle • 10/31/97 FRI 14:25 FAX 612 340 2807 DORSEY & WHITNEY [002 • DORSEY & WHITNEY LLP NE"YO Rx MINN¢nPOLIS PILLSBURY CENTER SOUTH wASHINGTON.D.C. 220 SOUTH SIXTH STREET DENVER. LONDON MINNEAPOLIS.MINNESOTA 55402-1498 SEATTLE DP.USSELS TELEPHONE:(612) 340-2600 pAR.GO HONG KONG Fax: (612) 340-2868 BILLINGS DES MOINES MISSONLA ROCHESTER GREAT FALL% COSTA MESA CLEAT FONTAI E (612)WOMB October 31, 1997 BY FACSIM Mr. Steve Ach City Planner City of Elk River 13065 Orono Parkway • P.O.Box 490 Elk River, MN 55330 Dear Mr. Ach: This letter follows up on our several recent conversations. I am confirming your indication to me that any appeal by Cargill Inc. of Elk River's decision, dated October 1, 1997, not to issue a conditional use permit in connection with the company's proposed research facility is governed by the procedures set forth in Section 900.40 of the City's zoning ordinance. My understanding is that these • procedures include a 60-day appeal period as set forth in Section 900.40(3). You indicated last week that you would contact me if my understanding concerning the applicable appeal procedures was not correct in the City's view. Since my calls earlier this week to you were not returned, and I have not otherwise heard from Elk River, I believe the City agrees that Section 900.40 is controlling. Thank you. Ve •• y yo am- • Grego 'ontaine GAF:rjo of R River November 17, 1997 Greg Fontaine Dorsey & Whitney, LLP Pillsbury Center South 220 South Sixth Street Minneapolis MN 55402-1498 Dear Mr. Fontaine: This letter is a response to your letter dated October 31, 1997. • I would like to begin by clarifying the City's position regarding issuance of a conditional use permit for Cargill's research facility. No decision has been made by the City not to issue a conditional use permit for Cargill's research facility. The approvals required depend upon where the research facility is to located. The plans which were dropped off at City Hall in late September showed the facility located north of 165th Avenue. As noted in my October 1, 1997 letter to Rita Schmahl, the City Zoning Ordinance does not allow development in this area until utilities are made available. Therefore, in order to proceed at this location, the appropriate procedure would be to request an ordinance amendment modifying the current ordinance regarding development within the urban service boundary prior to water and sewer. If the research facility were proposed to be located south of 165th Avenue, a conditional use permit would be required. As noted in my October 1 letter, an application for a conditional use permit would be considered along with an ordinance amendment establishing a use for "agricultural business". I don't believe Section 900.40 of the City's Zoning Ordinance applies to any type of proposal north of 165th Avenue. However, if Carroll were proposing a • 13065 Orono Parkway • P.O. Box 490• Elk River, MN 55330 •TDD & Phone: (612)441-7420 • Fax: (612) 441-7425 facility south of 165th Avenue, and would like to appeal staffs interpretation • that a conditional use permit would be required, then Section 900.40 should be followed. Sincerely, ve c City Planner • • of rig • River October 1, 1997 Rita Schmahl Cargill 10383 165th Avenue Box 301 Elk River MN 55330-0301 Dear Rita: I briefly reviewed the plans that you dropped off at Elk River City Hall and noticed the location of the proposed building is along the north side of 165th Avenue. This property is zoned I-1 (Light Industrial) and is within the City's urban service boundary. Although the proposed use of the building as a research laboratory and office space is a permitted use in the I-1 zoning district, the City's zoning ordinance does not allow development within the urban service boundary until utilities are • made available. Therefore, I cannot review the plans you have submitted nor can we issue a building permit for a building at this location. If this same building would be constructed on the south side of 165th Avenue within the R1a (Single Family Residential) district, a conditional use permit would be required. The conditional use permit would basically be an amendment to the conditional use permit Cargill received in 1993 for a feed lot. As I discussed with Tim Thomas a couple weeks ago, a conditional use permit application on the property south of 165th Avenue would be considered along with an ordinance to create a definition that will accommodate Cargill's facility. If you have any questions or concerns, please feel free to contact me at 441-4902. I have enclosed the plans you provided me last week and would ask if you pursue a conditional use permit on the property south of 165th , please resubmit the plans along with the appropriate information and applications. Sincerely, S e c City Planner • \\elkriver\sys\shrdoc\planning\cargill.doc 13065 Orono Parkway • P.O. Box 490 • Elk River, MN 55330 • TDD &Phone: (612)441-7420 • Fax: (612)441-7425